Service and Metering Guide
... All electrical installations must comply with the Canadian Electrical Code and all amending bulletins issued by the British Columbia Safety Authority and CSA. Installations cannot be connected before FortisBC takes receipt of the “Supply Authority” copy of an approved Electrical Contractor Authoriza ...
... All electrical installations must comply with the Canadian Electrical Code and all amending bulletins issued by the British Columbia Safety Authority and CSA. Installations cannot be connected before FortisBC takes receipt of the “Supply Authority” copy of an approved Electrical Contractor Authoriza ...
Energy Meter Standard
... the supplier shall modify it at his own cost within the guarantee period. For the purpose of data security, the data transfer from the meter to CMRI and further to Base computer should be fully secured and any unauthorized attempt/change in data should be indicated on computer system. There should b ...
... the supplier shall modify it at his own cost within the guarantee period. For the purpose of data security, the data transfer from the meter to CMRI and further to Base computer should be fully secured and any unauthorized attempt/change in data should be indicated on computer system. There should b ...
Customer Metering and Service Guide
... Drawing 3-1 Underground Residential Pedestal, Service and Cable Stubbing Arrangement . 26 Drawing 3-2 Multiple Services in a Dwelling ......................................................................... 27 Drawing 3-3 Optional Townhouse Multi-Metering Without Disconnect Switch ................. ...
... Drawing 3-1 Underground Residential Pedestal, Service and Cable Stubbing Arrangement . 26 Drawing 3-2 Multiple Services in a Dwelling ......................................................................... 27 Drawing 3-3 Optional Townhouse Multi-Metering Without Disconnect Switch ................. ...
PL 3120®/PL 3150®/PL 3170
... Smart Transceivers, Neuron Chips, and other OEM Products were not designed for use in equipment or systems which involve danger to human health or safety or a risk of property damage and Echelon assumes no responsibility or liability for use of the Smart Transceivers or Neuron Chips in such applicat ...
... Smart Transceivers, Neuron Chips, and other OEM Products were not designed for use in equipment or systems which involve danger to human health or safety or a risk of property damage and Echelon assumes no responsibility or liability for use of the Smart Transceivers or Neuron Chips in such applicat ...
ES3 Metering Installation Requirements Part A
... Where this standard is issued as a controlled document replacing an earlier edition, remove and destroy the superseded document. DISCLAIMER As Ausgrid’s standards are subject to ongoing review, the information contained in this document may be amended by Ausgrid at any time. It is possible that conf ...
... Where this standard is issued as a controlled document replacing an earlier edition, remove and destroy the superseded document. DISCLAIMER As Ausgrid’s standards are subject to ongoing review, the information contained in this document may be amended by Ausgrid at any time. It is possible that conf ...
SAGE THERMAL GAS MASS FLOW METER Operations and
... design of our highly precise, NIST traceable Thermal Gas Mass Flow Meter. Sage Metering is your source for monitoring, measuring and controlling the gas mass flow in your industrial process, building management system or environmental application. Our high performance, NIST Traceable,Thermal Mass Fl ...
... design of our highly precise, NIST traceable Thermal Gas Mass Flow Meter. Sage Metering is your source for monitoring, measuring and controlling the gas mass flow in your industrial process, building management system or environmental application. Our high performance, NIST Traceable,Thermal Mass Fl ...
Electric Service Requirements - Benton Rural Electric Association
... instances, the waiver of this deposit is possible with an approved letter of credit from another utility. If the electric service requires an extension of facilities, the member will pay an engineering fee that is refundable if the project proceeds. ...
... instances, the waiver of this deposit is possible with an approved letter of credit from another utility. If the electric service requires an extension of facilities, the member will pay an engineering fee that is refundable if the project proceeds. ...
VCSEL’s Bonded Directly to Foundry Fabricated GaAs Smart Pixel Arrays
... chip and add significantly to the parasitic capacitance and inductance of the circuit. Monolithically integrating VCSEL’s with GaAs MESFET circuits is also possible and several successful attempts have been reported [2]–[4] for simple amplifier circuits. And while these have shown good characteristi ...
... chip and add significantly to the parasitic capacitance and inductance of the circuit. Monolithically integrating VCSEL’s with GaAs MESFET circuits is also possible and several successful attempts have been reported [2]–[4] for simple amplifier circuits. And while these have shown good characteristi ...
PowerLogic™ Factory Assembled Equipment
... The CM4000T circuit monitor enclosures are an ideal metering solution for monitoring key distribution points and sensitive loads requiring revenue accuracy and power quality analysis capabilities for critical loads. These pad-lockable, concealed hinge industrial enclosures are UL listed and are well ...
... The CM4000T circuit monitor enclosures are an ideal metering solution for monitoring key distribution points and sensitive loads requiring revenue accuracy and power quality analysis capabilities for critical loads. These pad-lockable, concealed hinge industrial enclosures are UL listed and are well ...
The payment meter is part of a system that uses token carriers to
... Critical components like IC’s & micro-controllers shall be STACK or IECQ approved. All major components & sub-assembly parts (LCD, LED electronic components etc.) shall have batch & source identification. Fully assembled & finished meter shall be subjected to burn-in test for 72 hrs. at 55 deg C und ...
... Critical components like IC’s & micro-controllers shall be STACK or IECQ approved. All major components & sub-assembly parts (LCD, LED electronic components etc.) shall have batch & source identification. Fully assembled & finished meter shall be subjected to burn-in test for 72 hrs. at 55 deg C und ...
Meter services specification guide
... Authority Having Jurisdiction: Defined in the NEC as an organization, office or individual responsible for enforcing the requirements of a code or standard or for approving equipment, materials, an installation or a procedure. Meter: The device or devices, including all auxiliary equipment necessary ...
... Authority Having Jurisdiction: Defined in the NEC as an organization, office or individual responsible for enforcing the requirements of a code or standard or for approving equipment, materials, an installation or a procedure. Meter: The device or devices, including all auxiliary equipment necessary ...
Instructions
... employees who are participating in ERCOT activities from using their participation in ERCOT activities as a forum for engaging in practices or communications that violate antitrust laws. The ERCOT Board has approved guidelines for Members of ERCOT Committees, subcommittees and working groups to be r ...
... employees who are participating in ERCOT activities from using their participation in ERCOT activities as a forum for engaging in practices or communications that violate antitrust laws. The ERCOT Board has approved guidelines for Members of ERCOT Committees, subcommittees and working groups to be r ...
Handbook on Electricity Meters
... Phase angle - in degrees lead or lag Active power - in Watts (W) Reactive power - in Reactive Volt-Amperes (VARs) Apparent power - in Volt-Amperes (VA) Power factor - as a ratio or percent ...
... Phase angle - in degrees lead or lag Active power - in Watts (W) Reactive power - in Reactive Volt-Amperes (VARs) Apparent power - in Volt-Amperes (VA) Power factor - as a ratio or percent ...
Shark 100/100T User Manual V.1.18
... torque on the meter disk. All three elements were arranged around the disk so that the disk was subjected to the combined torque of the three elements. As a result the disk would turn at a higher speed and register power supplied by each of the three wires. According to Blondell's Theorem, it was po ...
... torque on the meter disk. All three elements were arranged around the disk so that the disk was subjected to the combined torque of the three elements. As a result the disk would turn at a higher speed and register power supplied by each of the three wires. According to Blondell's Theorem, it was po ...
Technical Specifications for Single Phase Electronic
... these are tightened from the rear or screw less design for fixing the base and cover but provision for sealing arrangement must be there. A run through screw (stud) has to be provided from bottom side & sealing is to be done on the top side of the meter. Two independent sealing screws are to be prov ...
... these are tightened from the rear or screw less design for fixing the base and cover but provision for sealing arrangement must be there. A run through screw (stud) has to be provided from bottom side & sealing is to be done on the top side of the meter. Two independent sealing screws are to be prov ...
Metering
... tubing, or flexible metallic tubing, and shall be properly bonded. Mechanically unprotected service entrance cable shall not be used for connections between meter sockets. Customer shall provide provisions for PECO to lock and fasten any potential tamper points ahead of metering. ...
... tubing, or flexible metallic tubing, and shall be properly bonded. Mechanically unprotected service entrance cable shall not be used for connections between meter sockets. Customer shall provide provisions for PECO to lock and fasten any potential tamper points ahead of metering. ...
Powerpact 4 panelboards Contents
... n A side extension cubicle may be fitted on styles D/E/G which has provision for metering outgoing circuits, refer to metering on page 2/18. This cubicle also acts as a cable extension box. ...
... n A side extension cubicle may be fitted on styles D/E/G which has provision for metering outgoing circuits, refer to metering on page 2/18. This cubicle also acts as a cable extension box. ...
62-0391 Class 3400 Meter Install Manual - E-Mon
... The E-Mon D-Mon® Class 3400 meter is a 3-element meter with communications. The device is used to monitor electric power usage of individual loads after the utility meter and store kW and kVAR data for automatic meter reading. The Class 3400 meter is dual protocol capable and provides both RS485 and ...
... The E-Mon D-Mon® Class 3400 meter is a 3-element meter with communications. The device is used to monitor electric power usage of individual loads after the utility meter and store kW and kVAR data for automatic meter reading. The Class 3400 meter is dual protocol capable and provides both RS485 and ...
Class 2000 Installation Manual - E-Mon
... is used to bring in MAINS Power (voltage lines to power meter) and current sensor wiring. The 1/2” conduit opening located on the top of the enclosure is used to interface low voltage signals, such as the IDR interface and isolated pulse output. (Outdoor enclosures equipped with one 3/4” conduit ope ...
... is used to bring in MAINS Power (voltage lines to power meter) and current sensor wiring. The 1/2” conduit opening located on the top of the enclosure is used to interface low voltage signals, such as the IDR interface and isolated pulse output. (Outdoor enclosures equipped with one 3/4” conduit ope ...
62-0389—05 - Class 2000 Meter - E-Mon
... is used to bring in MAINS Power (voltage lines to power meter) and current sensor wiring. The 1/2” conduit opening located on the top of the enclosure is used to interface low voltage signals, such as the IDR interface and isolated pulse output. (Outdoor enclosures equipped with one 3/4” conduit ope ...
... is used to bring in MAINS Power (voltage lines to power meter) and current sensor wiring. The 1/2” conduit opening located on the top of the enclosure is used to interface low voltage signals, such as the IDR interface and isolated pulse output. (Outdoor enclosures equipped with one 3/4” conduit ope ...
Class 2000 Meter
... is used to bring in MAINS Power (voltage lines to power meter) and current sensor wiring. The 1/2” conduit opening located on the top of the enclosure is used to interface low voltage signals, such as the IDR interface and isolated pulse output. (Outdoor enclosures equipped with one 3/4” conduit ope ...
... is used to bring in MAINS Power (voltage lines to power meter) and current sensor wiring. The 1/2” conduit opening located on the top of the enclosure is used to interface low voltage signals, such as the IDR interface and isolated pulse output. (Outdoor enclosures equipped with one 3/4” conduit ope ...
MiniCloset-5c - Chipkin Automation Systems
... metering systems that utilize our patented, two-way Power Line Communications technology. For over 25 years, Quadlogic systems have used this patented technology to transmit advanced meter data over the existing power lines in a building or service territory. No additional communication wiring is re ...
... metering systems that utilize our patented, two-way Power Line Communications technology. For over 25 years, Quadlogic systems have used this patented technology to transmit advanced meter data over the existing power lines in a building or service territory. No additional communication wiring is re ...
AN3261
... Push SR0 and SR1 buttons simultaneously for 2 (6 or 10) seconds minimum (jumperselectable) → returns to the normal state from which it can be turned off by pressing the ON/OFF button ...
... Push SR0 and SR1 buttons simultaneously for 2 (6 or 10) seconds minimum (jumperselectable) → returns to the normal state from which it can be turned off by pressing the ON/OFF button ...
Code of Practice Two Issue 4
... Metering Equipment that meets the requirements of this Code of Practice is also applicable where the Registrant is required by its Supply Licence (and as referenced in Section L 3.2.6) to install Metering Equipment that is capable of providing measured electricity consumption data for multiple perio ...
... Metering Equipment that meets the requirements of this Code of Practice is also applicable where the Registrant is required by its Supply Licence (and as referenced in Section L 3.2.6) to install Metering Equipment that is capable of providing measured electricity consumption data for multiple perio ...
Smart meter
A smart meter is usually an electronic device that records consumption of electric energy in intervals of an hour or less and communicates that information at least daily back to the utility for monitoring and billing. Smart meters enable two-way communication between the meter and the central system. Unlike home energy monitors, smart meters can gather data for remote reporting. Such an advanced metering infrastructure (AMI) differs from traditional automatic meter reading (AMR) in that it enables two-way communications with the meter.