Download 260500 - Common Work Results for Electrical

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Portable appliance testing wikipedia , lookup

Electromagnetic compatibility wikipedia , lookup

Three-phase electric power wikipedia , lookup

Opto-isolator wikipedia , lookup

Surge protector wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Ground (electricity) wikipedia , lookup

Distribution management system wikipedia , lookup

Electrician wikipedia , lookup

Metadyne wikipedia , lookup

Power engineering wikipedia , lookup

Amtrak's 25 Hz traction power system wikipedia , lookup

Transformer wikipedia , lookup

Voltage optimisation wikipedia , lookup

Electronic engineering wikipedia , lookup

Electrical engineering wikipedia , lookup

History of electric power transmission wikipedia , lookup

Stray voltage wikipedia , lookup

Telecommunications engineering wikipedia , lookup

National Electrical Code wikipedia , lookup

Electrical substation wikipedia , lookup

Alternating current wikipedia , lookup

Mains electricity wikipedia , lookup

Transcript
UNIVERSITY OF ALASKA FAIRBANKS
DESIGN STANDARDS
SEPTEMBER 2014
DIVISION 26 - ELECTRICAL
SECTION 26 05 00
COMMON WORK RESULTS FOR ELECTRICAL
PART 1 - GENERAL
1.01
Facilities Services (FS) Division of Design and Construction is responsible for
coordinating with the FS Divisions of Maintenance and Utilities.
A. Utilities is responsible for the primary electrical systems on campus through and
including the building service transformers.
B. Maintenance is responsible for the secondary electrical systems on campus.
1.02
All work on the UAF high voltage system to comply with the "UAF HIGH VOLTAGE
OUTAGE PROCEDUREā€ located in Division 1 of the technical specifications.
1.03
Do not use multi-pole breakers to supply individual branch circuits in laboratories,
telecommunications rooms, server rooms, or other areas where circuit trips may interrupt
operation of critical equipment.
PART 2 - PRODUCTS
1.04
Power transformers: Provide Copper windings with all transformers unless otherwise
changed by the FS/Division of Utilities.
PART 3 - (NOT USED)
END OF SECTION
26 05 00 - 1