Download Document

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Climate change in Tuvalu wikipedia , lookup

IPCC Fourth Assessment Report wikipedia , lookup

Effects of global warming on Australia wikipedia , lookup

Transcript
Flood Forum Victoria
13 November 2014
Key achievements
Land development activity
•
10,000 statutory planning referrals (7,500 sub divisions, 2,500 development referrals)
•
9,000 feasibility, building permits and offers for conditions (works)
•
5,500 flood level enquiries
•
13,000 phone calls per annum
Future challenges
•
Sea level rise – flood mapped an additional 60,000 properties. Yet to be included in flood
overlays
•
Flow velocities – similar to flood level advice however service can’t currently be
automated
•
Urban growth – projections forecast an additional 1,000,000 people by 2030
•
Water Act – proposed changes require new activities to be included on property
information statements
Key achievements
Supporting sustainable urban development
•
Facilitating land development in the preparation and implementation of Precinct Structure
Plans and Development Services Schemes
• Plan and deliver infrastructure required for new developments to provide flood
protection, protect waterways and contribute to liveability in new growth areas
•
310 projects worked on during the year
•
37 new Development Services Schemes – now have 200 active Development Services
Schemes
•
$105M of developer contributed assets ($76M reimbursed to developers constructing
works on our behalf plus $29M of gifted assets from developers)
•
$58M financial contributions from development customers
•
Increased the value of planned assets on our books to over $3.1B
Key achievements
Flood mapping
•
7 drainage systems flood mapped and mitigation options developed
•
21 waterway and drainage systems (rural catchments) 1% AEP flood extents flood mapped
•
7 waterway and drainage systems flood mapped for full range of AEPs plus climate change scenarios
Flood Mitigation
•
5 urban drainage systems flood mitigation work has progressed to functional design stage with detailed
design and construction forecast for completion by June 2016
•
2 extra urban drainage systems at advanced investigation stage with construction forecast by
June 2018
Climate Change
•
1% AEP and sea level rise mapping for Port Phillip Bay and Western Port completed
•
Project managed Western Port pilot local coastal hazard assessment for project partners
Flood Events
•
No major events however numerous minor events, especially in Bunyip River catchment
What we are working on
Regional Floodplain Management Strategy
•
Commenced work on new strategy
•
Reviewed implementation and effectiveness of existing Flood Management and Drainage Strategy
•
Established external Project Control Board 14 partners – departments, agencies, councils,
associations – to guide development
•
Target completion date of late 2015
Office Living Victoria
•
Evaluated effectiveness of on-site rainwater storage for avoiding some of the future flood mitigation
costs associated with increased population and increased impervious surface areas
•
Revising our Waterways and Drainage Strategy
Water Plan 4
•
Commenced preparation of next pricing submission to Essential Services Commission which is due in
mid to late 2016
THANK YOU