* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download presentation slice
Stepper motor wikipedia , lookup
Power over Ethernet wikipedia , lookup
Spark-gap transmitter wikipedia , lookup
Power factor wikipedia , lookup
Immunity-aware programming wikipedia , lookup
Electrification wikipedia , lookup
Audio power wikipedia , lookup
Electric power system wikipedia , lookup
Electrical ballast wikipedia , lookup
Pulse-width modulation wikipedia , lookup
Current source wikipedia , lookup
Power inverter wikipedia , lookup
Variable-frequency drive wikipedia , lookup
Amtrak's 25 Hz traction power system wikipedia , lookup
Power engineering wikipedia , lookup
Electrical substation wikipedia , lookup
Three-phase electric power wikipedia , lookup
Resistive opto-isolator wikipedia , lookup
Schmitt trigger wikipedia , lookup
Opto-isolator wikipedia , lookup
History of electric power transmission wikipedia , lookup
Power MOSFET wikipedia , lookup
Power electronics wikipedia , lookup
Surge protector wikipedia , lookup
Stray voltage wikipedia , lookup
Voltage regulator wikipedia , lookup
Buck converter wikipedia , lookup
Alternating current wikipedia , lookup
Switched-mode power supply wikipedia , lookup
SuperRange: Wide Operational Range Power Delivery Design for both STV and NTV Computing Xin He, Guihai Yan, Yinhe Han, Xiaowei Li Institute of Computing Technology, Chinese Academy of Sciences The need of wide operation range • Microprocessor’s supply voltage range has been gradually increasing in these year – Intel Pentium Processor has a supply voltage range from 0.9V to 1.5V to support DVFS – Intel Sandy Bridge Processor requires a higher than nominal voltage to boost performance Intel Pentium Processor 0.9V 1.5V (66.7%) Turbo Boost in Intel Sandy Bridge 1 The need of wide operation range – Near Threshold Computing: set supply voltage to a value near to transistor’s threshold voltage (0.4V0.6V) Intel ISSCC2012 0.28V-1.2V Future Microprocessor has wide supply voltage range. Brings challenges to power delivery design 2 Background of Power Delivery Design • Voltage regulator is key to deliver power at a specified voltage level – Linear regulator-LDO – Switching regulator • Buck regulator(Off-VR) • Switch capacitor regulator(On-VR) Buck Regulator Switch Capacitor Regulator Power Conversion Efficiency Characteristics • VRs are delivering power to wide operational range cores High PCE High PCE • Off-VR: – High switching loss • On-VR: – Narrow optimal region • LDO-VR: – Limited efficiency Low PCE Low PCE Conventional design can’t meet the need of wide voltage range Contribution • Explore the design space of wide operational range power delivery design • Propose SuperRange, a wide operation range power delivery scheme • Present a VR aware power management algorithm to maximize performance under given power budget Design space exploration • Explore three optional design 1. Off-VRs • Two Off-VR evenly located 2. Off-VR + LDO-VR • An Off-VR serves as an frontend 3. Off-VR + On-VR • Off-VR delivers to STV and On-VR to NTV Option 1:Off-VRs scheme • Loss in Off-VRs 𝑃𝑐𝑎𝑝 dominants! 𝑃𝑐𝑎𝑝 = 𝐶𝑜 𝑉 2 𝑓 𝑃𝑐𝑎𝑝 𝑖𝑚𝑝𝑙𝑦𝑠 𝑓 Cross 10% Option 2:LDO-VR scheme • In LDO-VR – PCE is limited by the ratio of output voltage to input voltage • PCE is lower than 30% when delivering to NTV region Option 3:Off-VR + On-VR scheme • Using Off-VR to deliver to STV region • Two step voltage conversion 𝑉𝑥 = 𝐷 ∗ 𝑉𝑖𝑛 𝑉𝑜 = 𝑎 𝑉𝑥 − 𝐼𝑜 𝑅𝑖 , 𝑤ℎ𝑒𝑟𝑒𝑅𝑖 ∝ 1/𝑓 • How to decide intermediate voltage 𝑋 1) Fixed intermediate voltage 𝑋 – Off-VR delivers fixed output voltage 2V – Tuning On-VR params to achieve further conversion • PCE of Off-VRs is high • On-VR couldn’t deliver to all NTV levels at high PCE Off-VR + On-VR scheme 2) Using varied intermediate voltage 𝑋 – Off-VR delivers to varied voltage levels • Duty cycle tuning – On-VR further step these intermediate values to 0.4V-0.6V – Pros: • On-VR has high PCE(around 80%) – Cons: • The PCE of Off-VR remains low because of small load current Proposed SuperRange Design • Multi-phase Off-VR provides an opportunity to improve load current, thus PCE get improved – Modern Off-VR can dynamically change number of working phases • Decreasing the number of working phases would increase output ripple – 1.5uH inductor is big enough to reduce the ripple with acceptable area overhead SuperRange Overview • Supporting STV – Voltage conversion to STV is performed by Off-VR • Supporting NTV – Two step conversion. • Off-VR sets to single working phase • On-VR achieves further conversion(e.g. 3:1) VR aware power management algorithm • Maximize performance under given power budget – Find optimal core counts and VF setting More cores, Low voltage Few cores, High voltage • PCE with varying load current – Although low voltage improve app power efficiency, it degrades the PCE Algorithm • Determine voltage setting candidates – Computes the total powers when all cores are active at each voltage level – Selects the lowest voltage 𝑉𝐿 (𝑃𝐿 > 𝑃𝑏 ) and the highest voltage 𝑉𝐻 (𝑃𝐿 < 𝑃𝑏 ) • Determine active core count – Calculate max active core count at voltage 𝑉𝐿 and get corresponding performance – Compare the performance with 𝑉𝐻 and make decisions Experimental Setup • Target processor characteristics – Multicore processor consists 16 ALPHA cores which has 9 power state • (1.2v, 1.9GHz), (1.1v, 1.7GHz), (1.0v, 1.5GHz)… (0.4v, 0.3GHz) – 32MB LLC, distribute directory-based MESI – On chip interconnection: mesh + router • Voltage regulator model – Single topology (3 to 1) Switch capacitor voltage regulator – Buck voltage regulator like TI TPS 54912 Power Conversion Efficiency SuperRange combines the advantages of Off-VR and On-VR and exhibits high PCE over the entire voltage range Comparison • Performance comparison in power-constrait system SuperRange outperforms LDO scheme by 50% and Off-VR scheme by 30% Comparison • Maximum achievable performance comparison under shrinking power budget On average, SuperRange achieve 52% and 170% higher PCE than Off-VR and LDO-VR scheme. Conclusion • Power delivery design for wide operational range is an important issue • Explore the optional power delivery design scheme • The proposed SuperRange scheme achieves high PCE over the entire operational range • Propose a VR aware power management algorithm • Thank You for Your Attention • Question?