Download RIC 2011

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Electronic engineering wikipedia , lookup

Pulse-width modulation wikipedia , lookup

Fault tolerance wikipedia , lookup

War of the currents wikipedia , lookup

Electrical ballast wikipedia , lookup

Immunity-aware programming wikipedia , lookup

Electric power system wikipedia , lookup

Power inverter wikipedia , lookup

Ground (electricity) wikipedia , lookup

Variable-frequency drive wikipedia , lookup

Current source wikipedia , lookup

Ohm's law wikipedia , lookup

Resistive opto-isolator wikipedia , lookup

Schmitt trigger wikipedia , lookup

Electrification wikipedia , lookup

Rectifier wikipedia , lookup

Triode wikipedia , lookup

Metadyne wikipedia , lookup

Islanding wikipedia , lookup

Three-phase electric power wikipedia , lookup

Power MOSFET wikipedia , lookup

Opto-isolator wikipedia , lookup

Power electronics wikipedia , lookup

Buck converter wikipedia , lookup

Voltage regulator wikipedia , lookup

Amtrak's 25 Hz traction power system wikipedia , lookup

Power engineering wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Electrical substation wikipedia , lookup

Surge protector wikipedia , lookup

Stray voltage wikipedia , lookup

History of electric power transmission wikipedia , lookup

Voltage optimisation wikipedia , lookup

Alternating current wikipedia , lookup

Mains electricity wikipedia , lookup

Transcript
RIC 2011
Adequacy of Station Electric Distribution System
Voltages—Degraded Voltage Protection
Kenn Miller
Division of Engineering/NRR
March 9, 2011
1
Purpose of Session
• Ensure that design issues concerning station
electrical distribution system/offsite power system
interface and degraded voltage protection are
addressed
• Staff is issuing the Regulatory Issue Summary to
clarify the existing staff guidance and positions
2
NRC Regulation and Guidance
• Title 10 of the Code of Federal Regulations Part 50,
Appendix A, General Design Criteria 17, “Electric Power
Systems”
y
• June 1977 Letter to all Operating Reactors, “Statement of
Staff Positions Relative to Emergency Power Systems for
Operating Reactors”
• Generic Letter 79-36, “Adequacy of Station Electric
Distribution Systems Voltages”
• Branch Technical Position BTP-1 (Later BTP 8-6) of
NUREG 0800 / Standard Review Plan
3
1
NRC Staff Positions on DVRs (1977 Letter)
• Voltage calculations are necessary to develop DVR
settings, ensuring 1E equipment is supplied with
adequate voltage
• Voltage calculations should model the plant safety
related electrical distribution system and offsite circuits
• Voltage calculations should have cases that
demonstrate the protection of 1E systems by the DVR
• DVR time delays must support FSAR accident
analyses and protect 1E systems and components
while not reducing availability of adequate offsite power
4
NRC Staff Positions on Offsite Circuit /
Station Distribution Design Interface
• The offsite electric power system is the preferred
source of power to the plant
• Voltage calculations should demonstrate voltage
requirements of all plant components are
satisfied in all conditions
• Voltage analysis, while supplied from the offsite
circuit, should be based on the operating voltage
range of the transmission network connection.
5
NRC Staff Positions on Offsite Circuit /
Station Distribution Design Interface (cont.)
• Voltage calculations should model voltage at the
terminals of each safety related load.
• All plant electric distribution system automatic
functions should be assumed to occur as
designed
• Manual load shedding should not be assumed
6