Download Kathryn Campbell-Savours Priority Axis 5: Promoting climate

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Investment banking wikipedia , lookup

Investment fund wikipedia , lookup

Systemic risk wikipedia , lookup

Investment management wikipedia , lookup

Transcript
Kathryn Campbell-Savours
Priority Axis 5: Promoting climate change
adaptation, risk prevention and management
Priority 5b: Promoting investment to address specific risks, ensuring disaster
resilience and developing disaster management systems
20XX
ERDF Operational Programme
The Operational Programme:
•
Utilising ERDF to safeguard and enable sustainable economic growth, ensuring ‘at
risk’ communities, businesses and their local economy can adapt to climate change,
thus contribute to and benefit from sustainable local economic growth
•
Complementary to UK Government’s Flood and Coastal Risk Management Grant in
Aid; achieving viability for schemes that have a high potential economic development
and growth value but that have relatively low eligibility to domestic flood and coastal
resilience funding which focuses more on residential properties.
•
Flood mitigation measures will support the protection of major employment areas and
SMEs and unlock derelict, underused or neglected land on strategically important
sites/areas identified as central to realising growth aspirations.
Focus for Investment Priority 5b
Coastal resilience
•
•
•
•
•
managed realignment and mitigation of coastal squeeze
shoreline re-nourishment and cliff and dune system stabilisation
harbour, port and waterfront enhanced protection and adaptations. These
investments are not linked to transport
improvements to coastal frontages and seawalls
strengthening and extending of estuary embankments
Fluvial risk management
•
•
•
•
•
•
•
onsite or upstream attenuation and slowing the flow measures
diversion channels
raising strengthening and/or extending river walls and frontages
fixed and temporary barriers and gates
stepped back embankments
resilience measures for business infrastructure, including for example wet or
dry flood-proofing
river restoration and improved conveyance measures
Surface water run-off and drainage systems
•
•
integration, including retrofitting, of surface water and run off management
measures into urban and commercial redevelopments
innovative measures in contexts where flood risk and land management
relies on pumping and inter-relates with drainage
Challenges for Investment Priority 5b

Development timeline

Geographic focus

Operational Programme targets

Budget
Development Timeline
•
Design and cost information
•
Matchfunding
•
Permissions
•
Performance Framework targets
Geographic Focus
Operational Programme prioritises the following areas for
investment in the North East to:
 Northumbrian Coast
 the Tees Valley
 the Team Valley
Priority 5b - Output Targets
•
P6 – Businesses and properties with reduced flood risk
– No. of businesses that have reduced risk of flooding and/or coastal risk as a
result of activity through ERDF and are removed from ‘at risk’ status as a result
of a schemes or measures to manage those risks.
– ‘At risk’ properties are specified in the Environment Agency Flood Plan.

C23 - Surface area of habitats supported in order to attain a better
conservation status