* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download GLOBAL ENVIRONMENT FACILITY
Economics of global warming wikipedia , lookup
Citizens' Climate Lobby wikipedia , lookup
Attribution of recent climate change wikipedia , lookup
Effects of global warming on human health wikipedia , lookup
Solar radiation management wikipedia , lookup
Climate change and agriculture wikipedia , lookup
Media coverage of global warming wikipedia , lookup
Climate change in Tuvalu wikipedia , lookup
Scientific opinion on climate change wikipedia , lookup
Public opinion on global warming wikipedia , lookup
Climate change adaptation wikipedia , lookup
Years of Living Dangerously wikipedia , lookup
Climate change, industry and society wikipedia , lookup
Surveys of scientists' views on climate change wikipedia , lookup
IPCC Fourth Assessment Report wikipedia , lookup
United Nations Development Programme Country: Belarus Project Document Project title Management of the Niemen River basin with account of adaptation to climate change UNDAF Outcomes: Outcome 3.1. National capacity to mitigate and adapt to climate change enhanced Expected CP Outcome(s):: 3.1: Country’s capacity to mitigate and adapt to the climate change strengthened; and 3.2: Sustainable use of the country’s natural resources promoted. Expected Output(s): Assessment and forecast of water resources formation with account of different climate change scenarios and economic development tendencies with regard to the use of water resources and industrial capacity for the Niemen River basin. Proposals regarding the agreed indicators of water bodies status (ecological and chemical), along with respective criteria (values), and systems for classification of water bodies’ state and parameters. Enhanced transboundary cooperation including improved of information exchange on water resources use between Belarus, Lithuania and Russia. Executing Entity: Implementing Agencies: UNDP Ministry of Natural Resources and Environmental Protection of Belarus Brief summary The project is aimed at assisting Belarus in implementation of the United Nations Framework Convention on Climate Change (FCCC) by means of building national capacity for sustainable management of the country’s water resources in the context of climate change by the example of the Niemen River basin UNDP Country Programme period: 2011-2015 UNDP focal area: Environmental protection and energy; supporting climate change adaptation Atlas Award ID: 00061928 Altas Project ID: 00079039 Implementation period: 18 months (starting from the date of project official registration) PAC Meeting Date: 26 April 2011 Management Arrangements: NEX Approved Name Ministry of Natural Vladimir G. Tsalko Resources and Environmental Protection of Belarus: UNDP: Antonius Broek Total project budget: USD 170 000 including: - funding by the UNECE Water Convention and Environment and Security Initiative (ENVSEC), USD 170 000 Position Minister UNDP Resident Representative in Belarus Signature Date PART I. SITUATION ANALYSIS ................................................................................................................... 4 INTERNATIONAL FRAMEWORK ........................................................................................................................................ 4 NATIONAL CONTEXT ....................................................................................................................................................... 4 ISSUE DESCRIPTION ......................................................................................................................................................... 5 MAIN STAKEHOLDERS AND BENEFICIARIES OF THE PROJECT .......................................................................................... 5 LINK TO UNDP PRIORITIES ............................................................................................................................................. 5 PART II. PROJECT STRATEGY ..................................................................................................................... 6 PROJECT JUSTIFICATION.................................................................................................................................................. 6 GOALS, OBJECTIVES, OUTCOMES AND ACTIVITIES OF THE PROJECT ................................................................................ 6 LINK TO NATIONAL PRIORITIES AND OTHER INITIATIVES, PROGRAMMES AND PROJECTS ................................................. 8 PART III. RESULTS AND RESOURCES FRAMEWORK ............................................................................. 9 PART IV. PROJECT WORK PLAN ................................................................................................................ 12 PROJECT WORK PLAN .................................................................................................................................................... 12 PART V. MANAGEMENT ARRANGEMENTS ........................................................................................... 15 PART VI. MONITORING AND EVALUATION ............................................................................................ 16 PART VII. LEGAL FRAMEWORK .................................................................................................................. 18 PART VIII. APPENDICES ................................................................................................................................... 19 APPENDIX 1: UNDP SERVICES AIMED AT PROJECT IMPLEMENTATION ................................................ 19 APPENDIX 2. TERMS OF REFERENCE FOR THE PROJECT MANAGER ..................................................... 21 APPENDIX 3: RISK ANALYSIS................................................................................................................................. 23 APPENDIX 4: MONITORING AND ASSESSMENT PLAN ................................................................................... 24 2 LIST OF ABBREVIATIONS ENVSEC Environment and Security International Initiative (member organizations: UNEP, UNDP, UNECE, UN, OSCE, REC; associated member: NATO via Science for Peace and Security Programme) GRID-Arendal United Nations Environment Programme (UNEP) information center, Arendal, Norway. IWAC International Water Assessment Centre, Bratislava NPC National Project Coordinator NSDS-2020 National Strategy of Sustainable Socio-economic Development until 2020 Ministry of Environment Ministry of Natural Resources and Environmental Protection of the Republic of Belarus PCC Project Coordination Council PMT Project Management Team RUE ‘CRDIIUWR’ Republican Unitary Enterprise ‘Central Research and Development Institute for Integrated Utilization of Water Resources’ UNDP Regional Center UNDP Regional Center for Europe and CIS (based in Bratislava) UNECE United Nations European Commission for Europe UNFCCC United Nations Framework Convention on Climate Change WMO World Metrological Organization Zoï Environment Network International non-commercial environmental organization, Geneva, Switzerland. 3 PART I. SITUATION ANALYSIS INTERNATIONAL FRAMEWORK Management of transboundary water resources is one of the most important issues. The 1992 UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes provides a firm basis for transboundary cooperation, including climate change adaptation context. According to the Guidance on Water and Adaptation to Climate Change, the water resources management issue is attributed to the fact that on almost half of the Earth surface area water runoff takes place via international river basins. Transboundary waters create hydrological, social and economic interdependence between the countries. Water resources and climate change go beyond state boundaries and this makes climate change adaptation an international issue. The territory of the Republic of Belarus is a watershed between the basins of the Baltic and the Black seas. About 45% of the rivers flow to the Baltic Sea and 55 % – to the Black Sea. There are 7 big rivers (more than 500 kilometers long) in Belarus and all of them, except the Berezina river, are transboundary ones. In the context of climate change adaptation it is important to improve the integrated management of the water resources of the transboundary basin of the Niemen River, which flows through the territory of Belarus, Lithuania and the Russian Federation and falls into the Baltic Sea. It will facilitate international cooperation at all stages of elaboration of the climate change adaptation strategy for the Niemen River basin in transboundary context. The main international regulatory documents governing the development of international cooperation in the Niemen River basin include: Agreement between the Ministry of Natural Resources and Environmental Protection of the Republic of Belarus and the Ministry of Environmental Protection of the Republic of Lithuania on cooperation in the sphere of environmental protection (April 14, 1995); Agreement between the Government of the Republic of Belarus and the Government of the Russian Federation on cooperation in the sphere of nature conservation (July 5, 1994). NATIONAL CONTEXT On August 27, 2003 the Republic of Belarus committed to fulfill the Convention on the Protection and Use of Transboundary Watercourses and International Lakes (Helsinki Convention). The principals of the Helsinki Convention as well as the principals of the subsequent international documents (serving as addenda to the mentioned Convention), including United Nations Convention on Climate Change, stipulate the necessity of expanding international cooperation in the sphere of integrated management of the transboundary river basins’ water resources. The Republic of Belarus has the necessary legislative, regulatory and institutional framework for implementation of such international projects. The Ministry of Natural Resources and Environmental Protection is responsible for water resources management in the country. The Republican Unitary Enterprise ‘Central Research and Development Institute for Integrated Utilization of Water Resources’, reporting to the Ministry of Nature, is the main water resources research institution in the country. RUE ‘CRDIIUWR’ has all the necessary scientific capacity, staff and working experience in the sphere of hydrological, hydraulic and water balance computations, elaboration of integrated water resources utilization schemes, allowing it to successfully implement the proposed project. National legal acts stipulate an integrated approach to utilization and protection of the Belarusian waters and are aimed at fulfillment of the provisions of the UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes. 4 ISSUE DESCRIPTION The European Union Water Framework Directive recommends using the basin principle when managing water resources. There is an active water use in the Niemen River basin due to great number of industrial and agricultural enterprises as well as oil and product pipelines. The quality of the Niemen River water resources as well as the river’s regime (including regime which depends on the efficiency of water resources management), determine the qualitative and quantitative characteristics of the river basin’s water resources on the territory of Lithuania as well as ecological state of the Baltic Sea to a large extent. The issues of estimation and forecasting of water resources formation in the transboundary basin of the Niemen River as well as the quality of such water resources have become especially important over the recent decades due to climate change. No estimation and forecasting of water resources formation in the transboundary river basins in the context of climate change adaptation was done in the Republic of Belarus, no assessment methodologies were elaborated and no joint international projects were implemented. According to the Water Strategy of the Republic of Belarus until 2020 “… the issues of estimation and use of transboundary watercourses in the river basins with account of European approaches and in climate change adaptation context have not been adequately addressed”. That is why according to the Water Strategy of the Republic of Belarus until 2020 this issue is a strategic one for the country. MAIN STAKEHOLDERS AND BENEFICIARIES OF THE PROJECT In the context of this Project Document, under the term “beneficiaries” we mean society groups that will benefit from the project, including obtaining knowledge and skills, equipment, benefiting from enhanced legal and institutional framework, improved expert capacity etc. . Considering the above, the project beneficiaries include Ministry of Environment, the RUE ‘CRDIIUWR’, decision makers at national, regional and local levels involved in decision-making process with respect to water resources use, scientists dealing with water and climate change issues, and ultimately, the population of Belarus who will benefit from the improved environment. Among the stakeholders we should also name neighboring Lithuania and Russia (Kaliningrad oblast), sharing the Niemen River with Belarus. LINK TO UNDP PRIORITIES The project is in full compliance with the UNDP Country Programme for Belarus and contributes to the achievement of the programme outcomes 3.1 “Country’s capacity to mitigate and adapt to the climate change strengthened”; and 3.2: “Sustainable use of the country’s natural resources promoted.” The project also complies with the 2008-2011 UNDP Corporate Programme with regard to Environment and Sustainable Development section of the Programme. The project facilitates the improvement of decision-making process and contributes to the enhancement of ecological sustainability in the Republic of Belarus via capacity building for the development of international cooperation in the sphere of protection and use of water resources of transboundary river basins with account of adaptation to the climate change. The proposed activities are supplementary to the current UNDP and Belarusian Government’s efforts in the sphere of environmental protection. The project will open new possibilities for cooperation. The project corresponds to the goal and objectives of the “Environment and Security” initiatives, which is joint initiative of UNDP, ENECE, UNEP, OSCE, NATO and the Regional Environmental Centre (REC Budapest). Besides, project activities are aimed at better taking the environmental protection aspect into account during the process of planning and decision-making. The project fully complies with the UNDP activities to achieve Millennium Development Goals. 5 The project corresponds to the UNDP Gender Equality Strategy 2011-2013, which, as well, envisages full participation of women in preparation and implementation of strategic documents on environment, energy efficiency, adaptation to climate change as well enhancing women capacities in environmental decision-making. Those documents shall be developed with due respect to women’s concerns and interests. PART II. PROJECT STRATEGY PROJECT JUSTIFICATION The project is focused on management of the Niemen River basin with account of climate change. It is part of the UNECE Programme of pilot projects and thus it can use the platform for exchange of practices and experience between the projects and other similar initiatives aimed at development of cooperation for adaptation to the climate change in transboundary basins. Furthermore, the project on the Niemen River will be implemented within the framework of Environment and Security Initiative (ENVSEC). Programme of pilot projects ‘on development of cooperation for adaptation to the climate change in transboundary basins’ implemented within the framework of UNECE Water Convention is aimed at assisting UN member states in implementation of the Water Convention and the EU Water Framework Directive in the context of climate change, as well as it is aimed at supporting the UNECE member states to develop adaptation strategies and cooperation development measures in order to adapt to climate change in transboundary basins. The Niemen River project for the Republic of Belarus will be implemented with financial support of Finland via UNECE Water Convention. It is expected that additional funding for 2011-2012 can be raised within the framework of ENVSEC. Such additional funding will be allocated for implementation of activities aimed at meeting the project outcomes and objectives specified below. The Government of the Republic of Belarus emphasizes the importance of improving the mechanism of taking environment protection aspects into account during the decision-making process. Adaptation of methods used to estimate and forecast formation and use of transboundary river basins’ water resources to climate change will lead to the increase in the efficiency of managerial decisions in the sphere of water use. The project will provide the necessary support to the Ministry of Environment to develop capacity in the sphere of sustainable management of water resources and international cooperation in the protection and use of water resources applying the basin approach with account of climate change. The project will facilitate cooperation between the Republic of Belarus and the European countries in the sphere of environment protection. GOALS, OBJECTIVES, OUTCOMES AND ACTIVITIES OF THE PROJECT The main goal of the project is improvement of the integrated water resources management using the basin approach in the climate change context by the example of the Niemen River. The project will also facilitate the development of transboundary cooperation between the countries located in the Niemen River basin, and will facilitate achievement of mutual understanding regarding forecasted water resources reserves and water use, taking into account possible climate change impacts. The following objectives are planned to be met in the course of project implementation: - Assessment of water use characteristics in the Niemen River basin and its impact on the qualitative and quantitative characteristics of water resources; - Estimation and forecast of formation and use of water resources of the transboundary Niemen River basin with account of different climate change scenarios, economic development trends with respect to the use of water resources and to industrial development. The project will also result in enhancement of transboundary cooperation, including improvement of exchange of information about water resources use between Belarus, Lithuania and Russia, as well as in 6 proposals regarding the activities to adapt to climate change in the Niemen River basin. The abovementioned objectives will be met by implementation of the corresponding activities with more detailed results, specified below. Activity 1 Assessment of the current state of the water resources of the Niemen River basin (quantitative aspects) and assessment of economic activities impact on these resources 1.1) Analysis of the available hydrological data and assessment of the Niemen River’s hydrological regime change trends. 1.2) Elaboration of the proposals for (i) indicators (ecological and chemical) to evaluate the state of water bodies common for the whole Niemen River basin, (ii) classification system and criteria for assessment of ecological status based on the selected indicators. 1.3) Analysis of water use characteristics and overall assessment of its impact by means of computation of water balances under current conditions. 1.4) Determination of priority with respect to protection and use of the Niemen River basin’s water resources. As a result of this activity a report on the analysis of the current state of water resources and impact of economic activities on the water environment of the Niemen River basin will be prepared. The proposals on a set of indicators to be used to assess the current state of water bodies (ecological and chemical), along with a water bodies classification system and criteria for assessment of water bodies ecological status based on the selected indicators. Activity 2. Study of the change of the climatic characteristics for the Niemen River basin and elaboration of the climate change scenarios 2.1) Analysis of the international experience related to the possible climate change scenarios and models considering a possibility of their adaptation for the Niemen River basin. 2.2) Processing and statistical analysis of the benchmark climatic data obtained from the meteorological stations located in the Niemen River basin. 2.3) Assessment of the climate change tendencies based on the results of the benchmark meteorological data applying the ‘world’ models taking into account the experience of their application in Lithuania. Elaboration of the climate change scenarios. 2.4) Workshop to discuss preliminary research results. 2.5) Meeting of the Working Group / workshop-seminar. This activity will result in (i) a report containing results of the climatic data analysis; (ii) climate change scenarios will be elaborated; (iii) Internet-based information platform containing data on water resources management and climate change adaptation with regard to Belarus, Lithuania and Russia. Activity 3. Forecasting the runoff of the Niemen River basin in the context of climate change and with account of different scenarios for water use and socio-economic development 3.1) Selection of the common methodology to assess the climate change impact on the hydrological and hydrogeological regime of the Niemen River basin (taking into account international experience). 3.2) Building future water use scenarios. 3.3) Computation of the estimated future water balances and runoff changes. 3.4) Stakeholder meeting. In the course of this activity, the scenarios for future water use will be elaborated, along with agreed estimations of the climate change impact on the runoff based on the water balance calculations made on the basis of climate change scenarios. Activity 4. Analysis of the hydrometeorological, hydrochemical and hydrobiological monitoring systems in the Niemen River transboundary basin and assessment of the needs for these systems optimization for climate change monitoring (including emergency cases) 4.1) Analysis of the meteorological and hydrological monitoring systems and elaboration of proposals to optimize the systems to conduct climate change monitoring (including emergency cases). 4.2) Analysis of the hydrochemical and hydrobiological monitoring systems in the Niemen River transboundary basin and assessment of the possibility for optimization of such systems to conduct climate change monitoring (including emergency cases). 7 This activity will result in the proposals for optimization of the monitoring system for the Niemen River basin with account of climate change. Activity 5. Estimation and forecast of the future climate change impact on the water quality at the highest generalization level 5.1) Assessment of the current water quality in the Niemen River based on hydrochemical and hydrobiological indicators. 5.2) Analysis of the world practice with respect to the application of models for assessment of climate change impact on the quality of water resources. 5.3) Assessment of the climate change possible impact on the quality of water in the Niemen River for the selected climate change scenarios. 5.4) Meeting of the Working Group / workshop. 5.5) Stakeholder meeting. 5.6) Discussion of the climate change adaptation measures and a Niemen River basin water resources management plans. 5.7) Final seminar. Assessment of the climate change possible impact on the quality of water in the Niemen River will be the result of this activity. Activity 6. Elaboration of the common information platform (Internet database), containing data on water resources management and adaptation to climate change for the Niemen River basin countries. 6.1) Development of the database concept and structure. 6.2) Preparation of the initial data and filling out the database, development of the database pilot version. 6.3) Database trial operation and upgrade based on the project results and comments of the stakeholders. Final database integration into the RUE ‘CRDIIUWR’ website. This activity will result a common information platform (Internet database), containing data on water resources management and climate change adaptation for Belarus, Lithuania and Russia. LINK TO NATIONAL PRIORITIES AND OTHER INITIATIVES, PROGRAMMES AND PROJECTS The goals of this project are consistent with the main provisions of the Water Strategy of the Republic of Belarus until 2020, according to which assessment and use of transboundary watercourses with account of European approaches and in the context climate change adaptation is a strategic issue. The goals of this project are also consistent with the main provisions of the National Strategy of Sustainable Socio-Economic Development of the Republic of Belarus until 2020. The Strategy emphasizes the importance of fulfilling obligations under international agreements in the sphere of environmental protection and sustainable use of natural resources, and enhancing international cooperation in this sphere. According to Article 44 of the National Security Concept of the Republic of Belarus approved by the Edict of the President of Belarus No. 575 of November 9, 2010 ‘in the sphere of ecology and environment external threats to the national security include: global environmental changes associated with climate change…’. According to Article 56 of the Concept ‘…enhancement of international cooperation in the sphere of environmental protection and legal resolution of transnational ecological issues, increasing the accuracy of estimates and forecasts of state of environment, climate changes, dangerous weather and climatic phenomena…’ are considered as one of the main ways of elimination of internal threats and protection from external national security threats. That is why implementation of this project fully complies with the abovementioned provisions of the National Security Concept of the Republic of Belarus. This project is aligned with the Programme of pilot projects ‘on development of cooperation for adaptation to the climate change in transboundary basins’ implemented within the framework of UNECE Water Convention. The Programme is aimed at assisting the UN member states in implementation of the Water Convention and the EU Water Framework Directive in the context of climate change, as well as at supporting the UNECE member states to develop adaptation strategies and cooperation development measures in order to adapt to climate change in transboundary basins. 8 PART III. RESULTS AND RESOURCES FRAMEWORK Outcome of the UNDP Country Programme: 3.1: Country’s capacity to mitigate and adapt to the climate change strengthened; 3.2: Sustainable use of the country’s natural resources promoted. UNDP Country Programme’s indicators: GHG emission (tons of CO2 equivalent) into the atmosphere; Environmental Code exists Focal area (out of the 2008-2011 UNDP Strategic Plan): mainstreaming environment and energy Partners: RUE ‘CRDIIUWR’, ENVSEC Initiative Secretariat, Zoï Environment Network, GRID-Arendal Project title: Management of the Niemen River basin with account of adaptation to climate change EXPECTED OUTCOMES TARGET INDICATORS PLANNED ACTIVITIES 2011 Year 1: List of indicators of water bodies state and classification system for assessment of their ecological status approved for the Niemen River basin; The database of climatic data for the Niemen River basin prepared; Common methodology for assessment of climate change impact on qualitative characteristics of water resources drafted. Activity 1 Assessment of the current state of the water resources of the Niemen River basin (quantitative aspects) and assessment of economic activities impact on these resources 1.1) Analysis of the available hydrological data and assessment of the Niemen River’s hydrological regime change trends. 1.2) Elaboration of the proposals for (i) indicators (ecological and chemical) to evaluate the state of water bodies common for the whole Niemen River basin, (ii) classification system and criteria for assessment of ecological status based on the selected indicators. 1.3) Analysis of water use characteristics and overall assessment of its impact by means of computation of water balances under current conditions. 1.4) Determination of priority with respect to protection and use of the Niemen River basin’s water resources. Activity 2. Study of the change of the climatic characteristics for the Niemen River basin and elaboration of the climate change scenarios 2.1) Analysis of the international experience related to the possible climate change scenarios and models considering a possibility of their adaptation for the Niemen River basin. 2.2) Processing and statistical analysis of the benchmark climatic data obtained from the meteorological stations located in the Niemen River basin. 2.3) Assessment of the climate change tendencies based on the results of the benchmark meteorological data applying the ‘world’ models taking into account the experience of their application in Lithuania. Elaboration of the climate change scenarios. 2.4) Workshop to discuss preliminary research results. RESPONSIBLE PARTY Component 1. Output 1 – management of the water resources in the Niemen River basin at the national and international levels improved due to adaptation to the climate change Background: 1. Climate change scenarios and climate change impact on the water resources of the main basins of transboundary rivers do not exist for Belarus. There are also no joint (with other states located in the river basins) climate change scenarios. 2. There are no water use balances for the main transboundary rivers, including the Niemen River, with account of climate change adaptation. 2: Data base on water use for the Niemen River basin prepared; Database of hydrological data for computation of water balances prepared; Current water balance of the Niemen River basin computed. 3. There are no joint information systems (platforms) for the Republic of Belarus and the 3: Concept of a common information platform (Internet Ministry of Environment, UNDP Ministry of Environment, UNDP 9 EXPECTED OUTCOMES neighboring countries located in the transboundary river basins. Indicators: 1. Modern scenarios and methods for assessment of climate change impact on the hydrological and hydrogeological regimes of the Niemen River basin and the quality of surface waters prepared 2. Current water balance of the Niemen River basin with account of climate change adaptation, including the forecast of the Niemen River basin runoff developed. 3. Common Internet-based information platform, containing data on the management of water resources and adaptation to climate change for the Niemen River basin countries created and is accessible via the Internet. TARGET INDICATORS database) developed and discussed with the main stakeholders; The structure of the database developed; Pilot version of the database accessible via the Internet. Year 2012 1: Methodology for assessment of climate change impacts on qualitative characteristics of water resources ; Forecast of surface water quality change with account of the climate change elaborated. 2: Forecast of the Niemen River basin runoff change with account of the climate change elaborated. 3. Final common information platform, integrated into the CRDIIUWR website accessible via the Internet. PLANNED ACTIVITIES RESPONSIBLE PARTY 2.5) Meeting of the Working Group / workshop-seminar. Activity 3. Forecasting the runoff of the Niemen River basin in the context of climate change and with account of different scenarios for water use and socio-economic development 3.1) Selection of the common methodology to assess the climate change impact on the hydrological and hydrogeological regime of the Niemen River basin (taking into account international experience). 3.2) Building future water use scenarios. 3.3) Computation of the estimated future water balances and runoff changes. 3.4) Stakeholder meeting. Ministry of Environment Activity 4. Analysis of the hydrometeorological, hydrochemical and hydrobiological monitoring systems in the Niemen River transboundary basin and assessment of the needs for these systems optimization for climate change monitoring (including emergency cases) 4.1) Analysis of the meteorological and hydrological monitoring systems and elaboration of proposals to optimize the systems to conduct climate change monitoring (including emergency cases). 4.2) Analysis of the hydrochemical and hydrobiological monitoring systems in the Niemen River transboundary basin and assessment of the possibility for optimization of such systems to conduct climate change monitoring (including emergency cases). Ministry of Environment Activity 5. Estimation and forecast of the future climate change impact on the water quality at the highest generalization level 5.1) Assessment of the current water quality in the Niemen River based on hydrochemical and hydrobiological indicators. 5.2) Analysis of the world practice with respect to the application of models for assessment of climate change impact on the quality of water resources. 5.3) Assessment of the climate change possible impact on the quality of water in the Niemen River for the selected climate change scenarios. 5.4) Meeting of the Working Group / workshop. 5.5) Stakeholder meeting. 5.6) Discussion of the climate change adaptation measures and a Niemen River basin water resources management plans. 5.7) Final seminar. Ministry of Environment 10 EXPECTED OUTCOMES TARGET INDICATORS PLANNED ACTIVITIES RESPONSIBLE PARTY Activity 6. Elaboration of the common information platform (Internet database), containing data on water resources management and adaptation to climate change for the Niemen River basin countries. 6.1) Development of the database concept and structure. 6.2) Preparation of the initial data and filling out the database, development of the database pilot version. 6.3) Database trial operation and upgrade based on the project results and comments of the stakeholders. Final database integration into the RUE ‘CRDIIUWR’ website. Ministry of Environment, UNDP, RUE ‘CRDIIUWR’ Project management Ministry of Environment, UNDP 11 PART IV. PROJECT WORK PLAN PROJECT WORK PLAN activity Activities Activity 1 Assessment of the current state of the water resources of the Niemen River basin (quantitative aspects) and assessment of economic activities impact on these resources 1.1) Analysis of the available hydrological data and assessment of the Niemen River’s hydrological regime change trends. 1.2) Elaboration of the proposals for (i) indicators (ecological and chemical) to evaluate the state of water bodies common for the whole Niemen River basin, (ii) classification system and criteria for assessment of ecological status based on the selected indicators. 1.3) Analysis of water use characteristics and overall assessment of its impact by means of computation of water balances under current conditions. 1.4) Determination of priority with respect to protection and use of the Niemen River basin’s water resources. Activity 2. Study of the change of the climatic characteristics for the Niemen River basin and elaboration of the climate change scenarios 2.1) Analysis of the world experience of the possible climate change scenarios and the used models with account of their possible adaptation for the Niemen River basin. 2.2) Processing and statistical analysis of the benchmark climatic data obtained from the meteorological stations located in the Niemen River basin. 2.3) Assessment of the climate change tendencies based on the results of the benchmark meteorological data applying the ‘world’ models taking into account the experience of their application in Lithuania. Elaboration of the climate change scenarios. 2.4) Workshop to discuss preliminary research results. meetings 2012 2011 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 8 9 10 12 11 7 12 Activities 2.5) Meeting of the Working Group / workshopseminar. Activity 3. Forecasting the runoff of the Niemen River basin in the context of climate change and with account of different scenarios for water use and socio-economic development 3.1) Selection of the common methodology to assess the climate change impact on the hydrological and hydrogeological regime of the Niemen River basin (taking into account international experience). 3.2) Building future water use scenarios. 3.3) Computation of the estimated future water balances and runoff changes. 3.4) Stakeholder meeting Activity 4. Analysis of the hydrometeorological, hydrochemical and hydrobiological monitoring systems in the Niemen River transboundary basin and assessment of the needs for these systems optimization for climate change monitoring (including emergency cases) 4.1) Analysis of the meteorological and hydrological monitoring systems and elaboration of proposals to optimize the systems to conduct climate change monitoring (including emergency cases). 4.2) Analysis of the hydrochemical and hydrobiological monitoring systems in the Niemen River transboundary basin and assessment of the possibility for optimization of such systems to conduct climate change monitoring (including emergency cases). Activity 5. Estimation and forecast of the future climate change impact on the water quality at the highest generalization level 5.1) Assessment of the current water quality in the Niemen River based on hydrochemical and hydrobiological indicators. 5.2) Analysis of the world practice with respect to the application of models for assessment of climate change impact on the quality of water resources. 5.3) Assessment of the climate change possible impact on the quality of water in the Niemen River for the selected climate change scenarios. 2012 2011 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 13 Activities 1 2 3 4 5 6 5.4) Meeting of the Working Group / workshop 5.5) Stakeholder meeting 5.6) Discussion of the climate change adaptation measures and a Niemen River basin water resources management plans. 5.7) Final seminar Activity 6. Elaboration of the common information platform (Internet database), containing data on water resources management and adaptation to climate change for the Niemen River basin countries. 6.1) Development of the database concept and structure. 6.2) Preparation of the initial data and filling out the database, development of the database pilot version. 6.3) Database trial operation and upgrade based on the project results and comments of the stakeholders. Final database integration into the RUE ‘CRDIIUWR’ website. Project management 2012 2011 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 14 PART V. MANAGEMENT ARRANGEMENTS The Ministry of Natural Resources and Environmental Protection of Belarus will act as a national implementing agency. The main functions of the Ministry of Environment related to project management presented below. The Republican Unitary Enterprise “Central Research and Development Institute for Integrated Use of Water Resources”, which is the leading national agency on the issues pertaining to conservation and sustainable use of water resources, will provide scientific support to project implementation. This will include, among other issues, maintaining the State Water Cadastre, water use balances calculation, development of integrated schemes for water resources use, EIA studies of development projects planned within water bodies’ basins, estimations and prognosis of water bodies’ hydrological regimes and water quality taking into account climate change. The Ministry of Environment/RUE ‘CRDIIUWR’ will provide a separate room equipped with telephone line and furniture to host the project office. National Project Coordinator (NPC) appointed by the Ministry of Environment will be responsible for coordination of the project activities. For effective and timely project implementation a Project Manager (PM) will be hired, who will also perform the functions related to administrative and financial management of the project. The PM will be selected through an open competitive process in accordance with the respective UNDP rules and procedures. Effectiveness of the PM work will be evaluated annually by the UNDP Belarus. Based on the evaluation results and consultations with the NPC, a decision will be made on renewal/non-renewal of the PM contract. Tentative ToR for the PM presented in Appendix 2. An annual detailed work plan for the first project year will be prepared and approved by the UNDP and the Ministry of Environment within the first month of the project implementation. Work plans for the second and subsequent year of project implementation will be prepared within the last month of the current year. The project will be implemented in close cooperation with the UNECE and the Secretariat of the “Environment and Security” Initiative. Functions and duties on management and coordination of project activities The overall coordination (implementation and management) of the project activities will be conducted by the Ministry of environment. A Project Steering Committee (PSC) will be established, which main functions will include monitoring of the project implementation process, review and approval of annual work plans, annual and final reports, and other documents prepared by the project. Main functions of the Ministry of Environment Ensuring project implementation; Supervising operation of the project personell; Assisting in organization of procurement conducted within the project implementation and control of the use of the procured goods and services; Approval of technical assignments, tender bids, etc.; Ensuring the effective implementation of training and awareness raising actions; Ensuring preparation and submission of project implementation reports to the Ministry of Economy; Monitoring and evaluation of the project implementation; Organizing PSC meetings; Informing the Council of Ministers, ministries and other national governing authorities about the project progress on their request; Coordinating activities of the organizations taking part in the project actions; Analyzing effectiveness of the project implementation by different components; Developing proposals on improvement of the project implementation activities; and Approval of work plans, reports, terms of reference etc. 15 Main functions of the UNDP Functions performed by UNDP within the project implementation framework are presented in Appendix 1. PART VI. MONITORING AND EVALUATION Project monitoring and evaluation will be conducted in accordance with the established UNDP and SAICM Secretariat rules and procedures. Project Manager will report regularly to the UNDP Belarus and NPC on the project’s progress. In the beginning of project implementation, the Project Manager will prepare an annual detailed work plan (ADWP), defying the mail stages of project implementation, time frame, and quality criteria based on with project monitoring and evaluation will be conducted. An ADWP will be approved by the PSC. A gender balance will be sought for implementation of all the project activities. Project monitoring will be performed on a continuous basis to ensure efficient use of resources and achievement of the planned outcomes and outputs in accordance with the work plan. Project Monitoring and Evaluation Plan is presented in Appendix 4. Project audit, if necessary, will be performed in accordance with the UNDP requirements and current legislation of the Republic of Belarus. Quality Management for Project Activity Results Assessment of the current state of the water resources of the Niemen River basin (quantitative aspects) and Start: July, 2011 Activity 1 assessment of economic activities impact on these End: November, 2011 resources To increase the efficiency of the Niemen River basin’s water resources management with Goal account of the current water use characteristics To achieve this goal activities 1.1-1.4 will be performed Description Quality criteria Assessment method Assessment date Report on the analysis of the current state of Experts’ reports. Annual project report 3-d quarter water resources and impact of economic 2011 activities on the water environment of the Niemen River basin approved by the Ministry of Environment. Proposals regarding water bodies state indicators approved for the whole Niemen River basin, classification system and criteria for assessment of ecological status based on the selected indicators. Study of the change of the climatic characteristics for Start: July, 2011 the Niemen River basin and elaboration of the climate End: February, 2012 change scenarios Elaboration of scenarios of possible climate change for the Niemen River basin Goal To achieve this goal activities 2.1-2.5 will be performed Description Quality criteria Assessment method Assessment date Climate change scenarios; Internet-based Experts’ reports. Annual project report 1st quarter of platform containing data on water resources 2012 management and adaptation to climate change in the three countries. Activity 2 16 Forecasting the runoff of the Niemen River basin in the context of climate change and with account of Start: October 2011 Activity 3 different scenarios for water use and socio-economic End: March 2012 development Improving efficiency of the Niemen River basin water resources management with Goal account of adaptation to the climate change To achieve this goal activities 3.1-3.4 will be performed Description Quality criteria Assessment method Assessment date Scenarios of the future water use, Experts’ reports. Annual project report 1st quarter of assessment of the forecasted climate change 2012 impact on the runoff, based on the results of water balance computations, which were made with account of joint climate change scenarios. Analysis of the hydrometeorological, hydrochemical and hydrobiological monitoring systems in the Niemen Start: January 2012 Activity 4 River transboundary basin and assessment of the End: September 2012 needs for these systems optimization for climate change monitoring (including emergency cases) Improving efficiency of monitoring system for climate change monitoring (including Goal emergency cases) To achieve this goal activities 4.1-4.2 will be performed Description Quality criteria Assessment method Assessment date Proposals for optimization of the monitoring Experts’ reports. Annual project report 3d quarter of system for the Niemen River basin with 2012 account of climate change Estimation and forecast of the future climate change Start: January 2012 Activity 5 impact on the water quality at the highest End: October 2012 generalization level Improving water resources management in the Niemen River basin taking into account Goal climate change To achieve this goal activities 5.1-5.7 will be performed Description Quality criteria Assessment method Assessment date Assessment of climate change impact on the Experts’ reports. Annual project report 4th quarter of quality of water in the Niemen River. 2012 Elaboration of the common information platform Start: October 2011 (Internet database), containing data on water resources End: December 2012 management and adaptation to climate change for the Niemen River basin countries. Improvement of the efficiency of information support to the management of the Niemen Goal River basin water resources for all the countries located in the basin, informing the concerned users. To achieve this goal activities 6.1-6.3 will be implemented Description Quality criteria Assessment method Assessment date Database is integrated into the CRDIIUWR Experts’ reports. Annual project report 3d and 4th quarter website and is accessible via the Internet of 2012 Activity 6 17 PART VII. LEGAL FRAMEWORK This project document is a document referenced in Article 1 of the Standard Basic Agreement concerning Assistance signed between the Government of the Republic of Belarus and the United Nations Development Programme on September 24, 1992. According to Article 3 of the Standard Basic Agreement concerning Assistance the Executing Agency is fully responsible for its own protection and security, including protection and security of its property and personnel as well as the UNDP property being in the custody of such Executing Agency. The Executing Agency shall: Submit the corresponding security plan, taking into account the safety situation in the country where the project is implemented; Foresee all the possible risks and obstacles related to security issues and ensure the implementation of the security plan. UNDP reserves the right to check the implementation of such a plan and, if necessary, make proposals regarding improvement of such a plan. Inability to elaborate and implement the required security plan will lead to termination of the present Agreement. Executing Agency agrees to exert every effort to guarantee that none of the UNDP funds used under this Project is used to support persons or organizations implicated in terrorist attacks and that none of the recipients of any UNDP assistance is included to the Security Council Committee’s list, made in accordance with UN resolution 1267 (1999). The list is available on the website http://www.un.org/Docs/sc/committees/1267/1267ListEng.htm. This condition shall be included into all the Agreements concluded with sub-recipients or sub-contractors within the framework of this project document. 18 PART VIII. APPENDICES APPENDIX 1: UNDP SERVICES AIMED AT PROJECT IMPLEMENTATION Upon request of the Executing Agency UNDP may render assistance in project implementation with regard to following areas: a. Determination and/or employment of the project personnel; b. Determination and assistance in the conduct of educational activities and seminars; c. Procurement of goods and services; Procurement and personnel employment shall be done in accordance with the UNDP rules and procedures. Detailed description of possible services which can be provided by UNDP is specifies in the table below. In case if some additional assistance on behalf of UNDP is required the corresponding amendments are made to the project document appendices by mutual consent of the UNDP Resident Representative and the Executing Agency. In accordance with the provisions of the Standard Basic Agreement Concerning Assistance, signed between the Government of the Republic of Belarus and United Nations Development Programme on September 24, 1992 and provisions of the project document, regulations on obligations, privileges and immunities shall apply. The Government undertakes full responsibility for the project implemented by the Executing Agency in the national implementation mode. UNDP’s responsibility to assists the Executing Agency is limited to the services specified in the table below. Any claims or disputes arising in connection with or from the UNDP’s assistance shall be settled in accordance with the provisions of the Standard Basic Agreement concerning Assistance. According to the document of ‘Management of the Niemen River Basin with Account of Adaptation to Climate Change’ Project, UNDP provides the services to the Executing Agency in terms of national implementation of the project as specified below. Services to be provided: Type of service Schedule of provision of services Price of services (where appropriate) Amount and UNDP compensation method (where appropriate) Travel authorization The price is defined Based on the annual project according to the plans for the whole time of universal services price the project list annually approved by the UNDP Headquarters The total compensation amount is defined by the number of transactions made and is reimbursed via UNDP’s Atlas accounting system on the quarterly basis Administrative services (postage expenses, assistance in getting visa, customs clearance, etc) The price is defined according to the internal services price list Based on the annual project annually approved by the plans for the whole time of UNDP / The price is the project defined according to the universal services price list annually approved by the UNDP Headquarters The total compensation amount is defined by the number of service requests and is regularly reimbursed via UNDP’s Atlas accounting system 19 Effecting payments The price is defined Based on the annual project according to the plans for the whole time of universal services price the project list annually approved by the UNDP Headquarters The total compensation amount is defined by the number of transactions made and is reimbursed via UNDP’s Atlas accounting system on the quarterly basis Provision of services and assistance in the sphere of computer equipment and information technologies The price is defined according to the internal services price list Based on the annual project annually approved by the plans for the whole time of UNDP, and the project proportionally to the allocated expenses for IT specialist Total compensation amount is defined by the number of service requests and time spent and is regularly reimbursed via UNDP’s Atlas accounting system Procurement of goods and services The price is defined Based on the annual project according to the plans for the whole time of universal services price the project list annually approved by the UNDP Headquarters The total compensation amount is defined by the number of transactions made and is reimbursed via UNDP’s Atlas accounting system on the quarterly basis Staff selection and recruitment The price is defined Based on the annual project according to the plans for the whole time of universal services price the project list annually approved by the UNDP Headquarters The total compensation amount is defined by the number of transactions made and is reimbursed via UNDP’s Atlas accounting system on the quarterly basis Provision of information and communication services Based on the information and communication activities plan annually approved by the UNDP The price is defined according to the UNDP’s internal instruction regarding information and communication services The total amount is 1% of the approved budget funded from the UNDP resources twice a year via UNDP’s Atlas accounting system Functions and responsibilities of the involved parties are detailed in Resources and Outputs Framework and Project Management sections of this project document. 20 APPENDIX 2. TERMS OF REFERENCE FOR THE PROJECT MANAGER UNDP PROJECT Management of the Niemen River basin with account of adaptation to climate change Objective: The Project Manager is responsible for successful project implementation, efficient management, achievement of the planned outcomes and outputs, coordination and control of the project activities in accordance with the UNDP rules and procedures. Recruitment period: 1 year with possible extension Job duties: Control and coordination of the project activities in order to ensure the achievement of the outcomes in accordance with the project document and UNDP rules and procedures; Day-to-day project management, budgeting and control of expenditures, planning and general monitoring of the project; Preparation of the detailed project work plans in consultation with the Ministry of Environment and UNDP, ensuring fulfillment of the work plans, updating plans in case of necessity; Selection of local experts to perform certain activities in consultation with the Ministry of Environment and UNDP, supervision of the time of work performance; Preparation of the project progress reports for UNDP and Ministry of Economy, preparation of other reports requested by the UNDP and Ministry of Environment; Control over expenditure of the project funds in accordance with the budget, work plan and project document; Preparation of terms of reference for the project consultants; Monitoring of risks and indicators of project performance according to the project logical framework; Responsibility for fulfillment of target financial indicators in accordance with the approved annual work plans; Assurance of proper information exchange between project stakeholders; Assurance of the proper operational and financial closeout of the project in accordance with the UNDP procedures; Maintenance of regular contacts with the Ministry of Environment, the RUE ‘CRDIIUWR’ and UNDP regarding the project implementation issues which are within the competence of the mentioned institutions; Conduct of negotiations on cooperation with state administration bodies and potential donors to identify and raise additional resources; Prepares project budget revisions; Prepares financial reports for project, donors and other parties involved in implementation and funding of activities; Interacts with UNDP CO Programme/Finance Unit to request funds transfer, verify financial reports, budget revisions, receipts of contributions; Provides financial monitoring over project commitments and expenditures, assist in assuring proper project delivery; Provides proper control of the supporting documents for payments, reviews financial reports provided by implementing local partners; Prepares payment requests with proper support documentation; Prepares Travel requests and Requisitions for UNDP CO processing; Prepares recruitment requests and requisitions in the Atlas; Enter financial data into Atlas using external access: responsible for creation of requisitions, vouchers, vendors and Atlas reports; Performs functions of petty cash custodian; Maintenances and control of the assets and materials, equipment transfers; Arranges different activities within the project (trainings, seminars, procurement of tickets, arrangements on study visits, etc.); Keeps files with project documents, consultants’ reports; Drafts correspondence and documents within project; 21 Arranges meetings, both internal and external, takes minutes/notes; Provide interpretation and/or translation as requested; Expected outcomes: Successful implementation of the project and achievement of all the outcomes pursuant to the project logical framework Required skills and experience: University degree in the field of natural or technical sciences; Work experience in management of international technical assistance projects (minimum 1year); Experience in financial management of UNDP projects; Work experience in interaction with Belarusian institutions involved in environment protection; Outstanding communicative, organizational and management skills; Fluency in spoken and written Russian and English; Computer literacy; Contract conditions: Full-time employment; Project Manager reports to the UNDP and works in close collaboration with the Ministry of Environment; Belarus citizenship and permanent residence on the territory of Belarus. 22 APPENDIX 3: RISK ANALYSIS № 1 Risk description Project registration delay Detection date June 2011 Type Operational Impact on the project and probability Delay of the project starting date, what, in its turn, will lead to reduction of the time available for implementation of the planned activities. Tight schedule of implementation of all the planned activities may affect the quality of the project outcomes. Countermeasures Monitoring Preliminary consultations with governmental agencies responsible for project registration UNDP Detected Date of by update UNDP July 2011 Status Probability – 2 Impact – 4 23 APPENDIX 4: MONITORING AND ASSESSMENT PLAN Action Description Planned Date Execution Date Notes Detailed Work Plan Development of a detailed project work plan for first project year. First project month Prepared by Project Manager in English and Russian. Quality Progress Report (QPR) Quality Progress Report is prepared on quarterly bases and should focus on the completion of key results, based on quality criteria and methods captured in the Quality Management table presented in Section Quality Management for Project Activity Results. Annual Review Report shall consist of the Atlas standard format for the QPR covering the whole year with updated information for each element of the QPR as well as a summary of results achieved against pre-defined annual targets at the output level. Based on the Final Project Review Report, a final project review shall be conducted, to assess the performance of the project. This review is driven by the Project Steering Committee and may involve other as required. It shall focus on the extent to which progress is being made towards outputs, and that these remain aligned to appropriate outcomes. Preparation of quarter financial and ad-hock reports Lesson-learned report is prepared at the end of each project year; and at the end of the project. Within one week after a quarter ends. Prepared by Project Manager in English and Russian using the standard UNDP report format (available in the Atlas Executive Snapshot) Within two weeks after the project ends. Prepared by Project Manager in English and Russian Within one month after the submission of the an Annual Review Report. Prepared by Project Manager in English and Russian Within 2 weeks before project ends. Prepared by Project Manager using a format adopted from the UNDP Lesson-Learned log in English. Final Project Review Report Final Project Review Lesson-learned Report 24