Download to application (Word DOC)

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Ohm's law wikipedia , lookup

Stepper motor wikipedia , lookup

Power over Ethernet wikipedia , lookup

Current source wikipedia , lookup

Electrical ballast wikipedia , lookup

Resistive opto-isolator wikipedia , lookup

Opto-isolator wikipedia , lookup

Audio power wikipedia , lookup

Decibel wikipedia , lookup

Power factor wikipedia , lookup

Pulse-width modulation wikipedia , lookup

Power inverter wikipedia , lookup

Transformer wikipedia , lookup

Ground (electricity) wikipedia , lookup

Variable-frequency drive wikipedia , lookup

Electric power system wikipedia , lookup

Triode wikipedia , lookup

Electrification wikipedia , lookup

Single-wire earth return wikipedia , lookup

Islanding wikipedia , lookup

Rectifier wikipedia , lookup

Electrical substation wikipedia , lookup

Amtrak's 25 Hz traction power system wikipedia , lookup

Transformer types wikipedia , lookup

Power MOSFET wikipedia , lookup

Voltage regulator wikipedia , lookup

Power electronics wikipedia , lookup

Surge protector wikipedia , lookup

Buck converter wikipedia , lookup

History of electric power transmission wikipedia , lookup

Power engineering wikipedia , lookup

Stray voltage wikipedia , lookup

AC adapter wikipedia , lookup

Three-phase electric power wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Voltage optimisation wikipedia , lookup

Alternating current wikipedia , lookup

Mains electricity wikipedia , lookup

Transcript
Connection Impact Assessment Application Form
Grimsby Power Distribution System
This Application Form is for Generators applying for Connection Impact Assessment (“CIA”) on
the Grimsby Power Distribution System for generation projects > 10 kW.
It is important that the Generator provides all of the information requested below. Failure to do so
could result in the non-acceptance of this application form by Grimsby Power Incorporated. All
technical documents must be signed and sealed by a licensed Ontario Professional Engineer.
Applicants are cautioned NOT to incur major expenses until Grimsby Power approves to connect
the proposed generation facility.
Please return the completed form, fees and other required documents by mail to:
Grimsby Power Incorporated
231 Roberts Road
Grimsby, Ontario L3M 5N2
Attn: Sean Pook
Date:
(dd / mm / yyyy)
1. Project Name:
2. Ontario Power Authority (OPA) Feed-In Tariff Contract Number:
3. Proposed In-Service Date:
4. Project Size:
(dd/mm/yyyy)
Number of Units
Nameplate Rating of Each Unit
Generator connecting on
Proposed Total Nameplate Capacity
kW
single phase
kW
three phases
5. Project Location: Address
GPS Co-ordinates
Existing Grimsby Power Account
Contract with Energy Retailer [Yes/No]
OPA Reference # (if applicable)
6. Customer Status:
Existing Grimsby Power Customer
Yes
If yes, Grimsby Power Account Number
Customer name registered in this account
Contract with Energy Retailer?
Yes
Are you an HST registrant?
Yes
If yes, provide your HST registration number
Connection Impact Assessment Application Form
Original date: October 5, 2010
No
No
No
-
RT
Grimsby Power Incorporated
Page 1 of 5
7. Project Information:
Generator Single Point of Contact Person
Proposed Start of Construction
Proposed Energization Date
Project Developer
(Mandatory)
Owner
Consultant
Project Owner
(Mandatory)
Engineering Consultant
(Mandatory)
Company/Person
Contact Person
Mailing Address
Telephone
Fax
Email
Preferred method of communication with Grimsby Power:
8. Program Type:
9. Project Type:
(Fuel)
FIT
E-mail
Telephone
Mail
Fax
Net Metering
Wind Turbine
Hydraulic Turbine
Steam Turbine
Solar
Diesel Engine
Gas Turbine
Fuel Cell
Biomass
Co-generation/CHP (Combined Heat & Power)
Biogas
Other (Please Specify)
10. Machine Characteristics:
Machine Starting Inrush Current
Rotating Machine Type (if known):
Synchronous
Induction
Other (Please Specify)
11. A completed single line diagram (SLD)
Provide a SLD of the Generating Facility including the Interface Point / Point of Common Coupling
(PCC) to the Grimsby Power Distribution System.
SLD Drawing Number:
, Rev.
12. Location and Site Plan:
Provide Site Plan with approximate line routings for connection to nearby Grimsby Power facilities. The
Site Plan should include roads, concession and lot numbers and nearby power lines.
Drawing / Sketch No.
Rev.
13. Connection to the Grimsby Power Distribution System (if known):
Proposed connection voltage to the Grimsby Power distribution system:
Station:
Feeder:
kV
Single Line Diagram (“SLD”):
Provide a SLD of the Generating Facility including the Interface Point/Point of Common Coupling (“PCC”)
to the Grimsby Power distribution system.
SLD Drawing Number
, Rev.
Connection Impact Assessment Application Form
Original date: October 5, 2010
Grimsby Power Incorporated
Page 2 of 5
Generator Characteristics:
Number of generating unit(s):
Manufacturer / Type or Model No:
/
Rated capacity of each unit:
kW
kVA
If unit outputs are different, please fill in additional sheets to provide the information.
Rated frequency:
Hz
Rotating Machine Type:
Synchronous
Induction
Other (Please Specify)
Generator connecting on:
single phase
three phases
Limits of range of reactive power at the machine output:
Lagging (over-excited)
kVAR
power factor
Leading (under-excited)
kVAR
power factor
Limits of range of reactive power at the PCC:
Lagging (over-excited)
kVAR
power factor
Leading (under-excited)
kVAR
power factor
Starting inrush current:
pu (multiple of full load current)
For Synchronous Units:
Nominal machine voltage:
kV
Minimum power limit for stable operation:
Unsaturated reactances on:
kVA base
Direct axis sub transient reactance, Xd’’
pu
Direct axis transient reactance, Xd’
Direct axis synchronous reactance, Xd
Zero sequence reactance, X0
pu
Provide a plot of generator capability curve
(MW output vs MVAR)
Document Number:
, Rev.
kW
kV base
pu
pu
For Induction Units:
Nominal machine voltage:
kV
Unsaturated reactances on:
kVA base
kV base
Direct axis sub transient reactance, Xd’’
pu
Direct axis transient reactance, Xd’
pu
Total power factor correction installed:
kVAR
Number of regulating steps
Power factor correction switched per step
kVAR
Power factor correction capacitors are automatically switched off when generator breaker opens
Yes
No
Interface Step-Up Transformer Characteristics:
Transformer rating:
kVA
Nominal voltage of high voltage winding:
Nominal voltage of low voltage winding:
Transformer type:
single phase
Impedances on:
kVA base
R
pu,
X
pu
kV
kV
three phases
kV base
High voltage winding connection:
delta
star
Grounding method of star connected high voltage winding neutral:
Solid
Ungrounded
Impedance:
R
ohms
X
Connection Impact Assessment Application Form
Original date: October 5, 2010
ohms
Grimsby Power Incorporated
Page 3 of 5
Low voltage winding connection: delta
star
Grounding method of star connected high voltage winding neutral:
Solid
Ungrounded
Impedance:
R
ohms
X
ohms
Note: The term ‘High Voltage’ refers to the connection voltage to Hydro One’s distribution system, and
‘Low Voltage’ refers to the generation or any other intermediate voltage.
Intermediate Transformer Characteristics (if applicable):
Transformer rating:
kVA
Nominal voltage of high voltage winding:
Nominal voltage of low voltage winding:
Transformer type:
single phase
Impedances on:
kVA base
R
pu
X
pu
kV
kV
three phases
kV base
High voltage winding connection:
delta
star
Grounding method of star connected high voltage winding neutral:
Solid
Ungrounded
Impedance:
R
ohms
X
ohms
Low voltage winding connection: delta
star
Grounding method of star connected high voltage winding neutral:
Solid
Ungrounded
Impedance:
R
ohms
X
ohms
Note: The term ‘High Voltage’ refers to the intermediate voltage that is input to the interface step-up
transformer and the ‘Low Voltage’ refers to the generation voltage.
Load information (if known):
Maximum load of the facility:
kVA
kW
Maximum load current (referred to the nominal voltage
at the connection point to Hydro One system):
A
Maximum inrush current (referred to the nominal voltage
at the connection point to the Grimsby Power system):
Connection Impact Assessment Application Form
Original date: October 5, 2010
A
Grimsby Power Incorporated
Page 4 of 5
Attached Documents:
Item
No.
Description
Reference No.
No. of
Pages
Reference No.
No. of
Pages
1
2
3
4
5
6
7
8
9
10
Attached Drawings:
Item
No.
Description
1
2
3
4
5
6
7
8
9
10
Connection Impact Assessment Application Form
Original date: October 5, 2010
Grimsby Power Incorporated