* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Проблемы снижения выбросов парниковых газов в Кыргызской
Clean Development Mechanism wikipedia , lookup
Economics of climate change mitigation wikipedia , lookup
German Climate Action Plan 2050 wikipedia , lookup
Climate change mitigation wikipedia , lookup
Kyoto Protocol wikipedia , lookup
Fossil fuel phase-out wikipedia , lookup
IPCC Fourth Assessment Report wikipedia , lookup
Climate change in New Zealand wikipedia , lookup
United Nations Climate Change conference wikipedia , lookup
Carbon Pollution Reduction Scheme wikipedia , lookup
Low-carbon economy wikipedia , lookup
Climate change in Canada wikipedia , lookup
United Nations Framework Convention on Climate Change wikipedia , lookup
Politics of global warming wikipedia , lookup
Mitigation of global warming in Australia wikipedia , lookup
Kyrgyz Republic TES of Bishkek: first project proposal on reduction of greenhouse gas emissions in frameworks of clean development mechanism Zh. A. Molodsanova, A.K. Dzhundubaev JSC “Electric stations” Kyrgyz scientific and technical center “Energy” Bishkek Ratification of UNFCCC, КП for UNFCCC of Kyrgyz Republic Understanding importance of climate change problem, necessity of international integration of efforts of states on weakening of negative consequences of that process, Kyrgyz Republic has joined the UN Framework Convention on Climate Change as well as has ratified the Kyoto Protocol in January, 2000. Law of Kyrgyz Republic on ratification of UNFCCC was signed on January 14th, 2000. Kyoto protocol has been ratified by the Law of Kyrgyz Republic on January, 15th, 2003. National body on CDM One of the main requirements defining conditions and procedures for participation in CDM projects is creation of National body on CDM. National committee on consequences of climate change with functions of national body on Clean Development Mechanism in accordance with requirements of Kyoto protocol of Kyrgyz Republic was created on July 18th, 2005. Main idea of project proposal is partial substitution of outdated equipment on a modern one in order to decrease fuel consumption of largest TES of Kyrgyz Republic – Bishkek TES with set up capacity up to date: • Electric – 666 thousand kWt; • Thermal – 1443,9 Gcal/h. Bishkek TES Main equipment consists of 24 steam generating units of drum-type and 11 turbogenerator sets. including: • БКЗ (laterolog)-160-100 – 13 units • БКЗ(laterolog) -220-100– 11 units CO2 emissions of Bishkek TES, /thousand tones/ 2002 2003 2004 2005 2006 1332 1516 1467 1402 1273 (35,5%) (55,4%) (54,9%) (65,8%) (69,7%) * - in brackets – coal share in fuel structure Bishkek TES Operating life of traps of station # 1-3 of Bishkek TES has exceeded term of exploitation, reached overall depreciation, inefficient, reliable in exploitation. Reconstruction and introduction of new equipment and technologies is required. Bishkek TES Idea of the project: Replacement of three low capacity traps БКЗ (laterolog)-160 to one with high capacity of 420 tones of steam per hour as a set with turbine generator and automated system of fuel firing management processes. Bishkek TES New technology of clean coal combustion (i.e. “circulating boiling layer”) in suggested equipment suits coal of all types, any quality as well as its mixtures. It decreases deterioration due to less accumulation of slugs. In addition to that, the technology foresees fastening and capture of sulphur and nitrogen oxides. Economy of fuel and decrease of CO2 emissions from reconstruction of Bishkek TES by introduction of trap aggregate of steam production of 420 tones per hour whilst production of thermal and electric energy on the same level would be equal to: Fuel, (thousand t/year) СО2 emissions, (million tones/year) 102,6 0,200 Figure of TES, Bishkek Name of indicator Measure unit Base line (fact, 2006) Project line Sale э/э Thousand kWth 658602 658602 Sale т/э Thousand Gcal 2053,1 2053,1 Total sale э/э+т/э Thousand kWth 3046330,6 3046330,6 Natural fuel consumption, including: Domestic coal Thousand tones 13,9 20,0 Imported coal Thousand tones 654 599,8 Coal total Thousand tones Oil fuel Thousand tones 0,15 0 Million m3 143,5 79,8 Specific fuel consumption Thousand тут 554,3 451,7 Carbon dioxide emission Thousand tones 1320,56 1120,35 СО2kg/kWth 0,43 0,37 Natural gas Total emission of carbon dioxide on sale of electric and thermal energy Carbon dioxide emission reduction/year Thousand tones 667,9 619,8 200,21 Budget of the project Total expenses on the project 67,5 million US dollars Expenses for development of Technical and Economic Assessment 0,3 million US dollars Стоимость оборудования 43 million US dollars: including: trap – 28 million US dollars; turbine - 15 million US dollars Construction, wiring and start-andadjustment works 17,5 US$ миллионов Administrative costs, operating assets, conduction of preparation works, training of personnel 0,6 million US dollars Unexpected expenses 6,1 million US dollars • THANK YOU!