Download Document

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Electromagnetic compatibility wikipedia , lookup

Islanding wikipedia , lookup

Current source wikipedia , lookup

Ohm's law wikipedia , lookup

Resistive opto-isolator wikipedia , lookup

Rectifier wikipedia , lookup

Electrical substation wikipedia , lookup

History of electric power transmission wikipedia , lookup

Opto-isolator wikipedia , lookup

Portable appliance testing wikipedia , lookup

Voltage regulator wikipedia , lookup

Automatic test equipment wikipedia , lookup

Buck converter wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Rectiverter wikipedia , lookup

Distribution management system wikipedia , lookup

Stray voltage wikipedia , lookup

Surge protector wikipedia , lookup

Voltage optimisation wikipedia , lookup

Alternating current wikipedia , lookup

Mains electricity wikipedia , lookup

Transcript
9.4 Tests on block batches
The purpose of these tests is to ensure that all batches of blocks meet the
requirements on energy absorption and ageing proven by the type tests.
The manufacturer shall propose suitable tests for this purpose for the
approval of Power Systems. The tests shall be included in the ITP.
The batch and production tests and monitoring shall demonstrate that:
 Each production batch of blocks has adequate long term stability
performance
 Blocks with manufacturing deficiencies are not incorporated into
arrester sections.
 Accepted blocks have adequate energy withstand capability.
10 TYPE TESTS
Certified test reports on previously performed type tests on similar units
may be submitted to Power Systems for approval, together with a technical
report from the Supplier, under the following conditions:
 Tests performed in accordance with specified standards.
 The equipment are of the similar design as relevant for the actual test.
The technical report shall give details regarding similarities and differences
in the design to support the approval of the test reports by Power Systems.
Such type test reports, if approved, are accepted in lieu of performing new
type tests. These type test reports and the technical report shall be
referred to in the ITP and shall be submitted to Power Systems.
The measuring accuracy in all tests shall be in accordance with IEC
60099-4[4], clause 6.1.
10.1 Residual voltage test
As per TC33 Guidelines [7], clauses 7.1.1and 7.2.1.
Residual voltage tests shall be carried out on three samples of prorated
sections, consisting of single blocks. The following tests shall be performed
on each prorated section in open air.
 Steep current impulse residual voltage test
 Lightning impulse residual voltage test
 Switching impulse residual voltage test
The wave-forms of steep current impulse, lighting impulse and switching
impulse shall be as per TC33 Guidelines [7], clause 2.2.8.
The highest measured voltage versus the current per column shall be
presented as a curve. The voltage shall be presented in relation (p.u.) to
the maximum measured voltage at a certain current. The current
amplitude defining this base voltage, guaranteed residual voltage, shall be
the same as used in the routine test in section 9.1.2.
The residual voltage of the complete arrester is defined by this curve and
the sum of the residual voltages measured on individual blocks in the
routine test in section 9.1.2.