Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
SCHEDULE OF QUANTITIES BASE BID Item No. 1 Approximate Quantity and Units Lump Sum Description of Item & Written Unit Prices Bid Unit Price Dollars Total Ct Dollars Ct Mobilization; demobilization; site moving including relocation of equipment; cleanup during construction and at demobilization; perform field inspection, record field measurements & layout; obtain approval of all Submittals; Remove and replace all office furniture in work area; Punch List walkthrough; As-Built Drawings. at 2 Lump Sum Lump Sum $ Demolition of existing exterior and interior walls, windows and other nnon-structural elements to access work area and preform work. Remove floor tiles and store; Cover and seal furniture, air vents, etc. against dust and debris; Install curtains; temp. relocate furniture and fire equipment, as required. Restore to original condition after column pedestal repair work is complete. $ at Lump Sum $ Demolish existing slabs as shown on Contract Drawings. Dispose of debris, off site. 3 $ Lump Sum at 4 Lump Sum Lump Sum $ Excavate approximately 45 cubic yards of low deck fill, test excavated material and dispose of off site. Sheet and shore remaining low deck fill, Beam CB15, remaining conc. slab and other structural elements near the work area, as required. $ at Lump Sum $ Pier 78S Shed Column Pedestal Repair PRPA Project No. 17-038.1 Schedule of Quantities Base Bid $ 04-17-17: Rev. 0 Issued for Construction SCHEDULE OF QUANTITIES BASE BID Item No. 5 Approximate Quantity and Units 4 Each Unit Price Description of Item & Written Unit Prices Bid Dollars Total Ct Dollars Ct Repair concrete Pedestal & Concrete Beam CB15 including; demolishing deteriorated concrete; clean beam rear of corrosion, roughening pedestal and beam surface in area of repair; installing new steel reinforcement and epoxy dowels; pour or pump new concrete, as shown on Contract Drawings. at Each $ Backfill the low deck using 45 CY of compacted #57 stone as required by the Contract Documents. 6 Lump Sum at Lump Sum $ Install epoxy dowels and rebar. Construct the concrete structural slab & slab on grade. 7 8 Lump Sum $ $ at Lump Sum $ Install new timber bulkhead at the inshore end of existing sewer, as shown on Contract Drawings. $ $ $ Lump Sum Total of Items 1 through 8: $ NOTES: 1. The Total Cost of Items 1 Through 8 Shall Equal the Lump Sum Price of the Base Bid. 2. These prices shall be used for additions and/or deletions in the scope of work. 3. Prices shall include labor, material, equipment, taxes, and all other services and expenses incidental to the Work. Pier 78S Shed Column Pedestal Repair PRPA Project No. 17-038.1 Schedule of Quantities Base Bid 04-17-17: Rev. 0 Issued for Construction