Metering Procedures for LREC/ZREC Projects
... consider aggregate generation behind one customer revenue meter during the review even if the other generation on site is not part of the LREC and ZREC program. If the LREC/ZREC facility is impacted, or impacts other existing generation contracts, this condition must be remediated prior to REC meter ...
... consider aggregate generation behind one customer revenue meter during the review even if the other generation on site is not part of the LREC and ZREC program. If the LREC/ZREC facility is impacted, or impacts other existing generation contracts, this condition must be remediated prior to REC meter ...
AN2323
... Information in this document is provided solely in connection with ST products. STMicroelectronics NV and its subsidiaries (“ST”) reserve the right to make changes, corrections, modifications or improvements, to this document, and the products and services described herein at any time, without notic ...
... Information in this document is provided solely in connection with ST products. STMicroelectronics NV and its subsidiaries (“ST”) reserve the right to make changes, corrections, modifications or improvements, to this document, and the products and services described herein at any time, without notic ...
UFGS 26 27 13.10 30 Electric Meters
... site identified shall include sufficient metering components to measure the electrical parameters identified and to store and communicate the values as required in the following sections. Contractor shall verify that the metering system installed on any building site is compatible with the facility- ...
... site identified shall include sufficient metering components to measure the electrical parameters identified and to store and communicate the values as required in the following sections. Contractor shall verify that the metering system installed on any building site is compatible with the facility- ...
Tariffs 1 July 2016
... terminals.. A NEM compliant Type 1-5 interval meter is required with the ability to measure both active and reactive power. The customer may elect to use the LV agreed demand tariff, the LV actual demand tariff or, if SA Power networks has assigned the customer to it, the LV transition actual demand ...
... terminals.. A NEM compliant Type 1-5 interval meter is required with the ability to measure both active and reactive power. The customer may elect to use the LV agreed demand tariff, the LV actual demand tariff or, if SA Power networks has assigned the customer to it, the LV transition actual demand ...
VU Meters to Loudness Meter
... Until recently, VU meter and PPM were the only options available for“visualizing”sound level. Meanwhile, with the transition from analog to digital sound, audio technologies are rapidly evolving. As digital sound offers wider dynamic range in full bit depth than analog sound and easy-to-operate soun ...
... Until recently, VU meter and PPM were the only options available for“visualizing”sound level. Meanwhile, with the transition from analog to digital sound, audio technologies are rapidly evolving. As digital sound offers wider dynamic range in full bit depth than analog sound and easy-to-operate soun ...
servisavor instructions
... ampere load on one hot leg and a 50 amp load on the other hot leg. We have assumed there is no voltage drop due to the size of the service conductor. We have shown the customers load as fixed resistances across each hot leg to simplify the example. The restored voltage on the faulted leg will actual ...
... ampere load on one hot leg and a 50 amp load on the other hot leg. We have assumed there is no voltage drop due to the size of the service conductor. We have shown the customers load as fixed resistances across each hot leg to simplify the example. The restored voltage on the faulted leg will actual ...
Document
... Resistance RT is the total resistance of RX and the ohmmeter’s internal resistance. NOTE: RX is the external resistance to be measured. The ohmmeter’s internal resistance Ri is constant at 50 + 1450, or 1500 Ω here. If RX also equals 1500 Ω, RT equals ...
... Resistance RT is the total resistance of RX and the ohmmeter’s internal resistance. NOTE: RX is the external resistance to be measured. The ohmmeter’s internal resistance Ri is constant at 50 + 1450, or 1500 Ω here. If RX also equals 1500 Ω, RT equals ...
ppt_ch08
... Resistance RT is the total resistance of RX and the ohmmeter’s internal resistance. NOTE: RX is the external resistance to be measured. The ohmmeter’s internal resistance Ri is constant at 50 + 1450, or 1500 Ω here. If RX also equals 1500 Ω, RT equals ...
... Resistance RT is the total resistance of RX and the ohmmeter’s internal resistance. NOTE: RX is the external resistance to be measured. The ohmmeter’s internal resistance Ri is constant at 50 + 1450, or 1500 Ω here. If RX also equals 1500 Ω, RT equals ...
Technical Description
... • Energy measuring and registration modes standard – as an induction meter other options: bi-directional three-phase, two-phase, single-phase • Connection to network: a three-phase meter can also function as a single-phase or a twophase meter. • Additional functions: The forth measuring system ...
... • Energy measuring and registration modes standard – as an induction meter other options: bi-directional three-phase, two-phase, single-phase • Connection to network: a three-phase meter can also function as a single-phase or a twophase meter. • Additional functions: The forth measuring system ...
CR100_S2BS Meter Manual
... The S2AS meters form a family of solid state single phase meters to cover the whole range of residential metering applications. Single or two rate register, pulse output and communcation interface according IEC 1107. The meters can be used for currents up to 100 A. The meter is equipped with feature ...
... The S2AS meters form a family of solid state single phase meters to cover the whole range of residential metering applications. Single or two rate register, pulse output and communcation interface according IEC 1107. The meters can be used for currents up to 100 A. The meter is equipped with feature ...
PowerLogic Multi-Circuit Meter
... This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment ge ...
... This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment ge ...
ME372
... iron sheet. They are universal terminals for all shapes and cross sections of connected conductors up to 25 mm2. The terminals ensure the same contact quality with conductors either they are made of copper or aluminum. Only one screw in a current terminal reduces time needed for the meter installati ...
... iron sheet. They are universal terminals for all shapes and cross sections of connected conductors up to 25 mm2. The terminals ensure the same contact quality with conductors either they are made of copper or aluminum. Only one screw in a current terminal reduces time needed for the meter installati ...
Analog Panel Meters and Peripherals Technology for all your measurement needs...
... 900 Mckay Rd., unit 2, Pickering, Ontario L1W 3X8 Tel: 1-800-617-3413 Fax: 905-428-6086 email: [email protected] ...
... 900 Mckay Rd., unit 2, Pickering, Ontario L1W 3X8 Tel: 1-800-617-3413 Fax: 905-428-6086 email: [email protected] ...
MMU - Honeywell
... 7.1 Class 100, 200 and Green Class Meter Wiring Diagrams and Installation Procedures Wiring of each individual MMU meter is the same as for it’s respective stand-alone meter. Refer to the stand alone Class 100, 200, and Green Class Meter Installation Manuals for detailed wiring diagrams, and install ...
... 7.1 Class 100, 200 and Green Class Meter Wiring Diagrams and Installation Procedures Wiring of each individual MMU meter is the same as for it’s respective stand-alone meter. Refer to the stand alone Class 100, 200, and Green Class Meter Installation Manuals for detailed wiring diagrams, and install ...
Energy Meters Quick Selection Guide
... industrial and institutional energy monitoring applications offers unprecedented granularity of energy measurement data combined with advanced power quality analysis. These submeters provide improved energy efficiency and monitoring capabilities for multi-family, commercial, industrial, data center ...
... industrial and institutional energy monitoring applications offers unprecedented granularity of energy measurement data combined with advanced power quality analysis. These submeters provide improved energy efficiency and monitoring capabilities for multi-family, commercial, industrial, data center ...
FDJP Ordinance on Electrical Energy and Power Measuring
... If measuring instruments have to be connected contrary to subpara. 1, the consumption of the measuring installation itself should not lead to energy consumption being displayed. ...
... If measuring instruments have to be connected contrary to subpara. 1, the consumption of the measuring installation itself should not lead to energy consumption being displayed. ...
Communiqué Regarding the Meters to be used in the Electricity Market
... capable of supporting the implementation of multi-part tariffs and evaluation of other transactions on time basis, c. Capable of measuring and recording each day in eight time periods within at least four tariff periods, d. Capable of keeping the recorded data for four months, even in cases of power ...
... capable of supporting the implementation of multi-part tariffs and evaluation of other transactions on time basis, c. Capable of measuring and recording each day in eight time periods within at least four tariff periods, d. Capable of keeping the recorded data for four months, even in cases of power ...
enclosed meters
... Designed for Eaton’s IQ 35M, IQ 150, IQ 250/260, and Power Xpert® 2000/4000/6000/8000 and Multi-Point Meters, Eaton’s enclosed meter line offers mounting and installation flexibility, especially in retrofit applications where no metering compartment or mounting space is available in the existing ele ...
... Designed for Eaton’s IQ 35M, IQ 150, IQ 250/260, and Power Xpert® 2000/4000/6000/8000 and Multi-Point Meters, Eaton’s enclosed meter line offers mounting and installation flexibility, especially in retrofit applications where no metering compartment or mounting space is available in the existing ele ...
Fluke 30 Clamp Meter Service Data
... Clamp Meter Service Information WWarning Do not service the Meter unless you are qualified to do so. The service information provided in this document is for the use of qualified personnel only. To avoid electrical shock or personal injury: Always remove the test leads and input signals from the Met ...
... Clamp Meter Service Information WWarning Do not service the Meter unless you are qualified to do so. The service information provided in this document is for the use of qualified personnel only. To avoid electrical shock or personal injury: Always remove the test leads and input signals from the Met ...
(20-100 Amps).
... c) All these data shall be accessible for reading, recording and spot billing by downloading through optical port on MRI or Laptop computers at site. a) Meter shall store MD in every 30 min. period along with date & time. b) It should be possible to reset MD automatically at the defined date (or per ...
... c) All these data shall be accessible for reading, recording and spot billing by downloading through optical port on MRI or Laptop computers at site. a) Meter shall store MD in every 30 min. period along with date & time. b) It should be possible to reset MD automatically at the defined date (or per ...
Type B - Eaton
... Technical data Some of the toughest energy regulations ever seen in the UK are now in force. Part L2 of the Building Regulations introduced in England and Wales in 2006 addresses the conservation of energy in Public, Commercial and Industrial buildings, setting high standards for architects, enginee ...
... Technical data Some of the toughest energy regulations ever seen in the UK are now in force. Part L2 of the Building Regulations introduced in England and Wales in 2006 addresses the conservation of energy in Public, Commercial and Industrial buildings, setting high standards for architects, enginee ...
RGM Connection
... conducting current at a voltage as close to the system's normal communication level as possible, but never lower. For RS485 communication lines, the selected voltage rating is typically 6-8 V. Transient suppressors should be installed as close as possible to the port that is being protected, and the ...
... conducting current at a voltage as close to the system's normal communication level as possible, but never lower. For RS485 communication lines, the selected voltage rating is typically 6-8 V. Transient suppressors should be installed as close as possible to the port that is being protected, and the ...
Interface Meter
... These Regulations shall be applicable to meters installed and to be installed by all the generating companies and licensees who are engaged in the business of generation, transmission, trading, distribution, supply of electricity and to all categories of consumers. These regulations provide for type ...
... These Regulations shall be applicable to meters installed and to be installed by all the generating companies and licensees who are engaged in the business of generation, transmission, trading, distribution, supply of electricity and to all categories of consumers. These regulations provide for type ...
wireless energy meter reading system using zigbee
... communication has been designed, fabricated and tested successfully. This reduces the work of the office person to a great extend. It also reduces the difficulty faced by the people when readings are taken manually. It simplifies the work of the electricity board in tripping the supply to a particul ...
... communication has been designed, fabricated and tested successfully. This reduces the work of the office person to a great extend. It also reduces the difficulty faced by the people when readings are taken manually. It simplifies the work of the electricity board in tripping the supply to a particul ...
Smart meter
A smart meter is usually an electronic device that records consumption of electric energy in intervals of an hour or less and communicates that information at least daily back to the utility for monitoring and billing. Smart meters enable two-way communication between the meter and the central system. Unlike home energy monitors, smart meters can gather data for remote reporting. Such an advanced metering infrastructure (AMI) differs from traditional automatic meter reading (AMR) in that it enables two-way communications with the meter.