Download Request for Proposal Supply of Hybrid Power - bmobile

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Switched-mode power supply wikipedia , lookup

Grid energy storage wikipedia , lookup

Three-phase electric power wikipedia , lookup

Electric battery wikipedia , lookup

Telecommunications engineering wikipedia , lookup

History of electric power transmission wikipedia , lookup

Alternating current wikipedia , lookup

Electric power system wikipedia , lookup

Amtrak's 25 Hz traction power system wikipedia , lookup

Mains electricity wikipedia , lookup

Hybrid vehicle wikipedia , lookup

Electrification wikipedia , lookup

Power engineering wikipedia , lookup

Rechargeable battery wikipedia , lookup

Metadyne wikipedia , lookup

Vehicle-to-grid wikipedia , lookup

Islanding wikipedia , lookup

Transcript
Request for Proposal
Supply of Hybrid Power Systems
For Wireless Telecommunication Infrastructure Sites
For Bmobile Vodafone Limited
Papua New Guinea
Solomon Islands
Phase PO2A
December , 2014
BMOBILE VODAFONE LIMITED
RFP – PO2A SUPPLY OF HYBRID POWER
SYSTEMS FOR TELECOMMUNICATION SITES
Document No.
Effective Date
Revision No.
Revision Date
PMO_RFP_G2
22/12/2014
Final V1
22/12/2014
Phase PO2A – SUPPLY GENERATOR SETS FOR BMOBILE VODAFONE NETWORK
DEPLOYMENT
1. OVERVIEW
As part of the Bmobile Vodafone Network Expansion program, throughout PNG and Solomon
Islands, Bmobile hereby is calling for proposal from reputable selected Generators and Power
Solution suppliers to provide Hybrid Power units to power its Mobile Telecommunication
sites.
Bmobile is looking to install new and upgrade existing sites by May 1st 2015, when sites will
be ready as part of Project PO2A rollout in PNG. The hybrid power units selected will also be
used at Bmobile Vodafone sites in the Solomon Islands later in the year.
As a design baseline, Bmobile is looking for hybrid power solutions with;







Design shall have a design life of 10 years or over
Refuelling every 30 days
Low Capex cost
Low Opex cost
Efficient and dependable
Ability to interface with the Huawei BTS 3900 is desirable
Diesel generators to have the Deep Sea controller 7420.
2. DESIGN OVERVIEW
The Hybrid solution should be:
- based an efficient diesel generator with an adequate battery bank to support the load.
- The battery type should be sealed and maintenance free.
- Output is to be – 48V DC.
- Other inputs such as solar, wind and grid power should be available to the system as
a plug and play modules.
- The generator must not run continuously.
- Normal DOD of 30-35%, this allows the site to continue if the generator doesn’t start
and extends the number of cycles for the batteries.
- DC distribution panel with 2 x LVD for Priority and Non-Priority load control
- Maximum LVD of 50%
Page 2
BMOBILE VODAFONE LIMITED
RFP – PO2A SUPPLY OF HYBRID POWER
SYSTEMS FOR TELECOMMUNICATION SITES
Document No.
Effective Date
Revision No.
Revision Date
PMO_RFP_G2
22/12/2014
Final V1
22/12/2014
The hybrid power system sought is designed for Off Grid operations with a view to reduce
OPEX with comparison to conventional power solutions running 24/7 generators. The site
equipment will be Huawei cabinet with a -48 VDC input.
Category
Basic information
Information Item
Country
Application scenario
Grid condition (mean On-Grid Site
outage time)
Off-Grid Site
Indoor/Outdoor
Scenario
New Site/Rebuild Site
ON-Grid Site
Power Consumption
OFF Grid Site
Requirements
PNG & Solomon Islands
Off-Grid and On grid sites
4 hours/day with 184 Ah batteries
as backup
24 hours/day (24x7)
Outdoor
New Site and some replacement
1800-2000 W
1800-2000 W
Table 1.
In principal, the expected operation of the generator (genset) is as below.
Typically the generator will run for about 30% of the time or less. For the rest of the time, the
battery is discharging. A full cycle should take around one day hence the characteristics of
battery, generator and load, and optimisation of the solution should support this.


The charged battery bank will dissipates to preset voltage level (DOD 30-35%), At DOD
level the start signal is sent to the genset and ATS, which takes over site load and
recharges the discharged batteries.
When batteries fully charged, genset stops and cycle repeats.
Page 3
BMOBILE VODAFONE LIMITED
RFP – PO2A SUPPLY OF HYBRID POWER
SYSTEMS FOR TELECOMMUNICATION SITES


Document No.
Effective Date
Revision No.
Revision Date
PMO_RFP_G2
22/12/2014
Final V1
22/12/2014
Solar, wind or grid input into the system to minimise generator use. This should be
available as a modular option where by it can be a plug and play solution
For sites that have grid power the grid should charge the battery . If grid power is lost
the batteries will discharge to DOD level. Once DOD has been reached the genset will
start and take the site load and recharge the batteries until grid power returns.
3. SCOPE OF SUPPLY
The scope of work will include designing, supply and commissioning of complete Hybrid
power solution. The installation can be done by a local contractor upon supervision from the
selected supplier. The scopes are as follows:
1. ____kw load design. Use from table 1 above.
2. Deep cycle Batteries @ 30-35% of normal DOD and 50% for LVD.
3. Off grid hybrid design shall be based on Generator-Battery scenario. Battery for 18
hours and Generator for 6 hours.
4. Grid design shall be based on 4 hours battery backup @ 30-35% DOD. Note: For On
Grid sites we will only require the generators of a suitable capacity as deemed by the
vendor.
5. Selection of appropriate size generator (KVA), Battery bank (Ah) and Fuel tank capacity
(Lts).
6. Design shall include
 battery boxes (with cooling facility),
 equipment cabinet,
 Appropriate rating rectifiers system,
 DC distribution panel with 2 x LVD for Priority and Non-Priority load control

Control system to operate system according to selected scenario. The system
controller must accurately manage charge and discharge cycles, including charge
voltage, charge duration, charge rate and depth of discharge. There should be an
option to limit the charging current of the batteries by the user.






Full NMS monitoring integration using remote management and SNMP output
to Solarwinds
The network operator or service organization can prove the hybrid cost savings
Ensure operation remains optimal
Manage the response to faults
Support battery warranty of 3 years,
Lightning protection, cabling, and auxiliaries, earthing and manuals.
Page 4
BMOBILE VODAFONE LIMITED
RFP – PO2A SUPPLY OF HYBRID POWER
SYSTEMS FOR TELECOMMUNICATION SITES
Document No.
Effective Date
Revision No.
Revision Date
PMO_RFP_G2
22/12/2014
Final V1
22/12/2014
7. Equipment configuration shall be for outdoor installation.
8. All cabinets and battery boxes shall be waterproof, windproof and anti-corrosion and
have the capability to withstand the weather and remote locations of PNG, All
cabinets, tanks, and gensets must be provided with anti-theft locking systems.
2(a) GENERATOR SPECIFICATION AND REQUIREMENTS
All generators based on its ratings will be supplied with all basic features as per Table 2 –
Basic Generator Specification below.
Generator
Monitoring and
control
Storage type
Batteries
Equipment average
load
Protection
-Diesel
-Integrated tank minimum 250 litre for ON Grid sites
and 1000 Litre base tank for OFF Grid sites , with anti
theft mechanism for the tank and generator.
-Min service interval 1000 hours with Extended
Service with secondary oil filtration system installed.
-Outdoor silenced min 85 dba @1 meter
Full monitoring and remote control for start and
stop of generator.
Web based
Ability to host IP camera
Generator to be equipped with Deep Sea Controller
model -7420.
Sealed maintenance free
Sufficient capacity
Readily available to PNG market
1.8 – 2 Kw
Environmental protection for outdoor use and anti
theft for both fuel tank and generator.
Lightening protection
Over-voltage protection
Table 2 – Basic Generator specification
Page 5
BMOBILE VODAFONE LIMITED
RFP – PO2A SUPPLY OF HYBRID POWER
SYSTEMS FOR TELECOMMUNICATION SITES
Document No.
Effective Date
Revision No.
Revision Date
PMO_RFP_G2
22/12/2014
Final V1
22/12/2014
Other required information to be included in your proposal but not limited to;
Pre sale
support
Post sales
support
Training
Delivery
Factory

Ordering, design requirement, connectivity with on site power
equipment, site layout confirmation (tower base mount etc) and
successful bidder may be invited to setup model site/demonstration
of solution.
Spare part and maintenance kits supply. Frame supply contract 6
years and over. One contact for PNG and SI. Warranty for
Maintenance including repair and return of parts.
On site customer training, for staff and nominated contractors.
Objective; over time to handle all maintenance and trouble shoot
skills in-house. Basic, Advance and Specialised (such as Controller
programming etc). Training and resource plan. Training sites consider
PNG and SI.
Lead time to deliver from PO, CIF POM, LAE (PNG) and Honiara (SI),
Port of origin, route to PNG and SI, number of units fitting in one
container
Location, capacity to manufacture, closing periods
In addition to above requirements, respondent can propose optional features/option
with description and pricing for consideration.
4. Phase PO2A - ORDER LIST and SUMMARY TEMPLATE
Lae: 45 sets are to be delivered to Lae, PNG, of these 26 will be used as off grid systems
with full hybrid solution and 19 will be utilised as On Grid for which only generators will
be needed.
Honiara SI: 3 sets of Off Grid full hybrid units are to be delivered to Honiara Solomon
islands.
5. REFERENCE DOCUMENT BE INCLUDED IN YOUR RESPONSE
Detail specifications of solution supplied are to:


Include technical, data sheets and physical specifications, for generators and all
associated equipment proposed.
Include Full battery specification sheets, including technical, physical and DOD
curves.
Page 6
BMOBILE VODAFONE LIMITED
RFP – PO2A SUPPLY OF HYBRID POWER
SYSTEMS FOR TELECOMMUNICATION SITES




Document No.
Effective Date
Revision No.
Revision Date
PMO_RFP_G2
22/12/2014
Final V1
22/12/2014
Include detail and clear schematics of overall connectivity of proposed solution,
including, earthing, protection, performance monitoring and control.
Include Controller wiring diagrams
Above includes any 3rd parties systems in the proposals.
Information on the network control system.
6. RFP TIMELINE
Issue of RFP:
Closing date:
Successful bidder notified:
Monday 22 December , 2014
Wednesday 14 January , 2015, 17:00 hrs.
Wednesday 19 January, 2015.
Bmobile Vodafone at its discretion may change Closing date and time. Any such changes
shall apply to all bidders.
7. EVALUATION
Evaluation will be on the basis of technical and commercial proposal
Please note:
The commercial proposal will be required to be submitted after being qualified for the
technical solution.

Proven quality of solution, meeting requirement and ability to demonstrate the use
by other customers.
 The ability of the system to improve OPEX,
 Pricing,
 Presales and post sales support
 Capability to deliver and support.
The attached evaluation template should be filled by all vendors.
tender evaluation
template ver 3.xlsx
Page 7
BMOBILE VODAFONE LIMITED
RFP – PO2A SUPPLY OF HYBRID POWER
SYSTEMS FOR TELECOMMUNICATION SITES
Document No.
Effective Date
Revision No.
Revision Date
PMO_RFP_G2
22/12/2014
Final V1
22/12/2014
8. PRICING VALIDITY AND TERMS



Quotations are to be valid for 60 days, from date of submission to Bmobile.
All prices are to be in US$
Preferred prices are to be FOB and quote for shipping to PNG, Lae and SI, Honiara
separately. If unable to do so, clearly specify trading term.
9. REQUEST FOR FURTHER INFORMATION

Send by email to [email protected]