Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
idibri.com | idibri.uk Situated on 92 acres of land next to Peltier Lake, the church's environmental stewardship team is working on restoring the natural prairie grasses and habitat in the area, making it a beautiful setting for the large windows and open architecture of this 85,000sf facility. The live worship music is the same at all services, and the message is also identical. This worship space was a part of Phase 1 of their new construction at the Lino Lakes Campus, which also included a backstage space, lobby and basic audio-visual production control room. The lobby supports the emphasis that they have on community with distributed audio for background music and paging, and distributed video for announcements and to provide a window into what is happening in the main Interim Worship Space. The 400sf production control room houses the character generator, switcher, and engineering equipment for the IMAG Systems. We worked closely with BWBR and the Church, including touring a number of facilities, to determine how best to design their new room. We provided the initial room design, platform and backstage layouts that the architect used in their master plan. We also provided design services for audio, video projection, video production, theatrical lighting and rigging. Audio Lighting Theatre Consulting Theatrical Equipment Video Eagle Brook Church Bill Berger, Technical Director Eagle Brook Church 651.251.9788 New Construction $15 million BWBR 2005 2,200 Sheehy Construction idibri.com | idibri.uk