* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Reed Benson Infrastructure and Climate Change
Citizens' Climate Lobby wikipedia , lookup
Climate change feedback wikipedia , lookup
Climate governance wikipedia , lookup
Solar radiation management wikipedia , lookup
Attribution of recent climate change wikipedia , lookup
Economics of global warming wikipedia , lookup
Climate change in Tuvalu wikipedia , lookup
Media coverage of global warming wikipedia , lookup
Scientific opinion on climate change wikipedia , lookup
Effects of global warming on human health wikipedia , lookup
Climate change and agriculture wikipedia , lookup
Public opinion on global warming wikipedia , lookup
Climate change adaptation wikipedia , lookup
Climate change, industry and society wikipedia , lookup
Surveys of scientists' views on climate change wikipedia , lookup
Global Energy and Water Cycle Experiment wikipedia , lookup
IPCC Fourth Assessment Report wikipedia , lookup
Years of Living Dangerously wikipedia , lookup
Effects of global warming on Australia wikipedia , lookup
Reed D. Benson University of New Mexico School of Law Why are reservoirs important? Numbers: about 75,000 dams across the US Benefits: esp. storage for water supply, flood control, hydropower, reservoir recreation Impacts: dams have altered many rivers and have major, ongoing environmental impacts Adaptation: revised operations could bring much-needed flexibility to a system of laws and institutions that is otherwise pretty rigid Federal dam-building agencies 2 agencies built most of the West’s big dams: Bureau of Reclamation: mostly water supply Corps of Engineers: mostly flood control Hydropower became a major purpose of both Congress directly authorized most projects - authorizing statutes set project purposes - many projects authorized for > 1 purpose USBR’s Hoover Dam on the Colorado Federal dam operating plans A project’s authorized purposes largely determine its operating priorities Most federal projects are decades old, and many operate under plans about equally old Corps has detailed rules and guidance regarding dam operating plans, incl. updates USBR has no parallel rules/guidance Neither regularly revises/updates its ops plans In contrast: hydro relicensing US requires periodic review of operating regimes for non-federal hydropower projects - Federal Power Act licenses last 30-50 years - expiration requires “relicensing” by FERC - new license may change terms & conditions greatly to address environmental problems Why revise operating plans? Changing the operating regime may increase net benefits of a project (or avoid problems) - incorporating latest science on flow regimes - addressing observed or projected impacts of climate change on timing and rate of runoff - responding to changes in the project area - considering public values and priorities Dam operating plans in Alberta In southern Alberta, key reservoirs are owned and operated by a provincial agency, AEP - water supply (esp. irrigation) is main benefit AEP has great discretion re project operations - AEP is license issuer as well as holder - license terms allow for operational changes Still, AEP hasn’t regularly revised its ops plans - but has shown some flexibility in operations Why the inertia on gov’t dams? Why might operating agencies be reluctant to revise/update their operating documents? - resistance from existing users/beneficiaries - time, cost, flak associated w/ public review - in US, avoiding NEPA by keeping status quo What has brought about ops plan reviews? - Endangered Species Act (US federal dams) - influential local player seeks some change The Corp’s Lake Lanier in Georgia Climate change and dam ops SECURE Water Act (2009) directed USBR to set up a Climate Change and Water Program - it has emphasized reports and basin studies - it has done less in developing adaptation strategies, incl. changes in reservoir ops USBR’s agency-wide Climate Change Adaptation Strategy (2014) stresses water management flexibility, enhanced planning Congress is pushing Corps to review ops plans Why dam ops need attention “While it is true that global climate change will be likely to have environmental effects on the nation’s delicately balanced river and riparian systems, the construction and operation of dams has already had greater hydrologic and ecologic impacts on American rivers than any changes that might reasonably be expected from global climate changes in the near future.” W. Graf, “Dam Nation” (1999)