* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Voltage Stability and Reactive Power Planning
Ground (electricity) wikipedia , lookup
Power over Ethernet wikipedia , lookup
Audio power wikipedia , lookup
Electrification wikipedia , lookup
Electrical ballast wikipedia , lookup
Current source wikipedia , lookup
Immunity-aware programming wikipedia , lookup
Pulse-width modulation wikipedia , lookup
Power factor wikipedia , lookup
Resistive opto-isolator wikipedia , lookup
Power inverter wikipedia , lookup
Electric power transmission wikipedia , lookup
Electric power system wikipedia , lookup
Schmitt trigger wikipedia , lookup
Variable-frequency drive wikipedia , lookup
Opto-isolator wikipedia , lookup
Three-phase electric power wikipedia , lookup
Electrical substation wikipedia , lookup
Amtrak's 25 Hz traction power system wikipedia , lookup
Power MOSFET wikipedia , lookup
Power engineering wikipedia , lookup
Power electronics wikipedia , lookup
Surge protector wikipedia , lookup
Buck converter wikipedia , lookup
Voltage regulator wikipedia , lookup
History of electric power transmission wikipedia , lookup
Stray voltage wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Alternating current wikipedia , lookup
Voltage Stability and Reactive Power Planning Entergy Transmission Planning Summit New Orleans, LA July 8, 2004 1 Voltage Profile During Aug 14th Blackout • Voltages decay to almost 60% and initiates loss of load • Slow recovery leads to generators tripping • 60% voltage level also observed in 1995 Phoenix-area blackout 3 East Lake 5 Exciter Operation Exciter trips to manual Exciter trips completely 4 Power System Outage Task Force • Strengthen Reactive Power and Control Practices in all NERC Regions “Reactive power problem was a significant factor in the August 14 outage, and they were also important elements in the several of the earlier outages” -Quote from the outage report 5 NERC Recommendations Pertinent to Reactive Power Planning #7. #14. Evaluate reactive power and voltage control practices. Evaluate the effectiveness of existing reactive power and voltage control standards and how they are being implemented in the NERC regions Recommend revisions to standards or process improvements to ensure voltage control and stability issues are adequately addressed Improve system modeling data and data exchange practices. Establish and begin implementing criteria and procedures for validating data used in power flow/stability models by benchmarking model data with actual system performance Validated data shall be exchanged on an inter-regional basis 6 What is Voltage Instability/Collapse? • A power system undergoes voltage collapse if postdisturbance voltages are below acceptable limits: – Less than 0.8 PU – voltage collapse may be due to voltage or angular instability • Main factor causing voltage instability is the inability of the power systems to maintain a proper balance of reactive power and voltage control 7 Voltage Instability/Collapse • The driving force for voltage instability is usually the load. • The possible outcome of voltage instability: – loss of loads – loss of integrity of the power system • Voltage stability timeframe: – Short term/transient voltage instability: 0 - 30 seconds • Motor dynamics/stalling • OEL’s – long-term voltage stability: 1 – 60 minutes • Tap changers/Voltage regulators • OEL’s 8 Power-Voltage (P-V) Curve 9 Power – Voltage (P-V) Curve 10 Possible Solutions for Voltage Issues • Install/Operate Shunt Capacitor Banks • Add dynamic Shunt Compensation in the form of SVC/STATCOM to mitigate transient voltage dips • Add Series Compensation on transmission lines in the problem area • Implement under-voltage load shed (UVLS) program • Construct transmission/generation facilities 11 Over-excitation Limit - Per unit MVAR (Q) + Leading (Under-excited) Lagging (Over-excited) Generator Capability Curve 0.8 pf line Stator Winding Heating Limit Normal Excitation (Q = 0, pF = 1) MW Under-excitation Limit Stability Limit 12 Reactive Power Requirements for Generators • The facility should generate reactive power in accordance with the voltage schedule prescribed by the system dispatcher. • Above 230 kV: 1.02 PU • 230 kV: 1.01 PU • 69 kV – 161 kV: 1.00 PU • The facility shall have a reactive power capability to maintain a power factor between 0.95 lagging and 0.97 leading. • Units must be operated with the voltage regulator in auto mode. • Generator may be required to operate at its maximum reactive capability to meet required voltage schedules. • Ensure that adequate reactive reserves are available so that the system can be restored satisfactorily. 13 Areas of Voltage Stability Concern North Arkansas Mississippi West of the Atchafalaya Basin (WOTAB) Southeast Louisiana Western Region Amite South/DSG 14 Reactive Power Projects Implemented in Entergy Down Stream of Gypsy (DSG) Area: 300 MVAR Shunt Capacitor Banks - 2004 Automatic Under Voltage Load Shedding Program - 2004 Static exciter at Ninemile 4 Unit - 2004 200 MVAR Shunt Capacitor Banks – 2005 300 MVAR SVC at Ninemile 230 kV – 2005 Western Region: Automatic Under Voltage Load Shedding Program – 1998/modified 2004 Series Compensation on China-Jacinto 230 KV line – 2001 300 MVAR SVC at Porter 230 kV – 2005 Series Compensation on China – Porter 230 kV line - 2005 15 Summary • The increasing need to operate the transmission system at its maximum safe transfer limit has become a primary concern at most utilities. • Reactive power supply or VAR management is an important ingredient in maintaining healthy power system voltages and facilitating power transfers. • Inadequate reactive power supply was a major factor in most of the recent blackouts. 16 QUESTIONS ??? 17