Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
“Detector activities” after the IB upgrade Michele Punturo What we must do • 0 priority: – commissioning • 1 priority: – Items to be implemented • • • • Acoustic shielding in the laser lab Improvement of the cleanliness procedure in the towers New coil drivers … (MC LC windows?) … – Items to be investigated: • MC end mirror – Better substrate – Heavier payload • BS mirror – Larger mirror » Reduce scattered light • • • • • Eddy current dissipation New electronics Thermal compensation & Phase camera New quadrant centering devices (galvanometers) … Virgo+ Activities • New high power laser – N. Mann • FS monolithic suspension activities – M.Punturo Acoustic Shielding in the LL • Reduce the cross talk between the acoustic channel and the dark fringe • All the racks with fans displaced during the shutdown • A coverage of the laser table and of the external injection bench is under design – Two offers received: • 30 k€ • 16 k€ – A third company contacted • Offer in few days – Implementation: • End of winter, beginning of spring • As soon as an executive design will be available it will be shown in a detector meeting Cleanliness improvement in the tower • Wednesday, past week: • When the NI problem occurred I prepared (16/04/2003) this list of rules: – Keep the mirror clean – Remove the dust particles through an ionized air jet after the integration and tuning procedures – Inject, during the venting only dray air – Warm up the mirror, to reduce the probability of condensation on it • Some of them haven’t been respected – Need to patch the problem now (cleaning intervention) – Need to solve the problem in the future • Control of the moisture • Ionized warm air flux (need of infrastructure upgrade, already indicated in the urgent purchases in the October 2005 Detector Meeting in Naples) G.Losurdo Actuation Noise New coil drivers • New coil drivers have been designed by INFN Pisa + EGO support to solve the actuation noise problem – Two different sections • High power section for lock acquisition • Low noise section for linear regime – The two sections are driven by two independent DACs • Full production of new coil drivers in one year – Prototypes already installed in the end towers (EM contamination) – Simplified solution in the input towers (switch+resistor) – Simplified solution in the BS tower Transconductance Amplifier DAC 1 Coil Driver Ref. Mass Coil DAC 2 + RCo i l 10 RN O UT 5 00 - 1 L Co i l 3 mH R2 R R1 R 2 NEW end MC mirror • The losses in the MC are 846 ppm (F.Bondu) instead of 115 ppm • Defects and contamination in the curved MC mirror • This mirror must be replaced Small or large MC mirror? • Two new small substrates have been sent to GS Lumonics (Raffaele, could you confirm?) • The possibility to use a large substrate must be investigated – – – – – Better control of the payload “almost” standard geometry Herasil substrate available Movement mechanics complicated Optics + Mechanics studies must be started now New BS? • Stray light is evident in the BS WA IB NI wedge • With the higher injected power the problem should be enhanced – Larger BS needed • New substrate (wedge) to be realized Eddy current FUTURE problem • Virgo design • Current design – M=0.017 A m2 – Stainless Steel RM – M=0.05 A m2 – Aluminum RM • sRM=1.4×106W-1m-1 • sRM=3.2×107W-1m-1 – Qeddy=1.8×108 – Qeddy=9.4×105 h (f) [1 /s q rt(H z )] Experimental test: (VIR-NOT-PER-1390-27 (1996), VIR-NOT-PER-1390-80 (1997), Rev.Sci.Instr. 69, 1 0 2777 (1998)) -1 8 1 0 -1 9 1 0 -2 0 1 0 -2 1 1 0 -2 2 1 0 -2 3 (a (b (c (d 1 1 0 ) ) ) ) N C N M o m in a l V ir g o u rre n t m a g n e ts M = 0 .0 5 , A l R M o m in a l m a g n e ts M = 0 .0 1 7 , A l R M a g n e ts M = 0 .0 0 5 , A l R M 1 0 0 F re q u e n c y [H z ] 1 0 0 0 coil magnet post mirror Aluminum RM steel support Macor support Magnetic Field Now With Iron Hat Test in Clean Room Bmeas Model Model (top larger) 1.0 B/B 0 0.8 0.6 0.4 0.2 0 1 2 layers of 0.6mm 3 Conclusions • In parallel to the commissioning activities many “detector activities” are foreseen (and many more are needed) • Man power is an issue: – Many persons are involved in both commissioning and “detector”