3. Totalization
EXAMPLE:
In our example from Section 3.3, Pineco Widgets is an embedded customer of Spruce Hydro:
Pineco Widgets (an embedded customer of Spruce Hydro)
Metering data = 50 MW
MEC = 0.3%, or 0.15 MW
TLF = 1.0153
Pineco Widgets Purchase = (M2 + MEC2) x TLF
= (50 MW + .15 MW) x 1.0153
= (50.15 MW) x 1.0153 = 50.917 MW
We will now add the information for Spruce Hydro:
Spruce Hydro (LDC)
Metering data =120 MW
MEC = 0.2%, or 0.24 MW
SSL = 0.36 MW (calculated amount)
Spruce Hydro Purchase = (M1 + MEC1 + SSL1) – (M2+MEC2) X TLF
= (120 MW + .24 MW + .36 MW) - (50 MW + .15 MW) x 1.0153
= (120.6 MW) – (50.917 MW)
= 69.683 MW
Totalization Example
Typical LDC Connection, with Embedded Meter Point:
SSL1 = 0.36 MW
M1
Delivery Point 1 (SPRUCE) = 69.683 MW
Delivery Point 2 (PINECO) = 50.917 MW
TLF = 1.0153
Actual Meter
Point
M1 =120 MW;
MEC1 = 0.24 MW
ECP
(Embedded
Connection
Point)
M2 = 50 MW;
MEC2 = 0.15 MW