* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download karnataka
Grid energy storage wikipedia , lookup
Mercury-arc valve wikipedia , lookup
Current source wikipedia , lookup
Power inverter wikipedia , lookup
Opto-isolator wikipedia , lookup
Pulse-width modulation wikipedia , lookup
Electric power system wikipedia , lookup
Stray voltage wikipedia , lookup
Utility frequency wikipedia , lookup
Electrification wikipedia , lookup
Three-phase electric power wikipedia , lookup
Amtrak's 25 Hz traction power system wikipedia , lookup
Variable-frequency drive wikipedia , lookup
Buck converter wikipedia , lookup
Power electronics wikipedia , lookup
Voltage optimisation wikipedia , lookup
History of electric power transmission wikipedia , lookup
Alternating current wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Power engineering wikipedia , lookup
Electrical substation wikipedia , lookup
Mains electricity wikipedia , lookup
POWER GRID CORPORATION OF INDIA LTD. SRLDC,BANGALORE EXCERPTS FROM CERC ORDER DATED 26.06.2002 “In the interest of security and safety of the regional grid, we, therefore, feel that some parts of the States indulging in overdrawals have to be isolated/islanded and supplied from the State's own resources at whatever frequency they want to operate at the risk of their own machinery & equipment; but not through the Inter-State Transmission System or Inter-State Generation System.” EXCERPTS FROM CERC ORDER DATED 26.06.2002 “We, therefore, consider that a Committee ……… may go into the technical and commercial aspects of isolating/islanding some parts of the system, without damage to the Regional grid, in detail .” VIEW THE ORDER SECTION 55 ELECTRICITY (SUPPLY) ACT, 1948 AMENDED 1998 2) The Regional Load Despatch Centre shall give the apex body to ensure integrated operation of the power system in the concerned region. 3) The Regional Load Despatch Centre may give such directions and exercise such supervision and control as may be required for ensuring integrated grid operation and for achieving the maximum economy and efficiency in the operation of the power system in that state IEGC-Chapter - 3 Clause - 3.5 (i) As a general rule, the ISTS shall be capable of withstanding and be secured against the following contingency outages without necessitating load shedding or rescheduling of generation during Steady State Operation : Outage of a 132 kV D/C line or Outage of a 220 kV D/C line or, - Outage of a 400 kV S/C line or, - Outage of single Interconnecting Transformer, or - Outage of one pole of HVDC Bipole line, or - Outage of 765 kV S/C line. IEGC-Chapter - 6 Clause - 6.2 System Security Aspects: a ) All Regional constituents shall endeavor to operate their respective power systems and Power Stations in synchronism with each other at all times, such that the entire system within a Region operates as one synchronised system. IEGC-Chapter - 6 Clause - 6.2 System Security Aspects: b) No part of the grid shall be deliberately isolated from the rest of the Regional Grid, except (I) under an emergency, and conditions in which such isolation would prevent a total grid collapse and/or enable early restoration of power supply (II) when serious damage to a costly equipment is imminent and such isolation would prevent it (III) when such isolation is specifically instructed by RLDC. Complete synchronisation of grid shall be restored as soon as the conditions again permit it. The restoration process shall be supervised by RLDC, as per operating procedures separately formulated. IEGC Chapter - 6 Clause - 6.2 C ) No important element of the Regional grid shall be deliberately opened or removed from service at any time, except when specifically instructed by RLDC or with specific and prior clearance of RLDC. The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the constituents, and be available at RLDC/SLDCs. In case of opening/ removal of any important element of the grid under an emergency situation, the same shall be communicated to RLDC at the earliest possible time after the event. EXCERPTS FROM MANUAL ON TRANSMISSION PLANNING CRITERIA - CEA 2. PLANNING PHILOSOPHY & GENERAL GUIDELINES 2.1 The transmission system shall be planned on the basis of regional selfsufficiency with an ultimate objective of evolving a National Power Grid. GENERAL ISSUES MODUS OPERANDI INITIATION OF THE SCHEME AND NORMALISATION YARDSTICK FOR INITIATING ISOLATION/ISLANDING HOW LONG SHOULD SUCH ISOLATION LAST? SYSTEM CONSTRAINTS? WHO DECIDES? GENERAL ISSUES CONTD….. MODUS OPERANDI LOAD CONTROL /SWITCHING TO BE DONE BY STATE SYSTEM – LOGISTICS? WHO DECIDES WHAT LOADS ARE TO BE ADDED/REMOVED? VARIATIONS OF LOAD INVOLVES MANY SWITCHING OPERATIONS – WHO WILL COORDINATE THE SAME? INNUMERABLE HYPOTHETICAL COMBINATIONS POSSIBLE FOR ISLANDING GENERAL ISSUES CONTD…. MODUS OPERANDI CONCURRENT APPLICABILITY TO OTHERS SYSTEMS? IN CASE OF OVERDRAWALS BY TWO OR THREE CONSTITUENTS AT LOW FREQUENCY-WOULD THE SCHEME BE APPLIED SIMULTANEOUSLY? THIS WOULD REQUIRE CO-ORDINATION OF MANY SWITCHING OPERATIONS. ISOLATION OF GRID ISSUES INVOLVED OPERATION ISSUES SCHEDULING ISSUES PROTECTION ISSUES COMMERCIAL ISSUES STABILITY ISSUES SHORT CIRCUIT LEVELS L-INDEX – VOLTAGE STABILITY ANGULAR STABILITY REPORT OF HIGH COURT APPOINTED COMMITTEE OPERATIONAL ISSUES A PART OF LOAD(400-3000MW SAY) ISOLATED. STABILITY ISSUES LOWER SHORT CIRCUIT LEVELS IN BOTH PARTS LEADING TO VOLTAGE EXCURSIONS LOWER INERTIA - LEADING TO FREQUENCY EXCURSIONS 47.7 HZ 51.5 HZ .............CONTD OPERATIONAL ISSUES OPERATIONAL FLEXIBILITY LOST DIVERSITY WILL REMAIN UNUTILISED TRANSITION BETWEEN PEAK AND OFF-PEAK DIFFICULT TO MANAGE LINE LOADINGS – A PROBLEM DURING LOAD CHANGE OVER IN AP – HYDRO FLEXIBILITY UNAVAILABLE FREQUENCY RISE DIFFICULT TO CONTAIN IN BOTH BLOCKS PREDOMINANT THERMAL – LOWER INERTIA Df/dt WILL BE SHARP VOLTAGE AND FREQUENCY EXCURSIONS –EXTREME COMPLEXITY INVOLVED IN SWITCHING PROTECTION ISSUES DRASTIC REDUCTION IN SC LEVELS- OCR SETTINGS? FREQUENCY AND VOLTAGE EXCURSIONS- v/f SETTINGS? LOAD ENCROACHMENT PROBLEMS – LOW VOLTAGE - LOADING POWER SWING ISSUES TO BE EXAMINED FOR ISOLATION SCHEDULING PROBLEMS CONTRACTION/EXPANSION OF ISLAND TO BE DONE WITH CHANGING SCHEDULES COMPLEXITY INVOLVED IN SWITCHING FORCED OVERDRAWALS – A QUANDRARY THAT MAY BE UNAVOIDABLE STATE SYSTEM – INABILITY TO DRAW ENTITLEMENT LOAD MANAGEMENT/SWITCHING OPERATION – STILL IN STATE PURVIEW ISSUES TO BE EXAMINED FOR ISOLATION CONTD.... SCHEDULING PROBLEMS DRAWAL PATTERN VARIATION –:(MIN/MAX IN %) STATE SYSTEM MIN/MAX IN % 3D LOAD ANDHRAPRADESH 75-85% PROFILE KARNATAKA KERALA TAMILNADU 55-65% 55-60% 80-85% CONTRACTION AND EXPANSION OF ISLAND COMMERCIAL IMPLICATION- OD/UD COMMERCIAL ISSUES INABILITY TO DRAW AS PER ENTITLEMENT DUE TO INSUFFICIENT LOAD IN ISGS/ISTS BLOCK : STATE MAY BE FORCED TO UNDERDRAW FROM ISGS AND FORCED TO GENERATE AT COSTLY IPP’S/DEPLETED HYDRO – COMMERCIAL IMPLICATION?. OVERDRAWAL MAY CONTINUE FORCING OTHER CONSTITUENTS TO COMMIT COSTLY GENERATION SHORT CIRCUIT LEVELS – RELEVANCE TO GRID OPERATION SC LEVELS ARE AN INDICATOR OF THE ‘STRENGTH’ OF THE BUS TO REACTIVE POWER FLUCTUATIONS HIGHER SC LEVELS – BUS IS MORE STABLE – LIMITS VOLTAGE EXCURSIONS HIGHER SC LEVELS- BUS IS WELL INTERCONNECTED-PROXIMITY OF GENERATORS ESPECIALLY IMPORTANT DURING RESTORATION. SHORT CIRCUIT LEVELS – RELEVANCE TO GRID OPERATION AN EXAMPLE: CHARGING A 300 KM LINE FROM A 2000 MVA 400 KV BUS WOULD INCREASE THE VOLTAGE BY 33 KV CHARGING A 300 KM LINE FROM A 6000 MVA 400 KV BUS WOULD INCREASE THE VOLTAGE BY 11 KV SHRT CKT STUDY RESULT L INDEX INDICATES THE PROXIMITY TO VOLTAGE COLLAPSE IF THE INDEX APPROACHES 1 THEN THE BUS IS INCREASINGLY VULNERABLE TO VOLTAGE COLLAPSE DERIVED FROM LOAD FLOW JACOBIAN MATRIX SHOULD BE GENERALLY WITHIN 0.3 DURING NORMAL OPERATION FOR SR GRID. GENERALLY IN LINE WITH WHAT IS OBSERVED BY THE SYSTEM OPERATORS L INDEX STUDY 400 KV SUMMARY L INDEX STUDY RESULT L INDEX GOOTY 0.3126 AP CUDDAPAH 0.268 AP HYDERABAD 0.236 AP KHAMMAN 0.1794 AP NUNNA 0.1693 AP RAMAGUNDAM 0.1197 AP SIMHADRI 0.1177 AP BANGALORE 0.3431 KAR HOODY 0.3175 KAR NELAMANGALA 0.3101 KAR KOLAR 0.3043 KAR DAVANGERE 0.2157 KAR MUNIRABAD 0.1721 KAR RAICHUR 0.0804 KAR TRICHUR 0.2262 KER HOSUR 0.2539 TN SALEM 0.2011 TN SCIENTIFIC SETTLEMENT SYSTEM? ISGS LINKS SR GRID MAP KAR ISL CASE3 TN ISL CASE1 AP GRID MAP KARNATAKA GRID MAP KERALA GRID MAP TN GRID MAP SHORT CKT STDY RESULTS 400 KV L INDEX STUDY RESULTS 3D DEMAND SR JUNE 2002 3D DEMAND SR MAY2002 3D DEMAND SR MARCH 2002 SHORT CKT STDY RESULTS 220 KV SHORT CKT STDY RESULTS 230 KV ISOLATION OF PART OF KARNATAKA: CASE STUDY GRID CASE 1: SOMANAHALLY TRANSFORMER CONNECTED TO AP-TN-KER GRID AND MAP RADIALLY FEEDING 700MW LOAD, KAIGA EMBEDDED IN KARNATAKA SYSTEM.400 KV RTPS-N’SAGAR OPEN CASE 2: CASE 1 WITH KAIGA ISLANDED CASE 3: SPLIT BUS AT RTPS, KAIGA & 400KV UNITS OF RAICHUR WITH AP-KER-TN-KOLARSOMANAHALLI-HOODY-GUTTUR SYSTEM. SOMANAHALLY AND HOODY RADIALLY FEEDING BANGALORE LOADS EXCEPT PEENYA. CASE 1 BANGALORE LOADS ON AP-TN-KER GRID LOAD 3000 MW LOW VOLTAGE ZONE ABOUT 700 MW ON APTN-KER GRID KARNATAKA-SC LEVELS IN MVA ISLANDING IN KARNATAKA SYSTEM KARNATAKA STN_NAME STATE BASE CASE CASE1 CASE2 CASE3 RST4 AP 8760 8378 8371 8194 TPL4 AP 6768 5926 5916 5697 CNP4 AP 5055 4782 4776 4747 GTN4 AP 2936 3027 3018 2789 KOLAR4 KAR 6479 5362 5358 5868 RTPS4 KAR 5859 3962 3692 3149 SOMN4 KAR 5540 4394 4390 4850 HOODY4 KAR 5536 1522 1305 4911 NLMNG4 KAR 4818 1656 1423 3979 DVGRE4 KAR 4349 2545 2120 2890 GDHL4 KAR 3767 2777 2546 2330 ISOLATION OF PART OF KERALA AND TAMILNADU: CASE STUDY TAMILNADU : TTPS, BALAJI POWER,WIND, NILAGIRIS HYDRO, KADAMPARAI HYDRO IN ISOLATED PORTION. AP-KAR-KER AND N.TAMILNADU(NEYVELI-MAPS-ETS-NMTPSMTPS – GMR) IN ONE BLOCK KERALA- SPLIT BUS AT EDAMON AND THRISSUR WITH LOADS TAKEN RADIALLY AT BOTH POINTS TAMILNADU AND KERALA SC LEVELS IN MVA KERALA TN CASE1 STN_NAME STATE BASE CASE CASE1 RST4 AP 8760 8740 8725 CNP4 AP 5055 5014 4987 SOMN4 KAR 5540 5441 5312 KOLAR4 KAR 6479 6537 6526 TRICH4 KER 3838 2724 3239 N2MIN4 TN 10556 10128 9828 NLYEU4 TN 10223 9818 9537 SALEM4 TN 8119 7639 6523 SPBUDUR4 TN 7011 6923 6895 TRICHY4 TN 6661 6266 5654 MADURAI4 TN 5755 5251 4094 HOSUR4 TN 5474 5346 5277 UDMLPT4 TN 5433 4363 4032 OPERATIONAL ISSUES KARNATAKA KAIGA REMAINS EMBEDDED IN ISOLATED PORTION OF KARNATAKA FREQUENT HOUSE LOADING AND POISONING OUT EXPECTED. KAPS TO REDUCE GENERATION BY 40-50 MW TO PREVENT HUNTING DEPLETED HYDRO POSITION IN ISOLATED PART: PEAKING HYDRO TO BE RUN AS BASE STATION STORAGE POSITION ALREADY CRITICAL EXTREMELY LOW VOLTAGES TO BE EXPECTED IN SOUTH KARNATAKA. DELIVERING CGS ENTITLEMENT TO KARNATAKA KPTCL’S CGS ENTITLEMENT WITH FULL GENERATION AT NTPC,NLY,KAPS AND ONE UNIT AT MAPS IS AND WITH ALLOCATION OF 156 MW ER AND 100 MW PTC POWER = 1206 MW GOA’S ENTITLEMENT TO BE WHEELED BY KPTCL = 94 MW. TOTAL ENTITLEMENT OF KPTCL = 1310 MW AS KAIGA GENERATION OF 400 MW IS EMBEDDED KPTCL HAS TO IMPORT 910 MW AT 330 KV/400 MVAR IMPORT THE CAPACITY OF SOMANAHALLI TRANSFORMER IS 720 MW DELIVERING CGS ENTITLEMENT TO KARNATAKA KPTCL’S CGS ENTITLEMENT WITH FULL GENERATION AT NTPC,NLY, ONE UNIT AT KAPS AND MAPS IS AND WITH ALLOCATION OF 156 MW ER AND 100 MW PTC POWER = 1140 MW GOA’S ENTITLEMENT TO BE WHEELED BY KPTCL = 94 MW. TOTAL ENTITLEMENT OF KPTCL = 1234 MW AS KAIGA GENERATION OF 200 MW IS EMBEDDED KPTCL HAS TO IMPORT 1034 MW AT 330 KV/400 MVAR IMPORT THE CAPACITY OF SOMANAHALLI TRANSFORMER IS 720 MW DIFFICULTY IN DELIVERING ENTITLEMENT LOADS AT SOMANAHALLI TO BE REARRANGED DEPENDING ON KAPS GENERATION