* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download REQUEST FOR THE EXPRETION OF INTEREST FROM THE
Citizens' Climate Lobby wikipedia , lookup
Effects of global warming on human health wikipedia , lookup
German Climate Action Plan 2050 wikipedia , lookup
Economics of global warming wikipedia , lookup
Climate resilience wikipedia , lookup
Solar radiation management wikipedia , lookup
Climate change in Tuvalu wikipedia , lookup
Scientific opinion on climate change wikipedia , lookup
Media coverage of global warming wikipedia , lookup
Climate change and agriculture wikipedia , lookup
Public opinion on global warming wikipedia , lookup
Surveys of scientists' views on climate change wikipedia , lookup
Climate change adaptation wikipedia , lookup
Climate change, industry and society wikipedia , lookup
Climate change and poverty wikipedia , lookup
Years of Living Dangerously wikipedia , lookup
REQUEST FOR THE EXPRETION OF INTEREST FROM THE COMPANIES ALBANIA PROJECT “BUILDING THE RESILIENCE OF KUNE-VAINI LAGOON THROUGH ECOSYSTEM-BASED ADAPTATION (EBA)” (SPECIAL CLIMATE CHANGE FUND), Position information Job description: National EIA Consultancy Duty Station: Albania Starting date: As soon as possible Deadline for application: November 25, 2016 (midnight/local time) Organizational Context The Kune-Vaini lagoon system (KVLS), located within the Drini-Mati River Delta in the Lezha region of Albania, provides a wide range of valuable goods and services to nearby communities. These local communities derive the majority of their income from fishing or agriculture and therefore depend on functional, intact ecosystems in the lagoon system for their livelihoods. A rapid increase in population size and widespread poverty in the area have led to an increase in pressure on the lagoon for ecosystem goods and services, and to unplanned alterations in the buffer zone surrounding the lagoon. The unsustainable use and alteration of the KVLS is being compounded and will be further exacerbated by the effects of climate change, in several ways. Firstly, recent climate change models predict an increase in air and sea surface temperature, which will lead to increased evaporation. In addition, global climate models also predict a reduction in precipitation, which will also result in an increase in salinity in the lagoon with detrimental effects on the fisheries. Secondly, models predict an accelerating rate of sea-level rise (up to 61 centimetres by 2100) resulting in increased erosion and the consequent loss of habitat within the KVLS. Finally, the KVLS is expected to experience more intense and frequent floods and storm surges. These extreme events will lead to the erosion of beaches and riparian forests and the alteration of flow patterns within the KVLS, which in turn reduces physical barriers to extreme coastal flooding events and limits the capacity of the lagoon to buffer the surrounding communities from these events. In order to address this problem, Special Climate Change Fund (SCCF) resources have been provided to the Government of Albania to implement the project “Building the resilience of Kune-Vaini Lagoon (KVL) through ecosystem-based adaptation (EbA)” which aims to increase the capacity of government and local communities living nearby the KVLS to adapt to climate change using an integrated suite of adaptation interventions, including EbA. This will be achieved by the following outcomes of the project: 1. Improving technical and institutional capacity of policy- and decision-makers in Albania to address climate change risks through the implementation of adaptation interventions, including ecosystem-based adaptation (EbA). 2. Demonstrating adaptation interventions within the KVLS. 3. Improving awareness and knowledge of local communities and national stakeholders on effective EbA. Functions Summary of Key Functions: The environmental impact assessment (EIA) consultancy will be responsible for undertaking a comprehensive EIA of the SCCF project’s climate change adaptation interventions. The EIA should be conducted in accordance with all relevant laws in Albania, and should outline the potential environmental impacts fo the following interventions:: Reforestation of coastal forest; Rehabilitation of coastal dunes; Opening and maintaining a new tidal inlet channel; and Constructing and rehabilitating artesian wells. Objectives of the Assignment The objectives of this assignment are to develop a report and to evaluate all the environmental impacts of the SCCF project’s interventions. The consultancy should also develop an environmental management plan to mitigate any of the environmental impacts identified. Duties and Responsibilities of National EIA Consultancy: Become familiar with the project document and project objectives. Maintain regular communication with the Chief Technical Advisor and Project Coordinator to ensure that the correct and necessary deliverables are being produced in a timely manner. Develop a work plan for the study and the evaluation of the EIA according to the strategy and work plan of the project. The company will develop a comprehensive EIA for all of the SCCF project’s climate change adaptation interventions, including: ◦ Reforestation of coastal forest; ◦ Rehabilitation of coastal dunes; ◦ Opening and maintaining a new tidal inlet channel; and ◦ Constructing and rehabilitating artesian wells. Prepare a report detailing the findings of the EIA. The report should be detailed according to property type - national, municipal or private land. The EIA should include mitigation options (if necessary) to reduce environmental impacts. The EIA should include an impact evaluation on flora and fauna or any other related component in the sites where reforestation, tidal inlet construction, artesian well and dune rehabilitation will take place. Greenhouse gases impact assessment implementation (emissions/removals). Prepare a detailed Environmental Management Plan in compliance with national legislation and standards. Collaborate with other consultants employed by the SCCF project, particularly those consultants that are designing the reforestation/rehabilitation and construction interventions. of the proposed activities for Experience and qualifications: The contract will be implemented by an Albanian Consultancy/Company with relevant experience in Environmental Impact Assessment, communication strategy and participation regarding environmental issues at the national level. Company to have the licence for the EIA, according Albanian Legislation ; Work experience with Climate Change projects funded by international donors is an advantage. In the last five years the company must have managed projects in the field of environmental impact assessment approximately amount of 15 000 Euro. Strong communication, reporting and presentation skills. The staff of the company should have the following skills: Relevant university degree in environmental sciences, environmental education wetland/coastal zone management, communication and marketing. Ability to communicate effectively with a broad number of stakeholders/NGOs/Community groups/ general public etc. Fluency in English and ability to write reports and project management plans in English. Willingness to participate in field activities/surveys and travel to remote areas within the country. Schedule and deliverables The consultant will report to the Coordinator of the PCU and will prepare the following outputs: Work plan for the identification and evaluation of the environmental impact resources; Detailed Environmental Impact Assessment report. Public and stakeholder consultation and integration of the comments and recommendations; Final detailed Environmental Impact Assessment report Payments will be made upon receipt of the following deliverables: Detailed work plan: 20% EIA report for four interventions: 40% Final EIA report : 40% Language All final reports /deliverables must be submitted in English and Albania language Application Qualified candidates should submit a cover letter outlining their approach to the assignment, a detailed CV and financial proposal to: Pellumb Abeshi, General Director of Environmental Policies and director of the project, Ministry of Environment, [email protected] Viola Agasi, Project Coordinator Mobile:0692365066 / 0674091375 Email:[email protected] Rruga Vaso Pasha Pall 42/1/5 Tirane