Download Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Transmission (mechanics) wikipedia , lookup

Automatic transmission wikipedia , lookup

Transcript
Market Participant Comment Matrix
AESO AUTHORITATIVE DOCUMENT PROCESS
Market Participant Consultation Draft
Consultation on Proposed New Alberta Reliability Standards Definition “remedial action scheme” (“New RAS Defintion”)
Date of Request for Comment:
Period of Consultation:
August 4, 2015
August 4, 2015
Comments From:
ATCO Electric Ltd.
Date [yyyy/mm/dd]:
2015/08/25
through August 25, 2015
Contact:
Dan Bamber
Phone:
780 509-9152
Email:
[email protected]
Listed below is the summary description of changes for the proposed New RAS Definition. Please refer back to the Consultation Letter under the “Attachments” section to view materials related to
the proposed New RAS Definition. Please place your comments/reasons for position underneath (if any).
Definitions - New
Existing
No definition currently exists in
the Alberta reliabillity standards
Proposed Alberta reliability
standards definition
Rationale
Market Participant Comments
and/or Alternate Proposal
Remedial Action Scheme - means
a scheme designed to detect
predetermined power system
conditions and to automatically take
corrective actions that may include,
but are not limited to, adjusting or
tripping generation (MW and MVAr),
tripping load, or reconfiguring a
power system(s) in order to
accomplish objectives such as:
 maintaining stability of the
transmission system;
 maintaining acceptable
transmission system voltages;
 maintaining acceptable
transmission system power
flows; or
 limiting the impact of cascading
The AESO is proposing the New
RAS Definition to align with the
NERC definition and the proposed
amended remedial action scheme
definition for the ISO rules.
Comment # 1:
Issued for Market Participant Consultation: August 4, 2015
AESO Reply
ATCO Electric thanks AESO for
allowing us to provide comments
and ask questions on the proposed
definition.
Page 1 of 4
or extreme events.
The following do not individually
constitute a remedial action
scheme:
a) a protection system installed for
the purpose of detecting faults on
transmission facilities and
isolating the faulted facilities;
b) a protection system for
automatic underfrequency load
shedding and automatic
undervoltage load shedding
comprised of only distributed
relays;
c) out-of-step tripping and power
swing blocking schemes;
d) an automatic reclosing scheme;
e) a scheme applied on a facility for
non-fault conditions, including,
but not limited to:
(i) generator loss-of-field;
(ii) transformer top-oil
temperature;
(iii) overvoltage; or
(iv) overload
to protect the facility against
damage by removing it from
service;
f) a controller that switches or
regulates one or more of the
following:
(i) series or shunt reactive
devices,
(ii) flexible alternating current
transmission system
devices,
(iii) phase-shifting
transformers, variablefrequency transformers, or
(iv) tap-changing transformers
Issued for Market Participant Consultation: August 4, 2015
To Clarify - the overall ATCO Electric
UFLS program still falls under the
RAS definition given it is multiple
sites. Could the AESO please
confirm?
Item b) If a transmission voltage is
used to initiate the UVLS and/or a
transmission relay using the
transmission voltage sends a signal
to a distribution relay, but the setting
and action is taken by distribution
relays all within the same substation,
does that still comply to the intent of
item b and NOT fall into the RAS
category? Could the AESO please
confirm?
Item b)To Clarify - the Safety Net
Scheme where multiple UVLS are
implemented at various substations,
even though only distribution relays
are used, still falls within the RAS
definition. Could the AESO please
confirm?
Item e) Overvoltage tripping that
send remote DTT to protect line
connected equipment are not RAS
by definition. Could the AESO
please confirm?
Page 2 of 4
and that is located at and
monitors quantities solely at the
same station as the facility being
switched or regulated;
g) a flexible alternating current
transmission controller that
remotely switches static shunt
reactive devices located at other
stations to regulate the output of
a single flexible alternating
current transmission device;
h) a scheme or controller that
remotely switches shunt reactors
and shunt capacitors for voltage
regulation that would otherwise
be manually switched;
i) a scheme that automatically deenergizes a line for a non-fault
operation when one end of the
line is open;
j) a scheme that provides antiislanding protection (e.g. protects
load from the effects of being
isolated with generation that may
not be capable of maintaining
acceptable frequency and
voltage);
k) an automatic sequence that
proceeds when manually initiated
solely by a power system
operator;
l) a temporary SCADA action
scheme that may be implemented
to facilitate construction of
transmission projects to assist in
system performance during
temporary build stages;
m) modulation of high voltage direct
current or flexible alternating
current transmission via
supplementary controls, such as
Issued for Market Participant Consultation: August 4, 2015
Page 3 of 4
angle damping or frequency
damping applied to damp local or
inter-area oscillations;
n) a sub-synchronous resonance
protection scheme that directly
detects sub-synchronous
quantities (e.g., currents or
torsional oscillations); or
o) a generator control including, but
not limited to:
(i) automatic generation
control,
(ii) generation excitation (e.g.
automatic voltage
regulation and power
system stabilizers),
(iii) fast valving, and
(iv) speed governing.
Issued for Market Participant Consultation: August 4, 2015
Page 4 of 4
Related documents
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Event Reporting Form Template
Event Reporting Form Template
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
April 30, 2008
April 30, 2008
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Shunt Compensators
Shunt Compensators
Stakeholder Comment and Rationale Form  AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Market Participant Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Market Participant Consultation Draft
Alberta Reliability Standards Compliance Monitoring Program Applicability Assessment Request Form
Alberta Reliability Standards Compliance Monitoring Program Applicability Assessment Request Form
Need for the Hughenden 213S Substation Upgrade in the Hughenden area
Need for the Hughenden 213S Substation Upgrade in the Hughenden area
Market Participant Comment and Replies Matrix  AESO AUTHORITATIVE DOCUMENT PROCESS
Market Participant Comment and Replies Matrix AESO AUTHORITATIVE DOCUMENT PROCESS
Market Participant Comment and AESO Replies Matrix  Consultation on Proposed
Market Participant Comment and AESO Replies Matrix Consultation on Proposed
Stakeholder Comment and AESO Replies Matrix  Consultation on Proposed
Stakeholder Comment and AESO Replies Matrix Consultation on Proposed
Fidler Substation and Southern Alberta Transmission Reinforcement (SATR) Open Houses
Fidler Substation and Southern Alberta Transmission Reinforcement (SATR) Open Houses
March 15, 2016 To Stakeholders: Re:
March 15, 2016 To Stakeholders: Re:
Stakeholder Comment Form
Stakeholder Comment Form