Document related concepts

Electric power system wikipedia , lookup

Stepper motor wikipedia , lookup

Transistor wikipedia , lookup

Mercury-arc valve wikipedia , lookup

Pulse-width modulation wikipedia , lookup

Ground (electricity) wikipedia , lookup

Transformer wikipedia , lookup

Power inverter wikipedia , lookup

Electrical ballast wikipedia , lookup

Variable-frequency drive wikipedia , lookup

Power engineering wikipedia , lookup

Schmitt trigger wikipedia , lookup

Multimeter wikipedia , lookup

Ohm's law wikipedia , lookup

Current source wikipedia , lookup

Power MOSFET wikipedia , lookup

Resistive opto-isolator wikipedia , lookup

Transformer types wikipedia , lookup

Rectifier wikipedia , lookup

Islanding wikipedia , lookup

Triode wikipedia , lookup

Metadyne wikipedia , lookup

Power electronics wikipedia , lookup

Voltage regulator wikipedia , lookup

History of electric power transmission wikipedia , lookup

Electrical substation wikipedia , lookup

Distribution management system wikipedia , lookup

Three-phase electric power wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Stray voltage wikipedia , lookup

Buck converter wikipedia , lookup

Surge protector wikipedia , lookup

Opto-isolator wikipedia , lookup

Voltage optimisation wikipedia , lookup

Alternating current wikipedia , lookup

Mains electricity wikipedia , lookup

Transcript
SERVICE CASE
FOR TESTS
OF CURRENT LOADS
TECHNICAL AND
OPERATIONAL DOCUMENTATION
1.
APPLICATION
The service case was designed for special demand of groups occupied with startup of electric power
stations. The range of cases includes a range of necessary functions that optimize the startup and
commissioning work.
The W-24A service case is designed for testing loads of current and voltage transformers. The voltage
transformer circuits of substations have to work under load. Lack of appropriate load causes the
transformers to operate in inappropriate accuracy class, thus making the energy meters calculate the
values wrongly. The W-24A case allows the measurement of circuit loads and in case of lack of
appropriate load the calculation of resistance values to be applied in order to load the circuits
appropriately. The transformer circuits can be loaded with the special RD3X50W resistors made by
Energoaparatura.
2.
CONSTRUCTION
The faceplate of the W-24A case is presented in fig. 1. The W-24A case contains:
three 500VA autotransformers,
three 100VA current transformers,
three phase current and regulated voltage meters,
three 58V, 10A grid transformers,
three overcurrent protectors,
a cutoff switch for the current circuit,
measurement and power supply cables.
Fig. 1. Faceplate of the W-24A case
DTR RNTr-1_02.2014
2
The W-24A service case is equipped with three 500VA autotransformers. The setting range for voltages
is from 0 to 260V AC. Their use is optional.
The case allows for simultaneous supply of three currents (0-15A AC) and three voltages (0-250V AC).
The faceplate features a three phase meter for displaying the current values of regulated voltage and
current. The service case is also equipped with a 3x58V AC (100V AC interphase voltage) phase voltage
source. This voltage is used to apply 100V AC to the measurement circuits of e.g. power consumption
meters. On customer demand there is also the possibility of manufacturing a device for a different
voltage.
WARNING!
All measurements conducted with the use of W-24 case shall be conducted pursuant to safe work
practice guidelines for Low Voltage operating devices.
3.
STARTUP
The three phase voltage shall only be connected with use of the safe laboratory cables provided
with the case. Before applying the voltage set the autotransformer dials to the 0V position. In case
of break in the circuit switch the circuit off with the “PRĄD” marked switch.
During load testing it is also possible to check the sequence of the phases. In order to perform that
switch the subsequent phases with the S-type safety located on the front side of the case. This
safety also switches off the 58V AC circuit. The current measurements shall be performed with use
of test pincers.
TECHNICAL DETAILS
Inputs
Supply voltage
4.
Supply voltage UN
UN = 3 x 230V AC
Permissible voltage range
0.8xUN to 1.2xUN
Power consumption
Less than 3x550W
Input connectors
16
DTR W-24A_02.2014
3
Insulation
General data
Rated voltage
350V
Electric strength
2.5kV; 50 Hz; 1 min.
Case protection grade
IP-41
External dimensions
406/330/174
Ambient humidity
Less than 95%
Operating temperature range
From -5oC to 45oC
Mass in service
15kg
Tab. 2. Technical details
5.
CE MARKING
The CE marking was performed in 2013. The marking is placed on the rating plate on the lid of the case.
The rating plate is shown on figure 3. The rating plate includes the basic parameters of the W-24A service
case.
Fig. 3. Rating plate of the W-24A service case
6.
SERVICE
The devices manufactured by Energoaparatura SA are subject to standard, two-year warranty
period.
The warranty and post-warranty services are provided in the premises of the Energoaparatura SA
company in Katowice.
DTR W-24A_02.2014
4
7. PROCEDURE FOR WASTE MANAGEMENT OF USED ELECTRONIC DEVICES.
Pursuant to the 29 July, 2005 used electric and electronic devices Act (Journal of Laws “Dz.U.” No.
180, item 1495) the used product shall be returned to the Energoaparatura SA company or to a
company providing utilization services for electronic waste.
8. FURTHER CUSTOMER INFORMATION
In technical matters :
In sales-related matters:
Jacek Gumul
Head of Electronics Department
tel. +48 32 728 55 73
[email protected]
Marta Szpaczyńska
Marketing Specialist
tel. +48 32 728 54 05
[email protected]
DTR W-24A_02.2014