Survey
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
“Detector activities” after the IB upgrade Michele Punturo What we must do • 0 priority: – commissioning • 1 priority: – Items to be implemented • • • • Acoustic shielding in the laser lab Improvement of the cleanliness procedure in the towers New coil drivers … (MC LC windows?) … – Items to be investigated: • MC end mirror – Better substrate – Heavier payload • BS mirror – Larger mirror » Reduce scattered light • • • • • Eddy current dissipation New electronics Thermal compensation & Phase camera New quadrant centering devices (galvanometers) … Virgo+ Activities • New high power laser – N. Mann • FS monolithic suspension activities – M.Punturo Acoustic Shielding in the LL • Reduce the cross talk between the acoustic channel and the dark fringe • All the racks with fans displaced during the shutdown • A coverage of the laser table and of the external injection bench is under design – Two offers received: • 30 k€ • 16 k€ – A third company contacted • Offer in few days – Implementation: • End of winter, beginning of spring • As soon as an executive design will be available it will be shown in a detector meeting Cleanliness improvement in the tower • Wednesday, past week: • When the NI problem occurred I prepared (16/04/2003) this list of rules: – Keep the mirror clean – Remove the dust particles through an ionized air jet after the integration and tuning procedures – Inject, during the venting only dray air – Warm up the mirror, to reduce the probability of condensation on it • Some of them haven’t been respected – Need to patch the problem now (cleaning intervention) – Need to solve the problem in the future • Control of the moisture • Ionized warm air flux (need of infrastructure upgrade, already indicated in the urgent purchases in the October 2005 Detector Meeting in Naples) G.Losurdo Actuation Noise New coil drivers • New coil drivers have been designed by INFN Pisa + EGO support to solve the actuation noise problem – Two different sections • High power section for lock acquisition • Low noise section for linear regime – The two sections are driven by two independent DACs • Full production of new coil drivers in one year – Prototypes already installed in the end towers (EM contamination) – Simplified solution in the input towers (switch+resistor) – Simplified solution in the BS tower Transconductance Amplifier DAC 1 Coil Driver Ref. Mass Coil DAC 2 + RCo i l 10 RN O UT 5 00 - 1 L Co i l 3 mH R2 R R1 R 2 NEW end MC mirror • The losses in the MC are 846 ppm (F.Bondu) instead of 115 ppm • Defects and contamination in the curved MC mirror • This mirror must be replaced Small or large MC mirror? • Two new small substrates have been sent to GS Lumonics (Raffaele, could you confirm?) • The possibility to use a large substrate must be investigated – – – – – Better control of the payload “almost” standard geometry Herasil substrate available Movement mechanics complicated Optics + Mechanics studies must be started now New BS? • Stray light is evident in the BS WA IB NI wedge • With the higher injected power the problem should be enhanced – Larger BS needed • New substrate (wedge) to be realized Eddy current FUTURE problem • Virgo design • Current design – M=0.017 A m2 – Stainless Steel RM – M=0.05 A m2 – Aluminum RM • sRM=1.4×106W-1m-1 • sRM=3.2×107W-1m-1 – Qeddy=1.8×108 – Qeddy=9.4×105 h (f) [1 /s q rt(H z )] Experimental test: (VIR-NOT-PER-1390-27 (1996), VIR-NOT-PER-1390-80 (1997), Rev.Sci.Instr. 69, 1 0 2777 (1998)) -1 8 1 0 -1 9 1 0 -2 0 1 0 -2 1 1 0 -2 2 1 0 -2 3 (a (b (c (d 1 1 0 ) ) ) ) N C N M o m in a l V ir g o u rre n t m a g n e ts M = 0 .0 5 , A l R M o m in a l m a g n e ts M = 0 .0 1 7 , A l R M a g n e ts M = 0 .0 0 5 , A l R M 1 0 0 F re q u e n c y [H z ] 1 0 0 0 coil magnet post mirror Aluminum RM steel support Macor support Magnetic Field Now With Iron Hat Test in Clean Room Bmeas Model Model (top larger) 1.0 B/B 0 0.8 0.6 0.4 0.2 0 1 2 layers of 0.6mm 3 Conclusions • In parallel to the commissioning activities many “detector activities” are foreseen (and many more are needed) • Man power is an issue: – Many persons are involved in both commissioning and “detector”