Download Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Pulse-width modulation wikipedia , lookup

Electrical ballast wikipedia , lookup

Power inverter wikipedia , lookup

Decibel wikipedia , lookup

Ohm's law wikipedia , lookup

Variable-frequency drive wikipedia , lookup

Current source wikipedia , lookup

Power engineering wikipedia , lookup

Three-phase electric power wikipedia , lookup

Islanding wikipedia , lookup

Resistive opto-isolator wikipedia , lookup

Amtrak's 25 Hz traction power system wikipedia , lookup

Electrical substation wikipedia , lookup

Rectifier wikipedia , lookup

Schmitt trigger wikipedia , lookup

Opto-isolator wikipedia , lookup

Triode wikipedia , lookup

Power MOSFET wikipedia , lookup

Power electronics wikipedia , lookup

History of electric power transmission wikipedia , lookup

Buck converter wikipedia , lookup

Surge protector wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Rectiverter wikipedia , lookup

Voltage regulator wikipedia , lookup

Alternating current wikipedia , lookup

Stray voltage wikipedia , lookup

Voltage optimisation wikipedia , lookup

Mains electricity wikipedia , lookup

Transcript
Stakeholder Comment and Rationale Form
AESO AUTHORITATIVE DOCUMENT PROCESS
Stakeholder Consultation Draft
2013-02-07
Second Consultation on Proposed New ISO Rules Section 304.4 Maintaining Network Voltage (“New ISO Rules Section 304.4 Version 2.0”)
Date of Request for Comment [yyyy/mm/dd]:
Period of Consultation [yyyy/mm/dd]:
Comments From:
2013/02/07
2013/02/07
through
2013/02/22
Company Name
Contact:
Company Contact
Phone:
Contact Phone Number
E-mail:
Date [yyyy/mm/dd]:
Listed below is the summary description of changes for the proposed new, removed or amended sections of the ISO rules. Please refer back to the Letter of Notice under the “Attachments to Letter
of Notice” section to view the actual proposed content changes to the ISO rules. Please place your comments / reasons for position underneath (if any).
1. ISO Rules
New
Proposed New ISO Rules Section 304.4 Version 2.0 sets out requirements
regarding adjustments to the set point of the automatic voltage regulator or
voltage regulating system or the on-load tap changer, and indicates exceptions.
Stakeholder Comments and/or Alternative Proposal
Comment # 1: Insert Comments / Reason for Position (if
any)
AESO Replies
The AESO is proposing the following amendments in Version 2.0:
1. Subsection 1 has been amended such that it is applicable to an operator of a
transmission facility operating a “controllable reactive power resource” rather
than a “synchronous condenser”.
In the AESO’s opinion, “controllable reactive power resource” is broader and
a more appropriate term to use in the context of “maintaining network
voltage”.
2.
Subsection 2 has been amended to allow for adjustments to the set point of
the automatic voltage regulator or voltage regulating system, the on-load tap
changer; or the set point or status of the controllable reactive power resource
after advising the AESO and receiving approval. In the AESO’s opinion, this
language more closely reflects the intent of ISO OPP 702 Voltage Control.
Issued for Stakeholder Consultation: 2013-02-07
Page 1 of 2
The AESO is seeking comments from stakeholders with regard to the following
matters:
1. Are there any subsections where stakeholders feel that language does not
clearly articulate the requirement for either the AESO or a market participant?
If yes, please indicate the subsections and suggest language that would
improve the clarity.
Other
Stakeholders wishing to comment on specific provisions are requested to copy
the provision into this area and provide comments.
Issued for Stakeholder Consultation: 2013-02-07
Comment # 2: Insert Comments / Reason for Position (if
any)
Page 2 of 2
Related documents
Event Reporting Form Template
Event Reporting Form Template
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
April 30, 2008
April 30, 2008
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Stakeholder Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Reply Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS
Stakeholder Comment and Reply Matrix AESO AUTHORITATIVE DOCUMENT PROCESS
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Alberta Reliability Standards Compliance Monitoring Program Applicability Assessment Request Form
Alberta Reliability Standards Compliance Monitoring Program Applicability Assessment Request Form
Power Amplifier - IHMC Public Cmaps (3)
Power Amplifier - IHMC Public Cmaps (3)
ch 16 Electricity Essential Questions
ch 16 Electricity Essential Questions
Stakeholder Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Shunt Compensators
Shunt Compensators
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation
Stakeholder Comment and AESO Replies Matrix
Stakeholder Comment and AESO Replies Matrix
Chapter 2
Chapter 2
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
July 19, 2012 Dear Market Participants and Interested Parties Re:
July 19, 2012 Dear Market Participants and Interested Parties Re:
Need for the Hughenden 213S Substation Upgrade in the Hughenden area
Need for the Hughenden 213S Substation Upgrade in the Hughenden area
AESO System Operating Limits Methodology for the Planning Horizon (R1 FAC-010-AB-2.1)
AESO System Operating Limits Methodology for the Planning Horizon (R1 FAC-010-AB-2.1)
ISO Rules Part 500 Facilities Division 502 Technical Requirements
ISO Rules Part 500 Facilities Division 502 Technical Requirements
Document 8855143
Document 8855143