SCHEDULE OF QUANTITIES
BASE BID
Item
No.
1
Approximate
Quantity and
Units
Lump Sum
Description of Item & Written Unit Prices Bid
Unit Price
Dollars
Total
Ct
Dollars
Ct
Mobilization; demobilization; site moving including
relocation of equipment; cleanup during
construction and at demobilization; perform field
inspection, record field measurements & layout;
obtain approval of all Submittals; Remove and
replace all office furniture in work area; Punch List
walkthrough; As-Built Drawings.
at
2
Lump Sum
Lump Sum $
Demolition of existing exterior and interior walls,
windows and other nnon-structural elements to
access work area and preform work. Remove floor
tiles and store; Cover and seal furniture, air vents,
etc. against dust and debris; Install curtains; temp.
relocate furniture and fire equipment, as required.
Restore to original condition after column pedestal
repair work is complete.
$
at
Lump Sum $
Demolish existing slabs as shown on Contract
Drawings. Dispose of debris, off site.
3
$
Lump Sum
at
4
Lump Sum
Lump Sum $
Excavate approximately 45 cubic yards of low deck
fill, test excavated material and dispose of off site.
Sheet and shore remaining low deck fill, Beam
CB15, remaining conc. slab and other structural
elements near the work area, as required.
$
at
Lump Sum $
Pier 78S Shed Column Pedestal Repair
PRPA Project No. 17-038.1
Schedule of Quantities
Base Bid
$
04-17-17: Rev. 0
Issued for Construction
SCHEDULE OF QUANTITIES
BASE BID
Item
No.
5
Approximate
Quantity and
Units
4 Each
Unit Price
Description of Item & Written Unit Prices Bid
Dollars
Total
Ct
Dollars
Ct
Repair concrete Pedestal & Concrete Beam CB15
including; demolishing deteriorated concrete; clean
beam rear of corrosion, roughening pedestal and
beam surface in area of repair; installing new steel
reinforcement and epoxy dowels; pour or pump
new concrete, as shown on Contract Drawings.
at
Each $
Backfill the low deck using 45 CY of compacted
#57 stone as required by the Contract Documents.
6
Lump Sum
at
Lump Sum $
Install epoxy dowels and rebar. Construct the
concrete structural slab & slab on grade.
7
8
Lump Sum
$
$
at
Lump Sum $
Install new timber bulkhead at the inshore end of
existing sewer, as shown on Contract Drawings.
$
$
$
Lump Sum
Total of Items 1 through 8:
$
NOTES:
1. The Total Cost of Items 1 Through 8 Shall Equal the Lump Sum Price of the Base Bid.
2. These prices shall be used for additions and/or deletions in the scope of work.
3. Prices shall include labor, material, equipment, taxes, and all other services and expenses incidental
to the Work.
Pier 78S Shed Column Pedestal Repair
PRPA Project No. 17-038.1
Schedule of Quantities
Base Bid
04-17-17: Rev. 0
Issued for Construction