Download Revenue Metering

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Document related concepts

Immunity-aware programming wikipedia, lookup

Sound level meter wikipedia, lookup

Smart meter wikipedia, lookup

Peak programme meter wikipedia, lookup

Multidimensional empirical mode decomposition wikipedia, lookup

Transcript
2. Data Validation, Estimation and Edit
Skill Check
Questions: Data Editing
Fill in the blanks in the following statements:
1. The MSP carries out an on-site investigation within ____ business days of the meter
trouble report.
2. If there is missing data or a validation failure of the main meter, data from the
________ meter is used.
3. Point-to-point calculation is used if the missing data or failed validation period is
_____ _____ or less.
Revised: July 2012
Revenue Metering
Public
Page 33