Download Downlaod File

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
Internship Presentation
At Eastern Cost AC
By: Turki Al Hammad
ID# 200700814
Outline
• Introduction
• Company’s Background
• Internship experience
• Problems and improvements
• Conclusion
Introduction
• Company name: Eastern Cost Air Conditioners
• Location: Industrial City in Dammam
• Internship period: 8 weeks
Company’s Background
• Eastern coast Air Conditioners (ECAC) a sector business of Eastern
cost group is a new supplier of air conditioners in the Middle East. It
manufactures and markets a whole range of air conditioners from
Room air conditioners to packaged units to large Chillers for
residential, commercial and industrial applications.
• Eastern cost Air Conditioners was founded in 2000 as one of the
first air conditioning companies to be established in Saudi Arabia.
• With its head office and prime plants in Dammam, Saudi Arabia
and a production facility in Italy, Eastern cost Air Conditioners
produces over 50000 air conditioners per year. It supplies air
conditioning products to over 15 countries across the world-the
major markets are GCC, Middle East.
Company’s Background Cont.
• The factory is divided into 6 departments:
1. Tube shop
2. Coil shop
3. Fab shop
4. Sub Assembly
5. RAC
6. Mini-Split
Internship Experience
Week
Task
1
Rotation
2
Project Selection
3
Working on the project
4
Working on the project
5
Working on the project
6
Working on the project
7
Finalizing and submitting the project
8
feedback
Internship Experience Cont.
The Project
• Purpose of the project:
1. Reduce the man power needed
2. Improve production rates
3. Reduce the production costs of each AC unit.
Solar Energy and panels
Internship Experience Cont.
The Project
• The main object of this project is to save the
electricity costs of the factory and there will be
no delay on the production.
Process
Problems and improvements
• Expensive
• Needs maintenance
Conclusion
• The internship program was a great opportunity
for me to interact with electrical machines and
how they operate.
• It gave me a better understanding about the
process of manufacturing Air Condetioners.
Thank you for listening and feel free to ask any
questions