Download Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
Stakeholder Comment and Rationale Form
AESO AUTHORITATIVE DOCUMENT PROCESS
Stakeholder Consultation Draft
2013-02-07
Second Consultation on Proposed New ISO Rules Section 304.4 Maintaining Network Voltage (“New ISO Rules Section 304.4 Version 2.0”)
Michael
Date of Request for Comment [yyyy/mm/dd]:
Period of Consultation [yyyy/mm/dd]:
Comments From:
ATCO Electric
Date [yyyy/mm/dd]:
2013/02/21
2013/02/07
2013/02/07
through
2013/02/22
Contact:
Michael Sturrock
Phone:
(780) 632-5931
E-mail:
[email protected]
Listed below is the summary description of changes for the proposed new, removed or amended sections of the ISO rules. Please refer back to the Letter of Notice under the “Attachments to Letter
of Notice” section to view the actual proposed content changes to the ISO rules. Please place your comments / reasons for position underneath (if any).
1. ISO Rules
New
Proposed New ISO Rules Section 304.4 Version 2.0 sets out requirements
regarding adjustments to the set point of the automatic voltage regulator or
voltage regulating system or the on-load tap changer, and indicates exceptions.
The AESO is proposing the following amendments in Version 2.0:
Stakeholder Comments and/or Alternative Proposal
Comment # 1: With Reference to Subsection (2):
“The Draft does not clearly indicate in section 2 that the
on load tap changer is in relation to the reactive power
resource. At what point does the reactive resource tie
into the system tap changers. The rule does not indicate
what on load tap changers will be under the rule and
what tap changers will not”.
AESO Replies
1. Subsection 1 has been amended such that it is applicable to an operator of a
transmission facility operating a “controllable reactive power resource” rather
than a “synchronous condenser”.
In the AESO’s opinion, “controllable reactive power resource” is broader and
a more appropriate term to use in the context of “maintaining network
voltage”.
2.
Subsection 2 has been amended to allow for adjustments to the set point of
the automatic voltage regulator or voltage regulating system, the on-load tap
changer; or the set point or status of the controllable reactive power resource
after advising the AESO and receiving approval. In the AESO’s opinion, this
language more closely reflects the intent of ISO OPP 702 Voltage Control.
Issued for Stakeholder Consultation: 2013-02-07
Page 1 of 2
The AESO is seeking comments from stakeholders with regard to the following
matters:
1. Are there any subsections where stakeholders feel that language does not
clearly articulate the requirement for either the AESO or a market participant?
If yes, please indicate the subsections and suggest language that would
improve the clarity.
Other
Stakeholders wishing to comment on specific provisions are requested to copy
the provision into this area and provide comments.
Issued for Stakeholder Consultation: 2013-02-07
Comment # 2: Insert Comments / Reason for Position (if
any)
Page 2 of 2
Related documents
Event Reporting Form Template
Event Reporting Form Template
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
April 30, 2008
April 30, 2008
Stakeholder Comment and Reply Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS
Stakeholder Comment and Reply Matrix AESO AUTHORITATIVE DOCUMENT PROCESS
Stakeholder Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Alberta Reliability Standards Compliance Monitoring Program Applicability Assessment Request Form
Alberta Reliability Standards Compliance Monitoring Program Applicability Assessment Request Form
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Power Amplifier - IHMC Public Cmaps (3)
Power Amplifier - IHMC Public Cmaps (3)
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
ch 16 Electricity Essential Questions
ch 16 Electricity Essential Questions
Shunt Compensators
Shunt Compensators
Stakeholder Comment and AESO Replies Matrix
Stakeholder Comment and AESO Replies Matrix
Salient Contents of Book on `Basics of Electric Power System
Salient Contents of Book on `Basics of Electric Power System
Chapter 2
Chapter 2
Variable Power Supply
Variable Power Supply
July 19, 2012 Dear Market Participants and Interested Parties Re:
July 19, 2012 Dear Market Participants and Interested Parties Re:
Stakeholder Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Need for the Hughenden 213S Substation Upgrade in the Hughenden area
Need for the Hughenden 213S Substation Upgrade in the Hughenden area
AESO System Operating Limits Methodology for the Planning Horizon (R1 FAC-010-AB-2.1)
AESO System Operating Limits Methodology for the Planning Horizon (R1 FAC-010-AB-2.1)
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation
Stakeholder Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft