Download Series 300 Frequently Asked Questions Features

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Document related concepts

Electrification wikipedia, lookup

Mains electricity wikipedia, lookup

Buck converter wikipedia, lookup

Switched-mode power supply wikipedia, lookup

Opto-isolator wikipedia, lookup

Alternating current wikipedia, lookup

Metadyne wikipedia, lookup

Voltage optimisation wikipedia, lookup

Stray voltage wikipedia, lookup

Distribution management system wikipedia, lookup

Pulse-width modulation wikipedia, lookup

Variable-frequency drive wikipedia, lookup

Islanding wikipedia, lookup

Electrical substation wikipedia, lookup

Three-phase electric power wikipedia, lookup

Switch wikipedia, lookup

Crossbar switch wikipedia, lookup

Resonant inductive coupling wikipedia, lookup

Relay wikipedia, lookup

Transcript
Is there a preferred source?
Yes, normal (utility) source is considered preferred.
What is the contact transfer time of the ATS?
The contact transfer time of the ATS will not exceed 100 ms for all frame sizes.
DISCONTINUED
PRODUCT
Note: The actual Hot-Hot transfer time; varies based on ampere frame size.