* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Power Quality Measurements
Pulse-width modulation wikipedia , lookup
Three-phase electric power wikipedia , lookup
Utility frequency wikipedia , lookup
Buck converter wikipedia , lookup
Power factor wikipedia , lookup
Wireless power transfer wikipedia , lookup
Standby power wikipedia , lookup
Power inverter wikipedia , lookup
Power over Ethernet wikipedia , lookup
Electric power system wikipedia , lookup
Voltage optimisation wikipedia , lookup
Distributed generation wikipedia , lookup
Electrical substation wikipedia , lookup
Audio power wikipedia , lookup
History of electric power transmission wikipedia , lookup
Electrification wikipedia , lookup
Power electronics wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Electrical grid wikipedia , lookup
Amtrak's 25 Hz traction power system wikipedia , lookup
Alternating current wikipedia , lookup
IPA Cross-border Co-operation Programme Hungary-Croatia 2007-2013 Measurement on AC side – Power Quality Measurements Photovoltaic Systems as Actuators of Regional Development REG-PHOSYS ; doc.dr.sc. Z.Klaić The project is co-financed by the European Union through the Hungary-Croatia IPA Crossborder Co-operation Programme The Impact of PV on Distribution System – Power Quality Measurements Photovoltaic power plant – renewable-based DG: - generate DC power, - have inverters as interface to the distribution system. power inverters + variable power flow of the PV = harmonics in the output PV current. 2 The Impact of PV on Distribution System – Power Quality Measurements So, it is necessary to estimate the impact of Photovoltaic on distribution power network. The best way – power quality measurements. 3 The Impact of PV on Distribution System – Power Quality Measurements Power quality measurements • Before and after the connection of PV on the distribution grid • According to EN 50160 – 7 days before and 7 days after the connection • According to IEC 61000-4-30 – analyzer class A 4 The Impact of PV on Distribution System – Power Quality Measurements The results of Power quality measurements: • According to EN 50160 • According to Croatian Grid Code 5 The Impact of PV on Distribution System – Power Quality Measurements Analisys of Power quality measurements according to EN 50160: • Voltage fluctuation • Voltage dips and short interruptions • Flickers • Harmonics and interharmonics • Overvoltages • Transients • Waveform distortion • Voltage imbalance • Power frequency variations • Signaling voltages • DC component 6 The Impact of PV on Distribution System – Power Quality Measurements Analisys of Power quality measurements according to the Croatian Grid Code: • Limits for Voltage fluctuations and Frequency variations simmilar to EN 50160 • Allowed contribution of power plant on distribution grid for • THDU, (2,5 % Un, for 0,4 kV level) • Flikers and • Voltage imbalance. This is the reason for analysis of power quality measurements before and after the connection of PV on the distribution grid. 7 The Impact of PV on Distribution System – Power Quality Measurements Total harmonic distortion, THDU (% Un), before the connection of PV. 8 THDU (% Un), after the connection of PV. The Impact of PV on Distribution System – Power Quality Measurements The real power delivered to distribution grid from PV power plant – during 7 days test operation of PV. 9 Voltage deviation Range Limit Mark 230 V ± 10% 95,0 % OK 230 V +10%/-15 % 100,0 % OK Range Limit Mark 50 Hz ± 1% 99,5 % OK 50 Hz +4%/-6% 100,0 % OK Range (contribution) Limit Mark <2,5 % 95 % OK Range (contribution) Limit Mark <1,3 % 95 % OK Range (contribution) Limit Mark Pst (shortterm) < 0,7 95,0% OK Plt (longterm) < 0,5 95,0 % OK Range Limit Mark Definiran u EES 100% OK Frequency deviation THD Imbalance Flickers Power factor Mark Influence on signal OK 10