* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Red Writing: information about the content of the policy
Immunity-aware programming wikipedia , lookup
Power engineering wikipedia , lookup
Spark-gap transmitter wikipedia , lookup
Pulse-width modulation wikipedia , lookup
Ground (electricity) wikipedia , lookup
Electromagnetic compatibility wikipedia , lookup
Electrical ballast wikipedia , lookup
Portable appliance testing wikipedia , lookup
Current source wikipedia , lookup
Power inverter wikipedia , lookup
Variable-frequency drive wikipedia , lookup
Electrical substation wikipedia , lookup
Schmitt trigger wikipedia , lookup
History of electric power transmission wikipedia , lookup
Three-phase electric power wikipedia , lookup
Opto-isolator wikipedia , lookup
Resistive opto-isolator wikipedia , lookup
Power electronics wikipedia , lookup
Stepper motor wikipedia , lookup
Distribution management system wikipedia , lookup
Resonant inductive coupling wikipedia , lookup
Power MOSFET wikipedia , lookup
Transformer wikipedia , lookup
Buck converter wikipedia , lookup
Voltage regulator wikipedia , lookup
Surge protector wikipedia , lookup
Stray voltage wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Alternating current wikipedia , lookup
400 kV Inductive Voltage Transformer Schedule A — Eskom’s requirements. Schedule B — To be completed by the tenderer. Item A 400 kV Inductive Voltage Transformer (VT) 1 Manufacturer SCHEDULE B Technical guarantees for equipment offered _________________ 2 Manufacturer's type number _________________ 3 System conditions for which the VT shall be suitable a) Rated frequency b) System neutral c) Rated r.m.s. line-to-line voltage d) Maximum continuous r.m.s. line-toline voltage 4 6 7 8 Hz kV 50 Effectively earthed 400 kV 420 kV 1425 _________________ _________________ Insulation a) Minimum crest value of full wave lightning impulse type test withstand voltage to earth at sea level on HV terminal b) Characteristic of impulse wave c) Minimum crest value of full wave switching impulse type test withstand voltage to earth at sea level on HV terminal d) Characteristic of impulse wave e) Minimum 60 s power frequency wet withstand type test voltage to earth at sea level on HV terminal f) Minimum 60 s power frequency dry withstand routine test voltage at sea level on HV terminal g) Partial discharge type test in accordance with 12 of IEC 60358 5 SCHEDULE A Eskom requirements 1-5/40-50 s kV 1050 250/2 500 s _________________ kV r.m.s. 630 _________________ kV r.m.s. 630 _________________ Complies _________________ 266 2500 _________________ _________________ 10 _________________ 1 1 1 3 _________________ _________________ _________________ _________________ Radio influence a) Test voltage b) Maximum radio influence voltage kV V LV terminals Minimum 60 s power frequency dry withstand routine test voltage on low voltage terminal kV r.m.s. VT Secondary windings a) Protection (P1) b) Protection (P2) c) Metering (M) d) Total Rated VT transformation ratios a) Protection winding (P1) b) Protection winding (P2) c) Metering winding _________________ 400/3 kV to 110/3 V 400/3 kV to 110/3 V 400/3 kV to 110/3 V _________________ _________________ _________________ 1 2 of 91 Revision: Page: (Continued) Item A 400 kV Inductive Voltage Transformer (VT) 9 Rated burden of secondary windings a) P1 winding b) P2 winding c) M winding d) Total burden 11 12 13 14 Secondary short circuit current a) P1 winding b) P2 winding c) M winding Recommended maximum rating of fuses protecting the voltage transformer secondary windings Minimum 60 s power frequency withstand routine test voltage on secondary windings SCHEDULE A Eskom requirements VA VA VA VA Mass of complete VT 16 Type test reports a) Reports available? b) If type test reports are not available, how soon can reports be made available? _________________ _________________ _________________ _________________ A __________________ __________________ __________________ A kV r.m.s. Secondary terminals a) Separate terminal box for secondary terminals with gland plate facilities. 15 50 50 50 150 SCHEDULE B Technical guarantees for equipment offered kg __________________ 2 __________________ Yes ________________ xxxxxxxxx __________________ xxxxxxxxxx xxxxxxxxxx _________________ __________________ ______________ Andre Marais Chief Engineer PDE HV Plant Date:_________ ______________ Chris vd Merwe Corporate Specialist Engineering Date:________