Download III. Meter data 1. Specifications Single Phase

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Telecommunications engineering wikipedia , lookup

Electromagnetic compatibility wikipedia , lookup

Islanding wikipedia , lookup

Power over Ethernet wikipedia , lookup

Ground (electricity) wikipedia , lookup

Electrification wikipedia , lookup

Stray voltage wikipedia , lookup

Rectifier wikipedia , lookup

Power engineering wikipedia , lookup

Immunity-aware programming wikipedia , lookup

Buck converter wikipedia , lookup

Electrical substation wikipedia , lookup

Opto-isolator wikipedia , lookup

Power electronics wikipedia , lookup

History of electric power transmission wikipedia , lookup

Portable appliance testing wikipedia , lookup

Automatic test equipment wikipedia , lookup

Earthing system wikipedia , lookup

Smart meter wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Distribution management system wikipedia , lookup

Three-phase electric power wikipedia , lookup

Surge protector wikipedia , lookup

Voltage optimisation wikipedia , lookup

Alternating current wikipedia , lookup

Sound level meter wikipedia , lookup

Peak programme meter wikipedia , lookup

Electrical wiring in the United Kingdom wikipedia , lookup

Multimeter wikipedia , lookup

Mains electricity wikipedia , lookup

Transcript
TECHNICAL SPECIFICATIONS
PREPAYMENT METERS
I. Standards
Electronic prepayment meters single and three phase must meet the STS protocol and meet the
requirements for IEC 1036 standards and SABS 1524-1 or equivalent recognized internationally.
Technical compliance with STS protocol shall be evidenced by a certificate of approval STS attached
to the technical bid, issued by an accredited international laboratory for this type of test.
Meters shall meet the provisions of this technical specification and all the requirements that are not
there otherwise provided for in the reference standards are:
- 62052-11:2002, Electricity metering equipment (ac) - General requirements, tests and test
conditions - Part 11: Metering equipment
- 62053-11:2003, Electricity metering equipment (ac) - Particular requirements. Part 11:
Electromechanical meters for active energy (classes 0,5, 1 and 2 classes). Replaces particular
requirements of IEC 60521 ed. 2, 1988
- 62053-22:2003, Electricity metering equipment (ac) - Particular requirements. Part 22: Static meters
for active energy (classes 0,2 S and 0,5 S). Replaces particular requirements of IEC 60687 ed. 2, 1992
- 62053-61:1998, Electricity metering equipment (ac) - Particular requirements. Part 61: Power
consumption and voltage requirements
- 62059-11:2002, Electricity metering equipment of - Dependability. Part 11: General Concepts
- 62059-21:2002, Electricity metering equipment of - Dependability. Part 21: Data Collection
dependability meters from the ground
- IEC 62053-21: Static meters for active energy (class 1 and 2).
- IEC 61038: Electricity metering - Tariff and load control Particular requirements for clock rates.
- IEC 62056-21: Data exchange for meter reading, tariff control and load direct exchange data locally.
- IEC 61358: Control of receipt of static meters for active energy alternating current and direct
connection (Classes 1 and 2)
- IEC 60529: Degrees of protection provided by enclosures (IP).
- In 50160: Voltage characteristics of electricity supplied by the distribution
- IEC 61000 - 4 - 11: Standard insulation against voltage surges and isolation
- IEC 62055-52: Standards Standard Transfer Specification (STS) and two-way communication port
The applicable provisions are those of the latest edition of these standards.
II. Meter Model
The counters are two models
1. Counters such SPLIT
They consist of two separate modules
a) Measurement Module: It is responsible for measuring electrical parameters (energy, power,
current, voltage, etc.) and protection of the meter (circuit breaker).. This module is expected to be
deported and placed out of reach of the client (support distributor niche)
b) Client Interface Module: It allows the client to communicate with the meter with the introduction
of credit and view information about the counter (credit level, consumption, electrical parameters,
etc.)..
Two options are proposed for the communication between the two modules:
- A wired communication via a telecommunications cable connecting the two parts over a maximum
distance of 150 m,
- A communication by CPL.
2. The Monobloc type counters
Counters Monobloc type are composed of a single module integrating the measurement system and
the client interface.
III. Meter data
1. Specifications Single Phase
- Description: prepaid electricity meter
- Current: Base current Ib = 5 A
- Voltage (V): 220 ± 25% (from 165 to 275 V)
- Frequency: 50 Hz ± 5%
- Start-up current: 20mA
- Resistance to surge
- Internal Power Consumption (IEC 62053-22 standard):
o Circuit voltage: ≤ 1 VA for a power supply connected to the voltage circuits
• ≤ 0.5 VA for supply not connected to voltage circuits
o Circuit Current: ≤ 2 W and 10 VA for a power supply connected to the voltage circuits
• ≤ 1 VA for supply not connected to voltage circuits
o Power supply: ≤ 10 VA
• Class size: Class 1
• allowing adjustment circuit breaker incorporated 1 to 30 amps
• The wiring diagram is shown on the inside cover of the son.
• The terminals must be designed to allow either a direct connection to copper or aluminum cables
of maximum cross-section of 25 mm ².
• The screws or fasteners cover and cover wraps and son must be related to their support. Hood and
son cover must be sealable.
2. Specifications phase meters
- Description: prepaid electricity meter
- Current: Base current Ib of 5 A per phase
- Voltage (V): 220/400 V (± 25%)
- Frequency: 50 Hz ± 5%
- Start-up current: 20mA
- Resistance to surge
- Internal Power Consumption (IEC 62053-22):
- Circuit voltage: ≤ 1 VA for a power supply connected to the voltage circuits
• ≤ 0.5 VA for supply not connected to voltage circuits
- Circuit: ≤ 2 W and 10 VA for a power supply connected to the voltage circuits
• ≤ 1 VA for supply not connected to voltage circuits
- Power supply: ≤ 10 VA
- Class size: Class 1
- Built-breaker allowing adjustment from 1 to 45 amps
- The wiring diagram is shown on the inside cover of the son.
- The connection will be unbalanced
- The terminals must be designed to allow either a direct connection to copper or aluminum cables of
maximum cross-section of 25 mm ².
- Screws or fasteners cover and cover wraps and son must be related to their support. Hood and son
hides must be probable.
3. Weather
- The accuracy of the meter will not be affected by the climatic conditions specified in Table 6 of
62052-11.6.2 standard. Thus, the counter will be functional under normal conditions where the
relative humidity is less than 75% for a period of 30 days distributed over a year with a relative
humidity of 95% and occasionally when it is 85% .
- High ability to withstand overvoltages prone to lightning or other surge zones
4. Envelope and Security Counter
• The housing of the meter shall provide security against fraud. It must fully protect the drivers and
internal circuitry and be so as to ensure the smooth running of the counter at room temperature,
impervious to moisture and dust with Degree of protection (IP 54).
• The power is available across the counter for any credit balance and will be discontinued as soon as
the credit is exhausted with a derogation 5 kWh for single phase and three-phase kWh meter 10 (- 5
and -10 kWh kWh subtracted automatically the next addition of credit).
• The meter must be equipped with an anti-fraud device so that if the hood or cover is removed son
counter will automatically fraud mode (client installation off). This device does not eliminate the
possibility of recalibrating the meter. Any attempt to open the counter current to suspend the
introduction of a code of recovery by persons qualified Senelec.
• The timer continues to operate even in case of reverse phase (the absolute value of the energy will
be considered in this case).
• When the interruption of supply is related to exceeding the power or power surge, there is no
automatic restoration of power supply: it is necessary to press a combination of keys to restore
energy supply.
• The operation of the anti-fraud must be guaranteed at all times, including during a power failure.
5. Display and storage system
• STS code to twenty (20) numbers;
• Digital display of the index at least seven digits with the kWh as a unit;
• Digital Keypad with audible and tactile feedback;
• Ability to move the meter prepayment post payment mode (settings to be made by the competent
staff Senelec);
• Ability to pass pre-payment meter in restricted settings to be made by the competent staff Senelec)
credit mode;
• The meter meets the STS protocol must store all transactions within it while calculating the average
of consumption (daily, monthly);
• Ability to extract information stored in the memory using a probe connected to an extraction
device in case the meter is off (off);
• Ability to extract information stored in the memory using an optical head connected to the same
device if the meter is in service;
• Bring up via the remote display:
• the counter number STS;
• The level indicators of credit;
• Digital display of the remaining (kWh) credit;
• the consumption index;
• the instantaneous power;
• the power limit;
• the means of consumption (daily and monthly);
• the low credit warning to at least two alarm levels (in percent, a visual symbol, ...);
• the status indication of fraud;
• maintenance information and diagnostic
• Information on the meter and the various transactions in particular at least the last five dates last
load and the value of credit kWh introduced;
6. Communication with the meter
• The existence of a query interface by optical port on the meter is required. Thus, it is possible to
access information stored in the meter memory and transfer to other uses.
• The program counter can also be made through the local interface.
• The meter is equipped with a communication port RS 485 address M-BUS protocol for any
communication with a hub or a device configured for this purpose.
7. Nameplate
• The meter shall have a visible plate (meter installed) indelibly marked with the following:
- The term "Senelec"
- The mark of the manufacturer;
- The type designation;
- The number of phases;
- The serial number and year of manufacture;
- The reference voltage;
- The nominal and maximum currents;
- The reference frequency;
- The meter constant;
- The accuracy class of the meter;
- The reference to the manufacturing standard.
- The colors of the counter will be specified in the order.
8. Sealing
The meter must be sealable so that its internal organs can not be accessed after removal of pellets.
9. Sealing
The meter shall comply with IP54 degree of protection at least for the unit of measurement and IP51
for the client interface as specified in IEC 60529. Monoblock counters will be protected IP54.
10. Qualimetry
The counting system must have information on the Power Quality in accordance with EN 50 160. In
this case, the information should be as comprehensive as possible to analyze the quality of power
customers.
11. Specific requirements relating to meters
In anticipation of regulatory changes to the administrative control of prices and / or the possibility of
conversion of prepaid post payment specified, the following special requirements must be taken into
account by prepayment meters:
• Possibility of controls for counters:
Meters shall keep records for each verification period which contain the meter readings used. In
order to establish the amount due for electricity, it is necessary, at least, record the following
information:
Either:
- The amount consumed for each rate to the number two power (2 peak and off-peak);
- The fixed premium, the rate depending on the time of use or seasonal rate applied.
Or
- The fixed premium, the rate depending on the time of use of two (2 peak and off-peak), or seasonal
rate applied;
- The total charges for the energy consumed for each rate.
Relating to the registration requirements of metrological data
The prepayment meter shall, at least, save one of the two information
Following:
a) total amount of the purchase and the price per unit of measurement for each rate if applicable;
b) the equivalent energy value supposedly provided for each fee (if applicable).
12. Dimensions counters
Compliance dimensions counters will be assessed using the boxes to receive with the associated
circuit breakers for three-phase enclosures, as specified dimensions of boxes on the table below:
• Model • Dimensions (H x W x D)
Single box with window mobile 250 x 180 x 150
1-phase meter box 300 x 250 x 180
Box 2 for single-phase 300 x 250 x 150
Box 4 for single-phase 450 x 250 x 150
13. Conditions of installation
• For a 2 meter boxes and more: The boxes are equipped with rails to attach the prepaid meters
track and will be adjusted in height and width.
• For three-phase enclosures: Fixing device adjustable meters in height and width to accommodate
the three-phase prepaid meter.
• For a 4 meter boxes and more: The boxes are equipped with rails to attach the prepaid meters
track and will be adjusted in height and width.
The boxes will be sealed security
Power Box Type Type Number of terminals Terminal section
Supply Box Set 2 counters 2 70 mm ²
Boxes 4 meters April 70 mm ²
Customer supply box 2 meters April 16 mm ²
Boxes 4 counters 8 16 mm ²
• Terminal block: boxes 2 and 4 single-phase meters will be equipped with terminals for the power
supply box and the following client features below.
Three-phase circuit breaker box: Front slot counter with four cylindrical bases, AD60 and lock under
counter terminal cover, sealable and reprehensible. Delivery with tetra polar coupe-circuit/compteur
copper bonding of 25 mm ² section.
• Cup circuit for phase box. Location before counter with four cylindrical nozzles, AD60 and lock in
caches terminal counter, condemned and sealed. Delivery with connection pole fuse / meter copper
section 25mm ².
Circuit breakers will be equipped with cylindrical fuses, AD60 conform to NFC 62-921 and IEC 269-2-1
standards.
• Setting counter: Presence device for fixing various models of three-phase prepaid meter (mounting
plate, mounting screws and phase meter piece, rails for boxes 2 and 4 meters, for single cabinets,
two possibilities fixing (Rail / Screws etc ... are provided
• Fixing Case: Paws for wall mounting and mounting strap option.
• Connection Meter: Meter connection cable 16 mm ² through cable entry cable glands or cones with
flexible cable power output and servo tubes
IV. Testing skills and reception
Counters purpose of this Technical Specification must meet the qualification tests and acceptance
tests (table below). The procedure of testing and sanctions are defined in IEC 62 052-11, 053-21 IEC
62, IEC 62053-22 and IEC 62 O55-52.
Trials (1-6) in the table below must be completed. These tests will include:
1. Qualifying Practice
Qualification tests must be performed by an official or accredited laboratory in the presence of
representatives of Senelec or a body authorized by it. Such tests shall be one or reports containing
the terms and penalties accompanied by a certificate of compliance if all tests are successful.
2. Acceptance tests
Before delivery of a lot of counters, tests (to the supplier) will be carried out on samples selected by
the / representatives Senelec.
These inspections and tests shall be performed by an accredited laboratory or in the manufacturer's
laboratory in presence of representatives of Senelec.
The tests include checks the conformity of the goods by visual, dimensional and material checks and
the tests No. 1, 2, 3, 4, 5 and 6 listed in the table below.
Under testing samples of 3 meters for each type will be selected by representatives of Senelec to be
installed in the test in the real environment Senelec a period of 15 days.
The problems found during this test phase will be resolved before delivery to Senelec batch counters
concerned.
No qualification tests
References
IEC 62052-11 CEI62053-21/22
1 Insulation Test
Voltage test shock
Test the AC voltage
7.3.2
7.3.3
2 Test metrological requirements
Verification test meter constant
Start test
Test idling
8.4
8.3
8.3
3 Test of electrical requirements
Testing the influence of supply voltage
Test influence of short-time overcurrents
Testing influence of self-heating
Heating tests
7.1
7.2
7.2
7.3
4 Test EMC
Measurement of radio disturbance
Immunity to damped oscillatory waves test
Resistance to RF electromagnetic fields
Immunity to conducted disturbances, induced by radio-frequency fields
Immunity test to shock waves
7.5.8
7.5.7
7.5.3
7.5.5
7.5.6
5 Testing the effect of climatic environments
Dry heat test
Cold test
Cyclic damp heat test
Test solar radiation
6.3.1
6.3.2
6.3.3
6.3.4
6 Mechanical Testing
Vibration
Shock test
Testing protection against the ingress of dust and water
Resistance tests and fire
5.2.2.3
5.2.2.2
5.9
5.8
V. Warranty
The meters are guaranteed for one year from the date of receipt in Dakar. This warranty covers any
abnormalities in the functioning of the meter and involves the replacement of faulty meter with a
new meter at the expense of the bidder.
During the warranty period any malfunction found showing non-compliance with the requirements
specified herein entitles Senelec to claim the replacement of all meters affected lots borne by the
bidder.
The objective, the choice of components and the hardware architecture, is that the counter field
service is a global failure rate less than or equal to 0.5% per year throughout the life desired product,
that is to say, for at least 15 years.
Aging tests will be carried out by an approved independent laboratory to verify this requirement life
of equipment. To take into account "setup stress", there may be a failure rate of up to 1% during the
first year after commissioning.
In case of failure of more than 1% in a batch, all the meters in the lot in question will be replaced at
the expense of the dealer and the warranty for the replacement meter set at one year after the date
of receipt.
VI. Training
The supplier will provide training (dependent) to five (5) persons representatives Senelec in the
training center of the meter manufacturer. This training will be held in a training center approved by
the meter manufacturer. It will be taught by certified trainers. Training will be provided in French and
will inter alia:
The operating principles
The configuration of the counters
Installation, connection and operation counters counters,
Maintenance and troubleshooting counters
The acquisition of internal data
VII. Accessories and Documentation
The supplier will provide:
• the list of accessories and equipment and the unit price
• all existing documentation, the documentation must be in French.
VIII. Volume / Planning Delivery
COUNTER TYPE QUANTITY
Monobloc single STS 2000
STS Split single communication cable 75000
STS Split single communication PLC 18000
STS Split phase communication cable 3000
Split-phase meters for CPL 2000
TOTAL 100,000
IX. Management system
The counters will be managed by a management system prepayment meters STS type with a capacity
up to 1.5 million customers, which is the acquisition proceedings in another project. Counters
provide in this project must meet the functional requirements described in the specifications It is the
Bidder to obtain the Owner any additional information necessary for the proper operation of
counters that will come with this system.
The system enables the following settings:
Setting and Organization Function Commercial
• The parameter management counters in post payment method and prepayment
• The management interfaces providing interfacing with the customer management system
• Setting the user profile
Setting rules for sales (product price / service)
• Setting the type of contract
• Setting prices
• Setting rules for sales (campaign, backward recovery, fraud recovery, prohibition, purchasing etc.).
• Validity date
• Targeted Clients (following customer segments)
• Accessibilities (business entities)
GENERAL CHARACTERISTICS OF SOFTWARE
meet the specifications STS (Standard Transfer Specification), the package must be a
modular architecture allowing it to be configured to mitigate the consequences of any development
of the system and its environment.
nd able to work with any counter responsive to the STS
protocol.
FUNCTIONAL REQUIREMENTS
Infrastructure and technical requirements
• The system will operate on the Oracle database for the exchange server data type and relational.
• The system must be fully configurable.
• The solution must manage alerts and application systems
• The proposed solution must ensure acceptable average response time on user transactions (HMI
treatments, communications network, data access).
• The proposed solution should allow to automate regular / recurring treatments.
• The user interface must be simple and an easy grip by users. The principles of navigation should be
consistent throughout the solution, a module to another.
• The proposed solution must operate in French.
• The proposed solution must integrate a complete online help with the ability to access contextsensitive help.
• The proposed solution must allow customization of editions and refunds.
• The organization's management system prepayment meters will allow:
- Managing customer database prepayment
- Management of all sales transactions stations
- Supervision and control of all other solutions sales credits (SMS, prepaid cards, Internet, etc.).
- The conduct of operations operating system real-time
- The sale of credit in all media used
The system will allow the management of 1.5 million prepaid customers throughout the national
territory, which will be provided by:
- 30 major agencies
- 75 commercial and rural branches
- External providers (sellers of credit)