* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Specs Part I - Jaipur Vidyut Vitran Nigam Limited ,Government of
Opto-isolator wikipedia , lookup
Voltage optimisation wikipedia , lookup
Three-phase electric power wikipedia , lookup
Buck converter wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Mains electricity wikipedia , lookup
Alternating current wikipedia , lookup
Portable appliance testing wikipedia , lookup
Electrical substation wikipedia , lookup
Distribution management system wikipedia , lookup
JAIPUR Office of the Superintending Engineer (JCC) Bani Park, Near Ram Mandir, Jaipur -302006(Rajasthan) TENDER SPECIFICATION FOR “Supply, Erection, Testing & Commissioning of SCADA Compatible Equipment’s in Jaipur City on Turn-Key Basis against Package No. SE/JCC/TN-01(Lot-I, II, III)” VOLUME - III PACKAGE No. SE/JCC/TN-01(Lot-I, II, III) Last date & time for submission of Proposal is 28.06.2013 up to 14.30 Part : I TECHNICAL SPECIFICATIONS TN-01/1 INDEX S. No Name of Item Pages No. 1. 36 KV INDOOR TYPE VACUUM CIRCUIT BREAKERS 3-25 2. 36 KV OUTDOOR TYPE VACUUM CIRCUIT BREAKERS 3. 12 KV INDOOR TYPE VACUUM CIRCUIT BREAKERS 38-54 4. 12 KV OUTDOOR TYPE VACUUM CIRCUIT BREAKERS 55-71 5. 33 KV CONTROL AND RELAY PANEL 26-37 72-96 6. 12 KV Ring Mains Unit 7. 33KV OUTDOOR LOAD BREAK SWITCH 115-122 8. 11 KV OUTDOOR LOAD BREAK SWITCH 123-130 9. Cable Jointing Kits 131-139 10. 33 KV outdoor CT’s 140-147 11. 11 KV XLPE cable 148-156 12. DT Structure 13. Numerical Relay 14 Shunt Trip Arrangement 97-114 157 158-159 160 TN-01/2 TECHNICAL SPECIFICATION OF 36 KV INDOOR TYPE VACUUM CIRCUIT BREAKERS 1.0 SCOPE : This specification manufacturer's covers works the design, manufacture, assembly, testing at before dispatch, supply, delivery of 3 pole, 50 Hz, 36 KV switchgear and control gear panels for indoor installation fitted with 36 KV vacuum circuit breakers including voltage transformers, current transformers, metering instruments, protection relays etc. as per schedule of requirement and installation & commissioning by the supplier as per Schedule-III (Part-B). The power system is with neutral solidly earthed. The equipment offered shall be safe, reliable and compact to install. The workmanship shall be of high order. The circuit breaker and protective devices shall be of latest design so as to ensure rapid and efficient interruption of fault current, low arc energy, small arcing time, complete phase segregation and freedom from fire hazards. 1.1 STANDARDS : The circuit breaker/metal enclosed switchgear, Voltage transformers, current transformers and all other equipment shall also comply with the requirement of latest edition of relevant Indian standards. Deviation from the standards and this specification if any, should be brought out in the tender and justified. Voltage transformer and current transformers shall be mounted within the panels. The governing standard shall be S. No. 1. 2. IS/IEC Reference IEC-62271/ 100-200 IEC-298 3. IS-3427 4. IS-8623 5. 6. 7. IS-13118 IEC-56 IEC-529 IS-5578 & 11353 8. 9. IS-325 IS-2629 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. IEC-137 IS-3347 IS-5561 IS-3156 IS-2705 IS-3231 IS-13010 IS-13779 IS-8686 IS-1248 IS-2099 IS-10118 IEC-694 Specification High Voltage Switchgear & Control gear A.C. Metal – enclosed and control gear for rated voltages above 1KV and including 72.5KV A.C. Metal – enclosed and control gear for rated voltages above 1KV and including 52KV. Specification for Low Voltage Switchgear and Control gear assemblies. Specification for High Voltage AC Circuit Breakers. Degrees of Protection. Marking and arrangement for switchgear bus bar main connections and auxiliary wiring. Specification for 3 Phase Induction motors. Recommended practice for hot dip galvanizing of iron and steel. Bushing for AC Voltages. Porcelain Transformer Bushings. Terminal Connectors Voltage Transformers Current Transformers Electric relays for power protection. Static Energy Meters Static Protection Relays Electrical measuring instruments High Voltage Porcelain Bushings. Minimum clearances for Outdoor Switchgear. Common Clauses for High Voltage Switchgear and Control TN-01/3 23. gear. Numerical Relays IEC-60255 & IEC-61330 Equipment’s conforming which ensure(s) equal would also be or accepted. to any other internationally accepted standard(s) better quality than the standard(s) mentioned above In case conforming to other standards or the tenderers alternative offer wish to offer equipment which tenderer considers advisable by reason of his own manufacturing requirement and experience would be acceptable provided descriptive matter, literature and complete certificates are submitted pointing out that the equipment/devices/arrangements as offered are equal or superior to that required by the accompanying specification with full justification. They shall furnish English translation of the relevant standards where the equipment conforms to any difference between other standards. Salient points of the standards adopted and those mentioned above shall be brought out. 1.2 a) PARTICULARS OF SYSTEM : i) Nominal system voltage : 33 KV ii) Highest system voltage : 36 KV iii) Frequency : 50 Hz iv) No. of phases : 03 v) Neutral earthing : Effectively earthed b) SERVICE CONDITIONS : The equipment should operate satisfactorily under the climatic conditions specified in this specification. The reference maximum ambient Air temperature may be taken as 50 Deg. C. as against 40 Deg. C. The permissible temperature rise for various equipment’s offered should therefore be derated accordingly. 1.2.1 CLIMATIC CONDITIONS: i) Peak ambient air temperature in shade. ii) Minimum ambient air temperature in shade. iii) Maximum relative humidity iv) Minimum relative humidity v) Dust storms are liable to occur from the period from March to July. vi) Height above mean sea level vii) Average number of thunder storm days per annum. viii) Average annual rainfall (Depending on area) ix) Number of months of tropical monsoon conditions p.a. 1.3 50 DEG C (-) 5 DEG C 95% 10% Less than 1000M 40 Days 10-100 cm June to Sept. PRINCIPAL PARAMETERS 1.3.1 CIRCUIT BREAKERS : a) Rating and characteristics of circuit breakers : 1. No. of poles : 2. Class : 3. Rated voltage : 4. Rated insulation level a) Light-ning impulse voltage : b) One minute power frequency : TN-01/4 3 Indoor 36 KV 170 KV (Peak) 70 KV (rms) withstand voltage. Rated frequency Rated normal current Short circuit breaking capacity Short time withstand current for 3 secs. 9. Protection class 10. Maximum opening time 11. Rated operating sequence 5. 6. 7. 8. b) : : : : 50 Hz 800 A 25 KA 25 KA : : : IP 5X Less than 3 Cycles O-0.3 Sec.-CO-3min-CO 12. Minimum operations at full rated short circuit breaking current. 13. Rated Breaking Capacity i) Symmetrical ii) Asymmetrical 14. Rated making capacity 15. Operating Mechanism : 100 : : : 16. Heater/Lamp/Socket : 25 KA As per relevant Standards 2.50x25 KA Motor operated Spring charged closing mechanism. 240 V A/C 17. Control Voltage : 110V DC : Characteristics of the operating mechanism of Circuit breaker and associated equipment : i) Method of operation : The circuit breakers shall be equipped with power operated mechanism to operate all the three phases simultaneously using universal motor operated spring closing mechanism. also be provided with hand operated The circuit 220/240V breakers shall spring closing mechanism. The Circuit Breaker shall have electrical and mechanical tripping arrangements under various conditions. In case of spring closing mechanism no main spring of the mechanism shall be plated, powder coated or given any other treatment so that spring property is not lost. ii) Number and type of spare, auxiliary switches/ contacts auxiliary switches : Adequate number of spare both of normally open and normally close type but not less than eight each shall be provided on the circuit breaker for use in the indication and controlling scheme of the circuit breaker. iii) Rated supply voltage and rated supply frequency : The rated voltage for the auxiliary supply shall be 240 V, 50 Hz AC supply. 1.3.2 DESIGN CRITERIA The bidder shall quote 36 KV Indoor type Vacuum Circuit Breakers conforming to M-2 class only. The equipment will be used in high voltage system having characteristics as listed in the specification. The equipment will be installed indoor in a hot, humid and tropical atmosphere. All equipment, accessories and wiring shall have tropical protection, involving special treatment of metal and insulation against fungus, insects and corrosion. The maximum temperature in any part of the equipment at specified rating shall not exceed the permissible limits as stipulated in the relevant standards and this specification. TN-01/5 The equipment shall be capable of withstanding the dynamic and thermal stresses of listed short circuit current without any damage or deterioration. The safety clearances of all live parts of the equipment shall be as per relevant standards. 1.3.3 CONSTRUCTIONAL FEATURES : a) The circuit breakers shall be triple pole metal clad truck mounted horizontal drawout type enclosed in cubicle made of CRCA sheet steel of minimum 3 mm thickness and shall comply with latest edition of relevant IS. The cubicle/ panels shall be vermin proof and dust tight. The cubicle shall be of folded type construction. The switchgears and control gear shall be complete with all necessary supporting frame work, nuts and bolts etc. for securing the same to the floor. The operating mechanism shall operate (close/open) all the three phases simultaneously. The operating mechanism, links etc. should be accessible for maintenance. Mechanical safety shutters should be provided between breaker and panel. Engagement and disengagement of auxiliary supply should be automatically linked through the movement of the truck so that in service condition auxiliary supply is automatically made. All six terminals shall brought out of cubicle through appropriate class of cable termination and sealing kits. All the breakers shall be supplied with necessary clamps suitable for appropriate current ratings. Suitable arrangement of earthing on the switchgear and control shall be gear panels provided. The arcing contacts shall be made of homogeneous special alloy so that surge voltages are reduced to negligible level and multiple arc reignition is eliminated. All the connecting bus bar & current carrying parts shall be made of copper for these indoor circuit b) breakers. For indoor panels, SWITCHGEAR (circuit breakers, CTs, PTs etc.) and controlgear (relays, meters etc.) shall be mounted on the same panel. A set of air insulated electrolytic copper bus bars having maximum current density 1.5 Amp./ mm2 with minimum cross sectional area of 720 mm2 with PVC sleeves or PVC insulation are to be provided for all indoor switchgear panels. The switchgear panels shall be provided with the arrangement for extending the bus bar and inter-connecting bus bars. Their supports, nuts and bolts etc. will be supplied loose. The region of such inter connection shall normally be blanked on panels. The bus bars should be of electrolytic copper with permissible limits of current density. Size of the bus bar and current density should be specified in the tender. The bus bar conductor shall conform to IS:8034. The bus bar shall be rated for 25KA for 3 Seconds. c) The following safety interlocks & features are required to be provided in the breaker:1) For VCB Chamber i) Rack in Operation from Test to Service:It should not be possible to rack in the VCB Truck unless & until the VCB is in switched off condition, VCB chamber door is closed, LV Control plug is connected & locked and the Cable earthing switch (if provided) is switched off. TN-01/6 ii) Rack Out Operation from Service to Test:It should not be possible to rack out the VCB Truck unless & until the VCB is in switched off condition. iii) For earthing switch in cable chamber: It should not be possible to operate the earthing switch unless & until the respective VCB Truck is in test condition. iv) The movement of VCB shall be duly interlocked so that it can not be racked in to service position in pre closed condition & it is not possible to rack out from service position in pre closed condition. Any attempt to close the VCB into intermediate position shall be blocked by sustained mechanical tripped command overriding on to the mechanism to avoid closure of the contacts of VCB. Any attempt to cause the movement of VCB shall initiate the tripping of a VCB and only thereafter the movement shall be facilitated. v) The mechanism shall be trip free type with inherent capability of O-CO operation. vi) The Circuit Breaker should be designed in such a manner that there should be proper metal compartmentalization of the various circuit breaker parts such as breaker chamber, Bus bar chamber & Cable chamber. vii) Test and service position limit switches shall be provided. viii) The provision should be made to avoid accidental contact & access to the high electrically stressed area by providing appropriate touch to safe metal screens when the VCB is posed into service position inside the cubical. ix) No separate VCB handling trolley shall be required to insert the VCB inside the panel. The VCB shall be floor rolling type. x) The VCB should be provided with proper interlock for the secondary isolating plug & socket type contacts so that it is not possible to insert the VCB from the test to service position unless the secondary plug socket is connected & it is not possible to remove the secondary plug socket into intermediate position & in service position. xi) The insulation used shall be non hygroscopic & non deformable type and it should be free from any partial discharge when exposed to sustain over voltages. xii) The VCB shall be completely type tested as per IEC 62271-100/200 or ISS. xiii) The operating instruments like switches etc shall be placed at height less than 1900mm. xiv) The total height of the panel should not exceed more than 2700mm and width should not exceed 1200mm. xv) The panel should be designed totally on air clearances basis with no dependency on the external shrouds & add on insulations. xvi) The panel shall have epoxy spout insulators between the bus bar & VCB chamber to have proper compartmentalization. TN-01/7 xvii) The bus risers shall be epoxy coated and should be integral part of the spout bushings. xviii) Entire bus bar compartment is provided with solid insulation scheme to have less dependency on the inter phase barriers. xix) The panel shall have rigid sheet steel construction for better stability and shall be self standing without the external bracings. xx) The panel should be designed to have gravity operated self resetting type pressure relief flaps to have internal arc fault proof design. xxi) The panel should have integral foundation frame. xxii) The CT’s shall be top terminal CT’s and mounted on the panel base frame to facilitate easy mounting and serviceability. xxiii) Adequate cable termination space of around 700mm shall be provided with facility to terminate 3 cables of 3CX400 sq. mm size. xxiv) Panel should be provided with independently operated, insulated type non metallic shutters with pad locking facility. The shutters shall automatically operate with the VCB trolley movement. xxv) The multi-core cable entry should be provided optimally from front or rear side of the panel. The necessary arrangement of cable entry from Left Hand/ Right Hand side through self-standing side cable boxes should also be made. xxvi) Hinges of door shall be concealed type to avoid rusting and obstructive opening of the door. xxvii) The quality of welding shall be good and there should not be any lumps and splatters on the panel”. xxviii) All the gasket shall be of chemically treated neoprene. xxix) Hole & Pin locking (Check nut) arrangement should also be provided while fixing the vacuum interrupter at bottom side. 1.3.4 VACUUM CIRCUIT BREAKER : The three phase vacuum circuit breakers will have three interrupters (one interrupter per phase) mounted on same carriage. interrupters shall be air The insulated in epoxy resin tank or with epoxy resin phase barriers. Each interrupter shall have fixed and moving contacts in sealed envelope having vacuum below 10-6 torr. The metallic bellow shall permit axial movement of moving contact and act as vacuum seal. The contacts shall good electrical and thermal have requisite conductivity and shall mechanical strength and be made of copper chromium alloy. Complete literature of vacuum bottles shall be furnished with the tender. The vacuum interrupter should be housed in epoxy pole unit and make of Vacuum Interrupter should be BEL, CGL, SIEMENS, ABB & ALSTOM /AREVA, MEGAWIN only. 1.4 VOLTAGE TRANSFORMERS : 1. Highest equipment voltage 2. No. of phases 3. Insulation level a) Impulse withstand voltage b) One minute power frequency : : 36 KV 3 : 170 KVP TN-01/8 withstand voltage on : i) Primary winding ii) Secondary winding 4. Frequency 5. Transformation ratio 6. Rated output 7. Accuracy class 8. Winding connection 9. Rated voltage factor : : : : : : : : 10.Type of insulation : 70 KV rms 2 KV rms 50 Hz. 33000/110 V 30 VA / phase 0.5 Star/Star 1.2 continuous and 1.5 for 30 seconds Resin cast VTs shall be provided with HRC type fuses on the secondary side. The VT fuses on primary side shall also be provided with all safety precautions. One of the secondary terminals of the VTs shall be solidly earthed. The panel shall be provided with draw out of 3 Nos. Single Phase Voltage Transformers. 1.5 CURRENT TRANSFORMERS : 1. Rated voltage 2. Insulation level a) Impulse withstand voltage b) One minute power frequency voltage on i) Primary winding ii)Secondary winding 3. Frequency 4. Rated continuous thermal 5. Short time thermal rating 6. Transformer CTs of ratio 7. Rated output/accuracy etc. for CTs. 8. 9. : 36 KV : 170 KVP : : : : : : 70 KV rms 03 KV rms 50 Hz 120% of rated primary current 25 KA for 3 Sec. 400-200/5-5A. a) Rated output However VA burden should not be less than suitable for A.C. series trip requirement with shunt trip arrangement. b) Class of accuracy c) Accuracy limit factor d) Purpose Max. instrument security factor Type of Insulation Resin Cast Core-I 30 VA 5P 15 Relaying - Core-II 15 VA 0.5 S Metering 5 36 KV current transformers shall be single phase. The core shall be of high grade non ageing laminated silicon steel of low hysteresis loss and high permeability to ensure high accuracy for both normal and fault current. 1.6 The rating of secondary winding shall be 5 Amps. However, the current transformers will have to satisfy the requirement of rated VA burden, class of accuracy, accuracy limit factor and short time specified in clause No. 3.5 at thermal rating all transformation as have been ratio. Magnetization curves corresponding to all secondary taps must be submitted with the tender. The ratings of current transformers of all classes regarding ratio error, knee point voltage, resistance of secondary winding etc. shall have to be co-ordinated with the requirements of protective any extra cost. TN-01/9 relays and protection scheme, without 1.7 Before commencement of supplies one No. panel with circuit breaker, VT etc. will have to be subjected to temperature rise test without extra charges in the presence of our Inspecting Officer. 1.8 The tenderer shall also arrangement, furnish schematic and along with the tender, complete outline diagrams indicating arrangement and position of current transformers, voltage blocks etc. Type of current transformer and voltage general the mounting transformer terminal transformer employed shall also be clearly stated. 1.9 INDICATING AND INTEGRATING METERS/INSTRUMENTS : 1.9.1 All indicating instruments shall be of switchboard type, back connected, suitable for flush mounting and provided with dust and vermin proof cases for tropical use and finished in suitable colour. All instruments shall means for adjustment of have practical laboratory accuracy. Only analog type indicating instruments shall be acceptable. The limits of errors for ammeters/voltmeters shall be those permissible for class 1.0 or better instruments as per IS:1248. The ammeters and voltmeters shall be suitably scaled to indicate the current/voltage for all the rating of current/voltage transformers. A phase selector switch with four/six position shall be used meters shall to be located measure at eye the current/voltage of each phase/line. The level to facilitate observation of readings correctly. 1.9.2 A.C. Static HT Trivector Meter : 3 phase 4 wire A.C. Static H.T. Trivector meter of accuracy class 0.5S for measurement of energy as per latest specification of JVVNL with DLMS protocol, shall be provided on each Outdoor VCB Kiosks. Following makes of HT TVMs are acceptable: i) Secure ii) L&T iii) ABB/Elster iv) Schlumberger v) Genus Infra Any other make being procured by Nigam shall also be acceptable. 1.10 RELAYS : The circuit breaker shall be fitted with shunt trip coil for operation on Numerical Over Current and Earth Fault relay. The coils should be rated for 110VDC operation on station battery. Three phase protection relays shall be Numerical Over-current & Earth Fault protection having 3 element for over current and one for earth fault protection with instant trip. The setting for over-current shall be 50-200% (continuous range) and for earth fault element from 5 to 80% (continuous range). These relays shall be non directional with selectable curve for all standard IDMT curves. The numerical relays shall have following features:i. Self Diagnosis ii. Minimum last five abnormal events recording (over current & earth fault) indicating fault current and phase, along with Date & Time. TN-01/10 iii. On-line display of current. iv. Communicable with open Protocol having RS-485 port. v. Instantaneous Over-Current Protection with adjustable timer. vi. Breaker Failure detection. vii. In-built Circuit Breaker Trip Circuit Supervision function during pre closing and post closing of Circuit Breaker. viii. DC supervision. ix. Very low burden on CT (less than 0.5VA) x. Continuous monitoring of module’s internal hardware and alarm generation in case of failure of any critical components. xi. 5 Digital Output contacts for local alarm as well as tele-signalling. The relay shall be numerical type mounted in flush pattern on the panel board. The relay should be rated for 5 Amp. CT secondary. The relay should conform to relevant ISS. The tenders shall furnish the detail in this regard along with the offer. All the relays shall be provided with test blocks in panel so designed that the relays may be tested in situ. The relays should have provision of testing either through test block or test plug easily accessible by injecting the voltage / current/frequency (as applicable) from external testing instruments /source without first disconnecting/ reenergizing the primary electrical circuit protected by the relays. Facilities for isolating the tripping circuit during such testing shall also be provided. Relay TTB shall have trip bypass arrangement. The requirement of test block shall not be applicable in case of drawout type relays which can be tested by using test plug without removing the relay from its casing. The testing facilities provided in the relays shall be specifically stated in the bid. One test plug with five panels or part thereof are to be supplied. The Following makes of Relays are acceptable:a. Areva. f. JVS b. ABB. g. SEL c. Easun Reyrolle h. ASHIDA d. C&S i. MEGAWIN e. Crompton j. Stelmec The technical suitability of relays/schemes may also be examined by Protection Wing & acceptability will be judged appropriately. The successful bidder must furnish type test reports as per relevant ISS/ IEC along with bid to suit the environmental conditions of our State, in respect of the relay (of the type and design offered) which should have been type tested in NABL accredited test laboratory in respect of such tests for which the lab has been accredited (for Indian make Relays)/ CPRI/ Nationally accredited testing laboratory (for Foreign make Relays). These type test reports should not be older than five years from the date of opening of bid. Bids without Type Test reports will be treated as Non-Responsive. Any other equivalent make of relays shall also be acceptable subject to prior approval of S.E. (JCC), JVVNL, Jaipur. TN-01/11 1.11 WIRING : All wiring shall be of switch board type consisting of copper conductor of 1.5 Sq. mm. for alarm / annunciation / control circuits and 2.5 Sq.mm. for CT and all other Circuits insulated with polyvinyl chloride insulation suitable for 660 Volt and in accordance with relevant service IS:732. Polyvinyl Chloride used shall have excellent resistance against burning, moisture, oil and vermin and shall be finished with clear colour. shall furnish Rubber insulated wiring shall not be acceptable. Tenderers the details of method being adopted by them for Joint/ Connections. All instruments and Panel wiring shall be of heat resisting and self extinguishing type in compliance with IS. Plastic or porcelain cleats of the limited compression type shall be used for holding wiring runs. All wires shall be suitable for bending to meet the terminal studs at right angles. Metal cases of all apparatus mounted on panels shall be separately earthed by means of copper wire or strips. The following colour scheme of the wiring shall be used as per IS:375. a) AC three phase circuits : i) No.1 Phase No.2 Phase No.3 Phase ii) Neutral Conductor iii) Connection to Earth b) D.C. circuits 1.12 MIMIC DIAGRAM : : : : : : : Red. Yellow. Blue Black Green Grey For indoor panels painted colour bands shall be used for the mimic bus. The mimic diagram shall be on eye level. Equipments such voltage transformers etc. shall be represented by as current transformers, suitable symbols. The colour shall be Red Shade 537 of IS-5. 1.13 INDICATING LEDs: Indicating LEDs shall be provided on the control board to indicate the following: 1. Visual indication of ON and OFF position of each circuit breaker. 2. Trip circuit healthy indication. 3. Auto trip indication for each circuit breaker panel. 4. VT supply indication. Each lamp body shall be of moulded insulation and shall be able to withstand a high voltage test of appropriate value. All LEDs shall be suitable for 240 V AC supply and shall have low power consumption and shall provide a wide illumination of sufficient intensity angle of for comfortable viewing. A glass of appropriate colour shall be screwed into the front of the LED. The design of LED shall be such as to facilitate replacement of defective LEDs. An engraved label indicating the purpose of the LED shall be provided with each LED. 1.14 TEST TERMINAL BLOCKS : Two nos. test terminal blocks shall be provided one for testing of relays and other for testing meters. They shall be of switch board, back connected type for front of panel mounting. The test blocks shall provide complete isolation of meters, instruments, etc. and the arrangement shall be such that testing power could be TN-01/12 connected at the test block from any external source or may be taken from the instrument transformers. Provision shall be made for short circuiting current transformers. Suitable sealing arrangement shall be provided in test terminal blocks. 1.15 FERRULES : Ferrules engraved/printed with the same number, letters or symbols as indicated in the connection and wiring diagram shall be provided on the terminal ends of all wires for identification of circuits for inspection and maintenance. Ferrules shall be of strong and flexible insulating material with glossy finish to prevent adhesion. They shall be engraved / printed and clearly marked and shall not be effected by dampness. Ferrule numbering shall be in accordance with IS:375. The same ferrule number shall not be used on wires in different circuits on a panel. 1.16 SPACE FOR CABLES AND CABLE GLANDS : Sufficient space for receiving the cables inside the switch board at the bottom of the cubicles and mounting arrangement for the terminal cable glands shall be provided. Cable gland plates should be above the ground level for the ease of working. 1.17 PAINTING & FINISHING: All interiors and exteriors of switchgear enclosure, breaker mechanism etc shall be finished and painted to produce a neat, fire resistant and durable surface which would prevent rusting and corrosion. Sheet metal component shall be pre-treated using 7 tank phosphating process consisting of de-greasing, acid pickling, derusting, phosphating and passivation including repeated rinsing in between. On completion of the passivation of the components, they shall be preheated and then epoxy powder coated or treated with one coat of primer & zinc chromate and finished with two coats of light gray enamel paint of shade 631 of IS 5 and stoved to achieve excellent anti-rusting and scratch resistant properties. The thickness of painting shall be around 60 microns. 1.18 SCHEDULE OF REQUIREMENTS : The requirement of circuit breakers shall be as per Clause No. 3.31. At a particular substation one or two transformers can be controlled through one breaker depending upon the necessity. Each of these breakers shall be equipped as per clause No. 3.19. 1.19 SCHEDULE OF EQUIPMENT : Item No. 1 (TRANSFORMER TYPE) 36KV/800 Amp. VCB Switchgear panel for indoor installation: 1. 36KV/800A Vacuum Circuit Breaker 1 No. drawout type with provisions of manual tripping by means of a control switch/push button. 2. Motor Charged Spring operated closing mechanism. TN-01/13 1 No. 3. Numerical 3 0/C + E/F relay 1 No. 4. Single phase 36 KV current transformers 3 Nos. of ratio 400-200/5-5A suitable for metering and protection. The class of accuracy shall be 0.5 S for metering and 5P15 for protection. Rated burden (output) shall be 30 VA for protection & 15 VA for metering for each secondary core. Instrument security factor for metering core shall not exceed 5. 5. Flush type switchboard mounting pattern 1 No. Analog voltmeter of class 1.0 or better accuracy suitable for 110 V phase to phase secondary scaled for 0-40 KV. 6. Voltmeter phase selector switch to 1 No. indicate phase to phase and phase to neutral voltage of all the three phases. 7. Indicating LEDs coloured red, amber and 3 Nos. blue for PT supply indication. 8. Arrangement for reception of incoming and 2 Nos. outgoing cable connection along with cable termination and sealing kits for 3 C x 400 mm sq. XLPE power cables. 9. Set of three phase air insulated main electrolytic copper bus bars of 800A continuous current rating having maximum current density 1.5 Amp./ Sq. & minimum cross sectional area 720mm Sq. with PVC insulation or sleeves. STC rating 25KA for 3 seconds. The busses within the cubical shall be of high conductivity electrolyte grade copper. The Bus bar joints shall be silver plated and bolted in such a manner that initial contact pressure around the square headed high tensile bolt will remain substantially undiminished at all temperature upto rated full load temperature. The Bus support and bushings shall be of epoxy resin cast type. All drop off from main bus to VCB and VCB to bushing terminations shall be suitable for current rating of circuit breaker . All the bus bar shall be sleeved with heat shrinkable sleeves of 36 KV voltage level (Insulated for a service TN-01/14 1 No. voltage of 36 KV) and bus bar shall be shrouded wherever possible. All the bus bar joints shall be shrouded and where shrouding is not possible, it shall be taped with HV self amalgamation tape. All the tap off bus bar connections inside panel and PT jumpers shall be sleeved with HT heat shrinkable sleeves. Special care shall be taken in the design of bus bar system to provide for thermal expansion and to minimize the chances of bus fault. Bimetallic washers shall be provided at the joints of two different metal surfaces. The bus supports and bushings shall be non hygroscopic non aging glass reinforced polymer. 10. Mechanical ON/OFF indicator. 1 No. 11. Operating handle for independent manual 1 No. closing mechanism. 12. Red indicating LED for ON indication. 1 No. 13. Green indicating LED for OFF indication. 1 No. 14. Auxiliary switch having minimum of 8 1 No. contacts 8 normally open and 8 normally closed. 15. Flush mounting pattern analog ammeter of class 1 No. 1.0 accuracy or better for 5 Amps. CT secondary scale 0-200/400 A. 16. Ammeter selector switch to indicate phase 1 No. current in all three phases and with OFF position. 17. AC HT Tri vector meter 1 No. 18. Auxiliary Relay type VAA 33 or equivalent 2 Nos. For transformer protection functions. 19. Trip Circuit Supervision Relay 1 No. 20. D.C. Supervision Relay 1 No. 21. Annunciator 16 window 1 No. 22. High Speed Trip Relay 1 No. 23. Semaphore indicators As per requirement 24. Three Position control switch for circuit 1 No. Breaker & Annunciation window 26. Automatic door CFL with Switch. 1 No. 27. 240V, 2 Nos. 80W AC single phase anti condensation heaters with thermostat (0-60 eg. C) and switch. 28. Anti pumping contactor. 1 No. TN-01/15 29. Operation Counter. 1 No. 30. Test terminal blocks for metering and 2 Nos. relays, 3 phase 4 wire. 31. Fault trip yellow LED. 1 No. 32.Ground bus system, size 50x6mm copper 1 No. may be provided and the earthing stud shall be capable of withstanding rated short circuit current and stud design shall be as per IS-133427 or IEC -200. 33. Bell for Alarm 1 No. 34. Hooter for Alarm 1 No. 35. 3 Pin Socket with switch 1 No. 36. 2 Pin Socket with switch 1 No. 37. Auto Trip Lamp 1 No. Item No. 2 (FEEDER TYPE) 36KV/800 Amp. VCB Switchgear panel for indoor installation: 1. 36KV/800A Vacuum Circuit Breaker 1 No. drawout type with provisions of manual tripping by means of a control switch/push button. 2. Motor Charged Spring operated closing 1 No. mechanism. 3. Numerical 3 0/C + E/F relay 1 No. 4. Single phase 36 KV current transformers 3 Nos. of ratio 400-200/5-5A suitable for metering and protection. The class of accuracy shall be 0.5 S for metering and 5P15 for protection. Rated burden (output) shall be 30 VA for protection & 15 VA for metering for each secondary core. Instrument security factor for metering core shall not exceed 5. 5. 33000/110 Volts three single phase voltage transformers 1 Set having 30 VA/phase burden and class of accuracy 0.5. The transformer shall be star-star connected. 6. Flush type switchboard mounting pattern 1 No. Analog voltmeter of class 1.0 or better accuracy suitable for 110 V phase to phase secondary scaled for 0-40 KV. 7. Voltmeter phase selector switch to indicate phase to phase and phase to neutral voltage of all the three phases. TN-01/16 1 No. 8. Indicating LEDs coloured red, amber and 3 Nos. blue for PT supply indication. 9. Arrangement for reception of incoming and 2 Nos. outgoing cable connection along with cable termination and sealing kits for 3 C x 400 mm sq. XLPE power cables. 10.Set of three phase air insulated main 1 No. electrolytic copper bus bars of 800A continuous current rating having maximum current density 1.5 Amp./ Sq. & minimum cross sectional area 720mm Sq. with PVC insulation or sleeves. STC rating 25KA for 3 seconds. The busses within the cubical shall be of high conductivity electrolyte grade copper. The Bus bar joints shall be silver plated and bolted in such a manner that initial contact pressure around the square headed high tensile bolt will remain substantially undiminished at all temperature upto rated full load temperature. The Bus support and bushings shall be of epoxy resin cast type. All drop off from main bus to VCB and VCB to bushing terminations shall be suitable for current rating of circuit breaker . All the bus bar shall be sleeved with heat shrinkable sleeves of 36 KV voltage level (Insulated for a service voltage of 36 KV) and bus bar shall be shrouded wherever possible. All the bus bar joints shall be shrouded and where shrouding is not possible, it shall be taped with HV self amalgamation tape. All the tap off bus bar connections inside panel and PT jumpers shall be sleeved with HT heat shrinkable sleeves. Special care shall be taken in the design of bus bar system to provide for thermal expansion and to minimize the chances of bus fault. Bimetallic washers shall be provide at the joints of two different metal surfaces. The bus supports and bushings shall be non hygroscopic non aging glass reinforced polymer. 11. Mechanical ON/OFF indicator. 1 No. 12. Operating handle for independent manual 1 No. closing mechanism. 13. Red indicating LED for ON indication. TN-01/17 1 No. 14. Green indicating LED for OFF indication. 1 No. 15. Auxiliary switch having minimum of 8 1 No. contacts 8 normally open and 8 normally closed. 16. Trip Circuit Supervision Relay 1 No. 17. D.C. Supervision Relay 1 No. 18. Annunciator 8 window 1 No. 19. High Speed Trip Relay 1 No. 20. Semaphore indicators As per requirement 21. Three Position control switch for circuit 1 No. Breaker & Annunciation window 22. Flush mounting pattern Analog ammeter of class 1 No. 1.0 accuracy or better for 5 Amps. CT secondary scale 0-200/400 A. 23. Ammeter selector switch to indicate phase 1 No. current in all three phases and with OFF position. 24. AC HT Tri vector meter 1 No. 25. Automatic door CFL with Switch. 1 No. 26. 2 Nos. 240V, 80W AC single phase anti condensation heaters with thermostat (0-60 Deg. C) and switch. 27. Anti pumping contactor. 1 No. 28. Operation Counter. 1 No. 29. Test terminal blocks for metering and 2 Nos. relays, 3 phase 4 wire. 30. Fault trip yellow LED. 1 No. 31.Ground bus system, size 50x6mm copper 1 No. may be provided and the earthing stud shall be capable of withstanding rated short circuit current and stud design shall be as per IS-133427 or IEC -200. 1.20 32. Bell for Alarm 1 No. 33. Hooter for Alarm 1 No. 34. 3 Pin Socket with switch 1 No. 35. 2 Pin Socket with switch 1 No. 36. Auto Trip Lamp 1 No. All equipment’s shall be complete in all respect. All apparatus which usual/necessary for may fittings, accessories or not have been mentioned above but which are the equipment’s shall be included for panel. 1.21 OPERATING AND MAINTENANCE INSTRUCTIONS : TN-01/18 each circuit breaker The successful immediately tenderers, on receipt 20 sets of the of order erection/operating shall arrange to dispatch and maintenance instruction manuals along with the requisite drawings of the equipment’s covered by this specification to this office for approval. Two sets of these, one set in English and one in Hindi will also be forwarded to the consignee along with each equipment. 1.22 TEMPERATURE RISE : The maximum temperature rise of various parts of the circuit breakers when tested under rated ambient temperature conditions shall not exceed the specified values at a peak of 50 deg. c. The breakers may be plated contacts if necessary to meet provided with the requirement of IS:13118 where higher temperature rise is permitted with silver plating contacts. The quantity facing shall be such that after carrying out operations specified for the silver one tenth of silver of the total number of mechanical endurance test, there is still continuous layer of silver on the contacts. The temperature rise of CTs and PTs shall also not exceed the permissible values as per relevant Indian Standards when corrected for max. ambient temperature at site. 1.23 NAME/RATING PLATE : All items of equipment included in this specification shall be provided with rating plates as per relevant standards and in addition with following particulars:Name & Address of Supplier Telephone No. Fax No. Date of Despatch Date of Expiry of Warranty Name of Purchaser TN No. : : : : : : : It will be mandatory for the supplier to punch TN No., Sr. No. & Make on two positions of the circuit breaker panel. 1.24 INSPECTION AND TESTING : 1.24.1 Each equipment shall comply with and shall be subjected to all routine and acceptance tests prescribed in the relevant Indian Standard Specification/IEC. 1.24.2 TEST OF 36KV INDOOR CIRCUIT BREAKER : i) ROUTINE/ACCEPTANCE TESTS: The following acceptance and routine tests shall be got conducted in presence of purchaser's representative as per stipulation of the relevant standards, on each unit. a) One minute power frequency voltage withstand dry test on main circuit. b) Voltage withstand test on control & auxiliary circuits. c) Measurement of insulation resistance of main circuit. d) Mechanical operation test. e) Design and visual checks. f) Any other tests not specified above but covered as edition of relevant IS/IEC. TN-01/19 per amendment/ latest ii) Inspection & tests on control gear : In addition to the above tests at 3.23.2(i) above specified by IEC, the following shall also be performed at manufacturer’s works in the presence of purchaser’s representative after completely assembling the kiosk. a) Checking wiring of circuits and their contacts. b) Insulation resistance of complete wiring, circuit by circuit with all equipment mounted on the panels. c) Checking and operational protective schedule and instruments meters. d) Checking of phase faults between R&Y, Y&B and B&R phases. Breaker should trip under all three conditions. iii) Temperature Rise test on One No. Breaker in the first offered lot shall also be done in the presence of the purchaser’s representative. iv) TYPE TESTS CONDUCTED ON MATERIAL AS PER RELEVANT STANDARDS : a) Dielectric tests. i) Lightning Impulse Voltage Test. ii) One Minute Power Frequency Test(Wet & Dry). b) Short time with stand current and peak withstand current test. c) Basic short circuit duties test. d) Single phase short circuit test. e) Mechanical Operation Test as per M-2 class. f) Out of phase making & breaking test. g) Capacitive Current Switching Test. i) Cable Charging Test. ii) Single Capacitor Bank Current Switching Test. h) Measurement of insulation resistance of main circuit. i) Temperature rise test. j) IP-5X test (for cubicle/control cabinet). k) Any other type tests not specified above but covered as per amendment / latest edition of relevant IS/IEC Where permitted in the relevant standard, a test specimen for type test may be a representative sub-assembly/ a representative functional unit. An individual type test is acceptable for a change of constructional detail, for any change in the design/type of type test report and the design/type offered against this specification, if the manufacturer can demonstrate and purchaser is satisfied that this change does not influence the result of the individual type test. The bidder may bring out in offer all such changes made in components, materials, design etc. as the case may be. The purchaser will interpret the meanings of drawings and specifications and shall have the power to accept/reject any type test which in his judgment is/is not in a manner acceptable to him. The decision of Purchase Committee in this matter shall be final and binding to all.” 3.24.3 The type test reports of Circuit Breakers, Current Transformers, Relays, meters etc. shall be complete Transformers, in all respect Potential along with oscillographic records, photographs etc. in respect of all type tests as per relevant ISS/IEC. TN-01/20 The type test certificates should be in respect of specific make and type / rating of the and Circuit not Breakers/ instruments, transformers etc. intended to be supplied in respect of the breakers etc. manufactured by their foreign collaborators if any. 3.24.4 Routine & acceptance test as per relevant standard shall be carried out on each equipment covered by this specification in the presence of purchaser's representative. If so desired by the purchaser all test reports shall be submitted and got approved from the purchaser before dispatch of the equipment. Before commencement of supplies one panel complete with Circuit Breaker, VT etc. will be subjected to temperature rise test in the presence of our Inspecting Officer. 3.24.5 INSPECTION AND TESTS OF CONTROL GEAR : All the tests (as mentioned at Clause 3.23.2(i)) and Inspection shall be made at the bidder place of manufacturer unless otherwise especially agreed upon by and purchaser at the time of purchase. The bidder shall inspection officer(s) representing the purchaser all the afford the reasonable facilities without charges, to satisfy him that the material is being furnished in accordance with this specification. The purchaser has the right to have the tests carried out at his own cost by an independent agency whenever there is a dispute regarding the quality of supply. The Inspection may be carried out by the purchaser at any stage of manufacture/ before dispatch as per relevant standard. Inspection and acceptance of any material under the specification purchaser, shall not relieve the bidder by the of his obligation of furnishing material in accordance with the specification and shall not prevent subsequent rejection if the material is found to be defective. The Bidder shall keep the purchaser informed in advance, about manufacturing programme so that arrangements can be made for inspection. The purchaser reserves the right to insist for witnessing the acceptance/ routine testing of the bought out items. The Bidder shall give 15 days advance intimation to enable the purchaser to depute his representative for witnessing the acceptance and routine tests. 3.25 INTER CHANGEABILITY : All similar materials and removable parts of similar equipments shall be inter changeable with each other. 3.26 TITLE PLATES: A Title plate bearing the name & purpose of each panel shall be fixed on the top of each indoor panel. 3.27 FAULT / TROUBLE ALARM SCHEME : The automatic trip of the Circuit Breaker due to operation of protection relays shall be indicated by sounding of a hooter. All non-trip alarms shall be indicated by an alarm bell. TN-01/21 3.28 MAKE AND TYPE OF BOUGHT OUT ITEMS : 3.32.1 The following make of bought out items will be acceptable to department : ------------------------------------------------------------------------------------------------S.No. Name of Item Make ------------------------------------------------------------------------------------------------1. Indicating Instrument AE/IMP/MECO (Analog type) 2. Indicating Instrument AE/IMP/MECO (Digital type) 3. Control Switch for Circuit ALSTOM/RECOM/SWITRON/ Breaker/Trip Transfer. KAYCEE 4. Selector Switch for Voltmeter/Ammeter SWITRON/KAYCEE/RECOM 5. Semaphore Indicator ALSTOM/DAV IND./ER 6. Indicating Lamp ALSTOM/TEKNIC/ VAISHNO/DAV 7. Annaunciator MINILEC/YESHMUN/ INSTALRAM/PROTON/ JVS/PRADEEP/ALAN 8. Push Button TEKNIC/VAISHNO/ESSEN 9. A.C. Hooter/Bell TARGET/INDUSTRIAL HOOTER/ALAN/JVS 10. D.C. Hooter TARGET/INDUSTRIAL HOOTER/ALAN/JVS 11. 12. 13. 14. 15. Heater SOFIA/ELTER/AIREX/KAYCEE Link Type test terminal block for testing of TVM CFL Tube IMP/CAPITAL PHILIPS/CROMPTON/BAJAJ 2 Pin/3 Pin socket with Switch (5/15A) Relays ISI MARK Areva/ABB/Easun Reyrolle/ C&S JVS/SEL/ASHIDA/MEGAWIN 16. HT TVM Secure/L&T/ABB/Elster/Schlumberger Other makes shall also acceptable if it is of "ISI MARK" or type tested for which tenderers shall furnish attested photo state copies of ISI Certificate/type test report not older than 5 years for the respective make offered with the prior approval of SE(MM) JVVNL, Jaipur. 3.32.2 Make / type of each relay, indicating control switches, instruments, integrating selector switches, indicating lamps, indicators, enunciator scheme, bell, hooter etc. shall be clearly instruments, semaphore and invariably indicated in the GTP (Guaranteed Technical Particulars), bill of material and unit price list. Only specific "EQUIVALENT/REPUTED make MAKE" accessories shall be indicated. will not TN-01/22 be given The for consideration. word 3.33 BILL OF MATERIAL : The firm shall furnish the bill of material for Indoor VCB Panel separately. 3.35 Desirable Features Required for Safety and Smooth functioning of the Circuit Breaker: As these breakers are to be installed inside the control room therefore the features related with the operators safety is of the paramount importance. A) Vacuum Circuit Breaker : i) The VCB shall be totally drawn out type with racking gears with distinct test & service positions. The contact wipe shall be independent of the manual intervention. ii) The movement of VCB shall be duly interlocked so that it can not be racked in to service position in pre closed condition & it is not possible to rack out from service position in pre closed condition. Any attempt to close the VCB into intermediate position shall be blocked by sustained mechanical tripped command overriding on to the mechanism to avoid closure of the contacts of VCB. Any attempt to cause the movement of VCB shall initiate the tripping of a VCB and only thereafter the movement shall be facilitated. iii) The mechanism shall be trip free type with inherent capability of O-CO operation. iv) The Auxiliary switch shall be 8 N/O + 8 NC contacts. v) keeping in view on unmanned substation and grid complexity, the rated operating sequence shall be of rapid auto-reclosing duty as O-0.3sec-CO-3min-CO. vi) In view of frequent operations encountered in the distribution system, it is highly beneficial to Nigam to opt for M2 Class mechanism (suitable for 10000 mechanical endurance operations as per latest IEC-62271-100) as against M1 Class mechanism (suitable for 2000 mechanical endurance operations) which will give long trouble free performance, thus saving huge life cycle costs in terms of maintenance and man power cost. vii) The Circuit Breaker should be design in such a manner that there should be proper metal compartmentalization of the various circuit breaker parts such as breaker chamber, Bus bar chamber & Cable chamber. viii) Test and service position limit switches shall be provided. ix) The provision is made to avoid accidental contact & access to the high electrically stressed area by providing appropriate touch to safe metal screens when the VCB is posed into service position inside the cubical. x) No separate VCB handling trolley shall be required to insert the VCB inside the panel. The VCB shall be floor rolling type. xi) The VCB is provided with proper interlock for the secondary isolating plug & socket type contacts so that it is not possible to insert the VCB from the test to service position unless the secondary plug socket is connected & it is not possible to remove the secondary plug socket into intermediate position & in service TN-01/23 position. This interlock as per IEC 60298 is an inherent part of the VCB & panel design. xii) The vacuum interrupter is housed into epoxy pole unit to have better environmental protection & safe operation under the fatal conditions. The bellow for the VI shall be of stainless steel. xiii) The insulation used shall be non hygroscopic & non deformable type and it is free from any partial discharges when exposed to sustain over voltages. xiv) The VCB shall be completely type tested as IEC 62271-100/200 or ISS xv) The VCB shall be Tested for E2, M2, C2 test duties. 1. B) VCB Panel features : i) The panel shall be totally dust and vermin proof & has degree of protection – IP5X. ii) The operating instruments like switches etc shall be placed at height less than 1900mm. iii) The total height of the panel should not exceed more than 2700mm and width 1200mm. iv) The panel is designed totally on air clearances basis with no dependency on the external shrouds & add on insulations. v) The panel shall have epoxy spout insulators between the bus bar & VCB chamber to have proper compartmentalization. vi) The bus risers shall be epoxy coated and is integral part of the spout bushings. vii) Entire bus bar compartment is provided with solid insulation scheme to have less dependency on the inter phase barriers. viii) The panel shall have rigid sheet steel construction for better stability and shall be self standing without the external bracings. The sheet thickness should not less than 3mm. ix) The panel is designed to have gravity operated self resetting type pressure relief flaps to have internal arc fault proof design. x) The panel is having integral foundation frame. xi) The CT’s shall be top terminal CT’s and mounted on the panel base frame to facilitate easy mounting and sevicibilty. xii) Adequate cable termination space of around 700mm shall be provided with facility to terminate 3 cables of 3CX400 sq. mm size. xiii) Panel is provided with independently operating insulated type non metallic shutters with pad locking facility. The shutters shall automatically operate with the VCB trolley movement. xiv) The panel shall be provided with draw out type of 3 No. single phase PT’s. xv) The multi-core cable entry can be provided optimally from front or rear side of the panel. Cable entry from LH/RH side through self standing side cable boxes. TN-01/24 Desirable Features for Relay : i) Numerical 3 over current and Earth fault relay with instant trip. ii) Instantaneous Over-Current Protection with adjustable timer. iii) Breaker Failure detection. iv) In-built CB Trip Circuit Supervision function during pre closing and post closing of CB. v) DC supervision. vi) Disturbance Recorder. Up 1 sec of actual waveform of current along with logical and physical status, are captured & saved in the built-in memory with date time stamping, for analyzing fault condition & fault location. vii) Fully communicable with IEC standard open protocol. viii) Separate Communication Port for SCADA (RS485) as well as Local testing (RS232C) ix) Very low burden on CT (less than 0.5VA) x) Continuous monitoring of module’s internal hardware and alarm generation in case of failure of any critical components. xi) Facility to synchronized Relay time from SCADA xii) 5 Digital Output contacts for local alarm as well as tele-signalling. TN-01/25 TECHNICAL SPECIFICATION FOR 36 KV OUTDOOR VACUUM CIRCUIT BREAKERS 1. SCOPE : This specification is intended to cover the design, manufacture, assembly, testing at manufacturer's works, supply, delivery, installation & commissioning of 36 KV Outdoor Vacuum Circuit Breakers Complete with all materials and accessories for efficient and trouble 1.1 It free operation. is not the intent to specify completely herein all details of the design and construction of equipment’s. However, the equipment shall conform in all respects to high standards of engineering, design and workmanship and shall be capable of performing in continuous commercial operation upto the Bidder's guarantee in a manner acceptable to the Purchaser, who will interpret the meanings of drawings and specifications and shall have the power to reject any work or material which in his judgment is not in accordance therewith. The offered equipment shall complete with all operation along with Such components of components necessary associated for its effective and trouble be free equipments, interlocks, protection schemes etc. shall be deemed to be within the scope of supply, irrespective whether those are specifically brought out in this specification and/or the commercial order or not. 2.0 2.1 STANDARDS : The circuit breaker shall conform to the available at the time of testing of relevant latest revisions with amendments standards, rules and codes, some of which are listed herein for ready reference:-. IS:13118/IS-3427/ IS:10118 (Part-III) – 1982/ IS:2165-1977/ IS:3716-1976/ IEC62271-100/ IEC-62271200 (with latest amendments) IS: 3156 IS: 2705 IS: 3231 IS:1248 IS:14697-1999 IEC-62053-22-2003 IEC-62052-11-2003 CBIP Technical Report No.88 revised July, 1996 read with amendment issued (April,99, September,99 and also any other amendment thereafter). 2.2 Circuit Breaker/ and control gear. metal enclosed Switchgear Voltage transformers. Current transformers. Electrical Relays for power system. Meters and Instruments Specification for AC static transformer operated watt hour and VAR hour meters class 0.2 S & 0.5 S. Specification for AC Static Watt hour Meters, class 0.2 S & 0.5 S. Specification for AC Static Electrical Energy Meter. Equipment meeting with the requirements of any other authoritative standards, which ensure equal or better quality than the standard mentioned above shall also be acceptable. If the equipment offered by the Bidder conforms to any other standard adopted and the specific standards shall TN-01/26 be clearly brought out in relevant schedule. Four copies of such Translations, shall 3. be standards with authentic English furnished along with the offer. CLIMATIC CONDITIONS : Equipment to be supplied against this specification shall be suitable for satisfactory continuous operation under the following tropical conditions :i) Peak ambient air temperature in shade. ii) Minimum ambient air temperature in shade iii) Maximum relative humidity. iv) Minimum relative humidity v) Dust storms are liable to occur during the period vi) Height above mean sea level vii) Average number of thunder storm days per annum. viii) Average annual rainfall (Depending on area) ix) Number of months of tropical monsoon conditions p.a. Note : Climate may be moderately hot and humid fungus growth. The ambient conditions. climatic 50 DEG C (-) 5 DEG C 95 % 10 % from March to July less than 1000M 40 DAYS 10-100 cm 4 tropical conducive to rust and conditions are also prone to wide variations in Smoke is also present in the atmosphere. Heavy lightning also occurs during June to October. 4. PRINCIPAL PARAMETERS OF CIRCUIT BREAKERS : 4.1 TYPE AND RATING 4.1.1 Type 36 KV Vacuum Circuit Breaker 4.1.2 Service Outdoor 4.1.3 Pole 3 4.1.4 Rated voltage (nominal/max.) 4.1.5 Rated frequency 50 Hz 33/36 KV 4.1.6 System Neutral earthing Effectively grounded. 4.1.7 INSULTATION LEVEL 4.1.7.1 Impulse withstand voltage 170 KVp 4.1.7.2 One minute power frequency withstand voltage. 70 KV rms 4.1.8 Rated Current 4.1.8.1 Continuous at 50 C. 1250 A 4.1.8.2 Short time current for 3 Sec. 4.1.9 25 kA Rated Breaking Capacity 4.1.9.1 Symmetrical 25 KA 4.1.9.2 Asymmetrical As per relevant standard TN-01/27 4.1.10 Rated making capacity 2.5 x 25 KA 4.1.11 Rated short time with stand current for 3 secs. 25 KA 4.1.12 a) Total break time b) Total closing time 3 cycles(Max.) 4 cycles (Max.) 4.1.13 Creepage distance 900 mm or more 4.1.14 Mounting. Steel Pedestal. 4.1.15 Operating duty For gang operation O-0.3Sec.-CO-3min-CO 4.1.16 Operating Mechanism Spring charged closing mechanism or magnetic actuator. Motor operated 4.1.17 Auxiliary voltage. 110 VDC 4.1.17.1 Spring charging Motor 230V/415V AC 4.1.17.2 Heater/Lamp/Socket. 4.1.18 230V AC Terminal Connector 4.1.18.1 Type Alluminium Alloy Type clamp suitable for both horizontal /vertical take off Bimetallic/ 4.1.18.2 Suitable for ACSR Conductor 4.2 4.2.1 10% Panther and 90% Dog Conductor System details H.V. System Voltage (Nominal/Max.) 33 KV /36 KV Phases 4.2.2 3 System Neutral Effectively earthed. Fault level 25 KA rms Auxiliary power Supply 4.2.2.1 A.C. Supply 1. 415 volts 3 ph 4 W 50 Hz 2. 230V 1 Ph 2 W 50 Hz 110 V 2 wire. 4.2.2.2 D.C.Supply 4.3 4.3.1 Symmetrical Supply point. Auxiliary power supplies listed above will be made available to each circuit breaker as below : AC supply. Single feeder. TN-01/28 DC supply. Single feeder. 4.3.2 Isolating switch fuse unit shall be provided at the circuit breaker for each incoming supply. For DC supply double pole throw switch shall be provided. 5. 5.1 GENERAL TECHNICAL REQUIREMENTS : DESIGN CRITERIA : The 36 KV Outdoor VCBs shall be conforming to M-2 Class. The used in high voltage system having characteristics equipment will be as listed in the specification. The equipment will be installed outdoor in a hot, humid and tropical atmosphere. involving All equipment, accessories and wiring shall have tropical protection, special treatment of metal and insulation against fungus, insects and corrosion. The maximum temperature in any part of the equipment at specified rating shall not exceed the permissible limits as stipulated in the relevant standards even at an ambient temperature of 50 Deg.C. The equipment shall be capable of withstanding the dynamic stresses of listed short and thermal circuit current without any damage or deterioration. The safety clearances of all live parts of the equipment shall be as per relevant standards. 5.2 5.2.1 SPECIFIC REQUIREMENTS : The circuit breaker shall be for outdoor installation, three pole vacuum type, having internal isolation without any sequential interlock. The duty of the circuit breaker shall involve satisfactory interruption of short circuit currents as listed in the specification. 5.2.2 CONSTRUCTIONAL FEATURE : Each circuit breaker shall comprise three identical poles, complete with a gang operated mechanism for specified duty. All these poles of circuit breaker shall be linked together electrically and mechanically for specified duty. The circuit breaker units shall be complete other accessories and materials with operating mechanism and to ensure complete assembly and proper functioning. The following features should be ensured:- a) Hinges of door shall be concealed type to avoid rusting and obstructive opening of the door. However, in case hinges are made of brass, then same may or may not be of concealed type. b) The quality of welding shall be good and there should not be any lumps and splatters on the panel”. c) All the connecting bus bar and current carrying parts shall be made of copper. d) All the gasket shall be of chemically treated neoprene. e) Hole & Pin locking (Check nut) arrangement should also be provided while fixing the vacuum interrupter at bottom side. TN-01/29 f) The vacuum interrupter should be housed in Epoxy Pole/ Porcelain bushing units and make of Vacuum Interrupter is required to be from BEL, CGL, SIEMENS, ABB/ ALSTOM/AREVA/MEGAWIN.. 5.2.3 BUS BAR, MAIN CONTACTS AND ARC QUENCHING CHAMBER : The busses within the cubical shall be of high conductivity electrolyte grade copper. The Bus bar joints shall be silver plated and bolted in such a manner that initial contact pressure around the square headed high tensile bolt will remain substantially undiminished at all temperature upto rated full load temperature. The Bus support and bushings shall be of epoxy resin cast type. All drop off from main bus to VCB and VCB to bushing terminations shall be suitable for current rating of circuit breaker . All the bus bar shall be sleeved with heat shrinkable sleeves of 36 KV voltage level (Insulated for a service voltage of 36 KV) and bus bar shall be shrouded wherever possible. All the bus bar joints shall be shrouded and where shrouding is not possible, it shall be taped with HV self amalgamation tape. All the tap off bus bar connections inside panel and PT jumpers shall be sleeved with HT heat shrinkable sleeves. Special care shall be taken in the design of bus bar system to provide for thermal expansion and to minimize the chances of bus fault. Bimetallic washers shall be provided at the joints of two different metal surfaces. The main contacts shall have adequate area carrying rated continuous and short and time contact pressure current without for excessive heating liable to cause pitting and welding. The tips of the arcing and main contacts shall be heavily silver plated (Min. 40 microns) or made of copper chromium alloy. The contacts shall be adjustable to allow for wear, shall be easily replaceable and shall have minimum movable parts and adjustments. The arc quenching device shall be of robust construction and shall not require any critical, adjustment. The devices shall be easily accessible and removable for access to the breaker contacts. 5.2.4 AUXILIARY CONTACTS : Each breaker shall be provided with eight normally open & eight normally closed electrically separate auxiliary contacts. These shall be in addition to those required for its own operation and indication. The auxiliary contacts shall be convertible type so that normally can be converted into open contacts normally close contact and vice versa at site. The auxiliary contacts shall be rated 10A at 240V AC and 4A at 110 V DC. 5.2.5 INTERLOCK : All electrical and mechanical interlocks which satisfactory operation of are necessary the circuit breaker shall be furnished. 5.2.6 INSULATOR : TN-01/30 for safe and Insulator shall be wet process porcelain, brown blemishes. Metal parts and hardware shall glazed and free from all be hot dip galvanised/ aluminium anodized. Insulator shall have adequate mechanical strength and rigidity to withstand the duty involved. When operated at maximum system voltage, there shall be no electrical discharge. Shielding rings, if necessary, shall be provided. Insulation shall be coordinated with basic impulse level of the system. The creepage distance shall correspond to heavily polluted atmosphere. The bushing shall not be subjected to direct point loading. They shall be provided with neck around clamps for evenly distributed pressure. The bushing shall be mounted using suitable clamps and gasket arrangement to provide required degree of protection. The bushing assembly shall be provided with lock nut and check nut which will be non-magnetic and non-corrosive. The provision shall be kept on roof bushing assembly to adopt arcing horn. The lifting arrangement shall not cause any effective loss of creepage distance/ phase to earth clearances as specified in the ISS/IEC. 5.2.7 OPERATING MECHANISM : Operating mechanism shall be spring operated with anti pumping and trip free features, complete with shunt trip coils. All three breaker poles shall operate simultaneously. Circuit breakers shall have provision so as to be suitable for three phase auto reclosing. In case of spring closing mechanism, no main spring of the mechanism shall be plated, powder coated or given any other treatment, so that spring property is not lost. The motor shall be universal type suitable for 220/240V. Spring Charge Indication Lamp shall be provided. The mechanism shall be designed for electrical local position. In addition to this, local control from remote as well as manual trip button shall be provided. Operation counter and mechanical ON-OFF indicator shall be provided. 5.2.8 CONTROL CUBICLE : A common monitoring located on control cubicle shall be devices and all individual poles. furnished to other accessories The cubicle house electricals, except controls, those which must be shall be IP-55 of gasketed weatherproof construction, fabricated from sheet steel minimum 3 mm thick. The cubicle shall have front access door with lock and keys, and removable gland plate at the bottom for owner's cable entry. Thermostat controlled space heater, internal illumination lamp 3 pin 5 A socket with individual ON-OFF switches shall be provided in the cubicle. For local operation following shall be provided : a) b) Local/Remote selector switch. Trip normal close control switches with pistol grip handle. TN-01/31 All electrical, mechanical connections between the control cubicle and individual poles shall be furnished. 5.2.9 WIRING Wiring shall be complete in all respects to ensure proper functioning control, protection, monitoring of the and interlocking schemes. Wiring shall be done with flexible 650V grade, PVC insulated, switch board wires with 2.5 sq.mm stranded copper conductor. Wiring between individual poles and control cubicle shall be routed through G.I. conduits. Each wire shall be identified at both ends with permanent markers bearing wire numbers as per wiring diagram. Wire termination shall be done with crimping type connectors with insulating sleeves. Wires shall not be spliced between terminals. All spare contacts of relays, push buttons, auxiliary switches etc. shall be wired up to terminal blocks in the control cubicle. 5.2.10 TERMINAL BLOCKS : Terminal blocks shall be 650 V grade, box clamp approved equal. Not more than two wires shall Spare terminals equal in number be type ELMEX 10 sq.mm or connected to any terminal. to 20% of active terminals shall be furnished. Terminal blocks shall be located to allow arranged that individual wires of easy access. Wiring shall be so an external cable can be connected to consecutive terminals. 5.2.11 TYPE OF MOUNTING : The circuit breaker shall be suitable for mounting on fabricated galvanised steel pedestal which shall be supplied along with the breakers. CT mounting bracket will also be supplied along with the breaker and shall be galvanised. 5.2.12 TERMINAL CONNECTORS : 1250 Amp. current rating terminal connectors of the circuit breakers suitable for connecting to ACSR Panther and Dog Conductor shall be supplied along with the breakers. Suitable earth connectors for earthing connections shall also be supplied with the circuit breakers. The terminal connectors shall conform to relevant standard IS-5561. 5.3 FITTING AND ACCESSORIES : Each circuit breaker shall be furnished complete with fittings and accessories as listed below : 5.3.1 Clamp type bimetallic/Alluminium Alloy terminal connectors suitable for ACSR Panther and Dog Conductor suitable both for horizontal & vertical take off. 5.3.2 Two ground pads suitable for termination of 50 x 6 mm flats. 5.3.3 Complete mounting steel pedestal along with CT mounting bracket. 5.3.4 Operating mechanism, double tripping coils and closing coil. 5.3.5 Auxiliary contacts and relays. 5.3.6 Local/remote selector switch, trip normal close control pistol control switch. TN-01/32 5.3.7 Manual tripping devices with protective flap for VCB's only mechanical ON-OFF indicator. 5.3.8 Operation counter. 5.3.9 Weather proof outdoor type control cubicle and pole boxes. Set of switch fuse units for AC and DC supply. 5.3.10 Space heater with thermostat and ON-OFF switch. 5.3.11 Cubicle illumination lamps with ON-OFF switch. 5.3.12 3 Pin 5A socket with ON-OFF switch. 5.3.13 Terminal blocks and internal wiring - lot as required. 5.3.14 Set of prefabricated pipe, fittings, clamps, hardware, interconnecting wires/cables etc. for connection between control cubicle and pole boxes as may be required to complete. 5.3.15 Interconnecting wires, GI conduits and accessories for connection between control cubicle and pole boxes. 5.3.16 Other standard accessories which are not specifically mentioned but are required to be supplied with breakers of similar type and rating for efficient and trouble free operation. 5.4 PAINTING & FINISHING All interiors and exteriors of switchgear enclosure, breaker mechanism etc shall be finished and painted to produce a neat, fire resistant and durable surface which would prevent rusting and corrosion. Sheet metal component shall be pre-treated using 7 tank phosphating process consisting of de-greasing, acid pickling, de- rusting, phosphating and passivation including repeated rinsing in between. On completion of the passivation of the components, they shall be preheated and then epoxy power coated or treated with one coat of primer & zinc chromate and finished with two coats of light gray enamel paint of shade 631 of IS 5 and stoved to achieve excellent anti-rusting and scratch resistant properties. The thickness of painting shall be around 60 microns. 6.0 6.1 TESTS: TEST BEFORE DESPATCH : The 36 KV circuit breakers and accessories shall be subjected to the following tests as per relevant IS/IEC before dispatch at manufacture's works ,. A) ROUTINE TESTS ON EACH UNIT AS PER RELEVANT STANDARDS : (i) One minute power frequency voltage withstand dry test on main circuit. (ii) Voltage withstand test on control & auxiliary circuits. (iii) B) Measurement of the resistance of main circuit. (iv) Mechanical operating test as per M-2 class. (v) Design and visual checks. TYPE TESTS CONDUCTED ON ONE UNIT OF EACH RATING AS PER RELEVANT STANDARDS: TN-01/33 (i) Dielectric tests. a) Lightning Impulse Voltage Test. b) One Minute Power Frequency Test (Wet & Dry). (ii) Short time withstand current and peak withstand current test. (iii) Basic short circuit duties test. (iv) Single phase short circuit test. (v) Mechanical Operation Test as per M-2 class. (vi) Out of phase making & breaking test. (vii) Capacitive current switching test. a) Cable Charging Test. b) Single Capacitor Bank Current Switching Test. (viii) Measurement of resistance of main circuit. (ix) Temp. rise test. (x) Environmental Tests: a) High Temperature Test as per clause No. 6.101.3.4 of IEC:62271-100 OR a) Documenting satisfactory circuit-breaker field experience in at least one location with ambient air temperatures frequently at or above the specified maximum ambient air temperature of 50 °C. (xi) IP-55 test (for cubical/control cabinet). (xii) Any other type tests not specified above but covered as per amendment/latest edition of relevant IS/IEC. 6.2 TYPE TESTS : The successful bidder must furnish type test reports. Where permitted in the relevant standard, a test specimen for type test may be a representative sub-assembly/ a representative functional unit. An individual type test is acceptable for a change of constructional detail, for any change in the design/type of type test report and the design/type of offered against this specification, if the manufacturer can demonstrate and purchaser is satisfied that this change does not influence the result of the individual type test. The bidder may bring out in their offer all such changes made in components, materials, design etc. as the case may be. The purchaser will interpret the meanings of drawings and specifications and shall have the power to accept/reject any type test report which in his judgment is/is not in a manner acceptable to him. The decision of Purchase Committee in this matter shall be final and binding to all. 6.3 TEST ON BOUGHT OUT ITEMS : Tests are not required to be performed on bought motor, terminal manufacturer. connector, CTs, Furnishing Test equipment manufacturers shall PTs, Relays, Certificate be Meters etc. at the works of of these items from deemed to TN-01/34 out equipments/items like be the satisfactory original evidence. Inspection of the tests at Sub-contractors works will be arranged by the supplier whenever required. 6.4 ROUTINE/ACCEPTANCE TESTS : (i) The following acceptance and routine tests shall be got conducted in presence of purchaser's representative as per stipulation of the relevant standards, on each unit. a) One minute power frequency voltage withstand dry test on main circuit. b) Voltage withstand test on control & auxiliary circuits. c) Measurement of the resistance of main circuit. d) Mechanical operating test as per M-2 class. e) Design and visual checks f) Any other test not specified above but covered as per amendment/latest edition of relevant IS/IEC. 6.5 TOLERANCE ON TEST RESULTS : As per relevant standards/specification. 6.6 TEST AT SITE : The purchaser reserves the right to conduct all tests on 36 KV circuit breakers after arrival at site and the contractor shall guarantee test certificate figures under actual service conditions. 7.0 INSPECTION : All the tests (as mentioned at Clause 6.4) and Inspection shall be made at the place of manufacturer unless otherwise especially agreed upon by the bidder and purchaser at the time of purchase. The bidder shall afford the inspection officer(s) representing the purchaser all reasonable facilities without charges, to satisfy him that the material is being furnished purchaser has the in accordance with this specification. The right to have the tests carried out at his own cost by an independent agency whenever there is a dispute regarding the quality of supply. The Inspection may be carried out by the purchaser at any stage of manufacture/ before dispatch as per relevant standard. Inspection and acceptance of any material under the specification by the purchaser, shall not relieve the bidder of his obligation of supplying material in accordance with the specification and shall not prevent subsequent rejection if the material is found to be defective. The Bidder shall keep the purchaser informed in advance, about manufacturing programme so that arrangements can be made for inspection. The purchaser reserves the right to insist for witnessing the acceptance/ routine testings of the bought out items. The Bidder shall give 15 days advance intimation to enable the purchaser to depute his representative for witnessing the acceptance and TN-01/35 routine tests. 8.0 DOCUMENTATION : 8.1 All drawings shall conform to International Standards Organization (ISO) `A', series of drawing sheet / specification, Standards specification IEC-56/IS-13118 & relevant standards. All drawings shall be in ink and suitable for micro filming. All dimensions and data shall be in S.I Units. 8.2 List of drawings and documents : The successful bidder shall furnish four sets of following drawings along with his offer. a) General b) outline Graphs and assembly showing drawings the performance of the equipment. of equipment’s in regard to magnetisation characteristics. c) Sectional views showing - i) General Constructional features. ii) the materials/ gaskets /sealings used. iii) the insulation, the winding arrangements, method primary/secondary winding to iv) of connection of the the primary/ secondary terminals etc. porcelain used and its dimensions along with the mechanical and electrical characteristics. d) arrangement of terminal's and details of e) Name / Rating Plate f) Schematic Wiring drawing with write up. g) Type test reports in case the equipment connection studs provided. has already been type tested. h) Test reports, literature, pamphlets of the bought out items, and raw material. All items of equipment included in this specification shall be provided with rating plates as per relevant standards and in addition with following particulars : 8.3 i) Name & Address of Supplier ii) Telephone No. iii) Fax No. iv) Date of Despatch v) Date of Expiry of Warranty vi) Name of Purchaser vii) TN No. The manufacturing of the equipments approved drawings and shall be strictly in accordance with the no deviation shall be permitted without the written approval of the purchaser. All manufacturing and fabrication work in connection with the equipment prior to the approval of the drawing shall be at the supplier's risk. 8.4 Approval of drawings/work by purchaser shall not responsibility and liability for the relieve the supplier of his ensuring correctness and correct interpretation of drawings for meeting the requirement of the latest revision of applicable standards, rules and codes of practices. The equipment TN-01/36 shall conform in all respects to high standards of engineering, design, workmanship and latest revisions of relevant standards at the time of ordering and purchaser shall have the power to reject any work or materials which, in his judgments is not in full accordance therewith. 9.0 PACKING AND FORWARDING : 9.1 The equipments transport as shall the be packed case may be, transport and outdoor storage responsible for any in damage crates suitable and suitable during transit. to improper and inadequate packing. carefully packed and marked to the equipment The easily with for vertical/horizontal withstand handling during The supplier during transit, due damageable the appropriate be provided. Any material found short inside the be to material shall be caution Wherever necessary, proper arrangement for lifting, such as shall shall symbol. lifting hooks etc. packing cases shall be supplied by supplier without any extra cost. 9.2 Each consignment shall be accompanied with a detailed the packing list containing following information: a) Name of the consignee. b) Details of consignment c) Destination d) Total weight of consignment. e) Sign showing upper/lower side of the crate. f) Handling and unpacking instructions. g) Bill of material indicating contents of each package. 9.3 The supplier shall ensure that the packing list and bill of material are approved by the purchaser before dispatch. 10.0 Optional Spares : The bidder shall also recommend optional breakers along with their total and unit spares that will be required for prices. However, the prices of optional spares will not be considered for bid evaluation. 11.0 OPTIONAL TOOLS AND TACKLES : The bidder shall also recommend optional tools and tackle that be required for general maintenance and operation of circuit breakers, along with their total and unit prices. However, the prices of these tools and tackle shall not be considered for bid evaluation. 13.0 PERFORMANCE WARRANTY PERIOD : The performance warranty period shall be 5 (Five) years from the date of receipt of equipment along with all accessories. TN-01/37 TECHNICAL SPECIFICATION OF 12 KV INDOOR TYPE VACUUM CIRCUIT BREAKERS AGAINST 1.0 SCOPE : This specification manufacturer's works covers the design, before dispatch, manufacture, assembly, testing supply, delivery of 3 pole, 50 Hz, 12 at KV switchgear and control gear panels for indoor installation fitted with 12 KV vacuum circuit breakers including voltage transformers, current transformers, metering instruments, protection relays etc. as per schedule of requirement and installation & commissioning by the supplier as per Schedule-III (Part-B). The power system is with neutral solidly earthed. The equipment offered shall be safe, reliable and compact to install. The workmanship shall be of high order. The circuit breaker and protective devices shall be of latest design so as to ensure rapid and efficient interruption of fault current, low arc energy, small arcing time, complete phase segregation and freedom from fire hazards. 1.1 STANDARDS : The circuit breaker/metal enclosed switchgear, Voltage transformers, current transformers and all other equipment shall also comply with the requirement of latest edition of relevant Indian standards. Deviation from the standards and this specification if any, should be brought out in the tender and justified. Voltage transformer and current transformers shall be mounted within the panels. The governing standard shall be : S. IS/IEC Reference Specification 1. IEC-60298 A.C. Metal – enclosed and control gear for rated voltages above 1KV and including 72.5KV 2. IS-3427 A.C. Metal – enclosed and control gear for rated voltages above 1KV and including 52KV. 3. IS-8623 Specification for Low Voltage Switchgear and Control gear assemblies. 4. IS-13118// IEC62271-100/ IEC62271-200 Specification for High Voltage AC Circuit Breakers. 5. IEC-60529 Degrees of Protection. 6. IS-5578 & 11353 Making and arrangement for switchgear bus bar main connections and auxiliary wiring. 7. IS-325 Specification for 3 Phase Induction motors. 8. IS-2629 Recommended practice for not dip galvanizing of iron and steel. 9. IEC-60137 Bushing for AC Voltages. No. TN-01/38 10. IS-3347 Porcelain Transformer Bushings. 11. IS-5561 Terminal Connectors 12. IS-3156 Voltage Transformers 13. IS-2705 Current Transformers 14. IS-3231 Electric relays for power protection. 15. IS-13779 Static Energy Meters 16. IS-8686 Static Protection Relays 17. IS-1248 Electrical measuring instruments 18. IS-2099 High Voltage Porcelain Bushings. 19. IS-10118 Minimum clearances for Outdoor Switchgear. 20. IEC-60694 Common Clauses for High Voltage Switchgear and Control gear. 21. IEC-60255 & Numerical Relays IEC-61330 Equipments conforming to any other internationally accepted standard(s) which ensure(s) equal or better quality than the standard(s) mentioned above would also be accepted. In case the tenderers wish to offer equipment conforming to other standards or alternative offer which tenderer considers advisable by reason of his own manufacturing requirement and experience would be acceptable provided descriptive matter, literature and complete certificates are submitted pointing out that the equipment/devices/arrangements as offered are equal or superior to that required by the accompanying specification furnish English translation of the conforms to any other relevant standards. Salient with full justification. They standards where points of the difference shall equipment between the standards adopted and those mentioned above shall be brought out. 1.2 a) PARTICULARS OF SYSTEM : i) Nominal system voltage : ii) Highest system voltage : 12 KV iii) Frequency : iv) No. of phases : v) Neutral earthing : b) SERVICE CONDITIONS : The equipment should operate specified in this specification. The 11 KV 50 Hz 03 Effectively earthed satisfactorily under reference the climatic conditions maximum ambient Air temperature may be taken as 50 Deg. C. as against 40 Deg. C. The permissible temperature rise for various equipments offered should therefore be derated accordingly. 1.2.1 CLIMATIC CONDITIONS: i) Peak ambient air temperature in shade. ii) 50 DEG C Minimum ambient air temperature TN-01/39 in shade. (-) 5 DEG C iii) Maximum relative humidity 95% iv) Minimum relative humidity 10% v) Dust storms are liable to occur from the period from March to July. vi) Height above mean sea level Less than 1000M vii) Average number of thunder 40 Days storm days per annum. viii) Average annual rainfall 10-100 cm (Depending on area) ix) Number of months of tropical monsoon conditions p.a. June to Sept. 1.3 PRINCIPAL PARAMETERS 1.3.1 CIRCUIT BREAKERS : a) Rating and characteristics of circuit breakers : 1. No. of poles : 2. Class : 3. Rated voltage : 4. Rated insulation level a) Lightning impulse voltage : b) One minute power frequency : withstand voltage. 5. Rated frequency : 6. Rated normal current : 7. Short circuit breaking capacity : 8. Short time withstand current : for 3 secs. 9. First pole to clear factor : 10. Protection class : 11. Maximum opening time : 12. Rated operating sequence : 13. Minimum operations at full : rated short circuit breaking current. 14. Rated Breaking Capacity i) Symmetrical : ii) Asymmetrical : 15. Rated making capacity : 16. Operating Mechanism : 3 Indoor 12 KV 75 KV (Peak) As per relevant standards. 50 Hz 630 A 16 KA 16 KA 1.5 IP 5X 5 Cycles 0-0.3Sec.-CO-3min-CO 100 16 KA As per ISS 2.50x16 KA Motor operated Spring charged closing mechanism or magnetic actuator. : 240 V A/C : 110V DC mechanism of Circuit breaker and 17. Heater/Lamp/Socket 18. Control Voltage b) Characteristics of the operating associated equipment : i) Method of operation : The circuit breakers shall operated mechanism to operate all the three be equipped phases with power simultaneously using 220/240V universal motors operated spring closing mechanism or magnetic actuator. The circuit breakers shall spring closing mechanism or magnetic also be provided with actuator. The Circuit hand operated Breaker shall have electrical and mechanical tripping arrangements under various conditions. In case of spring closing mechanism no main spring of the mechanism shall be plated, powder coated or given any other treatment so that spring property is not lost. TN-01/40 ii) Number and type of spare, auxiliary switches : Adequate number of spare auxiliary switches/ contacts both of normally open and normally close type but not less than four each shall be provided on the circuit breaker for use in the indication and controlling scheme of the circuit breaker. iii)Rated supply voltage and rated supply frequency : The rated voltage for the auxiliary supply shall be 240 V, 50 Hz AC supply. 1.3.2 DESIGN CRITERIA The bidder shall quote 12 KV Indoor VCBs conforming to M-2 Class. The equipment will be used in high voltage system having characteristics as listed in the specification. The equipment will be installed indoor in a hot, humid and tropical atmosphere. All equipment, accessories and wiring shall have tropical protection, involving special treatment of metal and insulation against fungus, insects and corrosion. The maximum temperature in any part of the equipment at specified rating shall not exceed the permissible limits as stipulated in the relevant standards and this specification. The equipment shall be capable of withstanding the dynamic and thermal stresses of listed short circuit current without any damage or deterioration. The safety clearances of all live parts of the equipment shall be as per relevant standards. 1.3.3 CONSTRUCTIONAL FEATURES : The circuit breakers shall be triple pole metal clad truck mounted horizontal draw out type enclosed in cubicle made of CRCA sheet steel of minimum 2 mm thickness and shall comply with latest edition of relevant IS. The cubicle/panels shall be vermin construction. proof and dust tight. The cubicle shall be of folded type Panel width shall be 610 mm. ± 50 mm. The switchgears and control gear shall be complete with all necessary supporting frame work, nuts and bolts etc. for securing the same to the floor. The operating mechanism shall operate (close/open) mechanism, shutters links all the three phases simultaneously. The operating etc. should be accessible for maintenance. Mechanical should be provided between breaker and panel. safety Engagement and disengagement of auxiliary supply should be automatically linked through the movement of the truck so that in service condition auxiliary supply is automatically made. All six terminals shall brought out of cubicle through appropriate class of cable termination and sealing kits. All the breakers shall be supplied with necessary clamps suitable for appropriate current ratings. Suitable arrangement of earthing the switchgear and control gear panels shall be provided. All the connecting bus bar shall be made of copper for these indoor circuit breakers. For indoor panels, SWITCHGEAR (circuit breakers, CTs, PTs etc.) and control-gear (relays, C&R panels meters etc.) shall be mounted on the same panel. A set of air insulated electrolytic copper bus bars having maximum current density 1.5 2 Amp. / mm & minimum cross sectional area 600 mm2 with PVC sleeves or PVC insulation are to be provided for all TN-01/41 indoor switchgear panels. The switchgear panels shall be provided with the arrangement for extending the bus bar and inter-connecting bus bars. Their supports, nuts and bolts etc. will be supplied loose. The region of such inter connection shall normally be blanked on panels. The bus bars should be of electrolytic copper with permissible limits of current density. Size of the bus bar and current density should be specified in the tender. The bus bar conductor shall conform to IS:8034. The bus bar shall be rated for 16KA for 3 Seconds. Painting of panel cubicle shall be epoxy based powder coated. The paint shade of indoor panels shall be shade 631 as per IS-5. 1.3.4 VACUUM CIRCUIT BREAKER : The three phase vacuum circuit breakers will have interrupter per phase) mounted on same carriage. The three interrupters (one interrupters shall be air insulated in epoxy resin tank or with epoxy resin phase barriers. Each interrupter shall have fixed and moving contacts in sealed envelope having vacuum below 10-6 torr. The metallic bellow shall permit axial movement of moving contact and act as vacuum seal. The contacts shall good electrical and thermal have requisite conductivity and shall mechanical strength and be made of copper chromium alloy. Complete literature of vacuum bottles shall be furnished with the tender.In order to have safe operation under fetal conditions, the vacuum interrupter should be housed in epoxy pole unit and make of Vacuum Interrupter will be as “BEL, CGL, SIEMENS, ABB, ALSTOM/AREVA/MEGAWIN”.Any other equivalent make of V.I. shall also be acceptable subject to prior approval of S.E. (MM), JVVNL, Jaipur. 1.4 VOLTAGE TRANSFORMERS : 1. Highest equipment voltage 2. No. of phases 3. Insulation level a) Impulse withstand voltage b) One minute power frequency withstand voltage on : i) Primary winding ii) Secondary winding 4. Frequency 5. Transformation ratio 6. Rated output 7. Accuracy class 8. Winding connection 9. Rated voltage factor 10.Type of insulation : : 12 KV 3 : 75 KVP : : : : : : : As per relevant standards 2 KV rms 50 Hz. 11000/110 V 30 VA / phase 0.5 Star/Star : 1.2 continuous and 1.5 for 30 seconds Resin cast : VTs shall be provided with HRC type fuses on the secondary side. The VT fuses on primary side shall also be provided with all safety precautions. One of the secondary terminals of the VTs shall be solidly earthed. One number three phase voltage transformer of this rated output will be required for each incoming indoor panel. Voltage transformers should be mounted in the top part of the cubicle for ease of replacement of fuses. 1.5 CURRENT TRANSFORMERS : 1. Rated voltage 2. Insulation level : TN-01/42 12 KV a) Impulse withstand voltage b) One minute power frequency voltage on i) Primary winding ii)Secondary winding 3. Frequency 5. Rated continuous thermal current : 75 KVP : : As per relevant standards 03 KV rms : 50 Hz : 120% of rated primary current : 16 KA for 3 Sec. 5. Short time thermal rating 6. Transformer CTs of ratio 600-400/5-5A for incoming type indoor panel and 200-100/5-5A for outgoing type panel. Rated output/accuracy etc. for CTs. Core-I Core-II a) Rated output 10 VA 10 VA 7. 8. 9. However VA burden should not be less than suitable for A.C. series trip requirement with shunt trip arrangement. b) Class of accuracy c) Accuracy limit factor d) Purpose Max. instrument security factor Type of Insulation 5P 15 Relaying - 0.5 S Metering 5 Resin Cast 12 KV current transformers shall be single phase. The core shall be of high grade non ageing laminated silicon steel of low hysterics loss and high permeability to ensure high accuracy for both normal and fault current. 1.6 The rating of secondary winding shall be 5 Amps. However, the current transformers will have to satisfy the requirement of rated VA burden, class of accuracy, accuracy limit factor and short time thermal rating as have been specified in clause No. 3.5 at all transformation ratio. Magnetization curves corresponding to all secondary taps must be submitted with the tender. The ratings of current transformers of all classes regarding ratio error, knee point voltage, resistance of secondary winding etc. shall have to be coordinated with the requirements of protective relays and protection scheme, without any extra cost. 1.7 Before commencement of supplies one panel of each type with circuit breaker, VT etc. will have to be subjected to temperature rise test without extra charges in the presence of our Inspecting Officer. All the type test certificates are also needed to be furnished without which tender is likely to be ignored. 1.8 The tenderer shall also arrangement, schematic furnish and along with the tender, complete general outline diagrams indicating the mounting arrangement and position of current transformers, voltage blocks etc. Type of current transformer and shall also be clearly stated. TN-01/43 voltage transformer terminal transformer employed 1.9 INDICATING AND INTEGRATING METERS/INSTRUMENTS : 1.9.1 All indicating instruments shall be of switchboard type, back connected, suitable for flush mounting and provided with dust and vermin proof cases for tropical use and finished in suitable colour. All instruments shall have practical laboratory means for adjustment of accuracy. The limits of errors for ammeters/voltmeters shall be those ammeters and current/voltage selector permissible for class 1.5 voltmeters shall be for all switch with the rating four/six instruments suitably as per IS:1248. The scaled of current/voltage to indicate the transformers. A phase position shall be used to measure the current/voltage of each phase/line. The meters shall be located at eye level to facilitate observation of readings correctly. 1.9.2 A.C. Static HT Trivector Meter : 3 phase 4 wire A.C. Static H.T. Trivector meter of accuracy class 0.5S for measurement of energy as per latest specification of JVVNL, shall be provided on each 12 KV indoor VCB. Following makes of HT TVMs are acceptable: i) Secure ii) L&T iii) ABB/Elster iv) Schlumberger v) Genus Infra Any other make being procured by Nigam shall also be acceptable. 1.10 RELAYS : The circuit breaker shall be fitted with shunt trip coil for operation on Numerical three Over Current and one Earth Fault element relay. The coils should be rated for 110VDC operation on station battery. Three phase protection relays shall be Numerical Over-current & Earth Fault protection having three element for over current and one for earth fault protection. The setting for over-current shall be 50-200% (in step of 10%) and for earth fault element from 10 to 80% (in step of 10%). These relays shall be non directional with selectable curve from all standard 5 IDMT curves. The numerical relays shall have following features:i) Self Diagnosis ii) Minimum last five abnormal events (with date & time) recording (over current & earth fault) including fault level and phase. iii) On-line display of current. iv) Communicable with open Protocol having RS-485 port. The relay shall be numerical type mounted in flush pattern on the panel board. The relay should be rated for 5 Amp. CT secondary. IS:3231 & 8686 specifications. The relay should conform to The tenders shall furnish the detail in this regard along with the offer. All the relays shall be provided with test blocks in panel so designed that the relays may be tested in situ. The relays should have provision of testing either through test block or test plug easily accessible by injecting the voltage / current/frequency TN-01/44 (as applicable) from external testing instruments /source without first disconnecting/ reenergizing the primary electrical circuit protected by the relays. Facilities for isolating the tripping circuit during such testing shall be also provided. The requirement of test block shall not be applicable in case of drawout type relays which can be tested by using test plug without removing the relay from its casing. The testing facilities provided in the relays shall be specifically stated in the bid. Necessary test plug etc. as may be required for proper testing shall be included in the contractor’s scope of supply. One test plug with five panels or part thereof are to be supplied. Technical suitability of relays/schemes may also be examined by Protection Wing & acceptability will be judged appropriately. The Following makes of Relays are acceptable:a. Areva. b. ABB. c. Easun Reyrolle d. C&S e. JVS f. SEL g. ASHIDA h. MEGAWIN i. CGL j. STELMEC 1.11. WIRING : All wiring shall be of switch board type consisting of copper conductor of 1.5 Sq. mm. for alarm / annunciation / control circuits and 2.5 Sq.mm. for CT and all other Circuits insulated with polyvinyl chloride insulation suitable for 660 Volt and in accordance with relevant service IS:732. Polyvinyl Chloride used shall have excellent resistance against burning, moisture, oil and vermin and shall be finished with clear colour. shall furnish Rubber insulated wiring shall not be acceptable. Tenderers the details of method being adopted by them for Joint/ Connections. All instruments and Panel wiring shall be of heat resisting and self extinguishing type in compliance with IS. Plastic or porcelain cleats of the limited compression type shall be used for holding wiring runs. All wires shall be suitable for bending to meet the terminal studs apparatus at right angles. Metal cases of all mounted on panels shall be separately wire or strips. The following colour earthed by means of copper scheme of the wiring shall be used as per IS:375. a) AC three phase circuits : i) No.1 Phase No.2 Phase No.3 Phase : Red. : Yellow. : Blue ii) Neutral Conductor : Black iii) Connection to Earth : Green b) D.C. circuits : Grey 1.12 MIMIC DIAGRAM : For indoor panels painted colour bands shall be used for the mimic bus. The mimic diagram shall be on eye level. Equipments TN-01/45 such as current transformers, voltage transformers etc. shall be represented by suitable symbols. The colour shall be Red Shade 537 of IS-5. 1.13 INDICATING LEDs / LAMPS : Indicating LEDs / Lamps shall be provided on the control board to indicate the following: 1. Visual indication of ON and OFF position of each circuit breaker. 2. Trip circuit healthy indication. 3. Auto trip indication for each circuit breaker panel. 4. VT supply indication. Each lamp body shall be of moulded insulation and shall be able to withstand a high voltage test of appropriate value. All lamps shall be suitable for 240 V AC supply and shall have low power consumption and shall provide a wide illumination of sufficient intensity colour shall be angle of for comfortable viewing. A glass of appropriate screwed into the front of the lamp body. The indication lamps shall be such as to design of the facilitate replacement of burnt lamps. An engraved label indicating the purpose of the lamp shall be provided with each lamp. 1.14 TEST TERMINAL BLOCKS : Two nos. test terminal blocks shall be provided one for testing of relays and other for testing meters. They shall be of switch board, back connected type for front of panel mounting. The test blocks shall provide complete isolation of meters, instruments, etc. and the arrangement shall be such that testing power could be connected at the test block from any external source or may be taken from the instrument transformers. Provision shall be made for short circuiting current transformers. Suitable sealing arrangement shall be provided in test terminal blocks. 1.15 FERRULES : Ferrules engraved/printed with the same number, letters or symbols as indicated in the connection and wiring diagram shall be provided on the terminal ends of all wires for identification of circuits for inspection and maintenance. Ferrules shall be of strong and flexible insulating material with glossy finish to prevent adhesion. They shall be engraved / printed and clearly marked and shall not be effected by dampness. Ferrule numbering shall be in accordance with IS:375. The same ferrule number shall not be used on wires in different circuits on a panel. 1.16 SPACE FOR CABLES AND CABLE GLANDS : Sufficient space for receiving the cables inside the switch board at the bottom of the cubicles and mounting arrangement for the terminal cable glands shall be provided. Cable gland plates should be above the ground level for the ease of working. 3.17 SCHEDULE OF REQUIREMENTS : TN-01/46 The requirement of circuit breakers shall be as per Clause 3.31. At a particular sub station two or more feeders can be controlled through one breaker depending upon the necessity. Each of these breakers shall be equipped as per clause No. 3.18. 1.18 SCHEDULE OF EQUIPMENT : Item No. 1 : (INCOMING TYPE) 12KV/630A Amp. VCB Switchgear panel for indoor installation: 1. 12KV/630A Circuit Breaker vacuum type drawout with provisions of manual tripping by means of A control switch/push button. 1 No. 2. Motor Charged Spring operated closing mechanism or magnetic actuator operated device. 4. Numerical 3 0/C + 1 E/F relay 4. Single phase 12 KV current transformers of ratio 600-400/5-5A suitable for metering and protection. The class of accuracy shall be 0.5 S for metering and 5P15 for protection. Rated burden (output) shall be 10 VA for each secondary winding. Instrument security factor for metering core shall not exceed 5. 1 No. 6. 11000/110 Volts three phase voltage transformers having 30 VA/phase burden and class of accuracy 0.5. The transformer shall be star-star connected. 1 No. 6. Flush type switchboard mounting pattern 96X 96 sq.mm moving iron/ moving coil AC voltmeter of class 1.5 accuracy suitable for 110 V phase to phase secondary scaled for 0-15 KV. 1 No. 7. Voltmeter phase selector switch to indicate phase to phase and phase to neutral voltage of all the three phases. 1 No. 8. Indicating lamps/LEDs coloured red, amber and blue for PT supply indication. 3 Nos. 9. 2 Nos. 10. Arrangement for reception of incoming cable connection alongwith cable termination and sealing kits for 3 C x 300 mm sq. XLPE power cables. Set of three phase air insulated main electrolytic copper bus bars of 630 A continuous current rating having maximum current density 1.5 Amp./ mm2& minimum cross sectional area 600 mm2 with PVC insulation or sleeves, STC rating 16 KA for 3 sec. 1 No. 3 Nos. 1 No. 11. Mechanical ON/OFF indicator. 1 No. 12. Operating handle for independent manual closing mechanism. 1 No. TN-01/47 13. Red indicating lamp/LED for ON indication. 1 No. 14. Green indicating lamp/LED for OFF indication. 1 No. 15. Auxiliary switch having minimum of 8 contacts 4 normally open and 4 normally closed. 1 No. 16. Flush mounting pattern 96x96 sq.mm. Moving Iron or moving coil ammeter of class 1.5 accuracy for 5 Amps. CT secondary scale 0-400/600 A. 1 No. 17. Ammeter selector switch to indicate phase current in all three phases and with OFF position. 1 No. 18. AC HT Tri vector meter 1 No. 19. Auxiliary Relay type VAA 33 or equivalent For transformer protection functions. 1 No. 20. Automatic door CFL with Switch. 1 No. 21. 240V, 80W AC single phase anti condensation heaters with thermostat (0-60 Deg. C) and switch. 2 Nos. 22. Anti pumping contactor. 1 No. 23. Operation Counter. 1 No. 24. Test terminal blocks for metering and relays, 3 phase 4 wire. 2 Nos. 25. Fault trip yellow lamp/LED. 1 No. 26. Trip Circuit healthy indication. 2 Nos. 27. Ground Bus size min. 25 x 6 mm. copper. 1 No. 28. Bell for Alarm 1 No. 29. Hooter for Alarm 1 No. 30. 3 Pin Socket with switch 1 No. 31. 2 Pin Socket with switch 1 No. 32. Auto Trip Lamp 1 No. Item No. 2 : (OUTGOING/ FEEDER TYPE) 12KV/630A Amp. VCB Switchgear panel for indoor installation: 1. 12KV/630A Circuit Breaker vacuum type drawout with provisions of manual tripping by means of A control switch/push button. 2. Motor Charged Spring operated closing mechanism or magnetic actuator. 1 No. 3. Numerical 3 0/C + 1 E/F relay 1 No. TN-01/48 1 No. 4. Single phase 12 KV current transformers of ratio 200-100/5-5A suitable for metering and protection. The class of accuracy shall be 0.5 S for metering and 5P15 for protection. Rated burden (output) shall be 10 VA for each secondary winding. Instrument security factor for metering core shall not exceed 3 Nos. 5. Arrangement for reception of incoming and outgoing cable connection alongwith cable termination and sealing kits for 3 C x 300 mm sq. XLPE power cables. 2 Nos. 6. Set of three phase air insulated main electrolytic copper bus bars of 630 A continuous current rating having maximum current density 1.5 Amp./mm2& minimum cross sectional area 600 mm2 with PVC insulation or sleeves. STC rating 16 KA for 3 seconds. 1 No. 7. Mechanical ON/OFF indicator. 1 No. 8. Operating handle for independent manual closing mechanism. 1 No. 9. Red indicating lamp/LED for ON indication. 1 No. 10. Green indicating lamp/LED for OFF indication. 1 No. 11. Auxiliary switch having minimum of 8 contacts 4 normally open and 4 normally closed. 1 No. 12. Flush mounting pattern 96x96 sq.mm. Moving Iron or moving coil ammeter of class 1.5 accuracy for 5 Amps. CT secondary scale 0-150/250 A. 1 No. 13. Ammeter selector switch to indicate phase current in all three phases and with OFF position. 1 No. 14. AC static HT Tri-vector meter 1 No. 15. Automatic door CFL with Switch. 1 No. 16. 240V, 80W AC single phase anti condensation heaters with thermostat (0-60 Deg. C) and switch. 2 Nos. 17. Anti pumping contactor. 1 No. 18. Operation Counter. 1 No. 19. Loose Set of 3 phase Air insulated inter connection electrolytic copper bus bars, 630 Amps. rating with PVC insulation with nuts and bolts supports etc. STC rating 16 KA for 3 seconds. 1 No. 20. Test terminal blocks for metering and relays, 3 phase 4 wire. 2 Nos. 21. Fault trip yellow lamp/LED. 1 No. TN-01/49 22. Trip Circuit healthy indication. 2 Nos. 23. Ground Bus size min. 25 x 6 mm. copper. 1 No. 24. Bell for Alarm 1 No. 25. Hooter for Alarm 1 No. 26. 3 Pin Socket with switch 1 No. 27. 2 Pin Socket with switch 1 No. 28. Auto Trip Lamp 1 No. 1.19 All equipments shall be complete in all respect. All fittings, accessories or apparatus which may not have been mentioned above but which are usual/necessary for the equipments shall be included for each circuit breaker panel. 1.20 OPERATING AND MAINTENANCE INSTRUCTIONS : The successful tenderers, on receipt immediately 20 sets of of order shall arrange to dispatch the erection/operating and maintenance instruction manuals along with the requisite drawings of the equipments covered by this specification to this office for approval. Two sets of these, one set in English and one in Hindi will also be forwarded to the consignee along with each equipment. 1.21 TEMPERATURE RISE : The maximum temperature rise of various parts of the circuit breakers when tested under rated ambient temperature conditions shall not exceed the specified values at a peak of 50 deg. c. The breakers may be plated contacts if necessary to meet provided with silver the requirement of IS:13118 where higher temperature rise is permitted with silver plating contacts. The quantity facing shall be such that after carrying out one tenth of silver of the total number of operations specified for the mechanical endurance test, there is still continuous layer of silver on the contacts. The temperature rise of CTs and PTs shall also not exceed the permissible values as per relevant Indian Standards when corrected for max. ambient temperature at site. 1.22 NAME/RATING PLATE : All items of equipment included in this specification shall be provided with rating plates as per relevant standards and in addition with following particulars:Name & Address of Supplier Telephone No. Fax No. Date of Despatch Date of Expiry of Warranty Name of Purchaser TN No. Purchase Order No. & Date : : : : : : : : TN-01/50 1.23 INSPECTION AND TESTING : 1.23.1 Each equipment shall comply with and shall be subjected to all routine and acceptance tests prescribed in the relevant Indian Standard Specification/IEC. 1.23.2 TEST OF 11KV INDOOR CIRCUIT BREAKER : i) ROUTINE/ACCEPTANCE TESTS: The following acceptance and routine tests shall be got conducted in presence of purchaser's representative as per stipulation of the relevant standards, on each unit. a) One minute power frequency voltage withstand dry test on main circuit. b) Voltage withstand test on control & auxiliary circuits. c) Measurement of the resistance of main circuit. d) Mechanical operating test as per M2 class. g) Design and visual checks. h) Any other tests not specified above but covered as per amendment/ latest edition of relevant IS/IEC. ii) Inspection & tests on control gear : In addition to the above tests at 3.23.2(i) above specified by IEC, the following shall also be performed at manufacturer’s works in presence of purchaser’s representative after completely assembling the breaker. e) Checking wiring of circuits and their contacts. f) Insulation resistance of complete wiring, circuit by circuit with all equipment mounted on the panels. g) Checking and operational protective schedule and instruments meters. h) Checking of phase faults between R&Y, Y&B and B&R phases. Breaker should trip under all three conditions. iv) TYPE TESTS : The following type tests shall be conducted on the offered material as per relevant standards:- a) Dielectric tests. Lightning Impulse Voltage Test. One Minute Power Frequency Test(Dry). b) Short time with stand current and peak withstand current test. c) Basic short circuit duties test. d) Single phase short circuit test. h) Mechanical Operation Test. i) Out of phase making & breaking test. j) Capacitive Current Switching Test. h) k) i) Cable Charging Test. ii) Single Capacitor Bank Current Switching Test. Measurement of resistance of main circuit. Temp. rise test. TN-01/51 l) IP-5X test (for cubicle/control cabinet). k) Any other type tests not specified above but covered as per amendment / latest edition of relevant IS/IEC The 12 KV Indoor vacuum circuit breaker offered shall be fully type tested as per relevant standards. Where permitted in the relevant standard, a test specimen for type test may be a representative sub-assembly/ a representative functional unit. An individual type test is acceptable for a change of constructional detail, for any change in the design/type of type test report and the design/type of offered against this specification, if the manufacturer can demonstrate and purchaser is satisfied that this change does not influence the result of the individual type test. The bidder may bring out in their offer all such changes made in components, materials, design etc. as the case may be. The purchaser will interpret the meanings of drawings and specifications and shall have the power to accept/reject any type test report which in his judgment is/is not in a manner acceptable to him. The decision of Purchase Committee in this matter shall be final and binding to all. 1.23.3 The type test reports of Circuit Breakers, Current Transformers, Potential Transformers, Relays, meters etc. shall be complete in all respect along with oscillographic records, photographs etc. in respect of all type tests as per relevant ISS/IEC. The type test certificates should be in respect of specific make and type / rating of the Circuit Breakers/ instruments, transformers etc. intended to be supplied and not in respect of the breakers etc. manufactured by their foreign collaborators if any. Necessary data with test reports to show capability of circuit breaker to withstand number of full level short circuit faults be also furnished. Complete literature must be sent with the tender. 1.23.4 Routine & acceptance test as per relevant standard shall be carried out on each equipment covered by this specification in the presence of purchaser's representative. If so desired by the purchaser all test reports shall be submitted and got approved from the purchaser before dispatch of the equipment. Before commencement of supplies one panel of each type complete with Circuit Breaker, VT etc. will be subjected to temperature rise test in the presence of our Inspecting Officer. 1.23.5INSPECTION AND TESTS OF CONTROL GEAR : All the tests (as mentioned at Clause 3.23.2(i)) and Inspection shall be made at the bidder place of manufacturer unless otherwise especially agreed upon by and purchaser at the time of purchase. The bidder shall inspection officer(s) representing the purchaser all the afford the reasonable facilities without charges, to satisfy him that the material is being furnished in accordance with this specification. The purchaser has the right to have the tests carried out at TN-01/52 his own cost by an independent agency whenever there is a dispute regarding the quality of supply. The Inspection may be carried out by the purchaser at any stage of manufacture/ before dispatch as per relevant standard. Inspection and acceptance of any material under the specification purchaser, shall not relieve the bidder by the of his obligation of furnishing material in accordance with the specification and shall not prevent subsequent rejection if the material is found to be defective. The Bidder shall keep the purchaser informed in advance, about manufacturing programme so that arrangements can be made for inspection. The purchaser reserves the right to insist for witnessing the acceptance/ routine testings of the bought out items. The Bidder shall give 15 days advance intimation to enable the purchaser to depute his representative for witnessing the acceptance and routine tests. 1.25 TECHNICAL PARTICULARS : 1.25.1 Make of various equipments should be equivalent etc. shall not clearly stated. Words like reputed, be accepted. Alternative makes of equipments should not be more than two in the order of preference. 1.25.2 INTER CHANGEABILITY : All similar materials and removable parts of similar equipments shall be inter changeable with each other. 1.26 OPTIONAL SPARES: The tenderer shall furnish list of recommended optional spares that will be required for breakers alongwith their total and unit prices. 1.27 TITLE PLATES: A title plate bearing the name and purpose of each panel shall be fixed on the top of each control as well as relay panel. 1.28 FAULT / TROUBLE ALARM SCHEME : The automatic trip of the Circuit Breaker due to operation of protection relays shall be indicated by sounding of a hooter. All non-trip alarms shall be indicated by an alarm bell. 1.29 PERFORMANCE WARRANTY PERIOD : The performance warranty period shall be 5 years from the date of receipt of equipment along with all accessories. 1.30 MAKE AND TYPE OF BOUGHT OUT ITEMS : 1.30.1 The following make of bought out items will be acceptable to department : ------------------------------------------------------------------------------------------------S.No. Name of Item Make ------------------------------------------------------------------------------------------------1. Indicating Instrument AE/IMP/MECO (Analog type) 2. Indicating Instrument AE/IMP/MECO (Digital type) 3. Control Switch for Circuit ALSTOM/RECOM/SWITRON/ Breaker/Trip Transfer. KAYCEE TN-01/53 4. Selector Switch for Voltmeter/Ammeter Semaphore Indicator 5. 6. SWITRON/KAYCEE/RECOM ALSTOM/DAV IND./ER Indicating Lamp 7. ALSTOM/TEKNIC/ VAISHNO/DAV Annunciator MINILEC/YESHMUN/ INSTALRAM/PROTON/ JVS/PRADEEP/ALAN 8. Push Button TEKNIC/VAISHNO/ESSEN 9. A.C. Hooter/Bell TARGET/INDUSTRIAL HOOTER/ALAN/JVS 10. D.C. Hooter TARGET/INDUSTRIAL HOOTER/ALAN/JVS 11. 12. Heater SOFIA/ELTER/AIREX KAYCEE Link Type test terminal block for testing of TVM IMP/CAPITAL 13. CFL Tube PHILIPS/CROMPTON/BAJAJ 14. 2 Pin/3 Pin socket with Switch (5/15A) ISI MARK The other makes of all bought out items shall be acceptable if it is of "ISI Marked" or type tested for which bidder shall furnish attested copies of ISI Certificate/type test reports not respective 1.30.2 older than Five years for the make offered, subject to prior approval of SE(MM), JVVNL, Jaipur. Make / type of each relay, indicating control Photostat switches, instruments, integrating selector switches, indicating lamps, indicators, enunciator scheme, bell, hooter etc. shall be clearly instruments, semaphore and invariably indicated in the GTP (Guaranteed Technical Particulars), bill of material and unit price list. Only specific "EQUIVALENT/REPUTED 1.31 make MAKE" accessories shall be indicated. will not be given The word for consideration. BILL OF MATERIAL : The firm shall furnish the bill of material for Indoor VCB Panel separately. 1.32 OPTIONAL SPARES : The bidder shall also furnish list of recommended optional spares that will be required for Breakers along with their total and unit prices. However, the prices of optional spares will not be considered for bid evaluation. TN-01/54 TECHNICAL SPECIFICATION FOR 12 KV OUTDOOR VACUUM CIRCUIT BREAKER KIOSKS 1.0 SCOPE This specification is intended to cover testing at manufacturer's works, breaker Kiosks with current the manufacture, assembly, supply, delivery of 12 kV transformers, relays, metering instruments etc. design Complete Vacuum Circuit Potential transformers, protection with all accessories and Installation & Commissioning by the supplier for efficient & trouble free operation (Separate price for Installation & Commissioning and Civil works). 1.1 It is not the intent to specify completely herein all details of the design and construction of equipments. However, the equipment shall conform in all respects to high standards of engineering, design and workmanship and shall be capable of performing in continuous commercial operation upto the Bidder's guarantee in a manner acceptable to the Purchaser, who will interpret the meanings of drawings and specifications and material which in his judgment shall is have the power to reject any work or not in accordance therewith. equipment shall be complete with all components necessary for The offered its effective and trouble free operation along with associated equipments, interlocks, protection schemes etc. supply, Such irrespective components shall be deemed to be of whether those are specially within the scope of brought out in this specification and/or the commercial order or not. 2.0 STANDARDS The 12 KV vacuum circuit breaker Kiosks shall conform to latest revisions with amendments of standards as under unless specified otherwise. Equipment meeting any other authoritative standard which ensure equal standard mentioned above will also be or better quality than the acceptable. In such cases a copy of standard (English version) adopted, should be enclosed with the tender. IEC62271/100-200 IS:13118/IS-3427 IS: 3156 IS: 2705 IS: 3231 IS:1248 IS:14697-1999 IEC-62053-22-2003 IEC-62052-11-2003 CBIP Technical Report No.88 revised July, 1996 read with amendment issued (April,99, September,99 and also any other amendment thereafter). High Voltage Switchgear & Control gears. Circuit Breaker/ metal enclosed Switchgear and control gear. Voltage transformers. Current transformers. Electrical Relays for power system. Meters and Instruments Specification for AC static transformer operated watt hour and VAR hour meters class 0.2 S & 0.5 S. Specification for AC Static Watt hour Meters, class 0.2 S & 0.5 S. Specification for AC Static Electrical Energy Meter. TN-01/55 3.0 CLIMATIC CONDITIONS: Equipment to be supplied against this specification shall be suitable for satisfactory continuous operation under the following tropical conditions :i)Peak ambient air temperature in shade. ii) Minimum ambient air temperature in shade iii) Maximum relative humidity. iv)Minimun relative humidity 50 DEG C (-) 5 DEG C 95 % 10 % v)Dust storms are liable to occur from the period March to July vi) Height above mean sea level vii) Average number of thunder storms days per annum. viii) Average annual rainfall ix) 4.0 less than 1000M 40 DAYS 10-100 cm (Depending on area) Number of months of tropical monsoon conditions p.a. 4 PRINCIPAL PARAMETERS OF CIRCUIT BREAKERS 4.1 TYPE AND RATING 4.1.1 Type 12 kV Vacuum circuit breaker 4.1.2 Service 4.1.3 Pole 4.1.4 Rated voltage (nominal/max.) 4.1.5 Rated frequency 4.1.6 System Neutral earthing Outdoor 3 11/12 kV 50 HZ Effectively grounded. 4.1.7 INSULTATION LEVEL 4.1.7.1 Impulse withstand 4.1.7.2 One minute power frequency withstand voltage. 75 kVp As per relevant standards. 4.1.8 Rated Current o 4.1.8.1 Continuous at 50 C. 4.1.8.2 Short time current for 3 Sec. 630 A 16 kA 4.1.9 Rated Breaking Capacity 4.1.9.1 Symmeterical 16 kA TN-01/56 4.1.9.2 Asymmeterical 4.1.10 As per relevant standard Rated making capacity 2.50X16 KA 4.1.11 Rated short time withstand current 3 secs. 4.1.12 Total break time Closing time 4.1.13 Creepage distance 16 KA 3 cycles(Max.) 4 cycles (Max.) 300 mm or more 4.1.14 Protection class of kiosk IP-55 as per IEC 529 4.1.15 Operating duty For gang operation O-0.3 Sec-CO-3min-CO 4.1.16 Operating Mechanism motor operated spring charged closing mechanism or Magnetic Actuator. 4.1.17 Spring charging Motor 220V-240V 4.1.17.1 Heater/Lamp/Socket. 4.1.18 Terminal Connector 4.1.18.1 Type Bimetallic clamp type/ Al. alloy. 4.1.18.2 Suitable for ACSR conductor 4.2 4.2.1 240V AC 10% Panther and 90% Dog Conductor System details H.V. System Voltage (Nominal/Max.) 11/12 kV Phases 3 System Neutral Effectively earthed. Fault level 16 KA r.m.s. Symmetrical 4.2.2 Auxiliary power Supply 4.2.2.1 A.C. Supply 1. 415 volts 3 ph 4 W 50 Hz 2. 240V 1 Ph 2 W 50 Hz 5. GENERAL TECHNICAL REQUIREMENTS:- 5.1 DESIGN CRITERIA The bidder shall quote 12 KV Outdoor VCB Kiosks conforming to M-2 class only. The equipment will be used in high voltage system as having characteristics listed in the specification. The equipment will be installed outdoor in a hot, TN-01/57 humid and tropical atmosphere. All equipment, accessories and wiring shall have tropical protection, involving special treatment of metal and insulation against fungus, insects and corrosion. The maximum temperature in any part of the equipment at specified rating shall not exceed the permissible limits as stipulated in the relevant standards. The equipment shall be capable of withstanding the dynamic and thermal stresses of listed short circuit current without any damage or deterioration. The safety clearances of all live parts of the equipment shall be as per relevant standards. The cowling provision shall be provided on the roof of 12 KV outdoor VCB Kiosk to avoid direct inception of water at any joint. 5.2 SPECIFIC REQUIREMENTS 5.2.1 The vacuum circuit breaker kiosk shall be for outdoor installation. The duty of the circuit breaker shall involve satisfactory interruption of short circuit currents as listed in the specification. The breaker shall be capable of interruption of low reactive current (lagging/leading) without undue over voltage. 5.2.2 CONSTRUCTIONAL FEATURE 5.2.2.1 a) The circuit breakers shall be of CRCA sheet steel triple pole horizontal fixed type enclosed in Kiosk of 3 mm thickness for load bearing members and 2 mm thickness for non-load bearing members and shall comply with latest edition of IS:13118/3427/IEC-56. The Kiosk shall be switchgears and supporting Control frame works, the floor. The operating three gears vermin shall Nuts be complete shall be mechanism shall operate with all necessary (close/open) all the mechanism links etc. should be for maintenance. The circuit breakers and its operating mechanism fully interlocked to prevent mal-operation. All the breakers shall be supplied with necessary current ratings. Rigid 630 Amps. dust tight. The and bolts etc. for securing the same to phases simultaneously. The operating accessible proof and current rating clamps and connectors suitable for type bimetallic/Al.alloy terminal form part earthing the switchgears shall of appropriate connectors of supply. Suitable arrangement of be provided. All the connecting bus bars shall be made of copper. b) Hinges of door shall be concealed type to avoid rusting and obstructive opening of the door. c) The quality of welding shall be good and there should not be any lumps and splatters on the panel. d) All the connecting bus bar and current carrying parts shall be made of copper. e) All the gasket shall be of chemically treated neoprene. f) Hole & Pin locking (Check nut) arrangement should also be provided while fixing the vacuum interrupter at bottom side. TN-01/58 5.2.2.2Switchgear (Vacuum Circuit breakers etc.)shall be mounted on insulated with the PVC same density. Size Kiosk. Bus insulation/sleeves coating. The bus bars should be of current etc.)and control of specified in the tender. The of electrolytic bars gear (CTs.,PTs, bars shall relays be on electrostatic air powder copper with permissible limits the bus and current density should be bus bars conductor shall conform to Indian standard 8084 and 3427 and shall be rated for 630 A,STC 16 KA for 3 sec. 5.2.2.3 All the meters, instruments, relays etc. shall be mounted kiosk. The on the switchgear outdoor circuit breakers Kiosk shall be suitable for AC shunt tripping arrangement. 5.2.2.4The Kiosk shall have an arrangement place in addition to for emergency shunt tripping from remote arrangement for local emergency tripping(Mechanical). The kiosk shall also have a system to check all the three the "Trip circuit healthy check" in phases. Necessary trip and closing coils shall be provided for operation of the breakers. 5.2.2.5 All the six terminals shall be brought out through appropriate class bushings. 5.2.2.6 The arcing contacts shall surge voltage be made are reduced of homogeneous special alloy so that to negligible level & multiple reignition is eliminated. 5.2.2.7 The circuit breaker kiosk shall be electrically and mechanically trip free under various conditions. 5.2.2.8 The provision shall be kept on the kiosk roof and roof bushing assembly to adopt arcing horns. 5.2.2.9 The lifting arrangement shall not cause any effective loss of creepage distance/ phase to earth clearances as specified in the ISS/IEC. 5.2.3 MAIN CONTACTS The main contacts shall have adequate area and contact pressure for carrying rated continuous and short time current without excessive heating liable to cause pitting and welding. The breakers may be provided with silver plated contacts, if necessary, to meet the requirement of IS:13118/IEC56 where higher temperature rise is permitted with silver plated contacts. The quantity of silver facing shall be such that after carrying out one tenth of total number of operations specified for mechanical endurance tests, there is still continuous layer of silver on contacts. 5.2.4 NUMBER & TYPE OF SPARE, AUXILIARY CONTACTS/ SWITCHES : Adequate number of spare auxiliary switches/contacts both of normally open & normally close type but not less than four each shall be provided on the circuit breaker for use in the indication and controlling scheme of circuit breakers. 5.2.5 INTERLOCK All electrical and mechanical interlocks which are necessary satisfactory operation of the circuit breaker shall be provided . TN-01/59 for safe and 5.2.6 a) BUSHINGS FOR CIRCUIT BRAKER KIOSK The out door circuit breakers shall be metal enclosed fitted with weather proof/ suitable type bushing conforming to IS:2099 and shall be designed to have necessary mechanical strength and rigidity required the and shall be free from objectionable interference and external and internal corona. The porcelain shall be of the wet process type, homogeneous, free from laminations and cavities or other flaws which could effect its chemical & mechanical strength and shall not be injuriously stressed by temperature change. The porcelain shall be thoroughly vitrified tough and impervious to moisture and shall be evenly glazed. The glazing shall be free from blisters or burrs. The bushing shall be designed manufactured & tested in accordance with latest edition of IS:2099. The type and characteristic data bushing shall be clearly specified. b) The bushing shall not be subjected to direct point loading. They shall be provided with neck around clamps for evenly distributed pressure. c) The bushing shall be mounted using suitable clamps and gasket arrangement to provide required degree of protection. d) The bushing assembly shall be provided with lock nut and check nut which will be nonmagnetic and non-corrosive. 5.2.7 OPERATING MECHANISM Characteristics of Operating mechanism of circuit breaker and associated equipments : Method of operation: The circuit breaker shall be equipped with power operated mechanism to operate all three phases Motor operated spring closing be electrically using 220/240 V AC mechanism or magnetic actuator type. It shall & mechanically trip free under various conditions. Kiosk shall also be provided with hand Operation counter 5.2.8 simultaneously operated spring charging closing mechanism. and mechanically ON-OFF indicator shall be provided. VACUUM CIRCUIT BREAKER The three phase vacuum circuit breaker will have three vacuum interrupters (one interrupter per phase) insulated with mounted on same carriage. The interrupters shall be air epoxy resin / insulated phase barriers. Each interrupter shall have fixed and moving contacts in sealed envelops torr. The metallic and act as vacuum seal. The contacts shall have requisite mechanical strength and electrical shall permit axial vacuum below 10-6 movement of moving contact good bellow having and thermal conductivity and shall be made of copper chromium alloy. Complete literature of vacuum bottles shall be furnished with the tender. In order to have safe operation under fetal conditions, the vacuum interrupter should be housed in epoxy pole unit and make of Vacuum Interrupter will be as “BEL, CGL, SIEMENS, ABB, ALSTOM/AREVA/MEGAWIN”. Any other equivalent make of V.I. shall also be acceptable subject to prior approval of S.E. (MM), JVVNL, Jaipur. TN-01/60 5.2.9 i) VOLTAGE TRANSFORMERS Highest equipment voltage ii) : 12 KV No. of phases. : 3 Nos. single phase VTs iii) Insulation level. a) Impulse withstand voltage : 75 KVP b) One minute power frequency withstand voltage on : i) Primary winding : As per relevant standard. ii) Secondary winding : 2 KV rms iv) Frequency. : 50 Hz. v) Transformation ratio. : 11000/110 V vi) Rated output. : 100VA/Phase vii) Accuracy class. : 0.5 viii) Rated voltage factor. : 1.2 continuous & 1.5 for 30 sec. ix) Type of insulation : Resin cast. VTs, shall be provided with HRC type fuses on the secondary side. The VT fuses on primary side shall also be provided with all safety precautions. secondary terminals of the VTs, shall be solidly earthed. Three One of the numbers single phase voltage transformer of this rated output will be required for each circuit breaker kiosk. Voltage transformers shall be fixed type and shall be suitable for single phasing. 5.2.10 CURRENT TRANSFORMERS i) Rated voltage. ii) Insulation level. a) Impulse withstand voltage iii) iv) v) : 12 KV : 75 KVP b) One minute power frequency withstand voltage on : i) Primary winding : As per relevant standard. ii) Secondary winding : 2 KV rms Frequency. : 50 Hz. Rated continuous thermal current: 120% of rated primary current Short time thermal rating and its duration. : 16 KA for 3 sec. vi) Transformation ratio of : Core-I Core.II CTs 400-200-100/5-5A ---------------a) Rated output 15 VA 15 VA b) Class of accuracy 5P 0.5S c) Accuracy limit factor. 15 d) Purpose Relaying Metering vii) Max. instrument security factor. :- TN-01/61 5 12 KV current transformers shall be single phase. The ageing laminated ensure high silicon steel of core shall be of grade non low hysteresis loss and high accuracy at both normal and permeability to fault current. 5.2.11 The rating of secondary winding shall be 5 Amps. Required transformers ratio can be achieved in any manner, However, the current transformers will have to satisfy the requirement of rated VA burden, Class of accuracy , accuracy limit factor and short time thermal rating as have been specified above at all transformation ratio. The rating of current transformers of all classes regarding ratio error, knee point voltage, resistance of secondary winding etc. shall have to be co-ordinate with the requirement of protective relays and protection scheme without any extra cost. 5.2.12The tenderer shall also furnish along with the tender, complete general arrangement, schematic and outline diagrams indicating the mounting arrangement and position of current transformers, potential transformer, terminal block etc. Type of current transformers and potential transformers employed shall also be clearly stated. 5.2.13 INDICATING AND INTERGRATING METERS/INSTRUMENTS: All indicating instruments shall be of switch board type, back connected suitable for flush mounting and provided with dust and vermin proof cases for tropical use and finished in suitable colour. All instruments shall have practical laboratory means of adjustment of accuracy. The limits of errors for ammeters/voltmeter shall be permissible for class 1.5 instruments as per IS:1248. The ammeters and voltmeters shall be suitable scaled to indicate the current for all the ratings current/voltage be of transformers. A phase selector switch with four/six positions shall used to measure the current/voltage of each phase. The located at eye level to facilitate meter shall be observation of readings correctly. Any alarm scheme shall have both audio-visual annunciations in redundancy of each other and appropriate accept and reset push buttons shall be part of alarm scheme. 5.2.14 RELAYS : The circuit breaker shall be fitted with numerical relay having shunt trip coil for operation on 3 over current & one earth fault element. The numerical relay to be provided with the 12 KV Outdoor VCB Kiosk, should be so designed so as to operate/ trip on earth fault as well as on over current faults but should not operate on unbalance load conditions during single phasing (which can be achieved through residual voltage control or otherwise). The circuit breaker shall have suitable arrangement for power supply of relay and breaker operation through shunt trip coil using power pack. The power pack should be suitable for 6 Nos. closing/ tripping operations and for future remote communication as well as breaker testing during long time power failure. The output voltage may be as per manufacturer’s design. The charging of Power pack shall be through 230 V A.C. supply available at Sub-Station. TN-01/62 The make, model No., type and Technical specification of the relay as well as power pack are required to be mentioned in the bid. The Relay & Power Pack arrangement system should be warranted for 5 years (in line with warranty of breaker). The numerical relays shall have following features:a. Self Diagnosis b. Minimum last five abnormal events recording (over current & earth fault) including fault level and phase along with date & time. c. On-line display of current. d. Communicable with open Protocol having RS-485 port. e. The relay should contain four shots, three phase, programmable & auto reclose control feature. The relay shall be numerical type mounted in flush pattern on the panel board. The relay should be rated for 110V AC as well as DC & 5 Amper CT secondary. The relay should conform to latest IEC specifications. The tenders shall furnish the detail in this regard along with the offer. Relay TTB shall have trip bypass arrangement. All the relays shall be provided with test blocks in panel so designed that the relays may be tested at site. The relays should have provision of testing either through test block or test plug easily accessible by injecting the voltage / current/frequency (as applicable) from external testing instruments /source without first disconnecting/ re-energizing the primary electrical circuit protected by the relays. Facilities for isolating the tripping circuit during such testing shall also be provided. The requirement of test block shall not be applicable in case of drawout type relays which can be tested by using test plug without removing the relay from its casing. The testing facilities provided in the relays shall be specifically stated in the bid. Necessary test plug etc. as may be required for proper testing shall be included in the contractor’s scope of supply. One test plug with five panels or part thereof are to be supplied. The technical suitability of relays/schemes may also be examined by Protection Wing of Discoms & acceptability will be judged appropriately. The bidder must furnish type test reports as per relevant ISS/ IEC along with bid to suit the environmental conditions of our State, in respect of the relay (of the type and design offered) which should have been type tested in NABL accredited test laboratory in respect of such tests for which the lab has been accredited (for Indian make Relays)/ CPRI/ Nationally accredited testing laboratory (for Foreign make Relays).These type test reports should not be older than Five years from the date of opening of bid. The Following makes of Relays are acceptable:a. Areva. b. ABB. c. Easun Reyrolle d. C&S e. JVS TN-01/63 f. SEL g. ASHIDA h. MEGAWIN i. STELMEC j. CGL Any other equivalent make of relays shall also be acceptable subject to prior approval of S.E. (JCC), JVVNL, Jaipur. 5.2.15 WIRING : All wiring shall be of switch board type consisting of copper conductor of 2.5 sq.mm cross section insulated with polyvinyl chloride insulation suitable for 660V service and in accordance with relevant IS:732. Polyvinyl chloride used shall have excellent resistance against burning, moisture, oil and vermin and shall be finished with clear colour. Rubber insulated wiring shall not be acceptable. Tenderers shall furnish the details of method being adopted by them for joint/ connections. All instruments and panel wiring shall be of heat resisting and self extinguishing type in compliance with British Standard Practice/IS. Plastic or porcelain cleats of the limited compression type shall be used for holding wiring runs. All wires shall be suitable for bending to meet the terminal studs at right angles. Metal cases of all apparatus mounted on kiosk shall be separately earthed by means of copper wire or strips. The following colour schemes of the wiring shall be used as per IS:375. a) AC three phase circuits : i) No.1 phase : Red No.2 phase : Yellow No.3 phase : Blue ii) Neutral conductor : Black iii) Connection to earth : Green 5.2.16 TERMINAL BLOCKS : Terminal blocks shall be 650 V grade, box approved equal. Not more than two wires shall clamp be type ELMEX 10 sq.mm or connected to any terminal. Spare terminals equal in number to 20% of active terminals shall be furnished. Terminal blocks shall be located to allow easy access. Wiring shall be so arranged that individual wires of an external cable can be connected to consecutive terminals. 5.2.17 TEST TERMINAL BLOCK : Two Nos. test terminal blocks shall be provided one for testing of relays and other for testing meters. They shall be of switch board type back connected for front of panel mounting. The test blocks shall provide complete isolation of meters, instruments etc. and the arrangement shall be such that testing power could be connected at the test block from any external source or may be taken from the instrument transformers. transformers. Suitable Provision shall be made for short circuiting current sealing arrangement shall be provided in test terminal blocks. 5.2.18 INDICATING LAMPS : Indicating lamps shall be provided on the control board to indicate the following: i) Visual indication of ON and OFF position of each circuit breaker. TN-01/64 ii) PT supply indication. Each lamp body shall be of moulded insulation and shall be able to withstand a high voltage test of appropriate value. All lamps shall be suitable for 240 V AC supply and shall have low power consumption and shall provide a wide angle of illumination of sufficient intensity for comfortable viewing. A glass of appropriate colour shall be screwed into the front of lamp body. The design of indication lamp shall be such as to facilitate replacement of burnt lamps. An engraved label indicating the purpose of the lamp shall be provided with each lamp. 5.2.19 FERRULES : Ferrules engraved/printed with the same numbers, of symbols as indicated in the connections and wiring diagram shall be provided on the terminal ends of wires for identification of circuits shall be of strong prevent shall not adhesion. for inspection and and flexible insulating material They shall maintenance. Ferrules with glossy finish to be engraved/ printed and clearly marked and be effected by dampness. Ferrule numbering shall with IS:375. The same ferrules all number shall be in accordance not be used on wires in different circuits on a panel. 5.2.20 HT TVM:3 phase 4 wire A.C. Static H.T. Trivector meter of accuracy class 0.5S for measurement of energy as per latest specification of JVVNL, shall be provided on each Outdoor VCB Kiosks. Following makes of HT TVMs are acceptable: i) Secure ii) L&T iii) ABB/Elster iv) Schlumberger v) Genus Infra Any other make being procured by Nigam shall also be acceptable. 5.2.21 All interiors and exteriors of switchgear enclosure, breaker mechanism etc shall be finished and painted to produce a neat, fire resistant and durable surface which would prevent rusting and corrosion. Sheet metal component shall be pretreated using 7 tank phosphating process consisting of de-greasing, acid pickling, de-rusting, phosphating and passivation including repeated rinsing in between. On completion of the passivation of the components, they shall be preheated and then epoxy powder coated or treated with one coat of primer & zinc chromate and finished with two coats of light gray enamel paint of shade 631 of IS 5 and stoved to achieve excellent anti-rusting and scratch resistance properties. The thickness of painting shall be around 60 microns. 5.3 SCHEDUOLE OF EQUIPMENTS, FITTING & ACCESSORIES : 12 KV 630 Amps Vacuum circuit breakers kiosks for out door installation : 5.3.1 1 No. - 12 KV 630 Amp. Vacuum Circuit Breaker horizontal fixed type with provision of manual tripping by means of push button and emergency shunt tripping. TN-01/65 Electrically operated through 230 V AC. A lockable Local/ Remote switch shall be provided, apart from Trip-Neutral-Close (TNC switch) control switch to select local/ remote operation of the switchgear. The breaker control switch shall have TripNeutral-Close position spring return sequence locking mechanism. The breaker control switch and selector switch shall be mounted on the front side of cubicle and located at a convenient height for easy operation. 5.3.2 1 No. actuator 5.3.3 - AC Motor charged spring operated closing mechanism or magnetic type closing mechanism. 1 No. - Shunt tripping arrangement/ Coil for operation and earth fault by relays along with emergency on over current (load) shunt tripping from remote place in addition to local emergency tripping(Mech.) One additional shunt trip coil, fitted very near to the original coil (which will be unwired) is also required to be provided. 5.3.4 3 Nos. - Single phase 12 KV Current Transformer ratio 400-200-100/5-5A suitable for metering and protection. The class of accuracy shall be 0.5 for metering and 5P15 for protection. Rated burden (output) shall be 15 VA for each secondary winding and it should not be less than suitable for tripping arrangement provided. Instrument security factor for metering core shall not be exceed 5. 5.3.5 6 Nos. - Rigid type bimetallic/ aluminium alloy terminal connector suitable for ACSR (10% Panther and 90% Dog Conductor) for both horizontal/ vertical takeoff. 5.3.6 1 No. - Mechanical ON/OFF indicator. 5.3.7 1 No. - Operating handle for independent manual closing mechanism. 5.3.8 1 No. - Red indicating lamp for ON indication. 5.3.9 1 No. - Green indicating lamp for OFF indication. 5.3.10 Spare auxilliary contacts/switch having 5.3.11 1 minimum 4 NO + 4 NC No. - Flush mounting pattern 96x96 sq.mm Moving Iron ammeter of class 1.5 accuracy suitable scaled for 5 Amps. CT secondary. 5.3.12 1 No. - Ammeter selector switch to indicate phase current in all three phases and with OFF position. 5.3.13 1 No. – Numerical 3 O/C + E/F relay. 5.3.14 1 No. HT TVM of accuracy class 0.5S as per latest specification of JVVNL. 5.3.15 2 Nos. - 240 V AC single phase 80 or 100 watt anti condensation heaters with thermostat and switch. 5.3.16 1 No. - Automatic door illumination lamp with switch. 5.3.17 3 Nos. - 11000/110 V single phase voltage VA/phase burden & transformers each having 100 class of accuracy 0.5 suitably connected to meters and indicating instruments etc. 5.3.18 1 No. - Flush pattern switch board mounting pattern 96x96 sq. mm moving iron AC voltmeter of class 1.5 accuracy suitable for 110 V phase to phase secondary suitably scaled. TN-01/66 5.3.19 1 No. - Voltmeter selector switch to indicate phase to phase & phase to neutral voltage of all the three phases. 5.3.20 3 Nos. - Indicating lamps coloured Red, Amber Blue for PT supply. 5.3.21 2 Nos. - Test terminal blocks to test meters and relays with sealing arrangement. 5.3.22 1 No. - Blank lable on the front of kiosks at the top. 5.3.23 Door locks with keys for all doors. 5.3.24 Pair of base channel for grouting in floor. 5.3.25 Arrangement to check healthy trip circuit in all three phases (separate lamps for R phase, Y phase and B phase) be provided. 5.3.26 1 set - Self auxiliary plug and socket. 5.3.27 1 No. - ground bus system, size 50x6mm copper may be provided and the earthing stud shall be capable of withstanding rated short circuit current and stud design shall be as per IS-133427 or IEC -200. 5.3.28 1 No. - Audio-Visual Annunciations. 5.3.29 1 No. - Operation counter. 5.3.30 1 No. - Name plate at front and back of each kiosk. 5.3.31 1 set - 3 phase air insulated main copper bus bar of 630 amp. continuous current rating having maximum current density 1.5 Amp./ MM2 with minimum cross sectional area 600 MM2 with PVC insulation or sleeves, STC rating 16 KA for 3 sec. 5.3.32 1 Set -Power Pack arrangement system as specified in cl. No. 5.2.14. 5.3.33 1 No. -Spring Charge Indication Lamp. The busses within the cubical shall be of high conductivity electrolyte grade copper. The Bus bar joints shall be silver plated and bolted in such a manner that initial contact pressure around the square headed high tensile bolt will remain substantially undiminished at all temperature upto rated full load temperature. The Bus support and bushings shall be of epoxy resin cast type. All drop off from main bus to VCB and VCB to bushing terminations shall be suitable for current rating of circuit breaker . All the bus bar shall be sleeved with heat shrinkable sleeves of 12 KV voltage level (Insulated for a service voltage of 12 KV) and bus bar shall be shrouded wherever possible. All the bus bar joints shall be shrouded and where shrouding is not possible, it shall be taped with HV self amalgamation tape. All the tap off bus bar connections inside panel and PT jumpers shall be sleeved with HT heat shrinkable sleeves. Special care shall be taken in the design of bus bar system to provide for thermal expansion and to minimize the chances of bus fault. Bimetallic washers shall be provided at the joints of two different metal surfaces. The bus supports and bushings shall be non hygroscopic non aging glass reinforced polymer. TN-01/67 5.4 MAKE AND TYPE OF BOUGHT OUT ITEMS : Make / type instruments, of each indicating instruments, integrating control switch for Circuit Breaker/Trip Transfer, for Voltmeter/Ammeter, Push relay, Semaphore Indicator, indicating selector switch lamps, annunciator, Button, A.C. Hooter/Bell, D.C. Hooter, Heater, Link Type Test Block for testing of TVM, CFL Tube, 2/3 Pin clearly and invariably indicated in Particulars), bill of material Socket the GTP and unit price list. with Switch Terminal etc. shall be (Guaranteed Technical Only specific make accessories shall be indicated. The word "EQUIVALENT/REPUTED MAKE" will not be given for consideration. The other makes of all bought out items shall be acceptable if it is of "ISI Marked" or type tested for which bidder shall furnish attested copies of ISI Certificate/type test reports not respective Photostat older than Five years for the make offered, subject to prior approval of SE(MM), JVVNL, Jaipur. Other standard accessories which are not specifically mentioned but are required to be supplied with circuit breaker kiosk of similar type and rating for efficient and trouble-free operation. 5.5 TEMPERATURE RISE : The max. temperature rise of various parts of the circuit breakers when tested under rated condition shall not exceed the specified values at a peak ambient temperature of 50 deg.C . The breaker may be provided with silver plated contacts if necessary to meet the requirement of IS:13118/IEC:56 where higher temperature rise is permitted with silver plated contacts. The quantity of silver facing shall be such that after carrying out one tenth of the total number of operations specified for mech. Endurance test, there is a layer of silver on the contacts. still continuous The temperature rise of CTs and PTs shall also not exceed the permissible values as per relevant Indian standards when corrected for max. ambient temperature at site. 6.0 TESTS : 6.1 TEST BEFORE DESPATCH : The 12 KV vacuum circuit breakers and accessories shall be subjected at maker's works before dispatch, to the following tests as per relevant IS/IEC. A) (i) ROUTINE TESTS ON EACH UNIT AS PER RELEVANT STANDARDS : One minute power frequency voltage withstand dry test on main circuit. (ii) Voltage withstand test on control & auxiliary circuits. (iii) Measurement of the resistance of main circuit. (iv) Mechanical operating test. (v) Design and visual checks. B) The following type tests shall be conducted on the material as per relevant standards: TN-01/68 (i) Dielectric tests. a) Lightning Impulse Voltage Test. b) One Minute Power Frequency Test (Wet & Dry). (ii) Short time withstand current and peak withstand current test. (iii) Basic short circuit duties test. (iv) Single phase short circuit test. (v) Mechanical Operation test as per M-2 class. (vi) Out of phase making & breaking test. (vii) Capacitive Current Switching Test. a) Cable Charging Test. b) Single Capacitor Bank Current Switching Test. (viii) Measurement of resistance of main circuit. (ix) Temp. rise test. (x) IP-55 Test (For cubicle/control cabinet). (xi) Any other type tests not specified above but covered as per amendment/latest edition of relevant IS/IEC. C) The type test reports of Circuit Breakers, Current Transformers, Potential Transformers, Relays, Meters etc. shall be complete in all respect as per relevant IEC/ISS. 6.2 TYPE TESTS : The 12 KV vacuum circuit breaker kiosk offered shall be fully type tested as per relevant standards. Where permitted in the relevant standard, a test specimen for type test may be a representative sub-assembly/ a representative functional unit.An individual type test is acceptable for a change of constructional detail, for any change in the design/type of type test report and the design/type of offered against this specification, if the manufacturer can demonstrate and purchaser is satisfied that this change does not influence the result of the individual type test.The bidder may bring out in their offer all such changes made in components, materials, design etc. as the case may be.The purchaser will interpret the meanings of drawings and specifications and shall have the power to accept/reject any type test report which in his judgment is/is not in a manner acceptable to him. The decision of Purchase Committee in this matter shall be final and binding to all. However, the purchaser reserves the right to demand repetition of some or all the type tests in presence of purchaser's representative. For this purpose, the bidder should indicate unit rates for carrying out such type tests. These test charges shall not be taken into consideration for bid evaluation. 6.3 TEST ON BOUGHT OUT ITEMS : Tests are not required to be performed on bought motor, terminal connector, Certificate etc. out equipments/items like at the works of manufacturer. Furnishing Test of these items from the original equipment manufacturers shall be TN-01/69 deemed to be satisfactory evidence. Inspection of the tests at Sub-contractors works will be arranged by the supplier whenever required. 6.4 (i) ROUTINE/ACCEPTANCE TESTS : The following acceptance and routine tests shall be got conducted in presence of purchaser's representative as per stipulation of the relevant standards, on each unit. (ii) a) One minute power frequency voltage withstand dry test on main circuit. b) Voltage withstand test on control & auxiliary circuits. c) Measurement of the resistance of main circuit. d) Mechanical operating test. e) Design and visual checks Inspection & tests on control gear. In addition to the above tests at 6.4 (i) above specified by IEC, the following shall also be performed at manufacturer's works in presence of purchaser's representative after completely assembling the kiosk. a) Checking wiring of circuits and their contacts. b) Insulation resistance of complete wiring, circuit by circuit with all equipment mounted on the panels. c) Checking of operational protective schedule , instruments and meters. d) Checking of phase faults between R&Y, Y&B and B&R phases. Kiosk should trip under all three conditions. (iii) Temp. rise test on one No. Kiosk in the first offered lot shall also be done in the presence of the purchaser's representative. (iv) Any other tests not specified above but covered as per amendment/latest edition of relevant IS/IEC. 6.5 TOLERANCE ON TEST RESULTS : As per relevant standards/specification. 6.6 TEST AT SITE : The purchaser reserves the right to conduct all tests on 12 KV circuit breakers after arrival at site and the contractor shall guarantee test certificate figures under actual service conditions. 7.0 INSPECTION : All the tests (as mentioned at Clause 6.4) and Inspection shall be made at the place of manufacturer unless otherwise especially agreed upon by the bidder and purchaser at the time of purchase. The bidder shall afford the inspection officer(s) representing the purchaser all reasonable facilities without charges, to satisfy him that the material is being furnished in accordance with this specification. The purchaser has the right independent agency to have whenever the tests carried out at his own cost by an there is a dispute regarding the quality of stage of supply. The Inspection may be carried out by the purchaser at manufacture/ before despatch as per relevant standard. TN-01/70 any Inspection and acceptance of any material under the specification purchaser, shall not relieve the bidder by the of his obligation of furnishing material in accordance with the specification and shall not prevent subsequent rejection if the material is found to be defective. The Bidder shall keep the purchaser informed in advance, about manufacturing programme so that arrangements can be made for inspection. The purchaser reserves the right to insist for witnessing the acceptance/ routine testing of the bought out items. The Bidder shall give 15 days advance intimation to enable the purchaser to depute his representative for witnessing the acceptance and routine tests. 8. PACKING AND FORWARDING 8.1 The equipments shall be packed in crates suitable for vertical/horizontal transport as the case may be, and suitable to withstand handling during transport and outdoor storage during transit. The supplier shall be responsible for any damage to the equipment during inadequate packing. transit, due The easily damageable and marked with the appropriate caution the improper and material shall be carefully packed symbol. Wherever necessary, proper arrangement for lifting, such as lifting hooks etc. shall material found short inside to packing cases be provided. Any shall be supplied by supplier without any extra cost. 8.2 Each consignment shall be accompanied with a detailed packing list containing the following information : a) Name of the consignee. b) Details of consignment c) Destination d) Total weight of consignment. e) Sign showing upper/lower side of the crate. f) Handling and unpacking instructions. g) Bill of material indicating contents of each package. 8.3 The supplier shall ensure that the packing list and bill of material are approved by the purchaser before dispatch. 9. Optional Spares The bidder shall also recommend optional spares that will be required for breakers along with their total and unit prices. However, the spares 10.0 will not be prices of operation considered for bid evaluation. PERFORMANCE WARRANTY PERIOD : The performance warranty period shall be 5 (Five) years from the date of receipt of equipment along with its all accessories. TN-01/71 TECHNICAL SPECIFICATION FOR 33 KV CONTROL AND RELAY PANELS 1.0 1.1 SCOPE : This specification covers design, engineering, manufacture, assembly, shop testing, inspection and testing before supply and delivery of Control and Relay Panels for 33 KV circuits to be installed at various 33/11KV sub-stations covered under Rajasthan and as detailed hereunder 1.2 It is not the intent to specify completely construction of equipment. to high standards of capable of However, the equipment shall conform in all respects engineering, performing herein all the details of the design and design and workmanship and shall be in continuous commercial operation up to the Bidder's guarantee, in a manner acceptable to the Purchaser, who will interpret the meanings of drawings and specifications material which, in equipment and of judgment, the power to reject any work or is not in accordance shall be complete with all trouble scope his and shall have therewith. components necessary for The offered their effective free operation. Such components shall be deemed to be within the bidder's supply irrespective of whether those are specifically brought out in this specification and/or the commercial order or not. 2.0 STANDARDS : The Relays, associated components and enclosures shall conform to the latest issues of standards as given below, except to the extent explicitly modified in the specification. ________________________________________________________ Indian Standard No. Title ________________________________________________________ IS-3231 Protective Relays IS-8686 Static protective relays IS-1248 General requirements of indicating and integrating meters IS-2705/1981 Current Transformers IS-4201/1983 Application guide for current transformers IS-2419 Dimensions of panel mounting and indicating & recording instruments IS-3156/1981 Voltage Transformers IS-3043/1966 Code of practice for earthing IS-8530/1977 MDI IS-14697-1999 Specification for AC Static Transformer operated watt hour and VAR hour meter 0.2 S and 0.5 S. IEC-62053-22-2003 Specification for AC Static Watt hour IEC-62052-11-2003 meters, class 0.2 S & 0.5 S. CBIP Technical Specification for AC Static Electrical Report No.88 Energy Meter. revised July, 1996 read with amendment issued (April,99, September,99 and also any other amendment thereafter). IS-9224 HRC cartridge fuse TN-01/72 IS-3202 IS-345 IS-6005 Climatic proofing for electrical equipment Code for wiring numbers Code for practice for Phosphating, Iron and Steel. IS-6875 Control switches (LV switching device for control and auxiliary circuits.) IS-375 Marking and arrangement for switchgear Busbar main connection and auxiliary wiring. IS-1554 PVC insulated cable up to and including 1100 V. IS-5578 Marking & arrangements for switchgear IS-11353 bus bars, Main connections and auxiliary wiring. IS-2147 Degrees of protection provided by enclosures for low voltage switchgear & control gear IS-5 Colours for ready mix paints IS-8623 Specification for low voltage switchgear and control gear assemblies. IS-13947 Specification for low voltage switchgear and control gear.(Covers degree of protection) ----------------------------------------------------------2.1 In case equipment conforms to other International standards which ensure equivalent or better performance than that specified under clause 2.0 the English version of such standards or the relevant extracts then of the same shall be forwarded with the bid and the salient features of comparison shall be brought out separately in additional information schedule. 3.0 3.1 SERVICE CONDITIONS: Climatic Conditions: The equipment to be supplied against this specification shall be suitable for satisfactory continuous operation under the following tropical conditions: i) ii) Location Maximum ambient air temperature ( deg C) in shade iii) Minimum ambient air temperature (deg C) iv) Average daily ambient air temperature (deg C) v) Max. yearly weighted ambient temperature (deg C) vi) Max. relative humidity vii) Max. altitude above mean sea level (Metres) viii) Average annual rainfall (mm) xi) Max. wind pressure (Kg/Sq.mt) x) Isoceraunic level (days/year) xi) In state of Rajasthan 50 deg C -5 deg C 45 deg C 35 deg C 100% Varies from 61 Mts. to 815 Mts 15 cm to 100 cm 195 4 Months (June to Sept) 0.3 g Seismic level (Horizontal Acceleration) NOTE: Hot and humid tropical climate is conducive The climatic conditions are conditions. Smoke is also also prone to rust and fungus growth. to wide variations in ambient present in the atmosphere. Heavy Lightning also occurs during June to October. TN-01/73 3.2 Auxiliary Power Supply : Auxiliary electrical equipment shall be suitable for operation on the following supply system: a) AC Supply b) D.C. Alarm, control 415 V, 3 Phase 4 wire 50 HZ, neutral grounded AC supply (230 V single phase) 110 VDC,2 wire. and protective device Each of the foregoing supplies shall be made available by the Purchaser at the terminal point for each equipment. Bidders boxes etc. The above board for operation of relays/switches and scope include supply of supply voltage interconnecting auxiliary cables, terminal may vary as below and all devices shall be suitable for continuous operation over entire range of voltages. 4.0 i) AC supply: Voltage +/- 10% frequency +/- 5% ii) DC supply: -15% to +10% PRINCIPAL PARAMETERS : 4.01 The C&R panels, required at various sub stations can be broadly classified into following categories of panels : ------------------------------------------------------------------------S.No. Particulars. Type of panels Simplex Duplex. ------------------------------------------------------------------------1. 33 KV C&R panel for controlling (a)HV side of 2 Nos. ) A of 33/11 KV ) transformers ) 2. 33 KV C&R panels for controlling B 2 nos. 33 KV feeder circuits. ------------------------------------------------------------------------- 4.02 The requirement of various sub stations will comprise of one or more of these panels. The simplex panel shall be complete in itself and provided with doors at the back, while the Duplex panels shall be with end doors which shall be provided only with transformer panels. The various panels shall generally be equipped as per Schedule-A. Statement showing CT ratio their technical particulars and instrument ranges to be provided at various sub-stations are placed at annexure I & II. Statement showing ratio of voltage transformers and capacitive voltage transformers proposed to be provided at various sub stations is placed at Annexure. III. 5.0 GENERAL TECHNICAL REQUIREMENT : 5.01 This specification cover the design, inspection and testing engineering, manufacture, before supply and delivery of control and duly mounted with protective relays, metering equipments the satisfactory operation of radial and assembly, relay board etc. required interconnected 33 KV for lines, Bus couplers and 33KV side of 33/11KV Power Transformer at various 33/11KV grid sub stations included in the specification to the satisfaction of purchaser. TN-01/74 5.02 The intention of the specification is to provide protective equipments on control boards relaying & metering enumerated in the specification and to be complete in every respect for the functions designated. It is required the supplier, in accepting the contract, agrees to that furnish all apparatus, appliances and material whether specifically mentioned or not but which may be found necessary to complete or test any of the herein specified schemes in compliance with any 5.03.01 protective the requirements of the specification without extra charges. Considerations may be given considers advisable by reasons of to his alternatives which the own requirements manufacturing and experience, provided descriptive literature commended device or arrangement as is submitted pointing equal to, or superior supplier out to the that required by the accompanying specifications. 5.03.02 The each supplier/tenderer should indicate the list of recommended spares and relays which should be purchased (i.e.P.S. module, spare relays and contacts, tripping relays). 5.03.03 Each supplier/tenderer should also indicate the list of test kits and test accessories required to test their relays which should be purchased. 5.03.04 The supplier will give training at the works for the supplied first time relays which are being to protection engineers free of cost and assist them in field for commissioning of these schemes (First five) free of cost. 5.04 RELAYING REQUIREMENTS : 5.04.01 The relay offered by the supplier shall comply with the requirements of latest issue of ISS:3231 & IS:8686 operation in or relevant BSS or IEC and shall be suitable for the climatic conditions specified under clause 3.1 of this specification . If complying with a specification other than BSS/ISS/IEC then an English translation of the same shall accompany the tender. 5.04.02 Each relay shall be provided with dust tight, removable covers with glass/clear plastic windows. The relay shall be so arranged that on opening the case, it shall be impossible for any dust which may have collected in or upon the case, to fall on the relay mechanism. The operation of the relays shall be practically free from errors due to normal variation in frequency and wave form and from ambient temperature effects between (-) 5 deg. C to 50 deg.C. 5.04.03 All relay voltage current coils/elements maximum possible thermal and shall be mechanical able to stresses withstand the likely to be encountered in service, without damaging the coil/element and mechanical parts. relay Each coil/elements shall be vacuum impregnated with an insulating compound and shall be heat and moisture resistant. The continuous electrical rating of all the coils shall be 110%. 5.04.04 The volt ampere burden of the relay coils shall be low and, as per the best modern design, shall be such that the setting and calibration will not easily get TN-01/75 out of adjustment. All contacts shall preferably be made of pure silver and shall be readily renewable and self cleaning type. 5.04.05 Time delay features which depend upon dash pots or other devices which are appreciably effected by change in temperature or humidity will not be acceptable. Permanent magnets shall be non ageing type. 5.04.06 Terminal blocks shall have bases and barriers moulded integrally with brass inserts and shall be suitable for 660 volts service, individual studs or screws with retainer type washer for terminals shall be provided for each incoming and outgoing feeders. 5.04.07 All fault detecting relays shall be equipped with phase relays with separate operation indicators. In three elements, each phase shall have separate indicator. 5.04.08 Annunciation and alarm circuits shall be operated by contacts on an auxiliary tripping relay or by a separate relay added for that purpose. All tripping shall be done by auxiliary tripping relays fed from separate D.C. source thereby providing isolation of the relaying circuits rom sources. Auxiliary specification the circuit breaker D.C. control tripping relays for all protections included in this shall be hand reset type. winding temperature trip, oil Transformer temperature trip, auxiliary protection like Buchholz trip/alarm and Oil surge trip shall be through auxiliary relays. 5.04.09 All the relays shall be provided with test blocks in panel so designed that the relays may be tested in situ. The relays should have provision of testing either through test block or test plug easily accessible by injecting the voltage/current/frequency (as applicable) from external testing instruments / source without first disconnecting / reenergizing the primary electrical circuit protected by the relays. Facilities for isolating the tripping such testing shall be not also provided. The circuit during requirement of test block shall be applicable in case of drawout type relays which can be tested by using test plug without removing the relay from its casing. Relay TTB shall have trip bypass arrangement. The testing facilities provided in the relays shall be specifically stated in the bid. Necessary test plug etc. as may be required for proper testing shall be included in the contractor's scope of supply. One test plug with five panels or part thereof are to be supplied. 5.04.10 All relays shall be suitable for 5 Amps. rated secondary voltage of 110/Root 3 volts between non-directional polarization C.T. secondary phase and current and neutral. for earth fault shall, however, be rated The for 110V. The normal frequency will be 50 cycles per second. 5.04.11 All devices required for correct operation of each relay shall be provided by the supplier without extra cost. 5.04.12 For over current & earth Fault protection, only numerical relay shall be provided. In three phase protection relay, the setting for over-current element shall be 50- TN-01/76 200% (in step of 10%) and for earth fault element from 10 to 80% (in step of 10%). The numerical relay shall have following features:a. Self Diagnosis b. Minimum last five abnormal events recording (over current & earth fault) including fault level and phase along with date & time. c. On-line display of current. d. Communicable with open Protocol having RS-485 port. e. The relay should contain four shots, three phase, programmable & auto reclose control feature. The auto reclosing control feature shall only be provided for the 33 KV Feeder Type C&R Panel only. 5.04.13 Based on the results of comprehensive test, the tenderer shall declare the performance of the protective system in terms of the following : 5.04.14 i) Fault setting. ii) Time of operation. iii) Stability limit. The bidder must furnish type test reports as per relevant ISS/ IEC along with bid to suit the environmental conditions of our State, in respect of the relay (of the type and design offered) which should have been type tested in NABL accredited test laboratory in respect of such tests for which the lab has been accredited (for Indian make Relays)/ CPRI/ Nationally accredited testing laboratory (for Foreign make Relays). These type test reports should not be older than three years from the date of opening of bid. Bids without Type Test reports will be treated as Non-Responsive. 5.04.15 MAKE OF RELAYS The following make of relays are acceptable to Nigam:i) ii) iii) iv) v) vi) vii) viii) ix) x) AREVA ABB EASUN REYROLLE JVS SEL ASHIDA C&S MEGAWIN CGL STELMEC Any other equivalent make of Relay shall be acceptable subject to prior approval of this office. 5.05 PROTECTION FOR 33 KV SYSTEM : 5.05.1 INCOMER (HV side of 33/11 KV transformer) Protection will be provided on 33 KV incomer which includes four pole IDMTL non directional inverse time combined over current & earth fault relay instantaneous attachment with stabilizing resistance. 5.05.2 FEEDER PROTECTION TN-01/77 with Protection of 33 KV feeder circuits against pole IDMTL non directional inverse time with 5.06 line faults shall be met by four combined over current & earth fault relay instantaneous attachment. FAULT/TROUBLE ALARM ANNUNCIATION SCHEME : 5.06.01 Each C/R panel shall be equipped with the annunciations details given required for Annunciation scheme for indicating the trip and non-trip hereunder. Each annunciation shall be alarms all as per clearly labelled to indicate the nature of particular annunciation. 5. 06.02 The following switches shall be provided with the annunciator : i) A common push button switch near the annunciator unit which when pressed shall cancel the audible alarm indication by means of the alarm lamps incorporated in the control switch cancellation relay. The shall remain illuminated, but shall change from flashing to steady glow. ii)A common reset push button shall be provided. By pushing this button, annunciation shall be restored to the normal condition. The lamp incorporated in the control switch should not glow after resetting all the protection devices. iii)A test push button switch shall be provided to illuminate all the lamps of the associated group. As long as the test switch is held in pressed position all the lamps shall remain illuminated. 5.06.03 Necessary auxiliary relays shall be provided indicate each trip in the annunciator scheme to alarm individually .Each alarm whether trip or nontrip shall have visual as well as audible annunciation. 5.06.04 The visual annunciator alarm shall be in the form of flashing display type glow pattern. The illuminated facias with inscription on the glass transducent plastic to indicate the operation of particular protection device shall be provided. The window shall remain illuminated till the particular initiating contact is reset. 5.06.05 As regards the audible indication, the automatic trip of the circuit breaker due to the operation of protection relays shall be indicated by sounding of a hooter. All non trip alarms shall be indicated by an alarm bell/ electronic bell. 5.06.06 33 KV Feeder circuits Following trip/Non trip alarm shall be provided on each panel controlling two 33 KV feeder circuits. Trip 5.06.07 i) Over current Feeder I trip. ii) Earth fault Feeder I trip. iii) Over current Feeder II trip. iv) Earth fault Feeder II trip. Non trip i) Trip circuit Feeder I faulty. ii) Trip circuit Feeder II faulty. 33 KV Transformer Following trip/Non trip alarm shall be provided on each panel controlling 2 Nos. 33 KV Transformer circuits. Trip TN-01/78 5.06.08 i) Over current HV trip Transformer 1. ii) Earth fault HV trip Transformer 1. iii) Over current HV trip Transformer 2. iv) earth fault HV trip Transformer 2. v) Buchholz alarm Transformer 1 vi) Buchholz alarm Transformer 2 vii) Buchholz trip Transformer 1 viii)Buchholz trip Transformer 2 ix) Oil temperature trip Transformer 1 x) Oil temperature trip Transformer 2 xi) Winding temperature trip Transformer 1 xii) Winding temperature trip Transformer 2 xiii)Oil surge relay trip Transformer 1 xiv) Oil surge relay trip Transformer 2 Non trip i) Trip circuit faulty Transformer 1. ii) Trip circuit faulty Transformer 2. iii) Minimum oil guage Transformer 1. iv) Minimum oil guage Transformer 2. v) Oil temperature alarm Transformer 1. vi) Oil temperature alarm Transformer 2. vii) Winding temperature alarm Transformer 1. viii)Winding temperature alarm Transformer 2. ix) D.C. under Voltage alarm Transformer 1. x) D.C. under Voltage alarm Transformer 2. It will be responsibility of the supplier to provide all the alarms and annunciation equipments required for General the safe and efficient operation of the sub description of the alarms required are given but the stations. supplier shall include other alarms that he considers necessary. 5.07 SPECIFICATION OF INDICATING AND INTEGRATING INSTRUMENTS AND METERS : 5.07.01 All indicating instruments shall be of switch board type back connected suitable for flush mounting use and with dust and vermin proof case for tropical finished in black colour. All fixing screws, nuts shall be designed Voltmeters, square and provided according HT Trivector pattern IS:2419/1963. Meters, and shall Energy to relevant Indian as well as and threaded Standards. conform Ammeters, power factor meters shall be conform to the provisions of the latest meters shall parts to edition of the provisions of relevant IS amended upto date. All instruments shall have practical means of adjustment of accuracy. The limits of errors for ammeters, voltmeters, Power factor meters and watt meters shall be those permissible for class.1 instruments of switch board type given in IS:1248. The energy meters shall however conform to class.0.5S accuracy. The calibration of the instruments shall function satisfactorily when mounted on steel panels or alternatively magnetically shielded instruments shall be used. 5.07.02 AMMETERS AND VOLT METERS : All ammeters and voltmeters shall be of moving iron spring controlled type. Ammeters shall be provided in all the individual feeder panels and transformer control panels to indicate the current in all the phases. The ammeters shall be suitably scaled to indicate the current TN-01/79 for all the ratios of current transformers. A phase selector witch with four position shall be used to measure the current in all the three phases and in the fourth position the ammeters shall be out of circuit. The voltmeters shall be provided wherever asked for in the detailed equipment requirement. A phase selector switch with six positions shall be used to indicate the voltage between phases and between phases and earth. 5.07.03 A.C. STATIC H.T. TRIVECTOR METERS : A.C. Static H.T. Trivector Meter shall be as per latest specification of JVVNL. The meters shall be located at eye level to facilitate observations of readings correctly. Purchaser reserves the right to get energy meters separately purchased from other source, installed on the control and relay panels to be supplied by the tenderer under this contract. In that event duly blanked cutout with mounting arrangement and wiring shall be provided on the control per details furnished and relay panels as by the purchaser. The price of the control and relay panel shall be reduced corresponding to the unit price given in the tender. 5.07.04 TESTING BLOCKS : Testing terminals shall be provided for carrying out calibration tests on Energy meters, without disconnecting the connecting leads or removing the meters. The test plug shall be so arranged that when the testing respectable are fitted, the current and voltage are automatically disconnected from the source and injection from the separate source is possible. 5.07.05 Unit prices of each metering and indicating instruments shall be given in the schedule of prices. For making adjustments in the panel mountings depending upon exact system requirement. 5.08 SPECIFICATION OF CONTROL AND RELAY BOARD 5.08.01 The equipment equivalent IEC offered should standards. specifications wherever conform The to relevant references of the Indian standards or relevant mentioned in the text of this specification given accordingly. Other authoritative standards which ensure an standard have been equal or better quality than the standards specified will also be accepted. 5.08.02 The Boards shall comprise of cubicles placed side by side to form continuous boards. The duplex type shall be mounted back to back and so arranged as to have a covered corridor in between to provide access to the internal wiring. Hinged lockable access doors shall be fitted at both ends of the corridor and switch boards interior shall be automatically lit by the opening of these doors. The control boards for the same line voltages at each sub-station shall be placed side by side. 5.08.03 For the existing sub stations the tendered shall ensure the matching of control & relay boards with the existing ones. The complete details of the existing control & relay panels shall be supplied to the following points shall be particularly coordinated. TN-01/80 successful tenderer. The i) The height and depth of the panel shall be perfectly matched. ii) Colour of panels both on exterior and interior shall be matched. iii)Size and appearance of instruments, control switches and indicating lamps mounted on the front of the panels shall be matched with the existing ones to the extent possible. iv) The size, colour and disposition of the mimic diagram shall be perfectly matched with the existing scheme. 5.08.04 For other new sub stations, access doors with concealed hinges having a swing of not less than 1050 mm on full opening of their position shall be provided at suit-able locations. The equipment specified shall be manner set out and where not set out, to manufactured in the the reasonable satisfaction of the purchaser. 5.08.05 The control and relay cubicles shall be of folded type construction. The front panels, base frame and door frame shall be manufactured from CRCA sheet steel 10 SWG (3mm) thick, while the side panels, roof and doors shall be manufactured out of 14 SWG (2mm) thick CRCA sheet steel. The bottom of the cubicle frame shall spaced be suitable for erection on flush concrete floor. Evenly grout bolts projecting through the base channels forming members of the frame shall be used for securing cubicles to the floor. The dimensions of control and relay panels where no specific matching is required shall be as follows : Height : 2312 mm (inclusive of base channel height of 102 mm). Width : 750 mm or suitable to accommodate date equipments Depth Duplex panel. : 610+762+610 mm (Corridor width is 762 mm). Simplex panel. : 610 mm 5.08.06 The front panels of all the cubicles shall be detachable and all inter connections from the control to the relay cubicles and vice verse shall be through terminal connectors. The inter connections shall preferably run underneath the top cover. In order to avoid sectionalizing the leads at two points, the top cover may be provided with hinges on the part. 5.08.07 The complete switch board shall be dust and vermin proof and shall be suitable for tropical use. All holes and extension windows in the panels shall be blanked and access doors shall be lined with compressible line at the edges. The complete boards shall incorporate all necessary meters, instruments, relays, control switches, indicating horizontal and vertical wiring supports, system, terminal blocks, heaters, In the make lamps, mimic buses, audible and visual cable glands, automatic maphore earth bars, interior alarms, lighting fuses, labels, cleats, ferrules, space indicators and other necessary equipment. relay panels, it will be the responsibility of the supplier provisions for the leads to scheme for different trip and non trip be connected to the annunciator alarms. The enclosure shall provide a minimum degree of protection equivalent to IP51 in accordance to IS2147. TN-01/81 to 5.08.08 All power and control cables will be connected in separate distributing trenches running immediately, underneath the control & relay panels. The cables will branch off into each cubicle through entry holes in the concrete floor opening in the bottoms of the cubicles. The tenderer shall mark the details of the cable entry holes, glands and position of grouting bolts to enable the purchaser to prepare foundations with pockets for grouting bolts while casting floor. 5.08.09 PAINTING : All unfinished surfaces of steel panels and frame work shall be sand blasted to remove rust, scale, foreign adhering matter and grease.A suitable rust resisting primer shall be applied on the interior and exterior surface of steel, which shall be followed by application of an under coat suitable to serve as base and binder for the finishing coat. I) All sheet steel work shall be phosphated in accordance with IS:6005 code of practice for phosphating iron and steel. II) Oil, grease, dirt and swarf shall be thoroughly removed by emulsion leaning. III) Rust and scale shall be removed by pickling with dilute acid followed by washing with running water rinsing with slightly alkaline hot water and drying. IV) After phosphating thorough rinsing shall be carried out with clean water followed by final rinsing with dilute dichromate solution and oven drying. V) The phosphate coating shall be sealed with application of two coats of ready mixed, stoved type zinc chromate primer. The first coat may be "flash dried" while second coat shall be stoved. VI) After application of primer two coats of finishing synthetic enamel paint shall be applied. Each coat shall be applied followed by stoving the second coat after inspection of first coat of painting. Generally the exterior colour of paint shall be as per shade 631 of IS5, except where specific matching is required. VII) Each of coat of primer and finished paint shall be of slightly different shade to enable inspection of painting. VIII) In case the tenderer proposes to follow any other established painting procedure like electrostatic painting, the procedure shall be submitted along with the tender for purchaser's review and approval. 5.08.10 PANEL WIRING : 5.08.10.1 All wiring other than for annunciation circuits shall be of switch board type 2.5 sq.mm conductor PVC insulated Indian Standards. For annunciation and alarm circuits, the wiring will be done chloride sq.mm used PVC shall and vermin and shall and in conductor/ Copper relevant 1.5 660V service copper with with suitable for multi strand tinned accordance insulated multi strand have excellent resistance be finished wiring shall not be acceptable. TN-01/82 with copper conductor. Polyvinyl against burning, moisture, oil clear colour. Rubber insulated 5.08.10.2 The wiring shall be supported by plastic cleats/PVC channels. Wires shall be terminated on to the terminal blocks with annealed and tinned (not soldered) crimp tag termination, seperate termination being used for each wire, and the size of termination suited to the size of wire terminated. Wiring shall in general be accommodated on the sides of the cubicles and the wires for each circuit shall be separately grouped. 5.08.10.3Wires shall not be jointed or tied between terminated points. At the terminal connections, washers shall be interposed between terminals and holding nuts. All holding nuts shall be secured by locking nuts. The connecting studs shall be secured by locking nuts. the connecting studs shall project at least 6 mm from the lock nuts surface.\ 5.08.10.4Bus wires shall be fully insulated and run separately. Fuses and links shall be provided to enable all circuits in a panel except lighting circuit to be from the bus wire. Whenever practicable all circuits in which isolated the voltage exceeds 125 volts, shall be kept physically separated from the remaining wiring. The function of each circuit shall be marked on the associated terminal boards. 5.08.10.5All wiring diagrams for the control and relay Boards shall be drawn as viewed from the back of the cubicles and shall be in accordance with the relevant I.S. 5.08.10.6Wiring connected to the space heaters in the cubicle shall have porcelain beaded insulation over a safe length from the heater terminals 5.08.10.7All wiring inter connecting the front boards over the corridors panels with the rear panels of the switch access shall be wired in gutters held against the ceiling of by means of screws. As the front and the back detachable, the interconnection shall be panels will be made through suitable terminal connectors securely fixed on the panel. 5.08.10.8All voltage bus wiring ,audible and non audible alarm bus wiring, A C & D C control supply, bus wiring for panel lighting and such other wiring which runs from panel to panel within the switch board shall be laid out in gutters and shall be suitably screened. 5.08.10.9All wire shall be suitable for bending to meet the terminal studs at right angle with the studs and they shall not be skewed .Metal cases of all apparatus mounted on panels shall be separately earthed by means of flexible copper wire or strip. 5.08.10.10The following colour scheme of the wiring shall be used : i) A.C. three phase circuits No. 1 Phase No. 2 Phase No. 3 Phase ii) Neutral Conductor iii) Connections to earth iv) D.C. circuits Colour Red Yellow Blue Black Green Grey 5.08.11FERRULES : TN-01/83 5.08.11.1Ferrules engraved with the same numbers, letters and symbols as indicated in the connection and wiring diagrams shall be provided on the terminal ends of all wires for easy identification of circuits for inspection and maintenance. 5.08.11.2Ferrules shall be of strong and flexible insulating material with glossy finish to prevent adhesion. They shall be engraved and clearly and durably marked and shall not be affected by dampness. 5.08.11.3Ferrules numbering shall be in accordance with IS:375/1963. The same ferrule number shall not be used on wires in different circuits on a panel. 5.08.11.4All points of interconnection equipments not for different between the wiring suppliers, where a carried change of out number for can be avoided, double ferrules shall be provided on each wire with appropriate numbers on the changing end. The change of numbering shall be shown on the appropriate connection wiring diagram of the equipment. 5.08.11.5 Alternatively marking of the wires may be done with legible numbers painted on the wires. 5.08.12 TERMINAL BLOCKS : 5.08.12.1Terminal block connectors built from cells of moulded dielectric and brass stud inserts shall be provided for terminating the outgoing ends of the panel wiring and the corresponding incoming tail ends of control cables. Insulating barrier shall be provided between adjacent connections .The height of the barriers and the spacing between terminals shall be such as to give adequate protection while allowing easy access to terminals. Provision shall be made on each pillar for holding 10% extra connections. All blocks shall be shrouded by easily removable shrouds of non inflammable moulded and transparent dielectric materials. 5.08.12.2The terminal blocks shall be suitable for 660 volts service and for connection with copper wires. 5.08.12.3Terminal blocks shall be mounted in such a manner as to afford easy access to terminations and to enable ferrule number to be read without difficulty. Wire ends shall be so connected to the terminals that no wire terminal number gets marked due to succeeding connections. In other words ferrule numbering at the terminals should be unambiguous and fool proof. Terminal board rows shall be adequately spaced and shall not be less than 100 mm apart so convenient access to wires as to permit and terminals. Lables in the form of engraved plastic plates shall be provided on the fixed portion of terminal boards. 5.08.12.4 No live metal parts shall be exposed at the back of the terminal boards. 5.08.12.5 All studs, nuts, bolts screws etc. shall be threaded according to the latest relevant Indian or equivalent International Standards. 5.08.13 SPACE HEATERS : Tubular/Rectangular space heaters suitable for connection to the single phase 230 volts A.C. supply complete with switches located at convenient positions shall be provided at the bottom of each cubicle to prevent condensation TN-01/84 of moisture. The Watt loss per unit surface of heater shall be low enough to keep surface temperature well below risible heat. Each cubicle shall also be provided with a switch of appropriate rating for control for space heater. 5.08.14 MIMIC DIAGRAM. Painted colour bands shall be used for the mimic bus. The Width of mimic diagram and its colour shall be matched with the existing panel. The mimic shall represent a single line arrangement The of the station switch Yard equipment. colour for showing the 33 KV voltage on the mimic shall be sed as green. However where specific matching is not required the color scheme for mimic shall be as under : 33 KV - Brilliant Green - Shade 221 of IS 5 11 KV - Signal Red - Shade 537 of IS 5. The mimic diagram shall be at the eye level. 5.08.15. SEMAPHORE INDICATORS Automatic ,rotating disc type semaphore indicators for indication of 'Close' and 'open' position of circuit breakers, earth isolators and incorporated in the mimic diagram. Other voltage Transformers The etc. shall equipments such as and shall be operated from 110 voltage. The the Semaphore shall be transformers, be represented by suitable symbols. operating coils of the semaphore indicators satisfactorily between switches limits volts of shall be continuously rated D.C. The 80 to disc shall have a 120 90 units percent will of degree angular operate rated D.C. movement clock wise/counter clock wise to show on/off position of the equipment. 5.08.16 INDICATING LAMPS.: 5.08.16.1Indicating lamps shall be provided on the control Board to indicate the following: i) Visual indication of 'on' and 'off position of each circuit breaker. ii) Auto trip indication for each circuit breaker. iii) Spring charged indication for circuit breaker. iv) V.T. supply indication on one part of the Panel. 5.08.16.2Each lamp body shall be of moulded insulation and shall a high voltage volts of appropriate value. All lamps shall be suitable for 110 D.C. supply provide be able to withstand and shall have low a wide angle of illumination of wattage sufficient of consumption and shall intensity for comfortable viewing. 5.08.16.3 The `on' and `Off' position indication lamps shall operate at 230 V Single phase A.C. supply. Automatic change over contactor for changing the 'on' and 'off' position indication lamps from A.C. supply to D.C. supply shall be provided to keep the lamps in working condition in case of failure of AC supply. Suitable ,IVT shall be added wherever there is voltage difference between AC/DC supply. TN-01/85 5.08.16.4A glass of appropriate colour shall be screwed into the front of the lamps body. The design of the indication lamps shall be such as burnt lamps. An engraved label indicating the purpose provided with each lamp.The lenses to enable the tenderer shall quote to facilitate of the lamp shall be unit prices for lamps and purchaser to order certain spare quantity along with the main panels. 5.08.17 SWITCH BOARD LIGHTING : The switch Board interiors shall be illuminated by connected to a 230 interior shall be free strain Volts single from hand phase incandescent A.C. Supply. The illumination of shadows and shall be planned to avoid any or fatigue to the wireman who may be called upon to do work. A door operated button switch shall be provided for control of entrances of corridor of cubicle lamps shall have its duplex C&R panels. In lighting on both case of simplex panels each own interior illumination lamp operated by respective door switch. 5.08.18 TRIP CIRCUIT SUPERVISION : For continuous supervision of the trip circuits, continuous trip circuit supervision relay shall be failure of installed. The relay shall operate self reset alarm contact for trip supply and open circuit of trip coil or trip circuit wiring. The relay shall monitor the trip circuit in both close and open position of the circuit breakers. 5.08.19 TITLE PLATES : A title plate bearing the name and purpose of each panel shall be fixed on the top of each control as well as relay panel. 5.08.20 TEST BLOCKS : Switch board type back connected test blocks with contacts shall be provided with links or other devices for shorting terminals of CT leads before interrupting the normal instruments circuit for injection from an external source or for inserting testing in the circuit without voltage testing studs shall causing open circuit of the CT. The preferably be housed in the narrow recesses of the block moulding insulation to prevent accidental short circuit across the studs. All test blocks for metering and shall be of flush mounting pattern the relays etc. whenever required, and the number of test blocks being provided on each control and relay panel shall be stated in the tender. 5.08.21 SAFETY EARTHING : Earthing of current free metallic parts or metallic mounted on the switch boards shall bodies of the equipments be done with 2.5 sq.mm PVC insulated green coloured copper wire. The two ends of this line shall be provided with crimp tag terminations and connected to a tinned copper earth bar of 25mm x 3mm section running longitudinally at the bottom of the control Board. The neutral point of star connected secondary winding of instrument transformers and one corner of the open delta connected LV side of voltage transformers, if TN-01/86 used, shall be similarly earthed by tails connected with the main earth bar at the switch board earthing system. Multiple earthing of any instrument transformer circuit shall be avoided. 5.09 CO-ORDINATION : 5.09.01 Circuit Breaker, current transformers, switches, H.T. TVM carrier voltage equipment etc., transformers, CVTs, isolating are being purchased from other suppliers and wiring diagrams of these equipments shall be furnished by the respective suppliers. Supplier responsible for of control preparing complete wiring and relay boards shall be diagrams and cable schedules including the control circuits of various equipments and shall also undertake to mount and wire any equipment received loose from other suppliers. 5.09.02 The control and relay board shall be suitably fabricated to match and arranged to form one continuous board with the existing panels at various sub stations wherever mentioned. 5.09.03 The feeder protection schemes proposed to be provided shall be co ordinated with the existing protection at the remote end of the section. The other protection schemes, wherever asked for, shall be suitably co ordinated with the existing protection at the various sub stations. Other coordination work if required, will also be done without any extra cost by the supplier of control and relay boards 5.09.04 The supplier shall be solely responsible to propose/select frequency for our existing carrier aided protection the suitable carrier schemes, meeting the requirement systems and arrange allocation of frequency of from the wireless advisor, Govt. of India. All relays/associated equipments shall be supplied as per frequency finally approved allocated by the wireless advisor Govt. of India accordingly. 6.0 6.1 TESTS : TEST BEFORE DESPATCH : The Control & relay Panels and accessories shall be subjected at maker's works before dispatch, to the following tests as per ISS. A) ROUTINE TEST ON EACH UNIT AS PER RELEVANT STANDARD IS 8623-1977 : 1) Inspection of wiring & electrical operation test. 2) Dielectric Test. 3) Checking of protective measures & of electrical continuity of the protective circuit. 6.2 TYPE TESTS : The 33 KV C&R Panel offered shall be fully type tested as per relevant standards. However, the purchaser reserves the right to demand repetition of some or all the type tests in presence of purchaser’s representative. For this purpose, the bidder should indicate unit rates for carrying out such type tests. These test charges shall not be taken into consideration for bid evaluation. 6.2.2 A) TYPE TESTS SHALL HAVE BEEN CONDUCTED ON ONE UNIT AS PER RELEVANT STANDARD IS 8623-1977 latest amended: TN-01/87 1) Verification of degree of protection IP-55 of encloser (i.e. C&R Panel) in accordance to IS-13947 Part-1. B) TYPE TEST REPORTS IN RESPECT OF APPROVED MAKE OF RELAYS ARE NOT REQUIRED TO BE FURNISHED FOR AUXILIARY & OTHER RELAYS (EXCEPT OVER CURRENT & EARTH FAULT RELAY). THE FOLLOWING TYPE TESTS ARE REQUIRED TO BE FURNISHED IN RESPECT OF NUMERICAL OVER CURRENT & EARTH FAULT RELAYS:i) Insulation Test. ii) High Frequency Disturbance Test. iii) Electrical Fast Transient Test. iv) Relay Characteristic, Performance & Accuracy Test. v) Steady State Characteristics & operating time Test. vi) Test for Thermal requirement. vii) Test for Mechanical requirement. viii) Test for rated burden. ix) Contact performance test. C) TYPE TESTS TO BE CONDUCTED ON ONE UNIT OF ANNUNCIATOR: a) High Voltage Test at 2 KV A.C. r.m.s. for one minute (IS: 3231/IEC 255-4 Clause 12.3) b) Impulse Test 1.2/50 micro sec. 5 KV impulses (IS: 8686/IEC 255-4). c) Performance/ Functional Test. d) Temperature Rise Test. e) Auxiliary Supply variation Test. f) High Frequency Disturbance Test (IS: 8686). 6.2.3 However, the purchaser reserves the right to demand repetition of some or all the type tests in presence of purchaser's representative. For this purpose , the bidder should indicate unit rates for carrying out such type tests. test charges shall not be taken 6.3 These into consideration for bid evaluation. TEST ON BOUGHT OUT ITEMS Tests are not required to be performed on bought out equipments like Relays, HT TVMs, switches etc. at the works of manufacturer except operational tests. Furnishing Test Certificate of equipments from the original manufacturers shall be deemed to be satisfactory tests at Sub-contractors works equipment evidence. Inspection of the will be arranged by the supplier whenever got conducted required. 6.4 ROUTINE/ACCEPTANCE TESTS : The following tests shall be in presence of purchaser's representative. 1) Checking of wiring of circuits & their continuity. 2) One minute 2 KV insulation withstand test at 50 cycles on all equipments on the panels & wiring. TN-01/88 3) Insulation resistance of complete wiring circuit by circuit with all equipments mounted on the panel. 4) Checking the operation, function and calibration of protection schemes, instruments & meters 5) Checking of colour scheme used in wiring as per following requirement : i) A.C. three phase circuits ------------------------No.1 Phase No.2 Phase No.3 Phase Colour -----Red Yellow Blue ii) Neutral conductor iii) Connections to earth iv) D.C. Circuits Black Green Grey 6) Checking of same ferrule numbers at both ends of wires. 7) Routine tests in accordance with relevant IS or other the international standards shall be carried out on all the instruments, relays and other devices or manufacturer's routine test reports shall be enclosed with inspection report. 6.5 TOLERANCE ON TEST RESULTS : The tests shall be conducted as per relevant ISS. 6.6 TEST AT SITE : The purchaser reserves the right to conduct all tests on Control & Relay Panels after arrival at site and the contractor shall guarantee test certificate figures under actual service conditions. 7.0 INSPECTION : All the tests (as mentioned at Clause 6.4) and Inspection shall be made at the place bidder of manufacturer unless otherwise especially agreed upon by and purchaser at the time of purchase. The bidder shall the afford the inspection officer(s) representing the purchaser all reasonable facilities without charges, to satisfy him that the material is being furnished in accordance with this specification. The purchaser has the right to have the tests carried out at his own cost by an independent agency whenever there is a dispute regarding the quality of supply. The Inspection may be carried out by the purchaser at any stage of manufacture/ before despatch as per relevant standard. Inspection and acceptance of any material under the specification by the purchaser, shall not relieve the bidder material in accordance with of his obligation of furnishing the specification and shall not prevent subsequent rejection if the material is found to be defective. The Bidder shall keep the purchaser informed in advance, about manufacturing programme so that arrangements can be made for inspection. The purchaser reserves the right routine testings of the bought to insist for witnessing out items. The the acceptance/ Bidder shall give 15 days advance intimation to enable the purchaser to depute his representative for witnessing the acceptance and routine tests. The inspection charges would be to TN-01/89 the purchaser's account (Boarding , lodging and to & fro journies upto the place of inspection only). 8.0 PACKING AND FORWARDING : 8.1 The loose equipment shall be vertical/horizontal handling during transport as transport packed the and in crates suitable for case may be and suitable to withstand outdoor storage during transit. The Supplier shall be responsible for any damage to the equipment during transit, due to improper and inadequate packing. carefully packed and marked The easily damageable material shall be with the appropriate caution symbol. Wherever necessary, proper arrangement for lifting, such as lifting hooks etc., shall be provided. Any material found short inside the packing cases shall be supplied by Supplier without any extra cost. 8.2 Each consignment shall be accompanied by a detailed packing list containing the following information : a) b) c) d) e) f) g) Name of the consignee. Details of consignment. Destination. Total weight of consignment Sign showing upper/lower side of the crate. Handling and unpacking instructions. Bill of material indicating contents of each package. The Supplier shall ensure that the packing and bill of material are approved by the Purchaser before dispatch. 9.0 HT TVMs : 9.1 3 phase 4 wire A.C. Static H.T. Trivector meter of accuracy class 0.5S for measurement of energy as per latest specification of JVVNL, shall be provided. Following makes of HT TVMs are acceptable: i) Secure ii) L&T iii) ABB/Elster iv) Schlumberger v) Genus Infra Any other make being procured by Nigam shall also be acceptable. The technical suitability of relays/schemes may also be examined by Protection 9.2 Wing & acceptability will be judged appropriately. 10.0 MAKE AND TYPE OF BOUGHT OUT ITEMS : 10.1 The following make of bought out items will be acceptable to department : ----------------------------------------------------------S.No. Name of Item Make ----------------------------------------------------------1. Indicating Instrument AE/IMP/MECO (Analog type) 2. 3. Indicating Instrument (Digital type) Control Switch for Circuit AE/IMP/MECO ALSTOM/RECOM/SWITRON/ TN-01/90 4. 5. Breaker/Trip Transfer. KAYCEE Selector Switch for Voltmeter/Ammeter SWITRON/KAYCEE/RECOM Semaphore Indicator ALSTOM/ DAV IND.(Deepl)/ER 6. Indicating Lamp ALSTOM/TEKNIC/ VAISHNO/DAV Ind. (Deepl) 7. Annunciator 8. Push Button 9. A.C. Hooter/Bell TARGET/INDUSTRIAL HOOTER/ALAN/JVS 10. D.C. Hooter TARGET/INDUSTRIAL HOOTER/ALAN/JVS 11. Heater SOFIA/ELTER/AIREX KAYCEE 12. 13. 14. MINILEC/YESHMUN/ INSTALRAM/PROTON/ JVS/PRADEEP/ALAN TEKNIC/VAISHNO/ESSEN DAV Ind. (Deepl) Link Type test terminal block for testing of TVM CFL Tube IMP/CAPITAL/ DAV Ind. (Deepl) PHILIPS/CROMPTON/BAJAJ 2 Pin/3 Pin socket with ISI MARK Switch (5/15A) Other makes shall also acceptable if it is of "ISI MARK" or type tested for which tenderers shall furnish attested photostat copies of ISI Certificate/type test report not older than 5 years for the respective make offered alongwith tender. 10.2 Make / type of each relay, indicating control switches, instruments, integrating selector switches, indicating lamps, instruments, semaphore indicators, annunciator scheme, bell, hooter etc. shall be clearly and invariably indicated in the GTP (Guaranteed Technical Particulars), bill of material and unit price list. Only specific make accessories shall be indicated. "EQUIVALENT/REPUTED 11.0 MAKE" will not be given The word for consideration. GUARANTEE PERIOD OF CONTROL AND RELAY PANELS : The guarantee period of each control & relay panels along with all accessories shall be for the period of 5 years from the date of receipt of panel along with all accessories. TN-01/91 DETAILS OF EQUIPMENTS SCHEDULE-A ----------------------------1. 33KV CONTROL AND RELAY PANELS FOR CONTROLLING TWO CIRCUIT BREAKERS FOR HV SIDE OF 33 KV TRANSFORMER : TYPE-A Equipment for each circuit shall occupy space on front of panel on either side of vertical centre as under : For Transformer 1 ----------------One Section of painted and overlaid mimic diagram for one main and one auxiliary bus arrangement with symbol. Three Semaphore indicators for automatic position indication of Isolators. One Semaphore indicator for automatic One Three position control switch for the circuit breaker with pistol grip handle. Four Indicating lamps for the following : position indication of circuit breaker. i) Circuit breaker `ON' Red. ii) Circuit breaker `OFF' Green. iii) Circuit breaker `Auto-Trip. iv) Circuit breaker White. Amber. spring charged. One Flush switch board mounting,144 mm square pattern, moving iron AC Ammeter of Class.1 accuracy, suitable for 5 Amps. CT secondary current suitably scaled. One Ammeter phase selector switch to indicate phase currents in all the three phases and off position. One 3 phase, 4 wire, Static HT-Trivector meters of class 0.5S accuracy. One Four Pole IDMTL non directional inverse time combined over current & earth fault relay with instantaneous attachment with stabilizing resistance. One IDMTL with One One non-directional earth fault relay with instantaneous attachment stabilizing resistance. High speed trip relay. Continuous supervision relay for trip circuit healthy check both in closed and open position of circuit breaker. One Test terminal block 3 phase 4 wire. Five Auxiliary relay for transformer trouble. FOR TRANSFORMER 2 : Equipments for Transformer 2 shall be identical to Transformer 1 with following additions :Three indicating lamps for the following : i) VT supply indication (3 nos.) Red, Amber ,Blue One Flush switch-board mounting, 144mm square pattern, voltmeter of class.1 accuracy moving suitable for 110V phase to secondary, suitably scaled. TN-01/92 iron AC phase VT One Voltmeter phase selector switch to indicate phase to phase and phase to ground voltages of all the three phases. FOLLOWING EQUIPMENTS SHALL ALSO BE PROVIDED ON THE C/R ANEL IN COMMON FOR BOTH CIRCUITS. One 24 way Annunciation windows complete with Annunciator relays for indicating 8 trip/non-trip alarms individually. One Set of 3 control Push buttons for `Accept' Reset and `lamp Test ' of above annunciation scheme. One Bell for Non trip alarm One Hooter for trip alarm One D.C. under voltage relay. One Space heater with switch. One 230V A.C. flourcent tube with door switch. One 3 Pin Socket with switch 15Amp. rating. One 2 Pin Socket with switch 5 Amp. rating. 2. 33KV CONTROL RELAY PANEL FOR CONTROLLING TWO FEEDER CIRCUIT BREAKERS. TYPE-B The C/R Panel shall accommodate equipment’s for two feeders. Each Circuit shall occupy space on front of panel on either side of vertical centre. EACH OF THE TWO CIRCUITS SHALL HAVE FOLLOWING EQUIPMENTS: One Section of painted and overlaid mimic diagram for one main + one auxiliary Bus arrangement with symbols. Four Semaphore indicators for automatic position indication of isolators and earth switch. One Semaphore indicator for automatic One Three position control switch for the circuit breaker with pistol grip handle. Four Indicating Lamps for the following :i) ii) iii) iv) Circuit Breaker `ON' position indication of circuit breaker. - Red Circuit Breaker `OFF' - Green Circuit Breaker `Auto-trip'-White. Circuit Breaker Spring charged -Amber. One Flush switch Board mounting 144mm square pattern moving iron A.C. Ammeter of Class-1 accuracy suitable for 5 Amps CT secondary suitably scaled. One Ammeter phase selector switch to indicate phase currents in all the three phases and off position. One 3 Phase, 4 wire, Static HT Tri-vector meter of class 0.5S accuracy. One Four Pole IDMTL non directional inverse time combined over current & earth fault relay with instantaneous attachment. One High speed trip relay. TN-01/93 One Continuous supervision relay for trip circuit healthy Check both in closed & open position of circuit breaker. One Test terminal block 3 phase 4 wire. FOLLOWING EQUIPMENTS SHALL ALSO BE PROVIDED ON THE C/R PANEL IN COMMON FOR BOTH CIRCUITS : One 8 way Annunciation windows complete with Annunciation relays for indicating 8 trip/non trip alarm individually. One Set of 3 control push buttons for `Accept' reset and Lamp `Test on above annunciation scheme. One 230V A.C. incandescent bulb with door switch. One Bell for Non trip alarm One Hooter for trip alarm One Space heater with switch. One 3 Pin Socket with switch 15 Amp rating. One 2 Pin Socket with switch 5 Amp rating. ANNEXURE-I 33 KV CURRENT TRANSFORMER FOR HV SIDE OF 33 KV TRANSFORMER (RATIO : 240-120-60/5-5A) -------------------------------------------------------NO OF CORE APPLICATION RATED CLASS OF MAXIMUM MIN. CORES NO. BURDEN ACCURACY INSTRUACCUMENT RACY SECURITY LIMIT FACTOR. FACTOR -------------------------------------------------------------2 1. BACKUP PROTECTION 40 VA 5P - 15 2. METERING 30A 0.5S 5 ------------------------------------------------------------- 33 KV CURRENT TRANSFORMER FOR 33 KV FEEDER (RATIO : 300-150/5-5A) -------------------------------------------------------------NO OF CORE APPLICATION RATED CLASS OF MAXIMUM MIN. CORES NO. BURDEN ACCURACY INSTRU- ACCUMENT RACY SECURITY LIMIT FACTOR. FACTOR ------------------------------------------------------------2 1. BACKUP 40 VA 5P 15 PROTECTION 2. METERING 30A 0.5S. 5 ------------------------------------------------------------- ANNEXURE-II TN-01/94 INSTRUMENT RANGES 33 KV ---------------------------------------------------------------------------:33 KV SIDE : 33 KV SIDE : S. INSTRUMENT :FEEDER PANEL : TRANSFORMER : NO. : : PANEL : ----------------------------------------------------1 AMMETER :0-300 A : 0-240 A : : : : 2 VOLTMETER : : 0-40 KV : : : : ----------------------------------------------------- ANNEXURE.III -----------TECHNICAL PARTICULARS OF VOLTAGE TRANSFORMERS PROPOSED TO BE UTILISED AT VARIOUS SUB-STATIONS. ----------------------------------------------------------: DETAILS OF VTs. : :----------------------------S.NO. PARTICULARS : 33 KV : ----------------------------------------------------------1 Type : Outdoor : : : : _ : 2 Rated primary : 33KV/_/3 : voltage. : : : : 3 No. of secondary : Two : winding. : : : : 4 Winding.I : 110/_/3 V : Winding.II : 110/_/3 V : : : 5 Rated burden : : : : : Winding.I : 100 VA : Winding.II : 100 VA : : : 6 Accuracy class. : : : : Winding.I : 0.5, 3 p : Winding.II : 3p : : : 7 Maximum ratio :Within limits specified by : error with rated :IS:3156 for accuracy class : burden & 5% normal :indicated. : primary voltage. : : : : 8 Maximum phase angle :Within limits specified by : error with rated :IS:3156 for accuracy class : burden & 5% normal :indicated. : primary voltage. : : : : 9 Oil :Transformer oil conforming : :to IS:335. : : : 10 Temperature rise of :Within limits specified : 1.2 times rated :by IS:3156. : TN-01/95 voltage with rated : : burden. : : : : 11 Rated voltage :1.2 continuous. : factor and time. :1.5 for 30 seconds. : : : 12 Temperature for :Within limits specified : 11 above. :by IS:3156. : ------------------------------------------------------- TN-01/96 TECHNICAL SPECIFICATION OF MOTORISED RING MAIN UNITS WITH SCADA COMPATIBILITY 1.0 Scope of work : Design, Engineering, Manufacturing, assembly, inspection and testing before dispatch, packing & forwarding and delivery at site/stores of outdoor type compact 11KV Ring Main Units SF6 with Load break Isolators for 11 KV Incoming & Outgoing cables and VCB for Distribution Transformer with motorization and necessary take off terminal units for SCADA automations, other accessories and auxiliaries equipment’s and mandatory spares, described herein and required for their satisfactory operation in various locations of the Jaipur Vidut Vitran Nigam Ltd., in following tentative quantity and combinations of load break isolators & breakers and all these units are shielded in a outdoor metal body with a dielectric media of SF6 gas/ solid state epoxy with provision of additional load break switches and circuit breakers extensible at both side. Provision of all the necessary take off terminal for “SCADA READY” Ring Mains Units capable of being monitored and controlled by the SCADA/DMS. Each RMU shall include its own power supply unit (including 230 V AC power supply from nearest JVVNL mains, batteries and battery charger) which shall provide a stable power source for the RMU. The RMU’s will be connected to the FRTU will be procured, supplied and installed as a part of R-APDRP Part-B. The RMU shall include potential free contacts so as to connect to SCADA/DMS via FRTU, so as to a. Monitor and control the open/close status of RMU circuit breaker and load break switches. b. Monitor the local/ remote position of RMU manually-operated switches that can be used to enable and disable remote monitoring. c. Monitor the health of the power supply, which will include the battery failure and low voltage indication. 1.1 d. Monitor the open/ closed status of RMU earthing switches. e. Monitor the open/ closed status of RMU enclose doors in case of hinge door. f. Monitor of low SF6 gas pressure indication g. Monitor the circuit breaker relay operation. h. Monitor for indication of main-circuit fault detected by the RMU’s FPI. i. FPI reset control j. Load break switches and circuit breaker open/ close control The objective of the RMUs is for extremely small construction width, Compact, maintenance free, independent of climate, easy installation, operational reliability, Safe and easy to operate, minimum construction cost, minimum site work and minimum space requirement. The dimensions of a RMU shall preferably be Approx. 1000X1000X1800 mm (WXDXH). 1.2 The RMUs shall conform in all respects to high standards of Engineering design, workmanship and latest revisions of relevant standards at the time of offer and TN-01/97 purchaser shall have the right to reject any material which in his judgment is not in full accordance therewith. 1.3 The type of the 11 KV circuit breaker shall be VCB and insulating medium for load break isolators, Earth switch, 11 KV Buses and other associated equipment’s should be SF6 gas / solid state epoxy confirming to relevant IS/IEC. 1.4 Each RMU shall be equipped with all the necessary connectors, terminal blocks and other accessories that will allow it to be connected to FRTU which will in turn send required indications and measurement to the SCADA/ DAS via communication medium. 1.4 The RMU hosing shall have a design such that in the event of an intenal arc fault, the operator shall be safe. This should be in accordance with IEC 62271-200. The outdoor RMU must be fully Type Tested for internal arc fault as below. - For 20KA/1 sec for Main tank hosing the switchgear and breaker - For 20KA/0.1 sec for the cable compartment. 1.5 As the Ring Main Units will be installed mostly under existing half four pole / two pole structures, therefore RMUs having FOOT PRINTS that fits exactly underneath shall be preferred for certain specific requirements. 2.0 STANDARDS : Unless otherwise specified elsewhere in this Specification, the RMU, Switchboard (Switchgear), Load break isolators, Instrument Transformers and other associated accessories shall conform to the latest revisions and amendments thereof of the following standards. IEC 60 298/ 12729:1988 IEC 62271-200/IS General requirement Switchgear for Metal Enclosed IEC62271-102/ IS 9921 Alternating current Dis-connector’s break isolators) and Earthing switch IEC 62271-100/ IEC 62271-200 Specification for alternating current circuit breakers. IEC 62271-1/ IEC 60694 Panel , Vacuum Circuit Breakers IEC 60044-1/IEC 60185/IS 2705:1992 Current Transformer IEC 62271-103 High voltage switches IEC 60273/IS :2099 Dimension of Indoor & Outdoor insulators with voltage > 1000 Volts IEC 60529/IS 13947(Part-1) Degree of protection provided by enclosures for low voltage switchgear and control gear IEC 60255 Electrical Relays IEC 60376 Filling of SF6 Gas in RMUs The following parts of RMU shall be type tested for Degree of protection:IP 67 - tank with high voltage components. IP 2X - front covers of the mechanism. IP 3X - cable connection covers. IP 54 - outdoor enclosure/kiosk. Equipment meeting with the requirements of any other authoritative standards, which ensures equal or better quality than the standard mentioned above shall also TN-01/98 (Load post be acceptable. If the equipment’s, offered by the Bidder conform to other standards, salient points of difference between the standards adopted and the specific standards shall be clearly brought out in relevant schedule. In case of any difference between provisions of these standards and provisions of this specification, the provisions contained in this specification shall prevail. One Hard copy of such standards with authentic English Translations shall be furnished along with the offer. 3.0. SERVICE CONDITIONS: All outdoor Equipment / material to be supplied against this specification shall be suitable for satisfactory continuous operation under tropical conditions as specified below:1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Maximum ambient air temperature in shade 500C Minimum ambient temperature in shade -2.50C Maximum Relative humidity 90% Minimum Relative humidity 10% Average Annual rainfall 10-100 Cm. Maximum wind pressure (Kg. Per sq. m.) 45 Height above mean sea level < 1000 Meter Dust storms are liable to occur during the period March to July Average number of rainy days per annum 100 Isoceraunic level (days / year) 40 Moderately hot and humid tropical, climate, Yes Conductive to rust and fungus growth Seismic level (horizontal acceleration) 0.08 g Due regard should be given to the climatic/service conditions under which the equipment is to work. Ambient temperature normally vary between -02.5°C and 50 °C, although direct sun temperature may reach 55 °C. The climate is also moderately humid and rapid variations occurs, relative humidity between 70% and 90% being frequently recorded, but these values generally correspond to the lower ambient temperatures. The equipment should also be designed to prevent ingress of vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials which may be liable to attack by termites and other insects should be avoided. 4.0 TECHNICAL PARAMETERS OF RMU: I. II. 11KV Bus Bar Type of material : Copper Current Carrying Capacity : 630 Amps. Short time rating current for 3 secs. : 20 KA Insulation of bus bar : SF6/solid state epoxy Bus bar connections : Anti-oxide grease Parameters for Switch Gear of DT and load break isolators Type : Metal enclosed No of Phases :3 No. of poles :3 Rated voltage :12 KV TN-01/99 Operating voltage :11 KV(+10% to – 20%) Rated lightning impulse withstand voltage :75 KV Rated power frequency withstand voltage :28 KV Insulating medium :SF6/Solid State epoxy. Rated filling level for insulation :0.5 bar/As Per IEC. Max.permissible site altitude at the above gas pressures:≤1000m (The operating pressure has to be adjusted for greater altitudes) Rated short time current :20 KA. Rated short time :3s Rated peak withstand current :50 KA. Operating mechanism : Circuit breaker with spring assisted anti reflex mechanism. Rated current (Bus): :630 A Rated current Load Break Isolator: :630 A Rated current (breaker) :200 A Circuit Breaker interrupter :Vacuum Interrupter Rated frequency : 50 Hz Rated operating sequence :O-3min- CO Number of mechanical/Remote operations for 1000 Nos. earthing & Ring switches Number of mechanical/ remote operations 2000 Nos. for circuit breakers III. PRINCIPAL FEATURES: S. No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 DESCRIPTION Circuit label Mimic diagram Supply voltage indication Current Transformer Self Powered based Microprocessor based IDMT Relay (3OC+1EF) Anti–Reflexing Mechanism Interlock to defeat the operation of the line side earthing when the line side isolator is ON. Interlock to defeat the operation of the earthing when the breaker is in service position and is ON. Local /Remote Switch Breaker ON/OFF indication Spring Charge indication / Spring assisted mechanism. Fault Tripping indication Bus bar end caps Whether the SF6 gas pressure gauge indicator and filling arrangement. TN-01/100 DT breaker Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 15 16 17 Whether the spring assisted mechanism with operating handle for ON/OFF. Whether the earth positions with arrangement for padlocking in each position and independent manual operation with mechanically operated indicator are provided RMUs are provided with necessary take off terminals for future SCADA automation. Yes Yes Yes IV Load break switch(Isolators) : Type : SF6/solid state epoxy load breaking and fault making. Rated current : 630 A Fault making capacity (KA peak min.) : 50 KA V Earthing switch for 11 KV Line side Isolation and DT : Rated short time current :20 KA. Rated short time :3s Rated peak withstand current :50 KA Interlocking facility: 1) Between 11 KV Line side isolator ‘ON”& Earthing. 2) Between 11 KV DT side breaker on close condition & Earthing. VI Current Transformers for breaker CT Type : Tape wound CT Description :The CTs of DT breaker shall be suitable for sensing the minimum primary variable current in the order of 1060 A and the secondary current for the CT is 1 A. The CT shall be housed in outside SF6 chamber for testing and Maintenance. : Class 10P10 protection : Suitable for Self Powered Relay. Accuracy Class Rated burden 5. GENERAL CONSTRUCTION FEATURE FOR RING MAIN UNIT: The compact RMU shall be designed to operate at the rated voltage of 12 KV. It shall include, within the same metal enclosure, earthing switches for each Load Break Switch and Circuit Breaker for earthing each of the devices. Suitable foolproof interlocks shall be provided to these earthing switches to prevent its inadvertent or accidental closing when the circuit is live and the concerned Load Break Switch/Circuit Breaker is in closed position. The limiting dimensions shall be preferably around 1000-mm width x 1000-mm depth x 1800-mm height for the initial two Load Break Switches and one Circuit Breaker. An additional width of 1000-mm for each addition of the Circuit Breaker is allowed. Provision should be made for extension of few more Circuit Breakers or Load Break Switches on a future date. The degree of protection required against environment shall be not less than IPX4 of IS 12063. The Compact RMU shall have atleast an IP54 Protection Index as per IS 12063 against dust and splashing of water. The active parts of the switchgear shall be maintenance free and the Compact RMU shall be of lowmaintenance type. 5.1 The Ring Main Unit shall be installed at 11 KV junction points to have continuous supply by isolating faulty sections. The RMU shall be both side extensible and TN-01/101 consists of the combinations of load break switches and Circuit breakers for a nominal voltage of 12 KV using SF6 gas/ solid state epoxy as insulating and Vacuum as arc quenching medium. 5.2 The RMU and combination shall be outdoor metal enclosed type. The RMU metal parts shall be of high thickness high tensile steel which must be grit/short blasted, thermally sprayed with Zinc alloy, phosphate and subsequently painted with polyurethane based powder paint, the overall paint layer thickness shall be not less than 80 microns. 5.3 Relevant IE rules for clearances, safety and operation inside the enclosure shall be applicable. The enclosure shall be free from pollution, humidity, dust, vermin etc. IP-54 and type tested for accelerated aging & weather proof at EREDA/CPRI/any other testing house meeting PQR. 5.4 All high voltage live parts except for the cable connections shall be insulated with SF6 gas/solid state epoxy. The SF6 /solid state epoxy enclosure shall be made of robotically/laser / TIG/ MIG welded stainless steel/ hermetically sealed metalized cast resin tank without use of sealant, gaskets, ‘O’ rings, etc. and shall be type tested for IP-67 Degree of protection. 5.5 The cubicle shall be touch proof metallic encapsulation with a electro galvanized sheet steel of high thickness and provided with a pressure relief arrangement away from operator. 5.6 RMU should be suitable for motorization in future for remote operation through SCADA. 5.7 Any accidental over pressure inside the sealed chamber shall be limited by the opening of a pressure-limiting device in the rear/top part of the enclosure. Gas will be release to the rear of the switchboard away from the operator to ensure safety of the operating personnel and all the manual operations will be carried out on the front of the switchboard. 5.8 The enclosure for switchgear and metallic RMU housing shall have a design such that in the event of an internal arc fault, the operator shall be safe. This should be in accordance with IEC 298 & Standard IEC 62271-100/200 and relevant TYPE TEST certificates shall be submitted. 5.9 The Entire units of RMU shall be in a single compact metal clad weather proof enclosure, outdoor type suitable for all weather conditions. The switchgear and bus bar shall all be filled with SF6 at 0.5 bar G/IEC/IS Standards relative pressure to ensure the insulation and breaking functions. The enclosure must be sealed for life and shall meet the “sealed pressure system” criterion in accordance with the IEC 298 & 62271-100/200 standard .The RMU must be a system for which no handling of gas is required throughout the 30 years of service life. 5.10 Suitable temperature rise test on the RMU with enclosure shall be carried out as per relevant IEC/IS. 5.11 Each switchboard shall be identified by an appropriately sized label, which clearly indicates the functional units and their electrical characteristics. TN-01/102 5.12 The switchgear and switchboard shall be designed so that the position of the different devices is visible to the operator on the front of the switchboard and operations are visible as well. 5.13 The entire system shall be totally encapsulated. There shall be no access to exposed conductors. In accordance with the standards in effect, the switchboards shall be designed so as to prevent access to all live parts during operation without the use of tools. 5.14 The entire 11 KV RMU shall be insulated by inert gas (SF6) / solid state epoxy suitable for operating voltage up to 12 KV respectively. The 12 KV circuit breakers must be VCB. It is necessary to fit an absorption material in the tank to absorb the moisture from the SF6 gas to regenerate the SF6 gas following arc interruption. The SF6 insulating compensating medium gas shall pressure be constantly indicator offering monitored a via simple a temperature indication. All the combination of the RMUs should have the required SF6 insulation by providing necessary gas chamber capacity. The provision to indicate pressure of SF6 Gas on RMU Panel shall be provided. 5.15 The tank shall be made of suitable stainless steel/ cast resin tank of adequate thickness and shall be able to withstand any accidental internal over pressure of at least 3 bars. 5.16 The Compact RMU shall be suitable for mounting on its connecting cable trench. A suitably sized nameplate clearly indicating its functional units and their electrical characteristics shall identify each unit. The positions of the different devices shall be clearly visible to the operator on the front of the compact RMU and the operations shall be clearly visible. The compact RMUs shall be such that access to live parts shall not be possible without the use of tools. 5.17 The design shall incorporate such features to prevent any accidental opening of the earth switch when it is in closed position. Similarly accidental closing of Circuit Breaker or Load Break Switch shall be prevented when the same is in open position from the release of any latch or spring in tension due to vibrations caused externally or internally and shall prevent accidents. 5.18 Each RMU shall be provided 230 V AC supply from the nearest JVVNL mains which shall provide a stable power source to RMU and battery charger. 5.19 The compact RMU shall be of single busbar outdoor, tropicalized in accordance with the relevant clauses mentioned in these specifications. An earth fault passage indicator using a core balance Current Transformer shall be provided for the Incomers to assist in identifying the faulty cable section in order to isolate the same. 5.20 • The Incomers panel shall comprise of, but not limited to the following: A triple pole Solid State epoxy /SF6 Load Break Switch rated 630 Amps or higher, with a rated making capacity under fault conditions with short circuit levels of 20 KA or above at 11 KV • Core balance Current Transformer and earth fault passage indicators (The indicator flag of the relay shall be visible till such time the relay is reset manually) TN-01/103 • These shall not require any external Power Supply and must be suitable for unattended places. 5.21 The transformer loop circuit control panels shall consist of but not limited to the following: • A triple pole Vacuum Circuit Breaker rated 200 Amps or higher, with a rated making capacity under fault conditions with short circuit levels of 20 KA or above at 11 KV • Manually charged spring closing mechanism • Electronic relay with associated Transformers of accuracy clause 10P10 and tripping mechanism. CT burden shall be as per requirement of self powered Relay. • Mechanical "ON", "OFF" indicator • Manual tripping device • Mechanical "Spring Charged", "Spring Free" indicator in case of stored energy devices. • Provision for retrofitting meters and SCADA System 6. Sulphur Hexafluoride Gas (SF6 GAS) : The SF6 gas shall comply with relevant standard IEC-376, 376A & 376B and shall be suitable in all respects for use in 12 KV panels under the operating conditions. The SF6 shall be tested for purity, dew point air hydrolysable fluorides and water content as per IEC-376, 376A & 376B and test certificate shall be furnished to the purchaser indicating all the tests as per IEC-376 for each Lot of SF6 Gas. The metallic enclosure should be tested for leakage at site. 7. RMU OUTDOOR METAL CLAD:The RMU enclosure must be a metallic; it follows an industrialized process of manufacturing. The RMU shall be of single bus bar SF6 gas/solid state epoxy insulated outdoor, tropicalised and metal enclosed type. The RMU metal parts shall be made of high thickness high tensile steel which must be grit/short blasted, thermally sprayed with Zinc alloy, phosphate and subsequently painted with polyurethane based powder paint, the overall paint layer thickness shall be not less than 80 microns. The rating of enclosure shall be suitable for operation on three phase, three wire, 12 KV, 50 cycles, A.C. System with short-time current rating of 20KAfor 3 seconds with Panels. TAKE OFF TERMINAL UNITS FOR FUTURE AUTOMATION : The RMU should be provided with necessary take off terminal units for future SCADA automations. Both the load break switches and the tee off circuit breaker shall be suitable for motorization in future. 8. ISOLATORS (LOAD BREAK TYPE) : The load break isolators for Incoming and Outgoing supply must be provided and the load break isolators are fully insulated by SF6 gas/Solid State Epoxy. The load break isolators shall consist of 630 Amp fault making/load breaking spring assisted ring switches, each with integral fault making earth switches. The switch shall be naturally interlocked to prevent the main and earth switch being switched ‘ON’ at the same time. The selection of the main and earth switch is made by a lever on the TN-01/104 fascia, which is allowed to move only if the main or earth switch is in the off position. The load break isolators should have the facility for future remote operation. Each load break switch shall be of the triple pole, simultaneously operated, non automatic type with quick break contacts and with integral earthing arrangement. The earthing switch shall also be designed for rated fault making of 50KA for operator’s safety reasons. 9. SCADA CONNECTIVITY: Provision shall be made in all the RMUs with necessary take off terminal units for future automations / SCADA connectivity. 10. VACUUM CIRCUIT BREAKER : The VCB for the controlling of Distribution Transformer must be provided inside the outdoor metal clad and insulated by SF6 gas/Solid State epoxy. The VCB circuit breaker must be a spring assisted three positions with integral fault making earth switch. The selection of the main/earth switch lever on the fascia, which is allowed to move only if the main or earth switches is in the off position. The manual operation of the circuit breaker shall not have an effect on the trip spring. This should only be discharged under a fault (electrical) trip; the following manual reset operation should recharge the trip spring and reset the circuit breaker mechanism in the main off position. The circuit breaker shall be fitted with a mechanical flag, which shall operate in the event of a fault (electrical) trip occurring. The ‘tripped’ flag should be an unambiguous colour differing from any other flag or mimic. Both the circuit breaker and ring switches are operated by the same unidirectional handle. The protection on the circuit breaker shall comprise of the following components: Protection Relay • The RMU shall be equipped with self-powered numerical relays, to trip the RMU circuit breakers. General • The Circuit Breaker in the RMU shall be fitted with a communicable-type, selfpowered numerical relay, i.e., one for each outgoing circuit breaker. The protection relay ’s auxiliary contracts shall be hardwired to the RTU. The relay shall also interface with the RTU via an Rs. 232/485 port in order to send, as a minimum, real-time readings using the open protocol. • The numerical relay shall be self- powered and should provide Inverse Definite Minimum Time (IDMT) and Instantaneous protection characteristics. ON this basis, the relay as a minimum shall provide. • Phase Over current Protection (50/51) • Earth Fault Protection (50N/51N) TN-01/105 • The relay shall be provided with an input for remote tripping. Which shall be realized via an electric output pulse even without presence of phase current. A flag indicator shall be installed for signaling the occurrence of trip conditions. Features and Characteristics • The numerical relay shall have the following minimal features and characteristics noting that variations may be acceptable as long as they provide similar or better functionality and/or fallibility. • It shall be housed in a flush mounting case and powered by the RMU power supply unit. • It shall have three phase over current elements and one earth fault element. • IDMT trip current settings shall be 50-200% in steps of 1% for phase over current and 10-80% in steps of 1% for earth fault. • Instantaneous trip current settings shall be 100-3000% in steps of 100% for phase over current and 100-200% in steps of 100% for earth fault. • Selectable IDMT curves shall be provided to include, for example, Normal Inverse, Very Inverse, Extreme Inverse, Long Time Inverse, and Definite Time. Separate curve settings for phase over current and earth fault shall be supported. • For IDMT delay multiplication, the Time Multiplies setting (TMS) shall be adjustable from 01 to 0.1 in 0.1 steps. • The relay shall also be provided with : - Alphanumeric Liquid Crystal Display (LCD) for relay setting. - Communications via a MODBUS RS 232/RS485 port to provide the RTU (and hence the DAS) with phase current measurements. It is also desirable that this same means of communication can be used by the RTU to send setting and control commands to the relay. - Parameter change capability that is password protected. The protection system should be suitable for protecting transformers of rated power from100 KVA to 1000 KVA . The relay should be housed within a pilot cable box accessible. A facility of provision for the delay of transformer in-rush current shall be provided on relay to avoid nuisance tripping. Outlived/ defective batteries wherever provided shall be replaced promptly during the Guarantee period of RMU. 11. BUSHINGS : The units are fitted with the standardized bushings that comply with IEC standards. All the bushings are the same height from the base and are protected by a cable cover. All the welded with 12. bushings the SS shall be Partial Discharge free & preferably Laser container in case of stain less steel tank type RMU. CABLE BOXES : All the cable boxes shall be air insulated suitable for dry type cable terminations. The cable boxes at each of the two ring switches shall be suitable for accepting HV cables of sizes 3c x 300 / 3c x 185 sq.mm and circuit breaker cable be suitable up to 3c x 70 sq.mm. TN-01/106 • Necessary Right angle Boot should be supplied to the cable terminations. The type of the Right angle Boot should be cold applied insulating Boot. • A non Ferro- magnetic cable clamp arrangement for 3 core XLPE cables must be provided for all cables terminated on the RMU. Glands in the base plate of the RMU shall be provided for proper Cable termination. 13. FAULT PASSAGE INDICATORS (FPI): This shall be integral part of the RMU and shall be provided to assist in identifying the faulty cable section in order to isolate the same. The Fault Passage Indicators (FPI) shall have automatic rest facility and shall be suitable for trouble free operation. The indicator flag of the relay shall be visible till such time the relay is reset. LED indicating bulb should be provided for better visibility particularly in day time. The FPI shall be mounted on the each of the Load Break Switch unit enclose along with its integral CT for phase and earth fault monitoring. The FPI shall either be self -powered type requiring no auxiliary power or build-in batteries. The FPIs shall include : Fault detection – phase to phase and phase to earth faults Potential free output contacts for hard wiring to FRTUs. On this basis, the SCDA/DMS will be able to monitor phase/ earth fault condition. Local fault indications – LED display on FPI front panel along with LED indication on front panel of RMU enclose. FPI shall be self-rest type upon fault indication. The characteristic of the FPIs shall include : Phase fault threshold configurable from at least 250 to 625 Amp. Earth fault threshold configurable from at least 40 to 100 Amp. Number of steps for adjusting phase and earth fault threshold at least four. Fault current duration range configurable from at least 40ms to 500 ms in 20 ms steps. Variation with respect to these characteristic may be acceptable as along as they prove applicable and provide the same or better flexibility. 14. CABLE TESTING FACILITY : It shall be possible to test the cable without opening the cable boxes or ‘where there is no provision for testing the cable without opening the door or cover’, opening of door or cover should not be possible unless the earthing switch is closed as per IEC 298 clause 5.102.4. The cable testing should be possible without dismounting the cable plugs but the after opening the cable covers. 15. VOLTAGE INDICATOR LAMPS AND PHASE COMPARATORS : The RMU shall be equipped with a voltage indication to indicate whether or not there is voltage on the cable. There should be a facility to check the synchronization of phases with the use of external device. It shall be possible for the each of the function of the RMU to be equipped with a permanent voltage indication as per IEC 601958 to indicate whether or not there is voltage on the cables. The indicating lamp shall be LED type for better visibility during day light. TN-01/107 16. EXPANDABILITY : Each combination of RMU shall have the provision for future extension on both sides by load break isolators / Circuit breakers, with a suitable trunking chamber and accessories and necessary Bus Bar. Extensible isolator(s) and circuit breaker(s) shall be individually housed in a separate SF6 gas/Solid State epoxy enclosures. Even in case of extensible circuit breakers, the Breaker should be capable of necessary short circuit operations as per IEC at 20 KA, and the Breaker should have a rated current carrying capacity of 200 A. 17. BUS COUPLER/ BUS BAR SECTIONALISER WITH LOAD BREAK SWITCH The load break switch of the Bus bar Sectionaliser shall be rated for 12 KV, 630A, 20KA for 3 secs. The LBS should be housed in a SF6/solid state epoxy Insulated stainless steel / cast resin enclosure conforming to IP-67 Degrees of protection and shall be with motorized mechanism. The sectionaliser shall be provided with all the necessary electrical and mechanical interlocks required for proper functioning with the Incomers. 18. Surge Voltage suppression : The RMU shall be designed to operate on input power containing voltage spikes. The equipment shall be protected against part failure or malfunctioning such as intermittent firing of triggering devices due to surge voltage spikes occurring randomly over the instantaneous supply voltage. The RMU shall be equipped with a surge suppressor device connected to the 3 – phase of the 11 KV bus of the RMU. The surge suppressor device shall confirm to the relevant IS standard or IEC standard. 19. PADLOCKING FACILITIES Provision shall be made for padlocking the load break switches/ Circuit breaker, and the earthing switches in either open or closed position with lock & master key. The circuit breakers and earthing switches can be locked in the open or closed position by 1 to 3 padlocks 6 to 8 mm in diameter. 20. WIRING & TERMINALS: The wiring should be of high standard and should be able to withstand the tropical weather conditions. The wiring cable must be standard single-core non-sheathed, Core marking (ferrules), stripped with non-notching tools and fitted with end sleeves, marked in accordance with the circuit diagram with printed adhesive marking strips. All wiring shall be provided with single core multi-strand copper conductor wires with P.V.C insulation and shall be flame retardant low smoke type. The wiring shall be carried out using multi-strand copper conductor super flexible PVC insulated wires of 650/1100V Grade for AC Power, DC Control and CT circuits. Suitable colored wires shall be used for phase identification and interlocking type ferrules shall be provided at both ends of the wires for wire identification. Terminal should be suitably protected to eliminate sulphating. Connections and terminal should be able to withstand vibrations. The terminal blocks should be stud type for TN-01/108 controls and disconnecting link type terminals for CT leads with suitable spring washer and lock nuts. Flexible wires should be used for wiring of devices on moving parts such as swinging Panels (Switch Gear) or panel doors. Panel wiring shall be securely supported, neatly arranged readily accessible and connected to equipment terminals, terminal blocks and wiring gutters. The cables should be uniformly bunched and tied by means of PVC belts and carried in a PVC carrying trough. The position of PVC carrying trough and wires should not give any hindrance for fixing or removing relay casing, switches etc., Wire termination shall be made with solder less crimping type of tinned copper lugs. Core identification plastic ferrules marked to correspond with panel wiring diagram shall be fitted with both ends of each wire. Ferrules shall fit tightly on the wire when disconnected. The wire number shown on the wiring shall be in accordance with the IS.375. All wires directly connected to trip circuits of breaker or devices shall be distinguished by addition of a red color unlettered ferrule. Inter-connections to adjacent Panels (Switch Gear) shall be brought out to a separate set of Terminal blocks located near the slots or holes to be provided at the top portion of the panel. Arrangements shall be made for easy connections to adjacent Panels (Switch Gear) at site and wires for this purpose shall be provided and bunched inside the panel. The bus wire shall run at the top of the panel. Terminal block with isolating links should be provided for bus wire. At least 10% of total terminals shall be provided as spare for further connections. Wiring shall be done for all the contacts available in the relay and other equipment and brought out to the terminal blocks for spare contacts. Colour code for wiring is preferable in the following colours. Voltage supply : Red, Yellow, Blue for phase and Black for Neutral CT circuits : Similar to the above DC circuits : Grey for both positive and negative • 250V AC circuits Earthing : : Black for both phase and neutral Green The wiring shall be in accordance to the wiring diagram for proper functioning of the connected equipment. Terminal blocks shall not be less than 650V grade and shall be piece-molded type with insulation barriers. The terminal shall hold the wires in the tight position by bolts and nuts with lock washers. The terminal blocks shall be arranged in vertical formation at an inclined angle with sufficient space between terminal blocks for easy wiring. The terminals are to be marked with the terminal number in accordance with the circuit diagram and terminal diagram. The terminals should not have any function designation and are of the tension spring and plug-in type. 21. EARTHING : TN-01/109 EARTHING OF ISOLATORS AND DISTRIBUTION TRANSFORMER BREAKERS (EARTH SWITCH) : Necessary arrangements shall be made at Load break isolators / Distribution Transformer Breaker for selecting Earth position. Mechanical interlocking systems shall prevent the RMU function from being operated from the ‘ON’ to ‘Earth On’ position without going through the ‘OFF’ position. The RMU outdoor metal clad, Switch Gear, Load break isolators, Distribution Transformer ,LT pillar box, & steel structure etc., shall be equipped with an earth bus securely fixed along the base of the RMU. When several units of the RMU (Extra Isolators / Breakers) are mounted adjoining to each other, the earth bus shall be made continuous and necessary connectors and clamps for this purpose shall be included in the scope of supply. The size of the earth bus shall be made of IEC / IS standards with tinned copper flat for RMU earthing. Provision shall be made on end of RMU for connecting the earth bus to the earth grid. All metal parts of the switchgear which do not belong to main circuit and which can collect electric charges causing dangerous effect shall be connected to the earthing conductor made of copper having Cross Sectional area of minimum 75 mm″. Each end of conductor shall be terminated by M12/equivalent quality and type of terminal for connection to earth system installation. Earth conductor location shall not obstruct access to cable terminations. The following items are to be connected to the main earth conductor by rigid or copper conductors having a minimum cross section of 75 mm″ (a) earthing switches (b) Cable sheath or screen (c) capacitors used in voltage control devices, if any. All metallic cases of the relays, instruments and other panel mounted Equipment’s shall be connected to the earth bus by independent copper wires of size shall be made of IEC/IS standards. The colour code of earthing wire shall be green. Earthing wires shall be connected on the terminals with suitable clamp connectors only and soldering shall not be permitted. 22. ACCESSORIES & SPARES: The following spares and accessories shall be supplied along with the main equipments at free of cost:1. Charging lever for operating load break isolators & circuit breaker of each RMU 2. Kit for identifying SF6 gas leakage – 5 numbers 3. All pressure gauges indications – 5 numbers 4. Necessary SF6 gas filling plant with adopter and tools etc for filling SF6 gas at Site --2 Nos 5. Necessary gas cylinders with adopter ,pressure gauge for storage of SF6 gas –2 Nos 6. Any other spares & Tools, which are all essentially required at the time of emergency and routine maintenance. TN-01/110 The following accessories shall be supplied with each compact RMU at free of cost: 1. 2. Pad locks for all doors with one set (3 Nos.) Master keys Earth bus formed out of 30X5 mm tinned Copper flat. 3. Wire guard protective mesh on the front doors and back for prevention of pasting of papers etc. 4. Base channel with foundation bolts 5. Live part shrouds, danger plates, caution boards, name plates, rating plates etc. as per requirements 6. All other components, even though not specifically mentioned, but required for the safe operation of the unit. 23. TESTING OF EQUIPMENT & ACCESSORIES: 23.1 INSPECTION & TESTIMG : The inspection may be carried out by the JVVNL at any stage of manufacture. The supplier shall grant free access to DISCOM’s representative at any reasonable time when the work is in progress. Inspection and acceptance of any equipment under this specification by the DISCOM shall not relieve the supplier of his obligation of furnishing equipment in accordance with the specification and shall not prevent subsequent rejection if the equipment is found to be defective. The supplier shall keep the DISCOM informed in advance, about the manufacturing programme so that arrangement can be made for inspection. The JVVNL reserves the right to insist for witnessing the acceptance/routine testing of the bought out items. The JVVNL has rights to inspect the supplier’s premises for each and every consignment for type & routine test. No material shall be dispatched from its point of manufacture unless the material has been satisfactorily inspected and tested / unless the same is waived by the JVVNL in writing. 23.2 ACCEPTANCE AND ROUTINE TESTS : All acceptance and routine tests as stipulated in the latest relevant IS/IEC shall be carried out by the supplier at his works in the presence of Nigam’s representative. The supplier shall give at least 15 days advance intimation to the DISCOM to enable them to depute their representative for witnessing the tests. The cost towards these tests and other expenses shall be borne by the supplier. 23.3 ADDITIONAL TESTS : The DISCOM reserves the right for carrying out any other tests of a reasonable nature at the works of the supplier/laboratory or at any other recognized laboratory/research institute in addition to the above mentioned type tests, acceptance and routine tests at the cost of the DISCOM to satisfy that the material complies with the intent of this specification. 23.4 TYPE TEST The successful bidder should, submit copies of all Type test certificate of their make in full shape as confirming to relevant ISS/IEC of latest issue obtained from a TN-01/111 laboratory/ testing house as detailed in Pre Qualifying Requirement (PQR) attached with. The above type test certificates should accompany the drawings for the materials duly signed and certified by the institution who has issued the type test certificate. The following type test certificate shall be provided: S. No. 01. 02. Short time current withstand test and peak current withstand test. Lightning Impulse voltage with-stand test 03. Temperature rise test 04 Short Circuit current making and breaking tests CB Isolator Power frequency voltage withstand test (dry/wet) Capacitive current switching test confirming to IEC Mechanical Endurance Test confirming to IEC / Measurement of the resistance of the main circuit. Checking of degree of protection Switch, circuit breaker, earthing switch making Capacity CB Earth Switch Switch, circuit breaker, earthing switch breaking Capacity CB Internal Arc Withstand Partial Discharge test on Complete RMU Other type & routine tests insists by IEC for RMU 05. 06 07. 08 09 10 11 12 13 14 23.5 Name of Type Test PRE-COMMISSIONING TESTS : All the pre-commissioning tests shall be carried out by Nigam representative in the presence of the supplier’s representative (if wish to present), for which 7 day advance intimation will be issued by field officer to the firm. 24.0 PERFORMANCE GUARANTEE 23.1 The performance Guarantee period shall be 5 (Five) years from the date of receipt of equipment along with its all accessories. 23.4 These guarantees shall supplement the general provisions covered under General Conditions of Contract in clause entitled “Guarantee”. 23.5 Liquidated damages for not meeting specified performance shall be assessed and recovered from the supplier. Such liquidated damages shall be without any limitation whatsoever and shall be in addition to damages, if any payable under any other clause of General Conditions of Contract. 25.0 NAME PLATE: Each RMU and its associated equipments shall be provided with a nameplate legible and indelibly marked with at least the following information. (a) (b) (c) (d) Name of manufacturer Type, design and serial number Rated voltage and current Rated frequency TN-01/112 (e) (f) (g) (h) (i) (j) (k) (l) Rated symmetrical breaking capacity Rated making capacity Rated short time current and its duration Purchase Order number and date Month and Year of supply & Expiry of Guarantee period Rated lighting impulse withstand voltage D.C. component of current. Feeder name(Incoming and Out going),DTs Structure name,11000Volts Dangers etc. NOTE:i) The word rated need not appear on the name plate. Recognized abbreviations may be used to express the above particulars. ii)Whether the circuit breaker is fitted with closing/tripping devices necessitating an auxiliary supply shall be stated either on the circuit breaker name plate or any other acceptable position. B) TECHNICAL SPECIFICATION OF RING MAIN UNITS FULLY MOTORIZED AND SCADA COMPATIBILE Nigam is also intend to purchase RMU fully motorized with SCADA compatibilty for which additional features shall be incorporated in addition to metioned in the above specification of RMU having provision for future motorization & SCADA compatibility to fullfill the following requirement :- i) Both LBS & T-off VCB shall be compatible for remote operation through SCADA. ii) Fault Passage Indicator (Non-communicable) shall be provided with potential free contacts for SCADA compatibilty & should have provision for remote reset. iii) Protection & auxialry relay should have self resetting feature as well as remote resetting feature. iv) status (Potential free contacts) signal to SCADA – to be wired to marshalling terminal block: v) • LBS close/open • LBS & CB Earth switch close/open • Battery Charger Fail • CB close/open • Protection relay operated • FPI operated • SF6 gas pressure low • Trip Coil healthy • Local remote • Spring charge • RMU door open • Power supply healthy Commands from SCADA – to be wired to marshalling terminal block: LBS clsoe/open, CB close/open, FPI Reset etc. The following are the specific requirement for SCADA connectivity & motorization: • Each RMU shall be fitted with a power supply, including batteries and battery charger, suitable for operating the motors of the on-load Isolators and Circuit Breakers. On this basis, the following operational specifications shall apply. • The Power supply unit shall conform to the following requirements :- Input : 230 V AC from the nearest JVVNL mains - Output : Stable 24/48 V DC. TN-01/113 • The Power supply The batteries shall have sufficient capacity to supply power to the following devices with a nominal backup of 4 hours • - RMU’s motors for a minimum of five (5) operations. - RMU’s trip coils, close coils, FPI (in case required). The batteries shall be of sealed lead acid VRLA or dry type and shall have a minimum life of vie (5) years at 25 C. • The battery charger shall be fully temperature compensated. • The prevent deep discharge of the batteries on loss of AC power source, the battery charger shall automatically disconnect all circuitry fed by the batteries following a user-adjustable time period or when the battery voltage falls below a preset value. If the battery voltage falls below the preset value, the time to fully recharge all batteries shall not exceed twenty-four (24) hours. • An automatic battery checking device shall be provided to check the battery’s health and initiate a battery-failed alarm signal in case battery deterioration is detected. Such detection may be based on comparing measurement values with set values with set values (e.g., internal resistance, voltage, etc.) • The battery charger shall be provided with an alarm displayed at the local control panel and remotely at the DAS to account for any of the following conditions. - Low battery voltage - High battery voltage - Battery failed - Battery charger over voltage - Grounded battery/battery-charger - Others according to manufacture’s design Motor : • The RMU shall be fitted with spring charging motors of high insulation class allowing the circuit breakers and load break switches to be operated without manual intervention. • In addition to allowing circuit breaker tripping by the RMU’s protection relays, the moterized operating mechanism shall be suitable for remote control by the SCADA. • The motors along with the supplied control card and push buttons shall allow Utility’s personnel to electrically operate the circuit breakers and load break switches at site without any modification of the operating mechanism and without de-energizing the RMU. TN-01/114 SPECIFICATION FOR 33KV OUTDOOR LOAD BREAK SWITCH WITH REMOTE COMMUNICATION CAPABILITIES 1. Scope:This specification covers requirement for outdoor pole mounted Load break switch (LBS) with capability of being integrated with any SCADA system using FRTUs. The load break switch shall be designed for pole mounted or substation installation. All of the unit’s protection, control and metering functions shall be electronically controlled within an integrated, modularized control unit. The load break should be capable of effectively extinguishing the arc by injecting the air through the pressurized chamber. Use of SF6 gas for either insulation or arc extinguishing is not permissible due to its harmful greenhouse effects. 2. General:The LBS shall be suitable for use on non-effectively earthed and effectively earthed networks and under the system conditions and service conditions as follows: 1 Rated Voltage kV 33 2 Highest System Voltage kV 36 3 Rated Normal Current A 800 4 No. of Poles 3 Air Break Load Break 5 Switch Type Switch Vertical/Horizontal 6 Operating Condition Break, Outdoor Type 7 Applicable Standard IEC 62271-103 -10 degrees C to +55 8 Temperature 1 9 degrees C min power frequency (Across / Phase-Earth) Lightning Impulse withstand kV 80 / 70 voltage 10 (1.2/50 us) (Across / Phase-Earth) kV 195 / 170 11 Rated Frequency Hz 50 12 Rated Short-time withstand current kA, s 16 for 3 seconds kA 13 Short Circuit Making Current (TDma) peak 14 Breaking/Interrupting Medium Air (Solid State) 15 Isolating Medium Air 16 Insulator Type Polymer 17 Creepage Distance (Minimum) mm 40 900 Motorized 18 Operating Mechanism 19 Mounting of Motor and Manual / Motor Operating TN-01/115 On the Pole with the Mechanism 3. switch 20 Closing Time ms < 1000 21 Opening Time ms < 1000 22 Suitable for future SCADA Yes 23 Padlocking facilities Yes Construction:The R,Y,B three-phase of the load break switch is installed on one great sectional galvanized square steel base, joint together with one integrative drive axis interphase to ensure for closing and opening three poles synchronously. The arching chamber should be maintenance-free, which should operate at the time of closing and opening. Being the heart of the load break switch, it should be capable of extinguishing the arc formed when operated on full load. There shall not be any requirement of external energy for holding the position CLOSE or OPEN. The use of HV/LV solenoids is not acceptable. Oil / SF6 is not acceptable for interruption or insulation purposes. The unit shall be designed for M1 class for mechanical endurance. Provisions shall be included for electrical close, and electrical and manual trip. Each pole of the LBS shall be identical to allow complete replacement of any individual pole, without disassembly or replacement of the other poles. All parts must be field replaceable. The LBS shall be suitable for mounting on channel on D.P. Structure. There should be no connecting rods / operating rods / down pipe which connects the switch mechanism to the control box located below. The motor and gears should be fitted with the switch on the pole with only wires coming down for connection with the control box. Depending on the design, each phase should have 2/3 insulators for fixed contacts and pads and for operation of the moving contact. The fixed contact, moving contact and terminal pads must be made of hard drawn electrolytic copper. The current density for fixed contact, moving contact and terminal pads must be minimum 2.0A/sqmm. 4. Mechanism:The load break switch should compose of a disconnect blade, an arc extinguishing chamber in air and an operating mechanism. The arc extinguishing chamber should be made of insulating material with the merits of high electric performance, arcendurance and high strength. The chamber should have a built-in spring with fast acting mechanism which ensures breaking of load current, hence being free from operating speed of the user. The arching gap and disconnect gap of the load break switch should be parallel in the course of opening and closing. This load break switch should be operate-able by a manual linking rod or motor operating mechanism. There should be a visible gap of switch after opening to produce functions of isolation and protection. The blade of the switch should use press spring to assure enough connection pressure to the contact. By use of the TN-01/116 spring the operation should be made convenient, the blade stable and the reliability of opening-closing operation should be guaranteed. The switch should open or close under rated load current and not require any secondary protection device. The load break switch should work on the principle of extinguishing the arc by a blast of compressed air produced by the switch itself while opening the main moving contact tube. 5. Solid Dielectric Insulation:The phase to phase shall be adequate for meeting the dielectric requirements. The creepage distance of insulators shall be minimum 900 mm to ensure the safety even in worst case failures of the quenching device. Use of boots or screw on bushings to meet Creepage is not acceptable. The switch will go through high vibrations due to fast operations and the high creepage will give added safety. The distance between pole to pole when the switch is open should take into consideration of the case when the chamber does not operate. 6. Adding SCADA compatibility:The load break switch should be capable of being integrated with SCADA functions using an FRTU (Feeder Remote Terminal Unit). The load break switch should be capable of reporting switch ON/OFF status and should be capable of being operated (OPEN/CLOSE) by GPRS function. 7. Control equipment 7.1 Control cabinet:- The control cabinet of the LBS should be capable of locally and remotely operating the LBS. It should be capable of sending the status of ON/OFF to the control room at the substation through a wire. The control cabinet should take an input of 220VAC/110VDC, which will be specified in the tender document, which is used to operate the motor and send a logical 1 or 0 to the control room indicating ON/OFF respectively. The control for the LBS shall be capable to be integrated with a high end SCADA compatible numerical relay which has inbuilt UPS and power control electronics cabinets that houses equipment for protection and control and shall be mounted independently of the LBS. The cabinet of the LBS should be capable of shall be adequately sealed and dust protected and shall be internally treated to prevent moisture condensation. The degree of protection shall be suitable for Outdoor installation. The cabinet must be made of stainless steel. Mild Steel or Aluminium will not be acceptable. The door of the cabinet shall be fitted with a robust fastening arrangement that is capable of being secured by a padlock. The control must have Open and Close pushbuttons. 8. REQUIREMENTS 8.1 General The load break switch shall be suitable for use on non-effectively earthed and TN-01/117 effectively earthed networks and under the system conditions and service conditions as follows: S. No. Item Data 1 Operating Mechanism LV Motor 2 Altitude Up to 3000 m; 3 Ambient Temperature Minimum- -10°C; Maximum- 55°C; 4 Maximum Daily Variation 35°C; 5 Pollution level Medium/heavy (Special Applications); 6 8.2 Lightning Activity High. Mounting 8.2.1 The LBS shall be suitable for single pole/DP mounting. 8.2.2 The LBS shall be fitted with an external M12 earthing stud, complete with a nut, lock nut and spring washer. The earth stud shall be welded to the tank for optimal earthing connection. 8.2.3 The mass of the mounting hardware, the LBS and the control cabinet and cable shall be stated in the tender documentation. 8.3 Insulators Aromatic epoxy resin with Silicone rubber boots Porcelain bushings and EPDM rubber are not acceptable. The 2 polymer post insulators must have a creepage distance of 900mm. All insulators must conform to IEC 62231 and the relevant type test reports may be furnished. 8.4 Finish 8.4.1 All interior and exterior ferrous surfaces of the LBS should be manufactured using mild steel. The interior and exterior of control cabinets shall be manufactured from 316 marine grade stainless steel. All support structures, mild steel parts and associated bolts and nuts with these parts, shall be hot-dip galvanized. 8.4.2 Suitable precautions shall be implemented to prevent corrosion due to the use of dissimilar materials. 9. Control equipment 9.1 Control cabinet 9.1.1 Cabinets that house equipment for protection and control shall be mounted independently of the LBS. 9.1.2 Suitable ultraviolet-resistant cable, 7 m long, shall be provided to connect the LBS to the control cabinet. If shorter or longer cables are required, the length will be specified in the tender documentation. 9.1.3 It shall be possible to disconnect the cable at the LBS while the LBS is connected to the power system, TN-01/118 without causing damage or malfunction. 9.1.4 Cabinets shall be adequately sealed and dust protected and shall be internally treated to prevent moisture condensation. The degree of protection shall be suitable for purpose. 9.1.5 The supplier shall ensure that the equipment housed in the control cabinet can withstand the heating effect of direct solar radiation without causing failure and/or malfunction. Details shall be provided in the tender documentation. The protection level should be IP-55 as per IEC 60259. 9.1.6 The cabinet shall make provision for bottom entry of auxiliary power cables. The holes shall be suitably blanked off. 9.1.7 The cabinet shall be fitted with an external M10 earthing stud with a nut, lock nut and a serrated washer. 9.1.8 The RTU will not be a part of the supply. 9.1.8 The door of the cabinet shall be fitted with a robust fastening arrangement that is capable of being secured by a padlock that has a shackle of 8 mm diameter. 9.1.9 The cabinet shall be easily removable for workshop repair purposes. 9.2 Electronic control equipment 9.2.1 The controls shall not suffer any damage if one or more poles of the load break switch fail to respond to either a trip or a close command. 9.3 Motor operating mechanism 9.3.1 The motor should be mounted along with the switch on the pole directly the main center operating rod of the switch. There should be no extra with linkages to connect the switch with the motor operating mechanism. 9.3.2 The motor operating mechanism must be enclosed in an SS enclosure and should be sealed accordingly to not allow any entry of water or dust. 10. Local control and indication 10.1 The local control and indication shall be as given in Table 1. Table 1: Minimum specification of local controls and indications 1 Item 2 Features Local control (See Note 1) Local/Remote 3 Remarks 2 position key switchable LBS Open Secure control LBS Close Secure control 0.1.1 Notes (preferable) Note 1: The two-position switch (labelled as below) shall allow the LBS controller to be set in the following modes: Remote: In this mode a local operator can trip the LBS and change the mode. A remote operator can trip or close the LBS. Local: In this mode a local operator can trip and close the LBS. A remote operator can only trip the LBS. 10.2 All local controls and indications shall be accessible in adverse weather condition. 10.3 The LBS shall be provided with a detachable lever. Only after attaching that lever, TN-01/119 the operator will be able to operate the switch locally. The lever has to be kept securely with the person handling the switch remotely - who alone can issue it to the authorized person so as to prevent any unauthorized manual operation of the switch. 10.4 The LBS status shall be clearly visible from ground level. 10.5 Malfunction of the LBS shall not pose a safety hazard to the operator due to the recoil or backlash of items such as external operating rods, cranks and levers. 10.6 Switches used for local control shall offer the type of control described in 1 i.e. secure or toggled control with clear marking for ON and OFF controls. 11. Power supplies 11.1 Test supply: The LBS shall accept an external AC 230 V 50 Hz supply. 11.2 Optional supply: The LBS shall accept an external DC 110/220 V supply. 12 Maintenance and commissioning 12.1 It shall be Possible to disconnect the LBS and table connect a simulated switch to the control cabinet for testing purposes. 13 Rating plate Each LBS shall bear a rating plate of an intrinsically corrosion-resistant material, indelibly marked with the sea-level rating for which the has been type tested. The rating plate shall be indelibly 14 equipment marked with: · the manufacturer's name; · the rated voltage and rated current · the rated short time withstand current (short circuit level) · the rated short circuit making current · the equipment type designation and serial number of the LBS; · the mass, in kilograms; · the date of manufacture; and · auxiliary supply voltage (if applicable). Additional information The following shall be submitted with the tender. 14.1 Load break switch details · manufacturer; · type designation; · place of manufacture; · short time withstand current; 14.2 A schematic-wiring diagram of the LBS offered. 14.3 A general-arrangement drawing of the LBS offered. 14.4 Details of the maintenance and operating equipment, procedures needed and a detailed parts list of the various components. 14.5 A description manuals, of including the LBS operation, maintenance with schedules, instruction fault and detection maintenance characteristics, communications facilities, the method of applying settings and controls, together with any software required and the cost thereof. The software requirements TN-01/120 shall be stated in the tender documentation. 14.6 A list of recommended spares and tools. 14.7 Details of technical back-up facilities available. These details shall be stated in the tender documentation. 14.8 Details of LV trip/close motor if available as an option 14.9 Power requirements for a close operation 14.10 The maximum achievable separation between the control unit and the load break switch. 14.11 Full details of the protocol implementation and the complete point database. 15 TESTS 15.1 Type tests The load break switch shall have been type tested in accordance with, and found to comply with, the requirements of IEC 62271-103 for the following, and the appropriate values shall be stated in the tender documentation: 15.1.1 Dielectric Tests (BIL and Power frequency). 15.1.2 Measurement of resistance of the main circuit 15.1.3 Short-time withstand current test. 15.1.4 Temperature rise test 15.1.5 Mechanical operations. 15.1.6 Cable Charging and Line Charging Test 15.1.7 Mainly Active Load Test 15.1.8 Closed Loop Current Test 15.2 The control cabinet and associated electronics shall have been type tested in accordance with IEC 60259. 15.3 All insulators shall have been type tested in accordance with IEC 62231. 15.4 Type Test records in the form of validated copies of test certificates issued by an NABL approved / International accredited testing authority shall be submitted with the tender documentation. 15.5 Only the tests conducted at NABL approved laboratory or an accredited international laboratory shall be accepted. 16 Routine/Acceptance tests 16.1 Routine tests, as required in the relevant standards, shall be carried out as a normal requirement of the contract and, unless otherwise agreed upon, shall be witnessed by the purchaser or by his appointed representative. No additional charge shall be levied for such tests or for the production or presentation of documentation related to routine tests. 16.2 Duplicate copies of routine test certificates shall be supplied together with the equipment when the latter is delivered to the final destination stated in the order. 16.3 Mechanical Operating Test: During these tests, which are performed without voltage or current in the main circuit, it shall be verified, in particular, that the switches open and close correctly TN-01/121 when their operating devices are energized or under pressure. It shall also be verified that operation will not cause any damage to the switches. The arrangement of the switch shall comply with specifications for the mechanical operation type tests, refer to 6.102.1 of IEC62271-103. A switch having a poweroperating device shall be subjected to the following tests: – at specified maximum supply voltage and/or maximum pressure of compressed gas supply: five operating cycles; – at specified minimum supply voltage and/or minimum pressure of compressed gas supply: five operating cycles; – if a switch can be manually operated besides its normal electric or pneumatic operating device: five manual operating cycles. A manually operated switch shall be subjected to the following test: 10 operating cycles. During these tests, no adjustment shall be made and the operation shall be faultless. It shall be verified that the position indication is operating correctly when the switches open and close. 17 PACKING/DOCUMENTATION 17.1 Assembly The switch must be factory assembled in all aspects including insulators, motor mechanism, fixed and moving contacts, operating rods, springs, chamber etc. 17.2 Packing All equipment shall be carefully packed to prevent damage or deterioration during normal transportation, handling and storage. Each container shall bear the following information on the outside of the container: o The address of the destination o The gross mass, in kilograms o The name of the manufacturer o The purchaser's order number and port of destination 18 Documentation Each LBS shall be supplied complete with the documentation as specified in the specification, together with the routine test certificates specified in 2.29 19 Related IEC / Standards IEC 62271-103 Standards for high-voltage switchgear and controlgear. TN-01/122 SPECIFICATION FOR 11KV OUTDOOR LOAD BREAK SWITCH WITH REMOTE COMMUNICATION CAPABILITIES 1 Scope:This specification covers requirement for outdoor pole mounted Load break switch (LBS) with capability of being integrated with any SCADA system using FRTUs. The load break switch shall be designed for pole mounted or substation installation. All of the unit’s protection, control and metering functions shall be electronically controlled within an integrated, modularized control unit. The load break should be capable of effectively extinguishing the arc by injecting the air through the pressurized chamber. Use of SF6 gas for either insulation or arc extinguishing is not permissible due to its harmful greenhouse effects. 2 General:The LBS shall be suitable for use on non-effectively earthed and effectively earthed networks and under the system conditions and service conditions as follows: 1 Rated Voltage kV 11 2 Highest System Voltage kV 12 3 Rated Normal Current A 630 4 No. of Poles 3 Air Break Load Break 5 Switch Type Switch Tilting Type, Vertical 6 Operating Condition Break, Outdoor Type 7 Applicable Standard IEC 62271-103 -10 degrees C to +55 8 Temperature 1 9 min degrees C power frequency (Across / Phase-Earth) kV 40 / 36 Lightning Impulse withstand voltage 10 (1.2/50 us) (Across / Phase-Earth) kV 105 / 95 11 Rated Frequency Hz 50 12 Rated Short-time withstand current kA, s 16 for 3 seconds kA 13 Short Circuit Making Current (TDma) peak 40 14 Cable Charging Current A rms 16 Mainly Active Load Breaking Current 15 (TD load 2 and TD Load 1) A 630 16 Closed Loop distribution circuit current A 630 17 Breaking/Interrupting Medium Air 18 Isolating Medium Air / Solid State 19 Insulator Type Polymer 20 Minimum Phase to Phase distance TN-01/123 mm 375 Minimum Isolating Distance (when in 3 21 open position) mm 275 22 Creepage Distance mm 450 23 Operating Mechanism Motorized and Manual Mounting of Motor / Motor Operating On the Pole with the 24 Mechanism switch 25 Closing Time ms < 750 26 Opening Time ms < 750 27 Suitable for future SCADA Yes 28 Padlocking facilities Yes Construction:The R,Y,B three-phase of the load break switch is installed on one great sectional galvanized square steel base, joint together with one integrative drive axis interphase to ensure for closing and opening three poles synchronously. The arching chamber should be maintenance-free, which should operate at the time of closing and opening. Being the heart of the load break switch, it should be capable of extinguishing the arc formed when operated on full load. There shall not be any requirement of external energy for holding the position CLOSE or OPEN. The use of HV/LV solenoids is not acceptable. Oil / SF6 is not acceptable for interruption or insulation purposes. The unit shall be designed for M1 class for mechanical endurance. Provisions shall be included for electrical close, and electrical and manual trip. Each pole of the LBS shall be identical to allow complete replacement of any individual pole, without disassembly or replacement of the other poles. All parts must be field replaceable. The LBS shall be suitable for mounting on channel on D.P. Structure. There should be no connecting rods / operating rods / down pipe which connects the switch mechanism to the control box located below. The motor and gears should be fitted with the switch on the pole with only wires coming down for connection with the control box. Each phase should have 3 insulators, 2 for fixed contacts and pads and 1 for operation of the moving contact. The fixed contact, moving contact and terminal pads must be made of hard drawn electrolytic copper. The current density for fixed contact, moving contact and terminal pads must be minimum 2.0A/sqmm. 4 Mechanism:The load break switch should compose of a disconnect blade, an arc extinguishing chamber and an operating mechanism. The arc extinguishing chamber should be made of insulating material with the merits of high electric performance, arcendurance and high strength. The chamber should have a built-in spring with fast acting mechanism which ensures breaking of load current, hence being free from TN-01/124 operating speed of the user. The arching gap and disconnect gap of the load break switch should be parallel in the course of opening and closing. This load break switch should be operate-able by a manual linking rod or motor operating mechanism. There should be a visible gap of switch after opening to produce functions of isolation and protection. The blade of the switch should use press spring to assure enough connection pressure to the contact. By use of the spring the operation should be made convenient, the blade stable and the reliability of opening-closing operation should be guaranteed. The switch should open or close under rated load current and not require any secondary protection device. The load break switch should work on the principle of extinguishing the arc by a blast of compressed air produced by the switch itself while opening the main moving contact tube. 5 Solid Dielectric Insulation:The phase to phase shall be minimum 375 mm and adequate for meeting the dielectric requirements. The creepage distance of insulators shall be minimum 450 mm to ensure the safety even in worst case failures of the quenching device. Use of boots or screw on bushings to meet Creepage is not acceptable. The switch will go through high vibrations due to fast operations and the high creepage will give added safety. The distance between pole to pole when the switch is open should take into consideration of the case when the chamber does not operate. 6 Adding SCADA compatibility:The load break switch should be capable of being integrated with SCADA functions using an FRTU (Feeder Remote Terminal Unit). The load break switch should be capable of reporting switch ON/OFF status and should be capable of being operated (OPEN/CLOSE) by GPRS function. 7 Control equipment 7.1 Control cabinet:The control cabinet of the LBS should be capable of locally and remotely operating the LBS. It should be capable of sending the status of ON/OFF to the control room at the substation through a wire. The control cabinet should take an input of 220VAC/110VDC, which will be specified in the tender document, which is used to operate the motor and send a logical 1 or 0 to the control room indicating ON/OFF respectively. The control for the LBS shall be capable to be integrated with a high end SCADA compatible numerical relay which has inbuilt UPS and power control electronics cabinets that houses equipment for protection and control and shall be mounted independently of the LBS. The cabinet of the LBS should be capable of shall be adequately sealed and dust protected and shall be internally treated to prevent moisture condensation. The degree of protection shall be suitable for Outdoor installation. The cabinet must be made of stainless steel. Mild Steel or Aluminium will not be acceptable. TN-01/125 The door of the cabinet shall be fitted with a robust fastening arrangement that is capable of being secured by a padlock. The control must have Open and Close pushbuttons. 8 REQUIREMENTS 8.1 General The load break switch shall be suitable for use on non-effectively earthed and effectively earthed networks and under the system conditions and service conditions as follows: S. No. Item Data 1 Operating Mechanism LV Motor 2 Altitude Up to 3000 m; 3 Ambient Temperature Minimum- -10°C; Maximum- 55°C; 4 Maximum Daily Variation 35°C; 5 Pollution level Medium/heavy (Special Applications); 6 8.2 Lightning Activity High. Mounting 8.2.1 The LBS shall be suitable for single pole/DP mounting. 8.2.2 The LBS shall be fitted with an external M12 earthing stud, complete with a nut, lock nut and spring washer. The earth stud shall be welded to the tank for optimal earthing connection. 8.2.3 The mass of the mounting hardware, the LBS and the control cabinet and cable shall be stated in the tender documentation. 8.3 Insulators Aromatic epoxy resin with Silicone rubber boots Porcelain bushings and EPDM rubber are not acceptable. The 2 polymer post insulators must have a creepage distance of 450mm. All insulators must conform to IEC 62231 and the relevant type test reports may be furnished. 8.4 Finish 8.4.1 All interior and exterior ferrous surfaces of the LBS should be manufactured using mild steel. The interior and exterior of control cabinets shall be manufactured from 316 marine grade stainless steel. All support structures, mild steel parts and associated bolts and nuts with these parts, shall be hot-dip galvanized. 8.4.2 Suitable precautions shall be implemented to prevent corrosion due to the use of dissimilar materials. 9 Control equipment 9.1 Control cabinet 9.1.1 Cabinets that house equipment for TN-01/126 protection and control shall be mounted independently of the LBS. 9.1.2 Suitable ultraviolet-resistant cable, 7 m long, shall be provided to connect the LBS to the control cabinet. If shorter or longer cables are required, the length will be specified in the tender documentation. 9.1.3 It shall be possible to disconnect the cable at the LBS while the LBS is connected to the power system, without causing damage or malfunction. 9.1.4 Cabinets shall be adequately sealed and dust protected and shall be internally treated to prevent moisture condensation. The degree of protection shall be suitable for purpose. 9.1.5 The supplier cabinet can shall ensure withstand that the the heating equipment effect without causing failure and/or malfunction. housed of in direct the solar control radiation Details shall be provided in the tender documentation. The protection level should be IP-55 as per IEC 60259. 9.1.6 The cabinet shall make provision for bottom entry of auxiliary power cables. The holes shall be suitably blanked off. 9.1.7 The cabinet shall be fitted with an external M10 earthing stud with a nut, lock nut and a serrated washer. 9.1.8 The RTU will not be a part of the supply. 9.1.8 The door of the cabinet shall be fitted with a robust fastening arrangement that is capable of being secured by a padlock that has a shackle of 8 mm diameter. 9.1.9 The cabinet shall be easily removable for workshop repair purposes. 9.2 Electronic control equipment 9.2.1 The controls shall not suffer any damage if one or more poles of the load break switch fail to respond to either a trip or a close command. 9.3 Motor operating mechanism 9.3.1 The motor should be mounted along with the switch on the pole directly the main center operating rod of the switch. There should be no extra with linkages to connect the switch with the motor operating mechanism. 9.3.2 The motor operating mechanism must be enclosed in an SS enclosure and should be sealed accordingly to not allow any entry of water or dust. 10 Local control and indication 10.1 The local control and indication shall be as given in Table 1. Table 1: Minimum specification of local controls and indications 1 Item 2 Features Local control (See Note 1) Local/Remote 3 Remarks 2 position key switchable LBS Open Secure control LBS Close Secure control 10.1.1 Notes (preferable) Note 1: The two-position switch (labelled as below) shall allow the LBS controller to be set in the following modes: TN-01/127 Remote: In this mode a local operator can trip the LBS and change the mode. A remote operator can trip or close the LBS. Local: In this mode a local operator can trip and close the LBS. A remote operator can only trip the LBS. 10.2 All local controls and indications shall be accessible in adverse weather condition. 10.3 The LBS shall be provided with a detachable lever. Only after attaching that lever, the operator will be able to operate the switch locally. The lever has to be kept securely with the person handling the switch remotely - who alone can issue it to the authorized person so as to prevent any unauthorized manual operation of the switch. 10.4 The LBS status shall be clearly visible from ground level. 10.5 Malfunction of the LBS shall not pose a safety hazard to the operator due to the recoil or backlash of items such as external operating rods, cranks and levers. 10.6 Switches used for local control shall offer the type of control described in table 1 i.e. secure or toggled control with clear marking for ON and OFF controls. 11 Power supplies 11.1 Test supply: The LBS shall accept an external AC 230 V 50 Hz supply. 11.2 Optional supply: The LBS shall accept an external DC 110/220 V supply. 12 Maintenance and commissioning 12.1 It shall be Possible to disconnect the LBS and connect a simulated switch to the control cabinet for testing purposes. 13 Rating plate Each LBS shall bear a rating plate of an intrinsically corrosion-resistant material, indelibly marked with the sea-level rating for which the equipment has type tested. The rating plate shall be indelibly marked with: 14 · the manufacturer's name; · the rated voltage and rated current · the rated short time withstand current (short circuit level) · the rated short circuit making current · the equipment type designation and serial number of the LBS; · the mass, in kilograms; · the date of manufacture; and · auxiliary supply voltage (if applicable). Additional information The following shall be submitted with the tender. 14.1 Load break switch details · manufacturer; · type designation; · place of manufacture; · short time withstand current; 14.2 A schematic-wiring diagram of the LBS offered. 14.3 A general-arrangement drawing of the LBS offered. TN-01/128 been 14.4 Details of the maintenance and operating equipment, procedures needed and a detailed parts list of the various components. 14.5 A description manuals, of the including LBS operation, maintenance with schedules, instruction fault and detection maintenance characteristics, communications facilities, the method of applying settings and controls, together with any software required and the cost thereof. The software requirements shall be stated in the tender documentation. 14.6 A list of recommended spares and tools. 14.7 Details of technical back-up facilities available. These details shall be stated in the tender documentation. 14.8 Details of LV trip/close motor if available as an option 14.9 Power requirements for a close operation 14.10 The maximum achievable separation between the control unit and the load break switch. 14.11 Full details of the protocol implementation and the complete point database. 15 TESTS 15.1 Type tests The load break switch / sectionalizer shall have been type tested in accordance with, and found to comply with, the requirements of IEC 62271-103 for the following, and the appropriate values shall be stated in the tender documentation: 15.1.1 Dielectric Tests (BIL and Power frequency). 15.1.2 Measurement of resistance of the main circuit 15.1.3 Short Circuit Making Test 15.1.4 Short-time withstand current test. 15.1.5 Temperature rise test 15.1.6 Mechanical operations. 15.1.7 Cable Charging and Line Charging Test 15.1.8 Mainly Active Load Test 15.1.9 Closed Loop Current Test 15.2 The control cabinet and associated electronics shall have been type tested in accordance with IEC 60259. 15.3 All insulators shall have been type tested in accordance with IEC 62231. 15.4 Type Test records in the form of validated copies of test certificates issued by an NABL approved / International accredited testing authority shall be submitted with the tender documentation. 15.5 Only the tests conducted at NABL approved laboratory or an accredited international laboratory shall be accepted. 16 Routine/Acceptance tests 16.1 Routine tests, as required in the relevant standards, shall be carried out as a normal requirement of the contract and, unless otherwise agreed upon, shall be witnessed by the purchaser or by his appointed representative. No additional charge shall be levied for such tests or for the production or presentation of TN-01/129 documentation related to routine tests. 16.2 Duplicate copies of routine test certificates shall be supplied together with the equipment when the latter is delivered to the final destination stated in the order. 16.3 Mechanical Operating Test: During these tests, which are performed without voltage or current in the main circuit, it shall be verified, in particular, that the switches open and close correctly when their operating devices are energized or under pressure. It shall also be verified that operation will not cause any damage to the switches. The arrangement of the switch shall comply with specifications for the mechanical operation type tests, refer to 6.102.1 of IEC62271-103. A switch having a poweroperating device shall be subjected to the following tests: – at specified maximum supply voltage and/or maximum pressure of compressed gas supply: five operating cycles; – at specified minimum supply voltage and/or minimum pressure of compressed gas supply: five operating cycles; – if a switch can be manually operated besides its normal electric or pneumatic operating device: five manual operating cycles. A manually operated switch shall be subjected to the following test: 10 operating cycles. During these tests, no adjustment shall be made and the operation shall be faultless. It shall be verified that the position indication is operating correctly when the switches open and close. 17 PACKING/DOCUMENTATION 17.1 Assembly The switch must be factory assembled in all aspects including insulators, motor mechanism, fixed and moving contacts, operating rods, springs, chamber etc. 17.2 Packing All equipment shall be carefully packed to prevent damage or deterioration during normal transportation, handling and storage. Each container shall bear the following information on the outside of the container: o The address of the destination o The gross mass, in kilograms o The name of the manufacturer o The purchaser's order number and port of destination 18 Documentation Each LBS shall be supplied complete with the documentation as specified in the specification, together with the routine test certificates specified in 2.29 19 Related IEC / Standards IEC 62271-103 Standards for high-voltage switchgear and controlgear. TN-01/130 TECHNICAL SPECIFICATION FOR HEAT SHRINKABLE TYPE CABLE JOINTING AND TERMINATION KITS FOR XLPE CABLES 1.01 SCOPE: This specification covers the design, manufacturing, testing and supply of HeatShrinkable type cable straight-through joints and cable end termination kits as per IS:13573(Pt.2)/2011 suitable for use with and installation on 33 KV and 11 KV XLPE aluminum conductor cables . 1.01.1 The cable accessories terminations, either specified in indoor this specification or outdoor, and i.e., cable end straight- through, shall be complete in all respects. Such complete set of accessories shall be termed as kit hereinafter in this specification. 1.01.2 Termination and jointing kits shall be heat-shrinkable type of proven make and of a design and type which have already been extensively used and fully type tested. The offered kits shall be easy in handling and simple to install without much skill , with minimum tools at site. 3.02 TYPE : 3.02.1 Termination Kits & Joints shall be heat shrinkable type for 33 kV & 11 kV XLPE cables suitable for Outdoor and Indoor Cable End Terminations and Straight Through Joints 3.02.2 It is not the intent to specify completely herein all the details of the design, manufacture & assembly of cable accessories; however, cable accessories shall confirm in all respects to a high standard of design & workmanship and be capable of performing in continuous commercial operation up to bidders guarantee in a manner acceptable to the purchaser, who will interpret the meanings of the drawings and specifications and shall have the power to reject any works or material which in his judgment are not in accordance therewith. The cable accessories offered shall be complete with all components necessary for the effective and trouble- free operations. Such components shall be deemed to be within the scope of supplier's supply irrespective of whether they are specifically brought out in this specification and/ or in the commercial order or not. 3.03 SYSTEM PARAMETERS 1 Nominal operating voltage 33 kV rms 11 kV rms 2 Maximum system voltage : 33 kV rms 12 kV rms 3 Frequency (Hz.): 50 +/- 1.5 50 +/- 1.5 4 Number of Phases 5 Type of Earthing Solid 6 Environmental conditions Humid 3 3 Solid Tropical Climate with atmosphere ,and/or , direct burial in water- logged ground. 7 Basic Insulation Level 170 kV (Peak) TN-01/131 75 kV (Peak) polluted 3.04 SERVICE CONDITIONS (A) The cable accessories to be supplied against this specifications shall be suitable for continuous & satisfactory operation under climatic conditions listed S.No. Particulars i) Peak ambient air temperature in shade (°C) 50°C ii) Minimum ambient air temperature (°C) 0°C iii) Maximum avg. ambient temp. 40°C over 24 Hrs. in shade below: ((°C) (B) iv) Maximum temperature attainable by an object 60°C V0 Maximum relative humidity (%) 100 % vi) Maximum altitude above mean sea level 1000 mtrs vii) Maximum wind pressure (Kg./Sq.Mtr.) 100 viii) Number of months of tropical monsoon conditions 4 months ix) Average No. of rainy days per annum 100 x) Average Annual Rainfall in cms. 10 to 100 The kits shall be provided with protection against rodent and termite attacks. 3.05 DESIGN FEATURES. The following considerations shall be taken into account in the design of the product, material properties and the components of the jointing and termination kits. i) Electrical stresses at the screen cut back in case of XLPE cables shall be controlled to a safe value. The stress control may be either through stress control tubing / stress control cone or other suitable means. The bidder shall furnish details of the technique employed straight-through joints. by them for stress control in cable- end terminations / The application of stress control system shall be safe, foolproof and independent of cable jointers’ skills. The stress control method used should withstand expansion and contraction of the cable during load cycling. ii) The cable end termination and jointing kits shall be so designed so as to prevent discharge/ leakage at the cut back and nicks / scratches on XLPE insulations. Full details of the method of discharge prevention shall be indicated by the bidder in their offer. iii) The cable end termination and jointing kits shall be so designed so as to give track - resistant erosion and weather resistant protection to the cable insulation. The outdoor end terminations and straight through joints shall be totally sealed against ingress of moisture of environment. TN-01/132 iv) All Outdoor End Termination kits as well as 33 kV Indoor End Termination kits shall be provided with rain (weather) sheds or creepage-extending petticoats. These shall be non-tracking , weather resistant, hydrophobic and have smooth surface to deflect any water/ dirt etc. The design of these rain (weather) sheds or creepageextending petticoats shall avoid any shed to shed conducting path under heavy rain conditions. v) The cable end terminations & jointing kits shall be class 1 as defined in IEEE standard 48/1996 with latest amendments. Documentary proof shall be required to prove compliance in this regard without which the bid may be ignored. vi) The lugs and ferrules provided should be suitable for compacted conductors and should withstand thermal short circuit of 250 deg. centigrade. 3.06 GENERAL REQUIREMENT FOR CABLE END TERMINATIONS / STRAIGHT- THROUGH JOINTS. i) The term heat shrinkable refers to extruded or moulded polymeric materials which are cross linked to develop elastic memory by irradiation method and supplied in expanded or otherwise deformed sizes/ shapes, subsequently heating in a strained state to a temperature above the shrink temperature resulting in the material recovering or shrinking to its original shape. ii) (a ) The stress control tubes used in heat shrinkable cable accessories shall have volume resistivity of minimum 1,00,00,000 ohm meters for both terminations & straight through joints. The relative permittivity shall be minimum 15. Bidder shall furnish documentary evidence confirming adherence to these along with the offer. Further, impedance of stress control temperature from tubes shall not change over a range of 0 °C to 125 °C. The stress control tubes must have a thermal endurance equivalent to 35 years life. The impedance should also remain constant in spite of the difference in stress which will exist within the sleeve due to heating effect within the conductor and the temperature of the environment. b) Bidder must submit graph showing effect on the impedance value of stress control tube due to effects of stress, temperature variations and thermal ageing of minimum 10,000 Hrs. with the offer. c) Copies of test reports on the critical components used in the joints & terminations be furnished as per as per IS:13573(Pt.2)/2011, be furnished along with the offer. i) The heat shrinkable polymeric material to be used for external leakage insulation between the high voltage conductors and grounds should be non-tracking, weather and erosion resistant and hydro-phobic in polymeric tubing, preferably coloured red, nature. and A heat-shrinkable flexible possessing non-tracking erosion and weather resistant properties shall work as an external covering for the cable covers. Rain - Sheds (skirts) provided should be of same material as the non-tracking tube specified in the paragraph above. Copies of test reports, confirming the nontracking tubes and rain-sheds (skirts) meeting the above requirements shall be furnished along with the offer. TN-01/133 ii) Since the sealants or adhesives to be used between the heat shrinkable materials and XLPE cable shall be exposed to high electrical stresses, they must be track resistant. Documentary evidence shall be furnished in this regard along with the offer. iii) All cuts/ nicks inadvertently occurred to XLPE insulation must be rendered discharge free by using suitable discharge suppression compound. iv) The heat shrinkable tubes may be either extruded or moulded type. v) The higher wall-thickness of heat shrinkable tubes / sleeves shall be preferred to counter the effect of erosion due to pollution. 3.07 OTHER REQUIREMENT i) The kit shall be suitable for storage without deterioration at a temperature upto 50 Deg. C and shall have unlimited shelf life. Conducting paints having limited shelf life are not acceptable. ii) Proper stress control, stress grading and non-tracking arrangement in the termination shall be offered by means of proven methods, details of which shall be elaborated in the offer. Detailed sectional view of assemblies shall be submitted along with the offer. iii) The straight through joints shall be suitable for underground buried installation with incorporated through joints back-fill and chances should be absolutely manufacturer shall use of flooding impervious to by water. the entry The of straight water. The proven technology and design to prevent entry of water or any other liquid inside the straight through joints and cables. iv) The end termination kits shall provide for total environmental sealing of the cable crutch and at the lugs end. The details of the environmental sealing provided shall be submitted along with the offer. v) Provisions for effective screening over each core shall be made and the bidder shall categorically confirm this aspect in the offer. vi) The materials and components not specifically which are stated in the specification but essential for satisfactory operation of the cable shall be deemed to be included in the kit without any extra cost. vii) The terminations / joints shall be of better tracking resistant properties and fully reliable earthing system to maintain continuous contacts with screening/ armouring as the case may be. viii) The armour / earthing arrangement shall form part of the terminations/ joints and shall be protected from erosion either by suitable tape or tube. ix) The terminations/ jointing kits shall have provision for shield connection and earthing whichever required. x) The fault level as well as duration withstand capacity of termination / jointing kits should be strictly matching with the parameters of cables for which the kits are intended to be used. xi) The trade / brand name of the manufacturer, shall be embossed / engraved or suitably marked with indelible ink / paint for the purpose of identification on the tubings and components which are visible from the outside. The words “JVVNL” along TN-01/134 with the trade / brand name of the manufacturer,TN No. , month / year of manufacture, size etc. shall be suitably printed / marked on the kit packing/Cartoon xii) Suitable creepage extension/ rain protection sheds for outdoor cable end terminations shall be provided. xiii) Adequate provisions for eliminating the chances of entrapment of air at steps formed by semicon screen shall be made. xiv) The terminations/ joints shall be supplied in kit form. All insulation and sealing materials, consumable items, conductor fittings, earthing arrangements and lugs etc. should be provided . xv) The bidder shall furnish the constructional features of material offered. xvi) An instruction manual in English and , optionally in Hindi script, complete method/ proceedings adopted for indicating installation of kits, preferably the with more diagrams/ pictorial presentation shall be supplied with each kit. Various items, quantity thereof included in each kit must be indicated in the instruction manual / packing slip provided in the kit packing. 3.08 CABLE SIZE AND ITS REQUIREMENT If the design of the cable jointing kits is such that same kit is suitable for more than one of the cable sizes mentioned at clause 3.06 , then the bidder shall furnish the details of kit number and corresponding cable sizes for which the kit is suitable. 3.09 CIRCULAR The SHAPED CONDUCTOR:- terminations/ jointing kits offered shall be suitable to be used on circular compacted XLPE cable conductor. 3.10 LUGS/ FERRULES Requisite number and size of lugs/ ferrules depending upon the type of the cable shall be provided in the kit. Lugs and Ferrules shall be of crimping type, shall confirm to the relevant standards in case of XLPE cables. 3.11 EARTH/SCREEN CONTINUIY i) Screen continuity by using tinned copper mesh and earth continuity by tinned copper braids of appropriate size shall be provided for transfer of screen/ earth in straight through joints. ii) Tinned copper braids of appropriate size shall be provided along with copper lugs of proper size for the continuity of screen/ armour along with adequate clamping arrangement. 3.12 EARTHING Earthing shall be as per relevant standards and the details of the earthing arrangement offered for the cable accessories shall be submitted along with the offer. 3.13 FIRE RESISTANCE The cable end terminations and straight-through joints shall be fire resistant. The components of kits shall have flame retardant property. TN-01/135 3.14 INTERCHANGEABILITY The components of different size of the kits shall be interchangeable between more than one cable sizes in case the need so arises. Bidders should indicate the range / limits of such interchangeability. 3.15 EASY INSTALLATION The bidder shall offer complete material and components for each kit so as to make one termination/ joint complete in all respects. The bidder shall indicate the list of the material/ components with the supplied quantities of each for each type of cable end termination and straight-through joint. i) The detailed bill of material and installation instructions shall be provided with each kit for verification by the purchaser's inspecting officer and at Nigam's stores / site. ii) All components shall be sealed separately and marked clearly for the purpose of identification of each component. All components shall be supplied in a single package as a complete kit for one termination/ joint and shall bear the manufacturer's name and the cable size or range of cable sizes for which the kit can be used. 3.16 SUPERVISORY ERECTION & COMMISSIONING The successful bidder shall provide free services of a trained jointer / foreman / erector ( hereinafter referred to as jointer ) for installation / jointing all 33 kV cable end terminations and straight-through joints. The jointer of the supplier shall be duly trained and certified by the manufacturer for supervision of installation of the cable accessories. The jointer shall direct the sequence of installation. The jointer shall correct in the field any errors, omissions on the part of the bidder, in order to make the equipment and material perform properly in accordance with the intent of this specification. The jointer shall be responsible for any damage to the accessory during his work as well as for any damage resulting from faulty or improper installation. The purchaser shall provide adequate number of skilled / semi- skilled workers as well as all ordinary tools and consumable T&P items used in the work such as LPG gas / kerosene. The purchaser shall not be responsible for any other expenses such as erector's insurance against personal injuries to the jointer etc. Special tools such as LPG torch, if required for jointing, erection and commissioning , shall be provided by the supplier at his cost. 3.17 GUARANTEED & OTHER TECHNICAL PARTICULARS (A) The successful bidder shall furnish the guaranteed and other technical particulars of the kits offered by him. The particulars which are subject to guarantee shall be clearly indicated. The bidder shall furnish the length of the tube used in the kits in the GTP attached. The complete drawings indicating such length of tubing must be also enclosed along with the type test reports duly authenticated by the testing agency. Without schedule of GTP completely filled in, the bid offer may be ignored. (B) The bidder shall highlight the various technical aspects and salient features of the kits offered by them. TN-01/136 3.18 GUARANTEE The cable end terminations and straight through joints shall bear guarantee for five years from the date of supply of last consignment against purchase order. Any defect noticed in the kit shall be attended by the supplier immediately but not later than 24 hours in Jaipur city and not later than 3 days in other places in the area of Jaipur Discom on receiving the complaint, and if required, the kit shall be replaced and installed ( only for 33 kV ) free of cost; otherwise the same will be arranged at the supplier's risk and cost. The successful bidder shall furnish manufacturer's warranty on Rajasthan Non-judicial stamp paper worth Rs.100/- in a manner as detailed at clause No. 1.41 of GCC 3.19 TESTS 1) TYPE TESTS a) The successful bidder shall furnish valid and authenticated type test certificate as per IS:13573(Pt.2)/2011 from a Govt. approved/ a Govt. recognized/ NABL accredited laboratory/ ILAC i.e. International Laboratory Accredited laboratory / ILAC i.e International Laboratory Accrediation Cooperation ( In case of foreign laboratory) b) The successful bidder should furnish documentary evidence in support of the laboratory whose type test have been furnished, that the said laboratory is a Govt/ a Govt. approved/ a Govt. recognized/ NABL accredited laboratory/ ILAC accredited ( in case of foreign laboratory) c) Such type test certificates should not be older than Seven years as on the date of bid opening. d) Bids not accompanied with requisite type test(s) certificate not older than Seven years as on the date of bid opening, shall be treated as non- responsive. 2) ACCEPTANCE TESTS A) The following tests shall constitute as Acceptance tests: (i) (ii) (iii) Visual examination Verification of bill of material / kit contents. Dimensional check including verification of lengths of tubes as given in the GTP. (iv) Tensile strength (v) Ultimate Elongation (vi) Longitudinal shrinkages (vii) Dielectric strength (viii) Volume Resistivity (ix) Torchability / Recovery -as per manufacturer’s standard (x) Tracking Resistance ( as per ASTM 2303 ) The above tests shall be carried out in the presence of the Purchaser's representative as per relevant prescribed standards , latest amended and the TN-01/137 sampling plan shall be 1% subject to minimum of one No. of assorted size/type for each voltage rating i.e. 33 kV and 11 kV separately. 3) ROUTINE TESTS The bidder must specify the details of the routine tests being conducted at their Works along with the standards applicable in their offer. 3.20 INSPECTION The supplier shall provide the facilities to carry out the prescribed acceptance tests on selected samples from the lot offered at one or more testing laboratories. The samples from the lot shall be selected by the inspecting officer or the person authorized by purchaser. All the tests shall be arranged and carried out as per the procedures laid down in respective specifications as per latest amendment in the presence of purchaser's nominee. The suppliers accordance should with satisfy the term themselves that the material offered are in of contract and fully confirms to the required specifications by carrying out a thorough pre-inspection of each lot before offering the same for inspection to the purchaser. Such pre-inspection on the part of the supplier shall minimise the chances of rejection during inspection. 3.21 LIST OF KIT CONTENTS The bidder shall furnish the lists of kit contents and shall also confirm unlimited shelf-life of the kits. 3.22 DEPARTURE FROM THE SPECIFICATION Should the bidder wish to depart from the specification in any respect, he should clearly state such departures indicating the reasons thereof. Unless this is done, the departmental specification will hold good and shall be binding on the supplier unless the departures have been approved in writing by the purchaser. 3.23 Applicable standards : S.No. Technical specification Name of IS/other material/equipment/ standard specification Other to if any. Machinery/T&P shall conform to which material should conform 1. Indian Standard Specification for BIS: 7098 cross-link polythylene insulated PVC sheathed cable (from 3.3 kv upto 33 KV) 2. IEC Specification for plastic cables IEC: 502 from 1 KV to 30 KV. 3. Standard for power cable accessories VDE: 0278 (PARTS I,II,IV,V) with rated voltage upto 30 KV 4. IEEE Standard Test Procedures & IEEE Requirement for Alternating Current Cable Terminations 2.5 KV Through 765 KV TN-01/138 48-1996 which 5. Performance Specification for High Voltage ESI: 09-13 Heat Shrinkable components for use with (with latest amended) high voltage solid type cable upto & including 33 KV 6 Indian Electricity Rules,1956 IE RULES 7 Specification for Compression type tubular terminal ends for aluminium BIS : 8308-1993 (with latest amendments) conductors of insulated cable 8 Joints & Terminations of polymeric cable for working voltage from 6.6 kv upto & including 33 KV performance requirement & Type test TN-01/139 BIS : 13573-1992 TECHNICAL SPECIFICATION FOR OUTDOOR TYPE 33 KV CTs 1.0 SCOPE: This specification covers the design, manufacture, assembly testing at manufacturer's works before dispatch, supply and delivery of Single Phase 50 Hz oil immersed, self-cooled, hermetically Transformers for installation at sealed, outdoor various type 33 KV Current Grid Sub-stations of Jaipur Discom. Consideration may be given to alternatives which the suppliers consider advisable by reason of his own manufacturing requirements & experience provided descriptive pointing matter/ recommended tests device this specification and certificates are submitted out the or arrangement equal to or superior to that required by if the purchaser is convinced of the quality and/or superiority of the equipment. These equipment shall be suitable for installation in system with neutral effectively grounded. 1.01 SCHEDULE OF REQUIREMENT: The requirement of 33 KV CTs shall be as under:S. No. Item 1. 33 Ratio KV Current Transformers 400-200-100/5-5 Amp, 0.5s class. The bidder should quote prices of above CTs with terminal connector suitable for panther conductor. 1.02 STANDARDS: The design, manufacture & testing of various equipments, covered by this specification shall comply with the latest issue of following and other applicable standards except the value wherever specified shall be considered relevant:- IS:2705 Specification for Current Transformers IS:2099 Specification for Bushing IS:5621 Specification for hollow porcelain bushing. IS:5561 Specification for electric power connectors. IS:335 Specification for new insulating oil. IS:4201 Application guide for Current Transformer. IEC:60044-1 & 2 Instrument Transformers Equipments conforming to other International and IEC Standards which ensure equal or higher quality than the standard(s) mentioned above would also be acceptable. In case the tenderer wishes to offer equipment conforming to other standard, they shall furnish English translation of the relevant standards 1.03 CLIMATIC CONDITIONS: The climatic conditions under which the equipment will be required to operate satisfactorily are as under:- i) The equipment offered by you shall conform in all respects to the relevant Indian standards specifications except TN-01/140 where stated otherwise in the order. Special care shall be taken in the design & manufacture of equipment to take into account the tropical conditions such dust & salt as high temperature excessive humidity, laden atmosphere at detailed below:- a) Maximum temperature of air in shade : 50 deg.C b) Minimum temperature of air in shade : (-) 5 deg.C c) Maximum relative humidity : 95 % d) Minimum relative humidity : 10 % e) Height above mean sea level : upto 1000 meters f) Dust storms are likely to occur the period from March to July g) Average number of thunder storms : 40 days/annum. h) Average number of tropical monsoon : 4 months conditions per annum. i) Average rain fall : 10-100 cms. depending upon area. ii) TROPICAL TREATMENT: All the equipment shall be suitably designed and treated for normal life and satisfactory operation under the hot and humidity Tropical Climatic Conditions specified under clause No. 3.03 the parts such and surface which material and shall be above and shall be dust and vermin proof. All are subject provided to corrosion with shall be made such protective finish of as would protect the equipment installed from any injurious effect of excessive humidity. You shall supply all such minor accessories required for the completion of the supply which have either not been specifically mentioned in this specification or your tender offer. 1.04 TECHNICAL REQUIREMENTS FOR 33 KV CURRENT TRANSFORMERS: i) The Current Transformers shall be of Single Phase oil immersed self cooled hermetically sealed & outdoor type suitable for the service conditions indicated complete in all respects conforming to latest issue of IS mentioned at clause 3.02 and modern practice of design & manufacture. The thickness of tank sheet shall be minimum of 3mm. ii) The core shall be of high grade non-aging laminated silicon steel of low hysterises losses and high permeability to ensure accuracy at both normal & over current. iii) The Current Transformers shall be hermetically sealed to eliminate breathing and prevent air and moisture from entering the tank. The method adopted for hermetically sealing shall clearly be stated in detail in the offer. These shall be provided with prismatic oil level gauge and pressure reliving devices capable for releasing abnormal internal pressure where necessary. Arrangement for oil filling/ drain valve/ plug / hole shall be sealed to avoid TN-01/141 leakage / pilferage of oil. The arrangement provided shall be indicated in the tender. For load shedding single phasing is adopted in the system. The offered CTs shall be suitable for working under such conditions. iv) For 33 KV CTs only live tank type design shall be acceptable v) PRINCIPAL TECHNICAL PARTICULARS OF CURRENT TRANSFORMERS:S. No. Description 1. 1. Type of CT/Installation Single Phase Live Tank oil filled PARTICULARS hermetically sealed, outdoor type. 2. Type of mounting Steel Structure 3 Nominal system voltage 33KV 4 Highest system voltage 36KV 5 Rated Insulation level. a. One minute dry power frequency 70KV (rms) withstands voltage. b. 1.2/50 micro second Lightning Impulse 170 KV peak voltage (KVP) 6 One minute High voltage power frequency test on a. Primary winding (test voltage) As per IS:2705/1992 (with latest amendment) b. Secondary winging (test voltage) As per IS:2705/1992 (with latest amendment) 7 Frequency 50Hz. 8 Transformation ratio(s) 400-200-100/5-5A 9. Method of earthing of system Effectively earthed 10. Rated 11. 12. 13. continuous Thermal current(s) 120% of rated primary rating(s) current (s) a) Rated short time thermal current. 25 KA (rms) for 1 Sec. b) Rated dynamic current (KAP) 62.5 Temperature rise for rated continuous Within limits of thermal current over an ambient temp. of IS: 2705/1992 with latest 50 Deg. C. amendments. Total creepage distance of porcelain 900 mm housing (Min.) 14. Max. Creepage factor for hollow porcelain 4.0 insulator 15. Core utilization for CTs having ratio 400- CORE-I CORE-II 200-100/5-5 Amp. Metering Back protection TN-01/142 up a. Rated burden VA 30 40 b. Class of accuracy 0.5S 5P c. Max. instrument security factor 5 - d. Accuracy limit factor (max.) - 15 vi) Necessary magnetization curve for the relevant core(s) shall be furnished. vii) TEMPERATURE RISE FOR CURRENT TRANSFORMERS : The limits of temperature rise of the windings, external surface of the core and other parts of the current transformers when carrying a primary current equal to the rated continuous thermal current at the rated frequency and with rated burden shall be governed by the provisions of latest issue of IS:2705 (Pt.I). The corresponding temperature rise for the terminal connectors shall not exceed at rated continuous thermal current of the CT beyond the limits prescribed in IS:5561/1970 or latest issue. 1.05 CORES AND WINDINGS FOR ALL CLASS CURRENT TRANSFORMERS: i) The current transformers core to be used for metering and instrumentation shall be of the accuracy class as specified. The saturation factor, instrument security factor of this core shall be low enough so as not to cause any damage to measuring instruments in the event of maximum short circuit current. Mu-metal or equivalent material shall be used for this purpose. This factor shall not exceed to 5 on all transformation ratio. ii) The current transformers cores to be used for protective relaying shall be of accuracy specified. The cores shall be designed for a maximum accuracy limit factor of 15 or min. knee point voltage specified as the case may be. The magnetization curves for applicable core shall be furnished by the tenderer along with the tender failing which offer is likely to be ignored. iii) The rating of the secondary winding shall be as per Clause No. 3.04(v) of this specification. The secondary terminals shall be brought out in a weather proof compartment on one side of current transformer for easy access and shall be provided with short-circuiting arrangements. Required transformation ratio can be achieved in any manner but the current transformers will have to satisfy the requirement of rated VA burdens, class of accuracy, accuracy limit factor, instrument security factor and short time thermal rating etc. as specified in Clause 1.4 (v) at all transformation ratio. The minimum knee point voltage and maximum secondary winding resistance shall correspond to the lowest ratio. In case tapings are provided on secondary side of current transformers to get the designed transformation ratios, magnetization curves corresponding to all secondary taps must be submitted with the tender. Secondary windings resistances at such secondary tap shall also be clearly specified. The secondary terminal box shall be provided with necessary glands with removable gland plate for control cables. The secondary terminal box shall conform to IP-55 test. TN-01/143 iv) Primary winding shall be made out of high conducting copper. The design density for short circuit current as well as conductivity for primary winding shall meet the requirement of IS:2705/1992 or latest issue. However for primary winding current density corresponding to the rated short time current shall not exceed 160 Amps./Sq.mm for copper conductor. Suitably insulated copper wire of electrolytic grade shall be used for secondary winding. The tenderer should furnish details of primary winding e.g. Number of primary turns, cross-section, short time current density and normal continuous rated current density in the primary winding so as to meet the requirement of IS. Winding shall have high mechanical strength for safety against stress. v) The shape of external metal parts shall ensure that rainwater runs off and there is no stagnation. vi) The requirement of current transformers of all classes regarding their ratio error, minimum keen point voltage, exciting current at knee point voltage, maximum resistance of secondary winding etc. shall have to be coordinated with the requirement of the protective relay and protecting scheme wherever required without any extra cost to the purchaser. vii) The CTs shall be of robust design, tested quality and reliable in operation. Only pure high-grade paper would evenly under controlled conditions and impregnated with mineral oil under vacuum shall be used for the main insulation. 1.06 FITTINGS & ACCESSORIES FOR CTs: The CTs shall be provided with the following fittings & accessories:- 1) 2 Nos. bimetallic terminal connector with each CT suitable for horizontal & vertical take off. The thickness of bimetallic strip/sleeve shall be of min.2 mm. 2) Oil level gauge. 3) Pressure release device if design recommended. 4) Expansion Chamber or suitable type of device for absorbing variation in volume of oil due to change in temperature of oil. 5) Oil filling/ drain valve/ plug/ hole with sealing arrangement. 6) Lifting lugs/ holes. 7) Weather proof secondary terminal box fitted with hinged/ bolted door and complete with terminals and short circuit arrangements. The secondary box hinged/ bolted door shall have sealing arrangement. 8) Two Nos. earthing terminals. 9) Name & Rating plate showing details of connection diagram. 1.07 GENERAL REQUIREMENTS OF 33 KV CTs: 1.07.1INSULATING OIL AND BUSHINGS: The quantity of insulating oil for first filling of each instrument transformer and complete specification of the oil shall be stated in the tender. The oil shall conform to the requirements of latest issue of IS: 335. The instrument transformers shall be of standards duly filed in with oil. The oil filled bushing shall be of standard make such as W.S. Industries, BHEL/MIL/Birla NGK/CJI/TEKMEK, KOLKATA. The bushing TN-01/144 shall be suitable for operation in heavily polluted atmosphere with creepage distance of minimum 25 mm per KV. The details of make and catalogue no. etc. of bushing shall be clearly stated in the guaranteed technical particulars. Pressure of nitrogen or any other inert gas used above the oil level to permit expansion or contraction of oil along with device to detect any leakage if any shall be stated in the tender. 1.07.2 TERMINAL CONNECTORS: The Instrument transformers shall be supplied with bimetallic terminal connectors for both ends suitable for ACSR Panther conductor as per requirement and confirming to IS:5561. Each terminal connector shall be suitable for both horizontal and vertical take off arrangement. The instruments transformers shall also be provided with two number earthing terminals of adequate size, protected against corrosion and metallically clean. Bimetallic strips or sleeves of suitable thickness to prevent bimetallic corrosion shall be provided as a part of the terminal connectors. 1.07.3 PAINTING: All ferrous parts of the Instrument Transformers exposed to atmosphere shall be painted externally with one coat of anti rust abide paint (Primer) and two coats of dark admirably grey paint (synthetic enamel paint of light grey shade No. 631 of IS:5). All interior surfaces in contact with oil shall be painted with two coats of heat resistant oil insoluble paint. 1.07.4TYPE OF MOUNTINGS: The tenderer may submit their drawing / design for supporting structures of the Instrument transformers offered by bidders. 1.08 NAME / RATING PLATE: All items of the equipment includes in this specification shall be provided with rating plates as per relevant standards. Rating Plate & terminal marking shall be as per relevant IS. Purchase order / TN reference shall also be given. 1.09 TYPE TEST REPORTS Certified copies of tests reports from any CPRI/ NABL accredited testing laboratories of all type tests as per relevant latest standard mentioned under section-III clause 3.02 in respect of similar equipment (voltage class wise) included in this specification along with bushing and terminal connector (if offered other than approved make) shall be furnished to adjudge the technical suitability by the successful bidder. The tenderer shall furnish necessary calculations on the basis of STC test reports furnished above to prove the CTs of offered ratios are capable to withstand the specified short circuit level. The type tests reports shall not be older than 5 years. The type tests details are as under : a) Short time current test b) Lightening impulse voltage withstand test. c) Temperature rise test. d) High voltage power frequency (wet) withstand test. e) Determination of errors or other characteristics. TN-01/145 1.09 i) INSPECTION & TESTING: Each equipment covered under this specification shall comply with and shall be subjected to all routine tests prescribed in the relevant Indian Standards specification as mentioned in Clause 3.02 above. ii) In the event of order, supplier shall have to get all type test conducted as per requirement of relevant standards on one sample out of first lot comprising minimum 25% of ordered quantity in presence of inspecting officer without any extra cost, at CPRI/ NABL accredited testing laboratories designated by purchaser for which facilities exists in India unless otherwise it is waived by the purchaser. iii) In case Bidder has furnished complete valid Type Test Reports of offered items as per requirement of Specification & ordered quantity is less than 100 Nos, the above condition of Type Test on 1-Sample from first lot comprising minimum 25% of ordered quantity in presence of inspecting officer without any extra cost, at CPRI/ NABL accredited testing laboratories shall not be applicable. In case Bidder has furnished BG in absence of Type Test then Type Test from first lot will be conducted as per Clause No. 3.12(ii). iv) In case a bidder who has supplied 33 KV CTs of offered ratio and accuracy to any three Discoms of Rajasthan during last 5 years from the date of opening of a new tender and type tests have been conducted from 1st lot offered for inspection than the condition of Type Test on 1 Sample from 1st Lot comprising minimum 25% of ordered quantity in presence of Nigam’s Inspecting Officer without any extra cost at CPRI/NABL accredited Lab as per clause No. 3.12(ii) of Specification shall not be applicable upon them for the ratio for which type test has conducted. v) Routine tests as per relevant standard shall be carried out on each equipment covered by this specification in the presence of purchaser’s representative if desired by the purchaser. All tests reports shall be submitted and got approved vi) During every lot offered for inspection, oil sample shall be drawn at random from any one equipment and same shall be tested as per IS: 335 for a) Break down voltage, b) Tan δ at 900 Centigrade. vi) One CT in each offered lot shall be opened for verifying the diameter and cross sectional area of primary conductor including verification of GTP. If CT fails in any of the tests/ verification at the works, the entire lot shall be rejected. vii) Dispatch Instructions of inspected material shall be issued only after successful type test reports. 1.13 TESTS AT SITE/ VERIFICATION AT STORES: The purchaser reserves the right to carry out any site tests as he may decide at his own cost and will claim reimbursement from the supplier, in case the material as a result of such test / tests is not found conforming for the prescribed specification. TN-01/146 Verification: - One CT in each offered lot received in Nigam’s stores shall be opened for verifying the diameter and cross sectional area of primary conductor including verification of GTP. If CT fails in above verification at Stores, entire lot shall be rejected and supplier shall lift the rejected lot. In case it found within specified limit, the supplier at his own cost shall reassemble/ replace the physically opened CT at works/ stores. The payment against supplies shall be released after obtaining successful store verification. 1.14 GUARANTEED TECHNICAL PARTICULARS: Guaranteed technical particulars for Instrument Transformers shall be furnished by the successful bidder. 1.15 MATERIAL AND WORKMANSHIP: All materials used in the manufacture of aforesaid equipment shall be of best quality and capable of satisfactory operation under climatic conditions mentioned in Clause 1.03 above. The workmanship shall be of the highest grade and the practice. 1.16 COMPLETENESS OF EQUIPMENTS: All fittings, accessories or apparatus which may have not been specifically mentioned in this specification but which are usual or necessary for the equipment’s shall be deemed to have been included in this specification. All equipment’s shall complete in all respect. 1.17 LATENT DEFECTS, ERRORS AND OMISSIONS: Any material / equipment or part thereof that developed defects, error or omissions in the apparatus, not disclosed prior to the final acceptance by the purchaser, but occur or are disclosed during the guaranteed period shall be corrected promptly or the apparatus or part there of shall be replaced by the supplier free of charges and all expenses for the transportation handling, installation of such replacement or any other incidental charges shall be borne by the supplier. 1.18 GUARANTEE PERIOD & REPLACEMENT DURING GUARANTEE PERIOD: Performance guarantee of the equipment shall be for the period of 36 months from the date of receipt in stores. The month & year of expiry of guarantee period shall be marked on the nameplate. Equipment failed within such guarantee period shall have to be replaced free of cost within 45 days of intimation. You shall furnish successful routine test reports of the equipment. If purchaser desires inspection prior to dispatch an inspecting officer shall be nominated for verification for the test reports. Transportation and lifting of defective material & delivery of replaced material shall be borne by the supplier. TN-01/147 TECHNICAL SPECIFICATION FOR 11 KV 3X185 sqmm CROSS-LINKED POLYETHYLENE (XLPE) INSULATED POWER CABLES 1. SCOPE: 1.1 This section provides for manufacture, testing before dispatch, supply and delivery F.O.R. destination of ISI Marked 11 KV Aluminium conductor Screened, Cross linked Polyethylene (XLPE) Insulated Armoured Shielded PVC Sheathed cable of rated voltage 11 KV (earthed system) conforming to IS:7098 (Part-II/1985) with latest amendment. The 11 KV Aluminium Conductor, Screened CROSS-LINKED POLYETHEYLENE (XLPE) INSULATED Armoured Shielded PVC Sheathed Power cable shall be ISI marked. 2. STANDARDS: Unless otherwise stipulated in this specification the following standards with latest amendments shall be applicable. i) IS:7098(Part-II) : Cross linked Polyethylene Insulated PVC sheathed cable for voltage from 3.3 KV upto & Including 33 KV. ii) IS:8130 iii) IS:5831 : Conductors for insulated Cables. : PVC insulation and sheath of Electric cables. iv) IS:3975 : Mild steel wires, strips and tapes for armouring cables. 3. v) IS:10810 : Methods of test for cables. iv) IS:10418 : Drums for Electric Cables CLIMATIC CONDITIONS: i) Peak ambient temperature 50 deg.C in shade. ii) Maximum average ambient 40 deg.C temperature in a 24 hours period in shade. iii) Min. ambient air temperature in shade iv) Maximum temperature attainable (-) 5 deg.C 60 deg.C by an object exposed to sun. v) Maximum relative humidity. 100% vi) Average number of thunder 40 storm days per annum. vii) Average number of rainy days 100 per annum. viii) Average annual rainfall 10 to 100 cm ix) Number of months of tropical Monsoon conditions. TN-01/148 4 months x) Maximum wind pressure. 100 kg/ sq. mm. xi) Altitude not exceeding 4. 4.1 1000 M GENERAL REQUIREMENT: The 11 KV power cable shall be ISI Marked Aluminium conductor screened cross linked polyethylene insulated armoured shielded and over all PVC sheathed. The 11 KV XLPE Cable shall conform to IS: 7098 (Part-II)/1985 with latest amendments shall bear ISI Certification mark. The cable shall be capable of withstanding the normal stresses associated with transportation, erection, reeling and unreeling operations without getting deformed. 4.2 The 11 KV XLPE Cable shall be suitable for the following conditions of laying: i) ii) iii) 4.3 Laid directly in ground. Installed outdoor in free air in vertical position. Drawn into underground ducts. The 11 KV XLPE Power Cable shall be suitable for use and temperature rise where ambient temperature due to conductor temperature not exceeding 90 degree C. under combination of load results in normal operation and 250 degree C under short circuit conditions. 4.4 The cable shall be used on 11 KV earthed system. The cables shall be suitable for continuous operation at a power frequency voltage 10% higher than rated voltage. 5.0 5.1 MATERIAL: CONDUCTOR: The conductor shall be composed of aluminium wires complying with the requirement of Class-2 of IS: 8130/1984. The bidder must guaranteed the minimum weight of Aluminium in Kg/Km corresponding to nominal cross sectional area of conductor as mentioned in the G.T.P. 5.2 INSULATION: The insulation shall be requirement given in 5.3 cross linked Table-1 polyethylene conforming to the of IS:7098(Part-II)/1985. SCREENING: The screening shall consist of one or more of the following: i) Non-Metallic semi conducting tape. ii) Non-Metallic semi conducting compound and ii) Non-Magnetic Metallic tape wire, strip or sheath. 5.4 FILLERS AND INNER SHEATH: 5.4.1 The filler and inner sheath shall be of the following: a) Vulcanized or Un-vulcanized rubber or b) Thermoplastic material. 5.4.2 Vulcanized or Un vulcanized rubber or sheath shall not be harder than sheath respectively. XLPE Thermoplastic material used for inner and PVC used for insulation and outer The filler and inner sheath material shall be chosen to be TN-01/149 compatible with the temperature rating of the cable and shall have no deleterious effect on any other components of the cable. 5.4.3 The Central hole / void, if any, of the cable shall be invariably filled with suitable filler material so that there is no gap in the center. 5.5 5.5.1 ARMOURING: The Armouring shall be of Galvanized Steel Strip. 5.5.2. Galvanized steel strips shall comply with the requirements of IS:3975/1979 with latest amendments. 5.6 OUTER SHEATH: 5.6.1 The outer sheath shall be of Poly Vinyl Chloride (PVC) compound conforming to the requirement of type ST-2 of IS:5831/1984. 6. CONSTRUCTION: 6.1 CONDUCTOR: The Conductor IS:8130/1984. shall be of stranded construction complying with Class-2 of The aluminium shall be reasonably uniform in size and shape and its surface be free from any sharp edges. 6.2 CONDUCTOR SCREENING: The conductor screening shall be provided over the conductor by applying nonmetallic semi conducing tape or by extrusion of semi conducting compound or a combination of the two. 6.3 INSULATION: The Conductor (with screen) shall be provided with cross linked polyethylene (XLPE) insulation applied by extrusion. The insulation shall be so applied that it fits closely on the conductor (or conductor screening) and it shall be possible to remove it without damaging the conductor. thickness of 6.4 The thickness of insulation and tolerance of insulation shall be as per Clause No.11 of IS:7098 (Part-II)/1985. INSULATION SCREENING: 6.4.1 The insulation screening shall consist of two parts namely metallic and non- metallic. 6.4.2 Non-metallic part shall be applied directly over the insulation of each core and shall consist of either a semi conducting tape or extruded semi conducting or a combination of the two or either material with a semi conducting coating. 6.4.3 Metallic part shall consist of either tape or braid or concentric serving of wires or a sheath should be non-magnetic and shall be applied over the non metallic part. 6.5 CORE IDENTIFICATION: The core identification shall be done as per Clause-13 of IS:7098 (Part-II)/ 1985. 6.6 LAYING UP OF CORES: The Cores (with screening) shall be laid together with a suitable right hand lay. Wherever, necessary the interstices shall be filled with non-hygroscopic material. 6.7 INNER SHEATH (COMMON COVERING): The laid up core shall be provided with inner sheath applied either by extrusion or by wrapping. However, application of inner sheath by EXTRUSION shall be TN-01/150 preferred. It shall be ensured that the shape is as circular as possible. The inner sheath shall be so applied that it fits closely on the laid up cores and it shall be possible to remove it without damage to the insulation. The thickness of inner sheath shall be as per Clause No.15.3 of IS: 7098 (Part-II)/ 1985 (with latest amendments. 6.8 ARMOURING: The armouring shall be applied over the inner sheath. The Galvanized Steel Armoured strips shall be applied as closely as practicable. The direction of lay of the Armour shall be left hand. A binder tape may be applied on the armouring. The dimensions of the galvanized steel strips shall be as specified in Table-4 of IS:7098 (Part-II)/1985. The joints in Armour strips if any shall be made by brazing or welding and the surface irregularities shall be removed. A joint in any strip shall be at least 300 mm. from the nearest joint in any other armour strips in the completed cable. 6.9 OUTER SHEATH: 6.9.1 The outer sheath shall be applied by extrusion over the armouring. The colour of outer sheath shall be black. 6.9.2 The thickness of the outer sheath shall be as per Clause No.17.3 of IS: 7098 (PartII)/1985 with latest amendments. 7.0 TYPE TESTS: 7.1 The material offered, shall be fully type tested as per relevant standard of specification of IS:7098 (Part-II/1985) amended up to date. constitute type tests: a) Tests of Conductor: i) Annealing test (for copper) ii) Tensile test (for aluminium) iii) Wrapping test (for aluminium) iv) Conductor Resistance test b) Tests for armouring wires/strips. c) Tests for thickness of insulation and sheath. d) Physical tests for insulation: i) ii) iii) Tensile strength and elongation at break. Ageing in air oven. Hot test. iv) Shrinkage test. v) Water absorption (gravimetric). e) Physical test for outer sheath: i) ii) iii) iv) Tensile strength and elongation at break. Ageing in air oven. Shrinkage test. Hot deformation, f) Partial discharge test. TN-01/151 The following shall g) Bending test. h) Dielectric power factor test: i) As a function of voltage. ii) As a function of temperature. i) Insulation resistance (volume resistivity test). j) Heating cycle test. k) Impulse withstand test. l) High voltage test. m) Flammability test. 7.2 However, the purchaser reserves the right to demand repetition of same or all the type tests in presence of purchaser’s representative. 7.3 The bidder must also clearly indicate various testing facilities available at their works for otherwise testing the material as per relevant particulars of the place where such standards. testing is In case proposed of to be conducted during the course of inspection shall be indicated with the offer. 8. INSPECTION (TEST BEFORE DISPATCH): 8.1 The inspection may be carried out by the purchaser at any stage of manufacturer. The Inspection & Testing shall be governed by various Clauses of General Conditions Of Contract. Acceptance of any equipment / material under this specification by the purchaser shall not relieve the supplier of his obligation of furnishing equipment in accordance with the specification and shall not prevent subsequent rejection if the equipment/material is found to be defective. The following Acceptance tests as per Clause No.18.2 of IS:7098(Part-II)/1985 shall be conducted in presence of the purchaser's authorized representative / agency on each lot of offered cables: i) Tensile Test. ii) Wrapping Test. iii) Conductor Resistance Test. iv) Test for thickness of insulation & sheath. v) Hot Set Test for insulation. vi) Tensile strength & elongation at break test for insulation and sheath. vii) Partial Discharge Test (for screened cables only). viii) High voltage test and ix) Insulation resistance (Volume resistivity) Test. x) Test for Armour: a) Verification of Dimension of Strip. b) Tensile Strength & elongation at break. c) Uniformity of Zinc Coating. d) Weight of Zinc Coating. e) Winding Test on Armour. f) Resistivity Test on Armour. TN-01/152 Cold impact test for outer sheath (IS:5831/1984) shall constitute the optional test and shall be conducted on first lot of the offered cables of each size as per Clause No.18.4 of IS:7098(Part-II)/1985. 8.2 ROUTINE TEST:The following shall constitute routine tests: a) Conductor resistance test b) Partial discharge test c) High voltage test. 8.3 The bidder shall furnish Packing list mentioning serial Nos. of Drums, length in each drum, gross weight of drum without lagging along with inspection offer duly signed by the authorized representative of the firm. The purchaser reserves the rights to insist for witnessing the acceptance / routine tests of the bought out items. 8.4 At least 5% of total numbers of drums subject to minimum of two (2) in the lot put up for inspection shall be selected at random to ascertain the length of cable by the following method. “At the works of manufacturer of the cable shall be transferred from one drum to another for checking any manufacturing defects in the cable, at the same time measuring its length with the help of the graduated pulley and cyclometer. The difference in average length thus obtained from the declared length by the supplier in the packing list shall be applied to all the drums if the cable is found short during checking the sample lot (s).” 8.5 The supplier shall present the latest Calibration Certificate(s) of testing instruments / equipment’s to be used for the testing of the material covered in the Purchase Order to the authorized inspecting of the officer/ inspecting agency purchaser. The testing instruments/ meters/ apparatus etc. should be got calibrated by the supplier from time to time from Govt. Laboratory or any independent test laboratory/house having valid accreditation Accreditation Board for Testing and Calibrating equipment’s / original Laboratories from National for the testing manufacturer having trace ability to NABL/NPL or equivalent. 8.6 The calibration certificate(s) should not in any case be older than one year at the time of presenting the same to the inspecting officer/ inspecting agency of the purchaser. The testing instruments/ equipment’s should be duly sealed by the Calibrating Agency and mention thereof shall be indicated in the calibration certificate(s). 8.8 TEST CHECKING OF MATERIAL AT STORES: (i) Sample drums from the material received at stores shall be selected for testing at CTL as per sampling plan given hereunder in presence of firm’s representative. The selected sample drum / drums shall be transported to CTL by concern S.S / ACOS of Nigam. TN-01/153 (ii) The selected sample drum for CTL testing shall be identified by the seals provided by Inspecting Officer / Inspecting Agency during pre-dispatch inspection at firms works and these sealing details shall be invariably mentioned in the selection Memo by the nominated officers of Nigam. The tests in the Nigam Testing laboratory (CTL) shall be conducted in the (iii) presence of representative of supplier for which a 7 days notice shall be issued through Fax / Speed Post stating Date & Time to the firm, so that supplier can depute their representative to witness the test . In case the supplier or his representative does not turn up the testing shall be proceeded & completed. The payment shall be released only after receipt of successful test reports for the samples selected at purchaser’s stores for mandatory test checking on the samples to be selected from material received at Nigam’s stores by officers to be nominated by Circle SE’s / SE (I&S) for testing at CTL. SAMPLING: One number Drum out of (iv) each lot / sub-lot of 25 Nos. Drums or part thereof for the material received in Stores of Nigam. TESTS: The following tests shall be carried out as per relevant clause of (v) latest IS on each selected drum by drawing sample of 10 Mtr. at CTL from random distance during re-winding: a) Rewinding test (Measurement of Length) & Checking of Manufacturing defects. b) Measurement of Resistance of conductor. c) Tensile strength & Elongation at Break Test for Insulation & Sheath d) Test for Thickness of Insulation & Sheath e) Hot Set Test f) Test for Armour: i) Verification of Dimension of Wire / Strip. ii) Tensile Strength & elongation at break. iii) Uniformity of Zinc Coating. iv) Weight of Zinc Coating. v) Winding Test on Armour. vi) Resistivity Test on Armour. g) Verification of Marking In addition to above tests remaining acceptance tests as per relevant IS shall also be conducted at CTL provided the testing facility is available at CTL for these tests time to time. Only those tests shall be conducted for which testing facilities are available in NIGAM’s Lab. vi) CRITERIA FOR ACCEPTANCE: a) If the measured of conductor resistance of the sample(s) exceeds beyond 2% as per the resistance specified in the contract, the material shall be rejected and the same shall have to be replaced by the supplier. TN-01/154 b) If the measured conductor resistance of the sample(s) exceeds the value specified in the contract but does not exceed by more than 2% of the resistance value specified in the contract, the material contained in the lot / sub-lot to which the sample belongs shall be accepted with a deduction @ 1.5% of the cost of cable for increase in resistance for every 1% or part thereof. a) If the sample(s) fails in any other test, the material shall be rejected and shall have to be replaced by the supplier. b) If the contractor / supplier fails to lift the material declared rejected or any part thereof from the consignee within a period of 15 days from the date of dispatch of information from the purchaser, the purchaser shall be entitled to effect recovery along with other actions as per Clause No. 1.62 of Section-II (General Condition of Contract). c) The results of measurement of length test shall be made applicable to all drums contained in each lot / sub lot by making deduction of less length of cable in a Sample Drum. 8.9 TEST CHARGES : All test charges incurred towards test checking of the material received in our stores shall be borne by the NIGAM. 9.0 IDENTIFICATION: 9.1 The manufacturer shall be identified throughout the length of cable as per Clause No.20.1 of IS:7098(Part-II)/ 1985. 9.2 The cable code employed shall be as per Clause No.20.3 of IS:7098 (PartII) /1985. 10.0 EMBOSSING: The cable shall also be required to be embossed with the word manufacturer or Trade name, ELECTRIC/ Voltage Grade/ NAME OF `Name of DISCOM/ TN- cable code, size of cable & year of manufacture at every meter length for which no extra charges shall be paid. The cable should be ISI marked & same should be embossed on the outer sheet of every meter length of HT Cable. 11. MARKING: The progressive length of cable in meter shall be marked on the outer sheath of every meter length of HT Cable. 12. PACKING AND MARKING: 12.1 The cable shall be wound on a non returnable wooden drum conforming to IS: 10418/1982 of suitable size. The ends of cables shall be sealed by means of non-hygroscopic material. Only one cable length shall be supplied on a drum. The cable can also be supplied on M-Steel Drums as per relevant ISS as applicable. 12.2 The cable drums shall carry the following information either stenciled or painted. i) Manufacturer's name, Brand or trade mark. ii) Type of cable and voltage grade. iii) Number of cores. TN-01/155 iv) Nominal cross-sectional area of the Conductor. v) Cable Code. vi) Length of cable on the drum. vii) Direction of rotation of drum (by means of an arrow). viii) Gross mass. ix) Year of manufacture. x) ISI Certification mark. xi) Purchase order/bid No. and xi) 13. Name of Consignee. STANDARD LENGTH: The cable shall be supplied in standard length of 250 Mtrs in one Drum for size 11 KV, 3CX185 Sq.mm. 13.1 A tolerance of (+/-) 5% shall be allowed on standard length. 14. GUARANTEED TECHNICAL PARTICULARS : The successful bidder shall furnish guaranteed technical particulars as per the specification and clearly mentioning the weight of aluminum as per MM wing of JVVNL. 15. DRAWINGS & DOCUMENTATIONS: The successful bidder is required to furnish the detailed constructional drawing of cable clearly showing shape of core, type, size of fillers/ interstices along with Center Filler etc. The calculations of weights of different components of the cable along with weight of armouring and calculation of number of armour strips indicating Lay Ratio & Lay Factor shall also be furnished. In absence of this, the bids are likely to be ignored. The drawing of drums shall also be furnished as per relevant applicable ISS. TN-01/156 TECHNICAL SPECIFICATION AND BILL MATERIAL OF 2POLE/ 4 POLE DT STRUCTURE The structure to house the distribution transformer should be fabricated with the following material as per the approved drawing. S.No Description Quantity 2-Pole 4-Pole 1. ISMB 150X75X2350 2 4Nos 2. ISMC 125X65X1500 2 2 Nos 3. ISMC 125X65X2000 2 2 Nos 4. ISA 65X65X6 2 2 Nos 5. ISA 65X6X1583 - 2 Nos 6. ISA 65X6X1238 - 2 Nos 7. Plate 400X400X12 - 4 Nos 8. ISA 100X100X6 4 8 Nos 9. Plate 120X120, 10mm thick 4 8 Nos 10. Plate 250X250X12 2 4 Nos 11. Plate 2000X1500, 5 mm 1 1 Nos 12. PVC Pipe 140mm dia 2 2 Nos 13. ISA 65X65X6 2000mm 1 1 Nos 14. ISA 65X65X6 500mm 3 3 Nos 15. Ladder for LT/HT cable 2 2 Nos. 16. ISMC 125X65 1370 mm 2 2 Nos 17. Leakage Oil Drain Tray 155X1000mm 1 1 Nos. TN-01/157 TECHNICAL SPECIFICATION FOR NUMERICAL RELAY The circuit breaker shall be fitted with shunt trip coil for operation on Numerical Over Current and Earth Fault relay. The coils should be rated for 110VDC operation on station battery. Three phase protection relays shall be Numerical Over-current & Earth Fault protection having 3 element for over current and one for earth fault protection with instant trip. The setting for over-current shall be 50-200% (continuous range) and for earth fault element from 5 to 80% (continuous range). These relays shall be non directional with selectable curve for all standard IDMT curves. The numerical relays shall have following features:i. Self Diagnosis ii. Minimum last five abnormal events recording (over current & earth fault) indicating fault current and phase, along with Date & Time. iii. On-line display of current. iv. Communicable with open Protocol having RS-485 port. v. Instantaneous Over-Current Protection with adjustable timer. vi. Breaker Failure detection.In-built Circuit Breaker Trip Circuit Supervision function during pre closing and post closing of Circuit Breaker. vii. DC supervision. viii. Very low burden on CT (less than 0.5VA) ix. Continuous monitoring of module’s internal hardware and alarm generation in case of failure of any critical components. x. 5 Digital Output contacts for local alarm as well as tele-signalling. The relay shall be numerical type mounted in flush pattern on the panel board. The relay should be rated for 5 Amp. CT secondary. The relay should conform to relevant ISS. The tenders shall furnish the detail in this regard along with the offer. All the relays shall be provided with test blocks in panel so designed that the relays may be tested in situ. The relays should have provision of testing either through test block or test plug easily accessible by injecting the voltage / current/frequency (as applicable) from external testing instruments /source without first disconnecting/ reenergizing the primary electrical circuit protected by the relays. Facilities for isolating the tripping circuit during such testing shall also be provided. Relay TTB shall have trip bypass arrangement. The requirement of test block shall not be applicable in case of drawout type relays which can be tested by using test plug without removing the relay from its casing. The testing facilities provided in the relays shall be specifically stated in the bid. One test plug with five panels or part thereof are to be supplied. The Following makes of Relays are acceptable:a. Areva. f. JVS b. ABB. g. SEL TN-01/158 c. Easun Reyrolle h. ASHIDA d. C&S i. MEGAWIN e. Crompton j. Stelmec The technical suitability of relays/schemes may also be examined by Protection Wing & acceptability will be judged appropriately. The successful bidder must furnish type test reports as per relevant ISS/ IEC along with bid to suit the environmental conditions of our State, in respect of the relay (of the type and design offered) which should have been type tested in NABL accredited test laboratory in respect of such tests for which the lab has been accredited (for Indian make Relays)/ CPRI/ Nationally accredited testing laboratory (for Foreign make Relays). These type test reports should not be older than five years from the date of opening of bid. Bids without Type Test reports will be treated as Non-Responsive. Any other equivalent make of relays shall also be acceptable subject to prior approval of S.E. (JCC), JVVNL, Jaipur. The scope also includes the necessary wiring to be done for the protection scheme to be workable and SCADA compatible. Desirable Features for Relay : i) Numerical 3 over current and Earth fault relay with instant trip. ii) Instantaneous Over-Current Protection with adjustable timer. iii) Breaker Failure detection. iv) In-built CB Trip Circuit Supervision function during pre closing and post closing of CB. v) DC supervision. vi) Disturbance Recorder. Up 1 sec of actual waveform of current along with logical and physical status, are captured & saved in the built-in memory with date time stamping, for analyzing fault condition & fault location. vii) Fully communicable with IEC standard open protocol. viii) Separate Communication Port for SCADA (RS485) as well as Local testing (RS232C) ix) Very low burden on CT (less than 0.5VA) x) Continuous monitoring of module’s internal hardware and alarm generation in case of failure of any critical components. xi) Facility to synchronized Relay time from SCADA xii) 5 Digital Output contacts for local alarm as well as tele-signalling. TN-01/159 TECHNICAL SPECIFICATION FOR SHUNT TRIP SCHEME IN PLECE OF EXISTING SERIES TRIP ARRANGEMENT The 11 KV circuit breakers fitted with series trip arrangement shall be converted into shunt trip coil arrangement for operation on Numerical Over Current and Earth Fault relay. The coils should be rated for 110VDC operation on station battery. The examining the existing protection scheme the bidder should furnish the shunt trip arrangement scheme for approval. TN-01/160