Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Veracity Asset Management Group Bid Package 15-114 6 Pad Mounted Transformers SPECIFICATION SHEET The following items are available for purchase as is, where is. The transformers are totally refurbished to new condition. 1) 1986 Pioneer – Old serial number A10669-2 – new serial # 1RD0434W - TRSF, PADMOUNT, 150KVA, 7.2/12.5KV/120/208, DF, RF TRANSFORMERS SHALL BE CONSTRUCTED AND TESTED IN ACCORDANCE WITH THE STANDARD BELOW. TRANSFORMERS SHALL BE THREE PHASE, PADMOUNT TYPE ONAN, FINLESS DESIGN, AND HAVE A 12470GrdY/7200 VOLT HIGH VOLTAGE WINDING AND A 208GrdY/120 VOLT SECONDARY WINDING. TRANSFORMERS WILL BE 15kV HIGH VOLTAGE INSULATION CLASS, COMPLETE WITH 15kV 200 AMP BUSHING WELLS. INSERT BUSHINGS ARE EXTERNALLY REMOVABLE AND CAN ACCOMMODATE ELASTIMOLD LOADBREAK ELBOWS. THE DEAD-FRONT DESIGN SHALL INCORPORATE A RADIAL FEED CAPABILITY THE HIGH VOLTAGE TAPS SHALL BE +5.0%, +2.5%, 0%, -2.5%, AND -5% WITH AN OFF-CIRCUIT TAP SWITCH LOCATED ON THE EXTERIOR OF THE TANK. THE 0% CENTRE POSITION TAP SETTING WILL BE EITHER 3 OR C AND THE TAP SWITCH IS TO BE SET IN THIS POSITION WHEN DELIVERED. ALL TRANSFORMERS SHALL COME COMPLETE WITH OIL- IMMERSED WITHDRAWABLE BAYONET FUSES, COMPLETE WITH DRIP TRAYS. THE BAYONET FUSE SHALL BE CONNECTED ELECTRICALLY IN SERIES WITH NON-USER ACCESSIBLE INTERNAL CURRENT LIMITING FUSE(S). ACCESSORIES SHALL INCLUDE, DOUBLE FRONT DOOR ACCESS WITH HANDLES AND HOLD OPEN DEVICES, A TOP LID FIR THE HIGH VOLTAGE AND LOW VOLTAGE COMPARTMENTS ENCLOSED IN A WEATHERPROOF TAMPER-PROOF COMPARTMENT, ONE (1) INCH IPS BRASS DRAIN BRASS OK FILL PLUG. TRANSFORMERS SHALL HAVE A BITUMINOUS COATING APPLIED TO ALL EXTERNAL UNDERSIDE SURFACES. STANDARDS: CSA-C227.4-06 (LATEST EDITION) THREE-PHASE, DEAD-FRONT, PADMOUNTED DISTRIBUTION TRANSFORMERS 1 2) 1982 Pioneer – Old serial number A8852-2 – new serial # 1RD0432T - 75KVA, 7.2/12.5KV/120/208, DF, RF 3) 1982 Pioneer – Old serial number A8852-5 – new serial # 1RD0433T - 75KVA, 7.2/12.5KV/120/208, DF, RF TRANSFORMERS SHALL BE CONSTRUCTED AND TESTED INACCORDANCE WITH THE STANDARD BELOW. TRANSFORMERS SHALL BE THREE PHASE, PADMOUNT TYPE ONAN, FINLESS DESIGN, AND HAVE A 12470GrdY/7200 VOLT HIGH VOLTAGE WINDING AND A 208GrdY/120 VOLT SECONDARY WINDING. 2 TRANSFORMERS WILL BE 15kV HIGH VOLTAGE INSULATION CLASS, COMPLETE WITH15kV 200 AMP BUSHING WELLS. INSERT BUSHINGS AREEXTERNALLY REMOVABLE AND CAN ACCOMMODATE ELASTIMOLD LOADBREAK ELBOWS. THE DEAD-FRONT DESIGN SHALL INCORPORATE A RADIAL FEED CAPABILITY THE HIGH VOLTAGE TAPS SHALL BE +5.0%, +2.5%, 0%, -2.5%, AND -5% WITH AN OFFCIRCUIT TAP SWITCH LOCATED ON THE EXTERIOR OF THE TANK. THE 0% CENTRE POSITION TAP SETTING WILL BE EITHER 3 ORC AND THE TAP SWITCH IS TO BE SET IN THIS POSITION WHEN DELIVERED. ALL TRANSFORMERS SHALL COME COMPLETE WITH OIL-IMMERSED WITHDRAWABLE BAYONET FUSES, COMPLETE WITH DRIP TRAYS. THE BAYONET FUSE SHALL BE CONNECTED ELECTRICALLY IN SERIES WITH NON-USER ACCESSIBLE INTERNAL CURRENT LIMITING FUSE(S). ACCESSORIES SHALL INCLUDE, DOUBLE FRONT DOOR ACCESS WITH HANDLES AND HOLD OPEN DEVICES, A TOP LID FOR THE HIGH VOLTAGE AND LOW VOLTAGE COMPARTMENTS ENCLOSED IN A WEATHERPROOF TAMPER- PROOF COMPARTMENT, ONE (1) INCH IPS BRASS DRAIN BRASS OK FILL PLUG. TRANSFORMERS SHALL HAVE A BITUMINOUS COATING APPLIED TO ALL EXTERNAL UNDERSIDE SURFACES. STANDARDS: CSA-C227.4-06 (LATEST EDITION) THREE-PHASE, DEAD-FRONT, PADMOUNTED DISTRIBUTION TRANSFORMERS 3 4) 1990 Cam Tram – Old serial number DC90L12201 – new serial # 1RD0435T - TRSF, PADMOUNT, 300KVA, 7.2/12.5KV/120/208, DF,RF, TRANSFORMERS SHALL BE CONSTRUCTED AND TESTED INACCORDANCE WITH THE STANDARD BELOW. TRANSFORMERS SHALL BE THREE PHASE, PADMOUNT TYPEONAN, FINLESS DESIGN, AND HAVE A 12470GrdY/7200 VOLT HIGH VOLTAGE WINDING AND A 208GrdY/120 VOLT SECONDARY WINDING. 4 TRANSFORMERS WILL BE 15kV HIGH VOLTAGE INSULATION CLASS, COMPLETE WITH15kV 200 AMP BUSHING WELLS. INSERT BUSHINGS ARE EXTERNALLY REMOVABLE AND CAN ACCOMMODATE ELASTIMOLD LOADBREAK ELBOWS. THE DEAD-FRONT DESIGN SHALL INCORPORATE A RADIAL FEED CAPABILITY THE HIGH VOLTAGE TAPS SHALL BE +5.0%, +2.5%, 0%, -2.5%, AND -5% WITH AN OFF-CIRCUIT TAP SWITCH LOCATED ON THE EXTERIOR OF THE TANK. THE 0% CENTRE POSITION TAP SETTING WILL BE EITHER 3 OR C AND THE TAP SWITCH IS TO BE SET IN THIS POSITION WHEN DELIVERED. ALL TRANSFORMERS SHALL COME COMPLETE WITH OIL-IMMERSED WITHDRAWABLE BAYONET FUSES, COMPLETE WITH DRIP TRAYS. THE BAYONET FUSE SHALL BE CONNECTED ELECTRICALLY IN SERIES WITH NON-USER ACCESSIBLE INTERNAL CURRENT LIMITING FUSE(S). ACCESSORIES SHALL INCLUDE, DOUBLE FRONT DOOR ACCESS WITH HANDLES AND HOLD OPEN DEVICES, A TOP LID FIR THE HIGH VOLTAGE AND LOW VOLTAGE COMPARTMENTS ENCLOSED IN A WEATHERPROOF TAMPER-PROOF COMPARTMENT, ONE (1) INCH IPS BRASS DRAIN BRASS OK FILL PLUG. TRANSFORMERS SHALL HAVE A BITUMINOUS COATING APPLIED TO ALL EXTERNAL UNDERSIDE SURFACES. STANDARDS: CSA-C227.4-06 (LATEST EDITION) THREE-PHASE, DEAD-FRONT, PADMOUNTED DISTRIBUTION TRANSFORMERS 5 5) 1986 Westinghouse – Old serial number LM23875 – new serial # 1RD0412W - TRSF, PADMOUNT, 300KVA, 7.2/12.5KV/347/600, DF, RF TRANSFORMERS SHALL BE CONSTRUCTED AND TESTED IN ACCORDANCE WITH THE STANDARD BELOW. TRANSFORMERS SHALL BE THREE PHASE, PADMOUNT TYPE ONAN, FINLESS DESIGN, AND HAVE A 12470GrdY/7200 VOLT HIGH VOLTAGE WINDING AND A 208GrdY/120 VOLT SECONDARY WINDING. TRANSFORMERS WILL BE 15kV HIGH VOLTAGE INSULATION CLASS, COMPLETE WITH 15kV 200 AMP BUSHING WELLS. INSERT BUSHINGS ARE EXTERNALLY REMOVABLE AND CAN ACCOMMODATE ELASTIMOLD LOADBREAK ELBOWS. THE DEAD-FRONT DESIGN SHALL INCORPORATE A RADIAL FEED CAPABILITY 6 THE HIGH VOLTAGE TAPS SHALL BE +5.0%, +2.5%, 0%, -2.5%, AND -5% WITH AN OFFCIRCUIT TAP SWITCH LOCATED ON THE EXTERIOR OF THE TANK. THE 0% CENTRE POSITION TAP SETTING WILL BE EITHER 3 OR C AND THE TAP SWITCH IS TO BE SET IN THIS POSITION WHEN DELIVERED. ALL TRANSFORMERS SHALL COME COMPLETE WITH OIL-IMMERSED WITHDRAWABLE BAYONET FUSES, COMPLETE WITH DRIP TRAYS. THE BAYONET FUSE SHALL BE CONNECTED ELECTRICALLY IN SERIES WITH NON-USER ACCESSIBLE INTERNAL CURRENT LIMITING FUSE(S). ACCESSORIES SHALL INCLUDE, DOUBLE FRONT DOOR ACCESS WITH HANDLES AND HOLD OPEN DEVICES, A TOP LID FIR THE HIGH VOLTAGE AND LOW VOLTAGE COMPARTMENTS ENCLOSED IN A WEATHERPROOF TAMPER-PROOF OMPARTMENT, ONE (1) INCH IPS BRASS DRAIN BRASS OK FILL PLUG. TRANSFORMERS SHALL HAVE A BITUMINOUS COATING APPLIED TO ALL EXTERNAL UNDERSIDE SURFACES. STANDARDS: CSA-C227.4-06 (LATEST EDITION) THREE-PHASE, DEAD-FRONT, PADMOUNTED DISTRIBUTION TRANSFORMERS 7 6) 1987 Federal Pioneer – Old serial number A12197-2 – new serial # 1RD0413 - TRSF, PADMOUNT, 500KVA,19.9/34.5KV/347/600, DF,RF TRANSFORMERS SHALL BE CONSTRUCTED AND TESTED IN ACCORDANCE WITH THE STANDARD BELOW EXCEPT THE HIGH VOLTAGE BIL LEVEL WILL BE 150kV. TRANSFORMERS SHALL BE THREE PHASE, PADMOUNT TYPE ONAN, FINLESS DESIGN, AND HAVE A 34500GrdY/19900 VOLT HIGH VOLTAGE WINDING AND A 600GrdY/347 VOLT SECONDARY WINDING. 8 TRANSFORMERS WILL BE 35kV HIGH VOLTAGE INSULATION CLASS, COMPLETE WITH 35kV 200 AMP BUSHING WELLS. INSERT BUSHINGS ARE EXTERNALLY REMOVABLE AND CAN ACCOMMODATE ELASTIMOLD LOADBREAK ELBOWS. THE DEAD-FRONT DESIGN SHALL INCORPORATE A RADIAL FEED CAPABILITY THE HIGH VOLTAGE TAPS SHALL BE +5.0%, +2.5%, 0%, -2.5%, AND -5% WITH AN OFF-CIRCUIT TAP SWITCH LOCATED ON THE EXTERIOR OF THE TANK. THE 0% CENTRE POSITION TAP SETTING WILL BE EITHER 3 OR C AND THE TAP SWITCH IS TO BE SET IN THIS POSITION WHEN DELIVERED. ALL TRANSFORMERS SHALL COME COMPLETE WITH OIL- IMMERSED WITHDRAWABLE BAYONET FUSES, COMPLETE WITH DRIP TRAYS. THE BAYONET FUSE SHALL BE CONNECTED ELECTRICALLY IN SERIES WITH NON-USER ACCESSIBLE INTERNAL CURRENT LIMITING FUSE(S). ACCESSORIES SHALL INCLUDE, DOUBLE FRONT DOOR ACCESS WITH HANDLES AND HOLD OPEN DEVICES, A TOP LID FOR THE HIGH VOLTAGE AND LOW VOLTAGE COMPARTMENTS ENCLOSED IN A WEATHERPROOF TAMPER-PROOF COMPARTMENT, ONE (1) INCH IPS BRASS DRAIN BRASS OK FILL PLUG. TRANSFORMERS SHALL HAVE A BITUMINOUS COATING APPLIED TO ALL EXTERNAL UNDERSIDE SURFACES. STANDARDS: CSA-C227.4-06 (LATEST EDITION) THREE-PHASE, DEAD-FRONT, PADMOUNTED DISTRIBUTION TRANSFORMERS EACH TRANSFORMER SHALL BE EQUIPPED WITH A NON-RESETTABLE DEVICE WHICH DETECTS INTERNAL TRANSFORMER FAULTS, INCORPORATES PRESSUE RELIEF AS SPECIFIED IN CLAUSE 8.3 OF CAN/CSA-2.2-06 AND PROVIDES AND EXTERNAL INDICATION VISIBLE FROM THE GROUND. THE APROVED DEVICE IS THE IFD (INTERNAL FAULT DETECTOR), MANUFACTURED BY IFD CORP. IT IS TO BE INSTALLED IN ACCORDANCE WITH IFD CORP. SERVICE INFORMATION AND LOCATES ON THE TRANSFORMER TANK IN THE RIGHT FRONT QUADRANT APPROX. HALFWAY BETWEEN THE RIGHTMOST SECONDARY BUSHING AND THE RIGHT HAND SIDE LIFTING LUG. 9 10 GENERAL INFORMATION Vendor reserves the right to end this sale at any time for any reason. Purchaser responsible for removal, loading and transportation of the units in a safe responsible manner that meet Sellers Safety Guidelines. All units are deenergized. Purchaser is responsible to arrange for all importing/exporting requirements along with any custom brokerage and duties if applicable. All offers to be submitted to Veracity. All bids are to be submitted by 5pm Friday June 19, 2015 11 PLEASE RETURN THIS PAGE, DULY EXECUTED. Offer to Purchase: (6) Reconditioned Pad Mount Transformers Sold “As-Is, Where-Is” Bids Must Submitted by 5 PM Friday June 19, 2015 Offeror’s name, address (including zip/postal code), telephone no., and fax no. Business Name: _________________________________________________ Contact Name: ________________________________________________ Address: ________________________________________________ Phone No: ____________________ E-mail Address: _________________________________________________ Fax No: _________________ The buyer pays all transportation costs and also bears the risks for bringing the goods to their final destination. Amount of Bid Submitted: ______________________________________ ($ ) Taxes 13% _____________________________________________________( ) . TOTAL AMOUNT__________________________________________ ) DATED at , this day of ($ ,2015 . SIGNATURE: _________________________________________________ TITLE: _________________________________________________ This is my formal offer and I accept all conditions of sale. To: Rob Krysa Veracity Asset Management Group 1520 Queen St. E. Suite BT2012, Sault Ste. Marie, On P6A 2G4 Phone: (705) 542-4821 Email: [email protected] 12 GENERAL CONDITIONS OF SALE 1. WITHDRAWAL –Seller reserves the right to withdraw from the sale any property which has not been removed by the Offeror, without incurring any liability except to refund to the Offeror the amount paid on account of such property. 2. CONDITION OF PROPERTY – The property listed herein (the “Property”) is for sale “asis-where-is”. The description of the Property is based on the best information available to Veracity and Seller. However, Veracity and Seller expressly disclaims all written, oral, express or implied warranties including any statutory warranties, and including any warranties of merchantability, fitness for purpose, freedom from the infringement of patents or other privately held rights and including any warranties as to the quantity, kind, character, quality, use or the results of the use, weight, size, functionality or description of any of the Property. 3. PAYMENTS –The Offeror agrees to make payment prior to the time of removal of the items. The Offeror agrees that payment shall be made via certified payment method including certified cheque, electronic fund transfer, money order, or a bank draft. The Purchase Price shall be paid in full by the Purchaser no later than 10 Business Days following the date of the notification of the acceptance of offer. Unless agreed in writing to an alternate timeframe, if the Purchaser has not made payment of the Purchase Price in full within 10 Business Days from the date of the Acceptance Notification, the purchase and sale of the Property contemplated by this Agreement may be considered null and void and the Purchaser shall lose all claim to and interest in the Property and may be held responsible for all loss, cost and expense incurred due to the Purchaser’s failure or default. 4. TITLE – Unless otherwise provided in the offer, title to the Property sold hereunder shall vest in the Offeror as and when removal is effected. 5. REMOVAL – The Offeror, upon acceptance of this offer by Seller and payment by the Offeror, shall at his/her expense, pack, load and remove the Property. Arrangements to be finalized with the contact identified in the Offer. 6. The Offeror is solely responsible for: (i) obtaining all import/export permits, licenses and permissions, (ii) complying with all applicable laws, regulations and conditions in connection with such permits, licenses and permissions, and (iii) the payment of all duties and brokerage fees. 13 7. FAILURE TO REMOVE – Should the Offeror fail to remove the property in accordance with Paragraph 5, Seller without prejudice to any other remedies, may cancel the contract without notice to the Offeror and retain as liquidated damages any deposit or amount paid on account of the Property. The Offeror shall lose all claim to and interest in the Property and will be held responsible for all loss, cost and expense incurred due to his/her failure or default. 8. CLAIMS – The Offeror shall not be entitled to contest the accuracy of any information in this document unless notice in writing, setting forth particulars of the Offeror’s claim, shall have been received by Veracity and Seller at its address shown on the face of the Offer to Purchase Form within thirty (30) days following acceptance of this offer, or within ten (10) days following removal of the Property in respect of which such claim is made, whichever is the earlier. No claim will be considered unless such Property is still held by or held on the Offeror’s premises for inspection by a representative of Seller. 9. DAMAGE TO THE PROPERTY – The Offeror shall be responsible for any damage to the Property resulting from the handling, packing, loading, removal and use of the Property sold. 10. ADJUSTMENTS – If, through withdrawal, damage, loss or error, the Property cannot be delivered to the Offeror, Seller’s liability shall be limited to a refund of the purchase price. 11. LIABILITY – In no event shall Veracity or Seller be liable to the Offeror for injuries suffered by or the death of any person, or for any loss or damage to any property arising out of the inspection, handling, removal or use of the property listed herein, whether based on contract, tort including negligence, strict liability or otherwise. The Offeror shall indemnify and save harmless Veracity and Seller from and against any and all claims, demands, actions, suits or proceedings of whatever nature including all costs and expenses incurred in connection therewith, brought or instituted by a third party, and based on or arising out of the inspection, handling, removal or use of the Property. 12. CONTACT – This Offer to Purchase form, together with the form of Acceptance, shall, when executed, constitute the entire agreement between the Offeror and Seller and time shall be deemed to be of the essence in all respects thereof. 13. SURVIVAL – The provisions of sections 2, 3, 4, 5, 6, 7, 8, 10, 11, and 13 shall survive the term of this Agreement. 14