Download Red Writing: information about the content of the policy

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Decibel wikipedia , lookup

Immunity-aware programming wikipedia , lookup

Power engineering wikipedia , lookup

Spark-gap transmitter wikipedia , lookup

Pulse-width modulation wikipedia , lookup

Ground (electricity) wikipedia , lookup

Electromagnetic compatibility wikipedia , lookup

Electrical ballast wikipedia , lookup

Ohm's law wikipedia , lookup

Portable appliance testing wikipedia , lookup

Current source wikipedia , lookup

Power inverter wikipedia , lookup

Islanding wikipedia , lookup

Variable-frequency drive wikipedia , lookup

Electrical substation wikipedia , lookup

Schmitt trigger wikipedia , lookup

History of electric power transmission wikipedia , lookup

Three-phase electric power wikipedia , lookup

Opto-isolator wikipedia , lookup

Rectifier wikipedia , lookup

Resistive opto-isolator wikipedia , lookup

Power electronics wikipedia , lookup

Stepper motor wikipedia , lookup

Triode wikipedia , lookup

Distribution management system wikipedia , lookup

Resonant inductive coupling wikipedia , lookup

Power MOSFET wikipedia , lookup

Transformer wikipedia , lookup

Buck converter wikipedia , lookup

Voltage regulator wikipedia , lookup

Surge protector wikipedia , lookup

Stray voltage wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Alternating current wikipedia , lookup

Voltage optimisation wikipedia , lookup

Mains electricity wikipedia , lookup

Transcript
400 kV Inductive Voltage Transformer
Schedule A — Eskom’s requirements.
Schedule B — To be completed by the tenderer.
Item
A
400 kV Inductive Voltage Transformer
(VT)
1
Manufacturer
SCHEDULE B
Technical
guarantees for
equipment offered
_________________
2
Manufacturer's type number
_________________
3
System conditions for which the VT shall
be suitable
a) Rated frequency
b) System neutral
c) Rated r.m.s. line-to-line voltage
d) Maximum continuous r.m.s. line-toline voltage
4
6
7
8
Hz
kV
50
Effectively
earthed
400
kV
420
kV
1425
_________________
_________________
Insulation
a) Minimum crest value of full wave
lightning impulse type test withstand
voltage to earth at sea level on HV
terminal
b) Characteristic of impulse wave
c) Minimum crest value of full wave
switching impulse type test withstand
voltage to earth at sea level on HV
terminal
d) Characteristic of impulse wave
e) Minimum 60 s power frequency wet
withstand type test voltage to earth at
sea level on HV terminal
f) Minimum 60 s power frequency dry
withstand routine test voltage at sea level
on HV terminal
g) Partial discharge type test in
accordance with 12 of IEC 60358
5
SCHEDULE A
Eskom
requirements
1-5/40-50 s
kV
1050
250/2 500 s
_________________
kV r.m.s.
630
_________________
kV r.m.s.
630
_________________
Complies
_________________
266
2500
_________________
_________________
10
_________________
1
1
1
3
_________________
_________________
_________________
_________________
Radio influence
a) Test voltage
b) Maximum radio influence voltage
kV
V
LV terminals
Minimum 60 s power frequency dry
withstand routine test voltage on low
voltage terminal
kV r.m.s.
VT Secondary windings
a) Protection (P1)
b) Protection (P2)
c) Metering (M)
d) Total
Rated VT transformation ratios
a) Protection winding (P1)
b) Protection winding (P2)
c) Metering winding
_________________
400/3 kV to
110/3 V
400/3 kV to
110/3 V
400/3 kV to
110/3 V
_________________
_________________
_________________
1
2 of 91
Revision:
Page:
(Continued)
Item
A
400 kV Inductive Voltage
Transformer (VT)
9
Rated burden of secondary windings
a) P1 winding
b) P2 winding
c) M winding
d) Total burden
11
12
13
14
Secondary short circuit current
a) P1 winding
b) P2 winding
c) M winding
Recommended maximum rating of
fuses protecting the voltage
transformer secondary windings
Minimum 60 s power frequency
withstand routine test voltage on
secondary windings
SCHEDULE A
Eskom
requirements
VA
VA
VA
VA
Mass of complete VT
16
Type test reports
a) Reports available?
b) If type test reports are not available,
how soon can reports be made
available?
_________________
_________________
_________________
_________________
A
__________________
__________________
__________________
A
kV r.m.s.
Secondary terminals
a) Separate terminal box for
secondary terminals with gland plate
facilities.
15
50
50
50
150
SCHEDULE B
Technical
guarantees for
equipment offered
kg
__________________
2
__________________
Yes
________________
xxxxxxxxx
__________________
xxxxxxxxxx
xxxxxxxxxx
_________________
__________________
______________
Andre Marais
Chief Engineer
PDE HV Plant
Date:_________
______________
Chris vd Merwe
Corporate Specialist
Engineering
Date:________