
Service and Metering Guide
... Site” copy of the form must be affixed to the structure receiving the electrical service. This form must be in plain view and will be left at the work site by FortisBC crews. ...
... Site” copy of the form must be affixed to the structure receiving the electrical service. This form must be in plain view and will be left at the work site by FortisBC crews. ...
2014 NC Electrical Code
... manufacturer requirements and industry standards, which ensure that there is no leakage current problems at the end of an appliance’s life-cycle. Proposed NCEC Change: The Committee was concerned about breaker cost for hardwired. Therefore, the Committee voted to amend the NEC language to match 20 ...
... manufacturer requirements and industry standards, which ensure that there is no leakage current problems at the end of an appliance’s life-cycle. Proposed NCEC Change: The Committee was concerned about breaker cost for hardwired. Therefore, the Committee voted to amend the NEC language to match 20 ...
MAX6854/MAX6855/MAX6856/MAX6858/MAX6860–MAX6869 Nanopower µP Supervisory Circuits with Manual Reset and Watchdog Timer General Description
... whenever the monitored voltage drops below the factorytrimmed reset threshold voltage, manual reset is asserted, or the watchdog timer expires. The reset output remains asserted for a minimum timeout period after VCC rises above the reset threshold and manual reset is deasserted. Factory-trimmed res ...
... whenever the monitored voltage drops below the factorytrimmed reset threshold voltage, manual reset is asserted, or the watchdog timer expires. The reset output remains asserted for a minimum timeout period after VCC rises above the reset threshold and manual reset is deasserted. Factory-trimmed res ...
SIPROTEC 5 – Devices Protection, Automation and Monitoring
... As the innovation driver and trendsetter in the field of power system protection for 100 years, Siemens helps you to design your power systems in an intelligent, ecological, reliable and efficient way, and to operate them economically. As a pioneer, Siemens has decisively influenced the development ...
... As the innovation driver and trendsetter in the field of power system protection for 100 years, Siemens helps you to design your power systems in an intelligent, ecological, reliable and efficient way, and to operate them economically. As a pioneer, Siemens has decisively influenced the development ...
MAX6826 Dual Ultra-Low-Voltage SOT23 µP Supervisors with Manual Reset and Watchdog Timer
... with Manual Reset and Watchdog Timer The MAX6826–MAX6831 are ultra-low-voltage microprocessor (µP) supervisory circuits designed to monitor two power supplies and have manual reset and watchdog input functions. These devices assert a system reset if any of the monitored supplies fall below the prepr ...
... with Manual Reset and Watchdog Timer The MAX6826–MAX6831 are ultra-low-voltage microprocessor (µP) supervisory circuits designed to monitor two power supplies and have manual reset and watchdog input functions. These devices assert a system reset if any of the monitored supplies fall below the prepr ...
06821 Datasheet - Mouser Electronics
... the Greek "tribos" meaning "to rub", and "elektros" meaning "amber", as mentioned above. It involves the transfer of electrons between materials. The atoms of a material with no static charge will have an equal number of positive (+) protons in their nucleus and negative (-) electrons orbiting the n ...
... the Greek "tribos" meaning "to rub", and "elektros" meaning "amber", as mentioned above. It involves the transfer of electrons between materials. The atoms of a material with no static charge will have an equal number of positive (+) protons in their nucleus and negative (-) electrons orbiting the n ...
Test Structures for Benchmarking the Electrostatic
... communication between the customer and foundry. The test structures have been defined with the following assumptions: • The structures are based on standard ESD protection elements in CMOS technology. The structures may be used in other technologies, such as SOI, SiGe, BiCMOS, RF-CMOS, but they do n ...
... communication between the customer and foundry. The test structures have been defined with the following assumptions: • The structures are based on standard ESD protection elements in CMOS technology. The structures may be used in other technologies, such as SOI, SiGe, BiCMOS, RF-CMOS, but they do n ...
MAX6340/ MAX6421–MAX6426 Low-Power, SC70/SOT µP Reset Circuits with Capacitor-Adjustable Reset Timeout Delay
... When VCC falls below 1V, RESET/RESET current-sinking (sourcing) capabilities decline drastically. In the case of the MAX6421/MAX6424, high-impedance CMOS-logic inputs connected to RESET can drift to undetermined voltages. This presents no problems in most applications, since most µPs and other circu ...
... When VCC falls below 1V, RESET/RESET current-sinking (sourcing) capabilities decline drastically. In the case of the MAX6421/MAX6424, high-impedance CMOS-logic inputs connected to RESET can drift to undetermined voltages. This presents no problems in most applications, since most µPs and other circu ...
technical specification for erection, testing
... constructed on turnkey EPC execution. EPC contractor is responsible for detailed design also. In this paragraph only salient features, basic design criteria and Owner’s minimum technical requirements are enumerated for the guidance of the Bidder. However, this should be referred in conjunction with ...
... constructed on turnkey EPC execution. EPC contractor is responsible for detailed design also. In this paragraph only salient features, basic design criteria and Owner’s minimum technical requirements are enumerated for the guidance of the Bidder. However, this should be referred in conjunction with ...
Characterization of Transition Edge Sensors for the Millimeter Bolometer Array Camera on the Atacama Cosmology Telescope
... The Thevenin voltage and the equivalent impedance constructed from the transfer function measurements. The figure on the left shows both the real part (blue), the imaginary part (red), and the amplitude (dashed blue) of the Thevenin voltage, up to the factor C(f )/Vbias (f ) described in the text. T ...
... The Thevenin voltage and the equivalent impedance constructed from the transfer function measurements. The figure on the left shows both the real part (blue), the imaginary part (red), and the amplitude (dashed blue) of the Thevenin voltage, up to the factor C(f )/Vbias (f ) described in the text. T ...
MAX793/MAX794/MAX795 3.0V/3.3V Adjustable Microprocessor Supervisory Circuits General Description
... Note 7: OUT switches from BATT to VCC when VCC rises above the reset threshold, if VBATT > VRST. In this case, switchover back to VCC occurs at the exact voltage that causes reset to be asserted, however, switchover occurs 200ms prior to reset. If VBATT < VRST, OUT switches from BATT to VCC when VCC ...
... Note 7: OUT switches from BATT to VCC when VCC rises above the reset threshold, if VBATT > VRST. In this case, switchover back to VCC occurs at the exact voltage that causes reset to be asserted, however, switchover occurs 200ms prior to reset. If VBATT < VRST, OUT switches from BATT to VCC when VCC ...
MAX6803/MAX6804/MAX6805 4-Pin, Low-Power µP Reset Circuits with Manual Reset General Description
... supervisory circuits monitor the power supplies in 2.85V to 5.0V µP and digital systems. They increase circuit reliability and reduce cost by eliminating external components and adjustments. They also feature a debounced manual reset input. These devices perform a single function: they assert a rese ...
... supervisory circuits monitor the power supplies in 2.85V to 5.0V µP and digital systems. They increase circuit reliability and reduce cost by eliminating external components and adjustments. They also feature a debounced manual reset input. These devices perform a single function: they assert a rese ...
For instruments with Serial Numbers
... • If this instrument is to be energized via an auto-transformer (for voltage change), make sure the common terminal is connected to the earth terminal of the power source. • Any interruption of the protective (grounding) conductor (inside or outside the instrument), or disconnecting of the protectiv ...
... • If this instrument is to be energized via an auto-transformer (for voltage change), make sure the common terminal is connected to the earth terminal of the power source. • Any interruption of the protective (grounding) conductor (inside or outside the instrument), or disconnecting of the protectiv ...
SERVICE MANUAL GPIB DC Power Supplies Agilent Series 654xA
... • If this instrument is to be energized via an auto-transformer (for voltage change), make sure the common terminal is connected to the earth terminal of the power source. • Any interruption of the protective (grounding) conductor (inside or outside the instrument), or disconnecting of the protectiv ...
... • If this instrument is to be energized via an auto-transformer (for voltage change), make sure the common terminal is connected to the earth terminal of the power source. • Any interruption of the protective (grounding) conductor (inside or outside the instrument), or disconnecting of the protectiv ...
AMD Functional Data Sheet, 940 Pin Package (public)
... or otherwise, to any intellectual property rights is granted by this publication. Except as set forth in AMD’s Standard Terms and Conditions of Sale, AMD assumes no liability whatsoever, and disclaims any express or implied warranty, relating to its products including, but not limited to, the implie ...
... or otherwise, to any intellectual property rights is granted by this publication. Except as set forth in AMD’s Standard Terms and Conditions of Sale, AMD assumes no liability whatsoever, and disclaims any express or implied warranty, relating to its products including, but not limited to, the implie ...
Transformer Modelling Guide
... Karim Shaarbafi, Ph.D., P.Eng. Supervising Engineer Prepared for: Pamela Mclean, P.Eng. Principal Modelling Engineer Version: Revision 2 The intent of this document is to provide a general guide for the purpose of assisting AESO and other authorized parties with modelling of transformers in the elec ...
... Karim Shaarbafi, Ph.D., P.Eng. Supervising Engineer Prepared for: Pamela Mclean, P.Eng. Principal Modelling Engineer Version: Revision 2 The intent of this document is to provide a general guide for the purpose of assisting AESO and other authorized parties with modelling of transformers in the elec ...
Chapter 3 - Electrical Installations - Rules and standards
... The following Rules come into force on 1 January 2016. Alterations to the preceding Edition are marked by beams at the text margin. DNV GL SE (Germanischer Lloyd SE has on 29 January 2014 changed its name to DNV GL SE. Any references in this document to Germanischer Lloyd or GL shall therefore also ...
... The following Rules come into force on 1 January 2016. Alterations to the preceding Edition are marked by beams at the text margin. DNV GL SE (Germanischer Lloyd SE has on 29 January 2014 changed its name to DNV GL SE. Any references in this document to Germanischer Lloyd or GL shall therefore also ...
Manual 3TK28 safety relays
... documentation. If products and components from other manufacturers are used, these must be recommended or approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and maintenance are required to ensure that the products operate safely and without any problems. ...
... documentation. If products and components from other manufacturers are used, these must be recommended or approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and maintenance are required to ensure that the products operate safely and without any problems. ...
Stray voltage
Stray voltage is the occurrence of electrical potential between two objects that ideally should not have any voltage difference between them. Small voltages often exist between two grounded objects in separate locations, due to normal current flow in the power system. Large voltages can appear on the enclosures of electrical equipment due to a fault in the electrical power system, such as a failure of insulation.