* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Alstom: 01B
Pulse-width modulation wikipedia , lookup
Electromagnetic compatibility wikipedia , lookup
Time-to-digital converter wikipedia , lookup
Immunity-aware programming wikipedia , lookup
Stepper motor wikipedia , lookup
Electrical substation wikipedia , lookup
Electrical ballast wikipedia , lookup
History of electric power transmission wikipedia , lookup
Power electronics wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Power MOSFET wikipedia , lookup
Voltage optimisation wikipedia , lookup
Ground loop (electricity) wikipedia , lookup
Stray voltage wikipedia , lookup
Current source wikipedia , lookup
Mains electricity wikipedia , lookup
Buck converter wikipedia , lookup
Surge protector wikipedia , lookup
Resistive opto-isolator wikipedia , lookup
Regenerative circuit wikipedia , lookup
Current mirror wikipedia , lookup
Alternating current wikipedia , lookup
Rint Circuit RB.A78 DCCT RPTE (16250 A) gnd 1Ω Rw DFLAS DQRB (75 mΩ) Pt 8 DQSB DFLAS (60 mV at Inom) 77xMB (7.85 H, ~ 150-450 nΩ) 77xMB (7.85 H, ~ 150-450 nΩ) DFLAS DFLAS DQRB (75 mΩ) Pt 7 Arjan Verweij, CERN, AT-MCS, 27/2/2007 I_min=350 A I_inj=760A I_nom=11850 A Stored energy at I_nom=1.22 GJ Signals: Vcircuit VDCCT Vlead (HTS and resistive) Vdump V-taps MB V1 213 212 219 heater A2 term. A 211 V2 100 W 113 term. B 14 15 V3 I 12 A1 112 111 119 13 Additional V-taps on busbars ?? QPS: Differential (V3-V2) – (V2-V1), threshold: 100 mV, 10 ms Stored signals: V1, V2, V3 during 10 sec before and 300 sec after quench, f=200 Hz Arjan Verweij, CERN, AT-MCS, 27/2/2007 Resistances PC: Rint=0.9 mW Warm cables: Rw ≈ 1 mW Cold joints in MB’s: 154x9x(0.4±0.2) nW ≈ 280-830 nW Cold joints in busbars: about 154x2x0.2 nW ≈ 60 nW Leads (at Inom): 4x0.06 V / 13000 A ≈ 18 mW Dump resistances: 2x75 = 150 mW NB: MB’s at 300 K: 154x5.7 W = 880 W Arjan Verweij, CERN, AT-MCS, 27/2/2007 Analysis PIC PC current loop parameters close to 15.7 H, 1 mW PLI-1 (760 A), PLI-2 (2000 A), PLI-3 (6000 A), PLI-4 (8500 A), PNO (12000 A) 1. Current loop stability (760, 2000, 6000, 12000 A) Vnoise (freq, ampl) on voltages for Q detection (Vdiff) and logging (VMB) (exp. for full circuit: DI= 0.012 mA, DV50 Hz=60 mV , DV300 Hz=350 mV ) Vthreshold (target: 100 mV) EMC ? Analysis of SRjoints (exp: 350-900 nW) 2. EE discharge without quench (760, 2000, 6000, 8500, 12000 A) t (exp: 15.7/0.151 = 104.0 sec) Vmax over dump resistance (exp: I * Rdump = 57 V) Vmax in circuit (exp: 0.25 * I * Rdump =14.2 V) Vmax over MB (exp: 0.102 H * I/t = 0.75 V) Quenchback ? Arjan Verweij, CERN, AT-MCS, 27/2/2007 3. Heater firing (select several magnets) (760, 2000, 6000, 12000 A) Q detection delay (exp: ??) Heater energy (exp: ??) Analyse VMB(t) and deduce RMB(t) and IMB(t) Analyse signal of quenched magnet for possible V oscillation. If present then .... Verify possible quenching of other magnets through: - erratic quench signal - quench back Verify possible quenching of busbar cable next to quenched magnet(s) 4. Current leads (760, 2000, 6000, 8500, 12000 A) Voltage over lead (exp: 60 mV) Temperatures at top and bottom of the lead Arjan Verweij, CERN, AT-MCS, 27/2/2007 Natural quench Find out quench origin (MB??, busbar, etc) Analyse quench: - Delay for Q detection - Delay for heater firing - Delay for start SC-n transition (induced by heaters) - Delay for diode conduction - Delay for PC abort and switch - Compare VMB(t) and IPC(t) to calculated/expected RMB(t) and IMB(t) behaviour, - Compare Q data with SM18 tests (in case of MB quench). Verify possible quenching of busbar cable next to quenched magnet(s), Analyse signal of quenched magnet for possible V oscillation. If present then: - detect if all diodes are still OK - perform HV test - connect 1 MHz data acq. system to sick magnet - perform quenches at reduced current Analysis should give an answer if it is safe to power the circuit again!!! Arjan Verweij, CERN, AT-MCS, 27/2/2007 Remarks It is not sure if voltage oscillation (of a ‘sick’ magnet can be seen using a sampling frequency of 200 Hz. A heater test at 760 A will probably not quench the magnet. No tests are made in SM18 at this current level. The total resistance of all (about 1700) splices in the circuit is rather unknown. I expect a value between 350 and 900 nW. We should try to deduce this value by measuring the voltage over all the magnets at several DC current levels (e.g. during the ‘current loop stability’ tests). The accuracy of this measurement is not known due to PC noise, voltage pick-up noise, and possible current redistribution effects. It should be tried to give at least an upper limit for the total resistance. Arjan Verweij, CERN, AT-MCS, 27/2/2007 Links EDMS 249359: Electrical connections of the LHC main dipoles LHCMBB_A0003: Instrumentation drawings voltage taps MBB LHC power converters, F. Bordry, Chamonix XI Results splice measurements FRESCA 0.8 Splice resistance [nOhm] 0.7 Jeumont Ansaldo BNN 0.6 0.5 0.4 0.3 0.2 0.1 0 0 2 4 6 8 10 12 14 16 18 20 Arjan Verweij, CERN, AT-MCS, 27/2/2007