Download COH Interference 7-10

Document related concepts

Transistor wikipedia , lookup

History of electric power transmission wikipedia , lookup

Portable appliance testing wikipedia , lookup

Immunity-aware programming wikipedia , lookup

Ground (electricity) wikipedia , lookup

Skin effect wikipedia , lookup

Stepper motor wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Voltage optimisation wikipedia , lookup

Electrical ballast wikipedia , lookup

Earthing system wikipedia , lookup

Mains electricity wikipedia , lookup

Opto-isolator wikipedia , lookup

Resistive opto-isolator wikipedia , lookup

Electromagnetic compatibility wikipedia , lookup

Surge protector wikipedia , lookup

Triode wikipedia , lookup

Rectifier wikipedia , lookup

Power MOSFET wikipedia , lookup

Buck converter wikipedia , lookup

Ohm's law wikipedia , lookup

Current source wikipedia , lookup

TRIAC wikipedia , lookup

Mercury-arc valve wikipedia , lookup

Current mirror wikipedia , lookup

Alternating current wikipedia , lookup

Stray voltage wikipedia , lookup

Transcript
Interference Testing Outline
Summary
How to Accomplish This?
• Conduct an ON/OFF survey of Columbia’s pipeline
with the existing bonds broken and all known foreign
influencing rectifiers interrupted (Columbia’s CP
system operating)
• Perform an ON/OFF survey of Columbia’s system with
only Columbia’s rectifiers interrupted. The foreign
companies are to be turned off at least 12 hours prior to
each survey
• Obtain potentials after all rectifiers have been turned
off for at least 48 hours