* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download Slide Title Goes Here
Power inverter wikipedia , lookup
Electrical ballast wikipedia , lookup
Variable-frequency drive wikipedia , lookup
Power engineering wikipedia , lookup
Current source wikipedia , lookup
Three-phase electric power wikipedia , lookup
Surface-mount technology wikipedia , lookup
Schmitt trigger wikipedia , lookup
Electrical substation wikipedia , lookup
Power electronics wikipedia , lookup
Power MOSFET wikipedia , lookup
Printed circuit board wikipedia , lookup
History of electric power transmission wikipedia , lookup
Resistive opto-isolator wikipedia , lookup
Voltage regulator wikipedia , lookup
Distribution management system wikipedia , lookup
Buck converter wikipedia , lookup
Surge protector wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Opto-isolator wikipedia , lookup
Stray voltage wikipedia , lookup
Alternating current wikipedia , lookup
H HF Multianode PMT Upgrade C A L Base Board Dy9, Dy10 Power Modification March 19, 2012 S. Los HCAL/CMS, FNAL March 19, 2012 1 H Board Modification C A L • Modification to the Base board includes two jumpers (for Dy09, and Dy10): – Allow to disconnect resistive divider from Dy09, and/or Dy10, to avoid situation when power supply should sink current (reason for the recently observed “voltage spikes”) – Bypass capacitors, and booster voltages are always connected to the dynodes Voltage distribution to the PMT sockets Resistive divider chain March 19, 2012 Bypass capacitor chain Dy09, Dy10 jumpers 2 H Base Board Luminosity Dependence C A L • Base board divider standing current was increased a factor x10 with respect to the existing situation • We should test that this is enough to run at full SHLC luminosity, and not suffer from luminosity-gain dependence (similar to what has Dick done for the prototype run without two booster voltages) – For a single particle hit (up to 300pC of maximum QIE10 signal) voltage drop on a 10nf bypass capacitor is 30mV – only 0.05%of the operating voltage – Dynode voltage recovery time is around 20ms (227 orbits of LHC beam, so we can only be sensitive to the luminosity effects at that scale) March 19, 2012 3 H Next Proto/Production C A L Quotes for production run of 280 boards: • $2700 - $4600 1. New prototypes of the HF Base board were ordered last Friday, due at Fermilab in a week 2. Assembly of 12 boards will take another week 3. In the first days of April new boards should be available for tests outside Fermilab 4. To be ready for spring 2013 I’d like to have an o.k. for the final Base boards in September 5. Adapter boards, which did not cause any problems, should be ordered a.s.a.p. 6. Cable retention boards should be prototyped, and tested with the existing cable prototype March 19, 2012 4