Download - ICF Builder Magazine

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Document related concepts

Prestressed concrete wikipedia , lookup

Stalinist architecture wikipedia , lookup

Curtain wall (architecture) wikipedia , lookup

Earth sheltering wikipedia , lookup

Green building wikipedia , lookup

Architecture of Bermuda wikipedia , lookup

Architecture of Madagascar wikipedia , lookup

Austrian walled towns wikipedia , lookup

Architecture of the Tarnovo Artistic School wikipedia , lookup

Earth structure wikipedia , lookup

Rural Khmer house wikipedia , lookup

American historic carpentry wikipedia , lookup

Precast concrete wikipedia , lookup

Diébédo Francis Kéré wikipedia , lookup

Construction management wikipedia , lookup

Building material wikipedia , lookup

Earthbag construction wikipedia , lookup

Transcript
Floor and Decking Options
Mountain Edge Resort, Sunapee, New Hampshire
As the largest and nicest condominium complex in the region, Mountain Edge Resort caters to a discriminating clientele, which is just
one reason owner/
developer Tom BehLocation:
rens chose to build
Newbury, New Hampshire
with ICFs. He had
Size: 82,000 sq. ft.
used IntegraSpec ICFs
Completed: Oct. 2004
on several other projOutstanding Energy Efficiency
ects, so he knew which
and Disaster Resistance
brand and contractor
he was going to work
Owner: Mountain Edge Resorts with early on.
General Contractor:
He also insisted
Mountain Edge Resorts
on using Lite-Deck for
ICF Installer: Cretepavers, Inc.
the floors.
Distributor: Cretepavers, Inc.
“We like the RForm: IntegraSpec
Value,
and it works very
Flooring: Lite-Deck
nicely with IntegraSpec,”
Fast Facts
Construction Team
20 ICF BUILDER
says Tammy Gaherty, a sales representative at the resort. “Having the
soundproof rooms, the high R-Value, and having a healthier environment are now some of the selling points used when we market the
resort and spa.”
The lower level was constructed with 8” and 10” concrete cores to
offset the 10’ of backfill pressure. Cretepavers installed 6” and 8” concrete cores for the above grade exterior and interior demising walls.