Transcript
Alberta Reliability Standards
Compliance Monitoring Program
Applicability Assessment Request Form
Please submit via email to: [email protected]
Review requested for:
PRC-004-AB1-1
Alberta Reliability Standard Identifier:
Analysis and Mitigation of Transmission and
Generation Protection System Misoperation
Alberta Reliability Standard Name:
Requirement (s):
Functional Entity Type:
PART I Entity Information:
New
Revised
Corporate Name
(Legal Name):
Other Name:
Corporate Address:
Province
/ State:
City:
Postal Code
/ Zip Code:
Registered entity contact for this request
Name:
Date:
Title:
Phone:
Fax:
Email:
PART II Submission Information:
Facility Name:
(i.e. Generation facility name, Transmission
line identifier, Transmission substation ID,
etc.)
AESO Identifier (if applicable):
(i.e. Asset ID, MPID)
Reason for request:
Version 3 – January 2, 2013
1
Please submit a copy of the following documentation with your Request Form:
The legal owner of a transmission
facility.
R1, R2.
Area single line diagram and station single line diagram showing
voltage levels and ownership of each of the applicant’s requested
transmission facilities (facility name) and connections, if any, to
generator facilities/generating units, other transmission facility
owners, and/or load facilities.
The legal owner of a generating
unit that:
(i) is not part of an aggregated
generating facility;
(ii) has a maximum authorized real
power rating greater than four point
five (4.5) MW;
(iii) is directly connected to the
transmission system or to
transmission facilities within the
City of Medicine Hat; and
(iv) has protection systems that
directly affect the reliability of the
bulk electric system which such
protection systems are those that
measure voltage, current, or
frequency from the generating unit
to the interconnected electric
system, but exclude the prime
mover and associated control
systems.
The legal owner of an aggregated
generating facility that:
(i) is directly connected to the
transmission system or to
transmission facilities within the
City of Medicine Hat;
(ii) has a maximum authorized real
power rating greater than four point
five (4.5) MW; and
(iii) has protection systems that
directly affect the reliability of the
bulk electric system. These
protection systems are those that
measure voltage, current, or
frequency from the aggregated
generating facility to the
interconnected electric system.
Version 3 – January 2, 2013
R1, R2.
Area single line diagram and station single line diagram showing voltage levels and ownership of each of the applicant’s requested
facilities (facility name) and connections, if any, to other transmission
facility owners, and/or load facilities.
R1, R2.
Area single line diagram and station single line diagram showing voltage levels and ownership of each of the applicant’s requested
facilities (facility name) and connections, if any, to other transmission
facility owners, and/or load facilities.
2
AESO USE ONLY
Date submitted by registered entity:
Version 3 – January 2, 2013
Date response issued to registered entity:
3
Related documents
Event Reporting Form Template
Event Reporting Form Template
Power Amplifier - IHMC Public Cmaps (3)
Power Amplifier - IHMC Public Cmaps (3)
sma 2230 probability and statistics ii
sma 2230 probability and statistics ii
ch 16 Electricity Essential Questions
ch 16 Electricity Essential Questions
Stakeholder Comment and AESO Replies Matrix
Stakeholder Comment and AESO Replies Matrix
April 30, 2008
April 30, 2008
Chapter 2
Chapter 2
Variable Power Supply
Variable Power Supply
Q1 A time varying current can be expressed as follows
Q1 A time varying current can be expressed as follows
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Resistance and Voltage Worksheet
Resistance and Voltage Worksheet
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Information Document – Voltage Control General Operating Practice
Information Document – Voltage Control General Operating Practice
CONNECTION AGREEMENT This Agreement is made at ______
CONNECTION AGREEMENT This Agreement is made at ______
Alberta Reliability Standard Analysis and Mitigation of Transmission and
Alberta Reliability Standard Analysis and Mitigation of Transmission and
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Consultation on Proposed “Package 11” New, Amended and Removed Reliability... Originally Proposed versus Final Proposed Versions
Consultation on Proposed “Package 11” New, Amended and Removed Reliability... Originally Proposed versus Final Proposed Versions
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment and Replies Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS
Market Participant Comment and Replies Matrix AESO AUTHORITATIVE DOCUMENT PROCESS
Alberta Reliability Standard Generator Operation for Maintaining Network Voltages VAR-002-AB-1.1b
Alberta Reliability Standard Generator Operation for Maintaining Network Voltages VAR-002-AB-1.1b