Download Transmission Availability Data System (TADS)

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Distributed element filter wikipedia , lookup

Index of electronics articles wikipedia , lookup

Yagi–Uda antenna wikipedia , lookup

UniPro protocol stack wikipedia , lookup

Immunity-aware programming wikipedia , lookup

Transcript
Transmission Availability
Data System (TADS)
Element Identifier Data Submission
Addendum
May 28, 2013
3353 Peachtree Road NE
NERC | Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum |Suite
R May 28,
2013
600,
North Tower
1 of 11
Atlanta, GA 30326
404-446-2560 | www.nerc.com
Table of Contents
Table of Contents ......................................................................................................................................................................... 2
1
Introduction ......................................................................................................................................................................... 3
1.1
Purpose ...................................................................................................................................................................... 3
1.2
Who Should Report .................................................................................................................................................... 3
1.3
When to Report .......................................................................................................................................................... 3
1.4
What to Report........................................................................................................................................................... 4
1.4.1 Definitions .............................................................................................................................................................. 4
1.4.2 Forms Overview ..................................................................................................................................................... 4
1.4.3 Data Confidentiality ............................................................................................................................................... 5
1.5
Data Submission Completion ..................................................................................................................................... 6
2
Detailed Form Descriptions ................................................................................................................................................. 7
2.1
Non-Reporting Transmission Owner Statement ........................................................................................................ 7
2.2
Reporting Transmission Owner Information .............................................................................................................. 7
2.3
Forms for Multiple-Owner Elements .......................................................................................................................... 7
2.3.1 Multiple-Owner AC and DC Circuits ....................................................................................................................... 8
2.3.2 Multiple-Owner AC/DC Back-to-Back Converters .................................................................................................. 8
2.4
AC and DC Circuit Detailed Inventory Data ................................................................................................................ 9
2.5
Transformer Detailed Inventory Data ...................................................................................................................... 10
2.6
AC/DC Back-to-Back Converter Detailed Inventory Data ......................................................................................... 11
2.6.1
Transmitting TADS Data Securely by E-mail ......................................................................................................... 11
NERC | Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum | May 28, 2013
2 of 11
1 Introduction
1.1 Purpose
1
Due to the recent modifications to the TADS program, there are a number of upcoming changes that Transmission Owners
(TOs) should be aware. To begin, detailed inventory will be collected for each TADS Element in contrast to the previous
method of summary inventory reporting. Also, TADS reporting will change to a quarterly reporting cycle. Finally, TADS
reporting will align with the Bulk Electric System definition during the 2014 reporting period. To facilitate these changes, a
transition period is required. During the transition period, Table 1 shows the entity data collection schedule.
This document is designed to assist TOs in preparation for the June 30, 2013 collection of Element Identifiers and Circuit
Mileage fields for all TADS reportable Elements.
1.2 Who Should Report
For U.S. Transmission Owners (TOs), providing TADS data is mandatory for all TOs on the NERC Compliance Registry. The
reason is that as NERC members, they must comply with NERC’s Rules of Procedure, and because Phase II TADS data was
2
requested in accordance with Section 1600, these non-U.S. Transmission Owners too must provide Phase II TADS data.
However, NERC, through the regions, will also be requesting TADS data from non-U.S. TOs on the NERC Compliance
Registry.
The following describe reporting requirements for different TO situations:
1.
Non-reporting TOs that do not own any TADS Elements as of the date they submit their completed Form 1.1 (in
December prior to the reporting calendar year – e.g., for 2009 calendar year reporting, Form 1.1 would be submitted in
December 2008) are not required to report any other TADS data for the reporting calendar year even if they
3
subsequently become owners of TADS Elements during that calendar year. However, a TO may voluntarily report data
for the year that the TADS Elements are added.
2.
TOs that become newly registered during a reporting calendar year are not subject to any TADS reporting requirements
until the next calendar year. However, a TO may voluntarily report data for the year that it first becomes newly
registered.
3.
A non-reporting TO that becomes unregistered during a calendar year is no longer subject to any TADS reporting
requirements. However, if a reporting TO becomes unregistered during a reporting calendar year, it has either (i)
retired all its TADS Elements or (ii) sold all its TADS Elements. In case (ii), the new TO shall assume the reporting
obligation of the unregistered TO for the entire calendar year. This will ensure that all TADS Elements continue to have
their data reported.
1.3 When to Report
Particularly, this document will detail the procedure required to complete data submission for the June 30, 2013 due date.
This data submission will include, for all TADS reportable Elements at 200 kV or higher, the Element Identifier and Circuit
Mileage (if applicable) fields. Additionally, several inventory fields are strongly recommended to be reported before June 30
but are not mandatory until the 2013Q4 reporting period (due by February 15, 2014).
1
http://www.nerc.com/gov/bot/Agenda%20Minutes%20and%20Highlights%20DL/2012/BOT_12-19-12cca_Complete_Public.pdf, pp. 510.
2
Phase I was approved by the NERC Board of Trustees prior to the addition of Section 1600 to the Rules of Procedure. Because NERC’s
Phase I TADS approval relied upon Section 39.2(d) of the Federal Energy Regulatory Commission’s regulations, 18 C.F.R. § 39.2(d), Phase I
is mandatory on all U.S. Transmission Owners. However, most non-U.S. Transmission Owners are voluntarily compiling with Phase I.
3
However, if after submitting From 1.1, a TADS Element is added by the TO prior to December 31 of the year prior to the reporting
calendar year, the TO must notify NERC and submit Form 1.2.
NERC | Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum | May 28, 2013
3 of 11
Introduction
Table 1: TADS Transition Schedule
Due Date
March 01, 2013
TADS Outage Data
Key Inventory Data
2012 Annual (200 kV+ Elements
Only)
June 30, 2013
Element Identifier and Circuit Mileage
Fields Only (200 kV+ Elements Only)
September 30, 2013
2013Q1 and 2013Q2
(200 kV+ Elements Only)
November 15, 2013
2013Q3
(200 kV+ Elements Only)
February 15, 2014
2013Q4 (200 kV+ Elements Only)
May 15, 2014
2014Q1
(All TADS Elements)
August 15, 2014
November 15, 2014
2014Q2 (All TADS Elements)
2014Q3
(All TADS Elements)
February 15, 2015
2014Q4
(All TADS Elements)
Update All Key Inventory Fields
(200 kV+ Elements Only)
If Applicable, Element Identifier and
Circuit Mileage Fields Only (Less than
200 kV BES Elements Only)
Update All Key Inventory Fields
(All TADS Elements)
1.4 What to Report
1.4.1 Definitions
The TADS Definitions document is a stand-alone document that is in the TADS Data Reporting Instruction Manual Appendix
4
7 . Most of the terms in the forms have specific definitions which may differ from the common usage of the same term. For
example, the term “AC Circuit” is specifically defined and includes both two- and three-terminal circuits. Therefore, it is
important that the TO refer to the definitions when completing the forms.
1.4.2 Forms Overview
In preparation for the Element ID submission, a subset of the TADS forms will be used. The relevant forms are listed below
as well as the location in this document that has the written instructions for completing each form.
4
http://www.nerc.com/comm/PC/Transmission%20Availability%20Data%20System%20Working%20G1/2013_NERC_TADS_DRI_App7.pdf
NERC | Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum | R May 28, 2013
4 of 11
Introduction
Table 2: Forms Overview
Form Name
Document Location
Bulk Upload Capability?
Non-Reporting Transmission Owner Statement
Chapter 2.1
No
Reporting Transmission Owner Information
Chapter 2.2
No
Multiple-Owner AC and DC Circuits
Chapter 2.3.1
Yes
Multiple-Owner AC/DC Back-to-Back Converters
Chapter 2.3.2
Yes
AC and DC Circuit Detailed Inventory Data
Chapter 2.4
Yes
Transformer Detailed Inventory Data
Chapter 2.5
Yes
AC/DC Back-to-Back Converter Detailed Inventory Data
Chapter 2.6
No, submit via e-mail.
Each data form has a common layout.
1.
A TO who does not own any TADS Element is referred to as a “non-reporting TO.” Those TOs must submit Form 1.1 to
its Regional Entity (RE). A TO which owns TADS Elements is referred to as a “reporting TO.” On Form 1.2, which is
required for a reporting TO, one portion requests the Transmission Owner’s name, its NERC ID number, the name of its
Regional Entity (RE), its country, and the reporting calendar year. This information is input once on Form 1.2 and linked
to subsequent forms. If a TO owns TADS Elements in different regions and/or different countries, it must complete
separate TADS submittals for each region and country.
2.
Many columns have drop-down menus that correspond to defined choices. For example, all Cause Codes are in a dropdown menu and provide the TO the choice among the defined Cause Codes only.
3.
To keep the form format and column letter designation the same within a form type, the unused columns are hidden
from view. Therefore, column letter designations will not be in sequence when a column has been hidden.
1.4.3 Data Confidentiality
Under NERC’s confidentiality policy (Section 1500 of NERC’s Rules of Procedures), the entity claiming that information is
confidential must state the category under which such information qualifies as confidential.
For practicality, we have made judgments that data on certain forms will likely be confidential information because it
contains critical energy infrastructure information (CEII), while other information is not confidential. A TO may change
NERC’s default confidentiality classification in Table 1.5 by sending an e-mail to the NERC project manager – see the TADS
Project Manager’s contact information in a Regional Entity and NERC TADS Contacts document that is posted at
http://www.nerc.com/filez/tadswg.html. If a TO wants non-confidential data to be made confidential, the TO must indicate
the category or categories defined in Section 1501 in which the data falls. See Section 1502 of the Rules of Procedure.
CEII is defined by Federal Energy Regulatory Commission (FERC) rules as follows:
1.
5
Critical energy infrastructure information means specific engineering, vulnerability, or detailed design information
about proposed or existing critical infrastructure that:
i.
Relates details about the production, generation, transportation, transmission, or distribution of energy;
ii.
Could be useful to a person in planning an attack on critical infrastructure;
iii.
Is exempt from mandatory disclosure under the Freedom of Information Act, 5 U.S.C. 552; and
iv. Does not simply give the general location of the critical infrastructure.
5
18 C.F.R. 388.113(c)(1)-(2)
NERC | Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum | R May 28, 2013
5 of 11
Introduction
2.
Critical infrastructure means existing and proposed systems and assets, whether physical or virtual, the incapacity or
destruction of which would negatively affect security, economic security, public health or safety, or any combination of
those matters.
Table 2 below summarizes the default confidentiality for information on each form for this data submittal:
Table 3: Form Default Confidentiality Status
Form
Default Confidentiality
Non-Reporting Transmission Owner Statement
Not confidential
Reporting Transmission Owner Information
Not confidential
Multi-Owner AC and DC Circuits
Confidential-CEII
Multi-Owner AC/DC Back-to-Back Converters
Confidential-CEII
AC and DC Circuit Detailed Inventory Data
Transformer Detailed Inventory Data
6
Confidential-CEII
6
AC/DC Back-to-Back Converter Detailed Inventory Data
Confidential-CEII
6
Confidential-CEII
1.5 Data Submission Completion
Upon completion of reporting, entities should, within webTADS, go to the Checklist. This is located in the Forms→Checklist
menu in webTADS. Then, entities should mark/verify that the Completed field is “Yes” for the following forms:
TO TADS Statement
TO Contacts
Multiple-Owner AC and DC Circuits
Multiple-Owner AC/DC BTB Converters
AC and DC Circuit Inventory Data
Transformer Inventory Data
AC/DC BTB Converter Inventory Data
This will indicate that the Element Identifier information has been submitted. However, the inventory fields in the Series
3.x forms will need to be updated with all fields before the 2013Q4 outage data deadline, February 15, 2014, as shown in
Table 2. An updated version of the TADS Data Reporting Instruction Manual will be provided for 2013 reporting in order to
facilitate the reporting of the additional fields, and they are not required for the June 30, 2013 data submission.
6
Detailed inventory data is considered Confidential-CEII. However, summary inventory data is considered not confidential.
NERC | Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum | R May 28, 2013
6 of 11
2 Detailed Form Descriptions
2.1 Non-Reporting Transmission Owner Statement
The Non-Reporting Transmission Owner Statement (TADS Form 1.1) is for TOs who do not own any TADS Elements as of
date they submit it. If a Transmission Owner owns no TADS Elements as of its submission date, it provides the contact
information of the person completing the form on behalf of the TO who is attesting to that fact.
Please submit this form before the June 30, 2013 deadline by submitting to your TADS Regional Entity Coordinator. If after
submitting this form, a TADS Element is added by the TO prior to December 31 of the reporting year, the TO must notify
NERC and submit the Reporting Transmission Owner Information Form (TADS Form 1.2) within webTADS.
2.2 Reporting Transmission Owner Information
The Reporting Transmission Owner Information form (TADS Form 1.2) asks for three types of TO information.
1.
It requests the business contact information for the primary and back-up TADS contact person for the Transmission
Owner.
2.
It contains a list to confirm which forms were filed and which forms were not filed. The list has drop-down menus for
“Submission Status” and “Reason Not Submitted” for the TO to explain which forms were submitted and if not
submitted, why they were not submitted (e.g., TO has none of the Elements reported on the form, the TO had no
outages, etc.).
3.
Finally, it lists the NERC default confidentiality status of TO data on each form. If a TO wants non-confidential data to
be made confidential, the TO must indicate the category or categories defined in Section 1501 in which the data falls.
See Section 1502 of the Rules of Procedure.
Please submit this form before the June 30, 2013 deadline by completing within webTADS. Please note that this form must
be completed before the subsequent forms in sections 2.3 to 2.7. Otherwise, webTADS will not allow entry of subsequent
data.
2.3 Forms for Multiple-Owner Elements
These forms are used to ensure that one TO takes on the TADS reporting responsibility for multiple-owner Elements for all
Automatic and Non-Automatic outages. If a TO has less than 100% ownership interest in such Elements, each TO must
enter this Element on the Multiple-Owner Elements forms (TADS Series 2.x forms). These multiple entries should be
coordinated by the TOs involved. This list of such Elements should also include any multiple-owner Element that was inservice for at least part of the reporting period. Such an Element and their associated multiple-owner Element Identifier
should be listed on the relevant form within Series 2.x. The coordinated entries should indicate which single TO will take
reporting responsibility for the Element. The single TO designated as the Reporting TO must include the Element’s circuit
mileage on their detailed inventory forms (TADS Series 3.x). Selecting a single TO to become the Reporting TO for these
inventory and outage Forms will avoid duplication of outage and inventory reporting. The other TOs who are multiple
owners must be aware that they should not report to TADS on that Element. In addition to the names of all multiple
owners, their registered NERC ID (or NERC assigned pseudo ID) of the designated reporting representative is also required
to be entered on the respective form within Series 2.x.
If a TO owns 100% of an Element, the reporting responsibility of that Element belongs to the TO. The Element should not
be entered on any Series 2.x form. For 100% owned AC Circuits, communication among the TOs who own the AC
Substations that bound the circuit is expected for the purpose of identifying data related to the cause of the outages which
the reporting TO must supply.
Among all of the owners for a particular Element, they must agree on the Element ID to be entered in Column I. Only the TO
declared to be the Reporting TO on the Series 2.x forms can use that Element ID. If other TOs attempt to enter Outages for
this Element, an error message will be generated.
Please submit the Form Series 2.x forms to webTADS before the June 30, 2013 deadline.
NERC | Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum | May 28, 2013
7 of 11
Detailed Form Descriptions
2.3.1 Multiple-Owner AC and DC Circuits
The characteristics of each multiple-owner circuit are input on this form (one circuit per row). TOs are expected to mutually
agree on who should report outage and inventory information (on TADS Series 3, 4, 5 and 6 forms) of the multiple-owner
circuit information for TADS and which other owners should not report. Do not enter circuits that you do not partially own.
If an AC Circuit or DC Circuit has more than 3 Terminal Names, please list only the first 3 Terminal Names on this form.
Table 4: Multiple-Owner AC and DC Circuits Form Fields (TADS Form 2.1)
Column
Form 2.1 Descriptor
None
Questions 1 and 2 in the top of the form ask whether there were any additions of
multiple-owner circuits during the reporting year and if so, whether those
changes were incorporated into the response. These questions apply to the
second submittal only, and appropriate “NA” responses are provided as an
answer associated with a first submittal.
A
The type of circuit (AC or DC), input from a drop-down menu, describes the main
characteristic of the Element.
B
From – Substation or Terminal Name. The alphanumeric code designating one of
the Substation Names for an AC Circuit or one of the Terminal Names for a DC
Circuit. If the Element has more than 3 Terminals, only list the first 3 Terminals.
C
To – Substation or Terminal Name. The alphanumeric code designating a second
Substation Name for an AC Circuit or a second Terminal Name for a DC Circuit.
D
To2 – Substation or Terminal Name. The alphanumeric code designating a third
Substation Name for an AC Circuit or a third Terminal Name for a DC Circuit.
E
The Voltage Class of the Element, input from a drop-down menu. The 400-599 kV
Voltage Class can only be used if “AC” is selected in column A, and the 400-499 kV
and 500-599 kV Voltage Classes can only be selected if “DC” is selected in column
A. Other Voltages Classes (200-299 kV and 600-799 kV) can be used for either AC
or DC Circuits. Data that does not conform to this requirement will be rejected
and an error notice provided.
F
Underground or Overhead. This Element characteristic is input from a drop-down
menu. See the definition of Overhead and Underground in Appendix 7, Section A.
G-H
The NERC ID number and name of the TO with TADS outage reporting
responsibility for the multiple-owner circuit.
I
The reporting TO’s Element Identifier. This is a required data entry. The multiple
owners of this Element shall also use the same Element Identifier on their Form
2.x for this Element. However, only one TO can be designated as the reporting TO
for a given set of multiple-owners using the given Element ID.
J-W
Only the Reporting TO should enter the Element Identifier of Multiple-Owner
Elements on their Series 3 forms.
The NERC ID numbers and name of the TOs that have an ownership interest in the
Element. Up to ten owner names are provided. One of the TOs must be the TO
with TADS reporting responsibility input in columns G-H. Among the multipleowners, only the reporting TO can input the above Column I Element ID for
reported outages on their Form 4.x and Form 6.x. The other multiple owners are
not permitted to use the above Column I Element ID for outages reported on their
Forms 4.x or Form 6.x.
2.3.2 Multiple-Owner AC/DC Back-to-Back Converters
The characteristics of each multiple-owner AC/DC Back-to-Back Converter are input on this form (one Element per row).
This form is not to be used for AC/DC Back-to-Back Converters owned 100% by a single TO.
NERC | Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum | R May 28, 2013
8 of 11
Detailed Form Descriptions
Table 5: Multiple-Owner AC/DC Back-to-Back Converters (TADS Form 2.2)
Column
Form 2.2 Descriptor
None
Questions 1 and 2 in the top of the form ask whether there were any additions of
multiple-owner AC/DC BTB Converters during the reporting year and if so, whether
those changes were incorporated into the response. These questions apply to the
second submittal only, and appropriate “NA” responses are provided as an answer
associated with a first submittal.
A
Converter Station Name. The alphanumeric code designating the converters name.
B
HIDDEN
C
The AC Circuit Voltage Class, input from a drop-down menu, on one side of the
converter
D
The AC Circuit Voltage Class, input from a drop-down menu, on the other side of the
converter
E-F
HIDDEN
G-H
The NERC ID number and name of the TO with TADS reporting responsibility.
I
The reporting TO’s Element Identifier. This is required.
J-Q
The NERC ID numbers and names of the TOs that are multiple owners of the
Element. Up to four owner names are provided. One of the TOs must be the TO
with TADS reporting responsibility input in column G-H.
2.4 AC and DC Circuit Detailed Inventory Data
This form (TADS Form 3.1) is to report detailed inventory data for both AC and DC Circuits. For the June 30, 2013 submittal,
only Element Identifiers and Circuit Mileage are required on a per-Element basis. If there are AC Circuits or DC Circuits that
are multiple-owner circuits reported by the TO, these Elements should be reported on this form.
For TADS purposes, a DC Circuit is assumed to have 2 poles. For example, a one-mile long DC Circuit with 2 poles would be
reported as having 1 DC Circuit Mile.
Although only Unique Element Identifier, Circuit Miles, and the initial Change/Reconfiguration Date are required for the
June 30, 2013 data submission, it is strongly recommended that Voltage Class and Circuit Type fields also be submitted.
webTADS will accept data without these fields, but the summary display will not display the total Circuits and Circuit Miles
by Voltage Class.
NERC | Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum | R May 28, 2013
9 of 11
Detailed Form Descriptions
Column
A
B
Table 6: AC Circuit and DC Circuit Detail Inventory Form
(* Indicates Mandatory for June 30, 2013 Reporting)
Form 3.1 Field Name
Form 3.1 Descriptor
Unique Element Identifier*
A TO defined unique Element Identifier. Element Identifiers
cannot be reused in any future reporting period for a different
Element. If there are multiple owners of the Element, those TOs
must agree on the Element Identifier.
Voltage Class
The Element’s Voltage Class.
AC Circuit= phase-to-phase
(Strongly Recommended)
DC Circuit= phase-to-return
C
D-I
J
Circuit Type
(Strongly Recommended)
HIDDEN
Circuit Miles*
K-T
V
HIDDEN
Change/Reconfiguration
Date*
W-Y
HIDDEN
The 400-599 kV Voltage Class can only be used if “AC” is selected
in column C, and the 400-499 kV and 500-599 kV Voltage Classes
can only be selected if “DC” is selected in column C. Data that
does not conform to this requirement will be rejected and an
error notice provided.
AC = AC Circuit Element
DC = DC Circuit Element
The Circuit Mileage of the Element. For TADS purposes, a DC
Circuit is assumed to have 2 poles. For example, a one-mile long
DC Circuit with 2 poles would be reported as having 1 DC Circuit
Mile.
Enter the date (mm/dd/yyyy) that the Circuit Mileage of the
Element last changed or the initial in-service date. If this is prior
to January 1, 2013, please use January 1, 2013 as the
Change/Reconfiguration Date.
2.5 Transformer Detailed Inventory Data
This form (TADS Form 3.2) is to report detailed inventory data for TADS reportable Transformer Elements. For the June 30,
2013 submittal, only Element Identifiers are required on a per-Element basis.
For TADS purposes, a transformer must have a low-side voltage of ≥200 kV to be reportable.
Although only Unique Element Identifier and the initial Change/Reconfiguration Date are required for the June 30, 2013
data submission, it is strongly recommended that the High Side Voltage Class field also be submitted. webTADS will accept
data without this field, but the summary display will not display the total Transformers by Voltage Class.
NERC | Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum | R May 28, 2013
10 of 11
Detailed Form Descriptions
Column
A
B
C
D-F
G
H-J
Table 7: Transformer Detail Inventory Form
(* Indicates Mandatory for June 30, 2013 Reporting)
Form 3.2 Field Name
Form 3.2 Descriptor
Unique Element Identifier*
A TO defined unique Element Identifier. Element Identifiers
cannot be reused in any future reporting period for a different
Element.
HIDDEN
High Side Voltage Class
The High-Side Voltage Class of the Transformer.
(Strongly Recommended)
HIDDEN
Change/Reconfiguration
Enter the in-service date (mm/dd/yyyy) of the Transformer. If this
Date*
is prior to January 1, 2013, please use January 1, 2013 as the
Change/Reconfiguration Date.
HIDDEN
2.6 AC/DC Back-to-Back Converter Detailed Inventory Data
This form (TADS Form 3.3) is to report detailed inventory data for TADS reportable Transformer Elements. For the June 30,
2013 submittal, only Element Identifiers are required on a per-Element basis.
For TADS purposes, an AC/DC Back-to-Back Converter must have both sides ≥200 kV to be reportable.
Although only Unique Element Identifier and the initial Change/Reconfiguration Date are required for the June 30, 2013
data submission, it is strongly recommended that the Voltage Class field also be submitted. webTADS will accept data
without this field, but the summary display will not display the total AC/DC Back-to-Back Converters by Voltage Class.
Column
A
B
C
D
E-G
Table 8: AC/DC Back-to-Back Converter Detail Inventory Form
(* Indicates Mandatory for June 30, 2013 Reporting)
Form 3.3 Field Name
Form 3.3 Descriptor
Unique Element Identifier*
A TO defined unique Element Identifier. Element Identifiers
cannot be reused in any future reporting period for a different
Element.
HIDDEN
Voltage Class
The High-Side Voltage Class of the Transformer.
(Strongly Recommended)
Change/Reconfiguration
Enter the in-service date (mm/dd/yyyy) of the AC/DC Back-toDate*
Back Converter. If this is prior to January 1, 2013, please use
January 1, 2013 as the Change/Reconfiguration Date.
HIDDEN
To submit this data, please send the XML workbook to [email protected].
2.6.1 Transmitting TADS Data Securely by E-mail
The webTADS data entry software will transmit data securely into webTADS. Therefore, e-mail will primarily be used by TOs
to transmit corrections to data that must be entered by a Regional Entity coordinator or NERC staff when webTADS data
entry is closed to TOs. If an entity (TO, RE, or NERC) has its own critical infrastructure protection (CIP) procedure for
transmitting confidential information by e-mail, that procedure should be followed. If those procedures are not yet
developed, the following process should be followed:
1.
2.
Password-protect the document to be transmitted, and send it via e-mail to the recipient. Do not include the password
in this e-mail.
In a second separate e-mail, send the password to the recipient of the document.
NERC | Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum | R May 28, 2013