* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download - Victoria Institution (College)
Buck converter wikipedia , lookup
Opto-isolator wikipedia , lookup
Voltage optimisation wikipedia , lookup
Alternating current wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Power inverter wikipedia , lookup
Mains electricity wikipedia , lookup
Distribution management system wikipedia , lookup
Earthing system wikipedia , lookup
TENDER BID DOCUMENT For Supply Installation Commissioning & Maintenance of 5kWp Grid Connected Rooftop Solar Power Plant and 500LPD Solar Hot Water System At Annex Building and Hostel Building of Victoria Institution (College) 78B, A.P. C. Road, Kolkata - 700 009 Page 1 1. Notice Inviting Bid Victoria Institution (College) 78B, A.P. C. Road, Kolkata - 700 009 Sealed tenders are invited from the manufacturers for solar PV Integrator design, supply, installation & commissioning and 2 years maintenance of two 5kWp Grid Connected SPV Power plant and 500LPD Solar Hot Water System (Annex Building & Hostel Building) at Victoria Institution (College)78B, A.P. C. Road, Kolkata - 700 009 Last date for submission of tender is 13th July, 2016. Tender should be submitted in the prescribed format (Bidding Schedule). All terms & conditions as mentioned in the tender documents should be bindings on the bidder. The principle of the college may reject any tender without showing any reason. Authorized Signatory Page 2 2. Eligibility and Qualification Criteria 1. The bidder should be a Registered Manufacturing Company/Firm/Corporation in India of SPV Cells/Modules Or PV System Electronic (Conforming to relevant National/ International Standards) having at least one or more Solar Photovoltaic Grid Connected Power Plant(s) aggregating to a total of 10kWp capacity should have been installed/commissioned.(Minimum size 5kWp) 2. The Bidder should have knowledge on installation of solar water heating system also. 3. Cumulative Experience of the Bidder in executing contracts of Solar Power plants (Installed & commissioned) should not be less than 50kWp (Documents needed). 4. Bidder should having experience at least one or more 500LPD Solar Hot Water system(s) aggregating to a total of 1500LPD capacity should have been installed/commissioned. 5. The Bidder should have valid CST/State VAT/TIN registration certificate. A copy of which should be enclosed. 6. Overall Average Annual Turnover of the Company/Firm/Corporation in the last two financial years should be at least 1.00crore.This must be the individual Company’s turnover and not that of any group of Companies. (A summarized sheet of turn over certified by registered CA should be compulsorily enclosed). 7. The Bidder should have registered office/authorized dealer/service network in Kolkata. 8. The Bidder should be an ISO certified Company. 3. Validity of Offer Unless otherwise specified, the bidder shall keep his tender valid initially for a period of 6 days from the due date of submission of the offer. 4. Other Terms & Conditions 1 2 3 4 5 6 7 8 9 10 Insertion, post-script, addition and alteration shall not be recognized unless confirmed by bidder's signature and stamp. Incomplete tender or tenders not submitted as per requirement as indicated in the NIB are likely to be rejected. Bidders shall submit their offer strictly as per terms and conditions of the tender document without any deviation. If at any time any of the documents/information submitted by the bidder is found to be incorrect, false or untruthful, the bid the resultant order may be summarily rejected/ cancelled at the risk of the bidder. Failure to furnish all information and documentary evidence as stipulated in the bid document or submission of an offer that is not substantially responsive to the bid document in all respects shall be summarily rejected. All bids will be received in duly sealed cover within the due date and time. Bids received after the due date and time is liable for outright rejection. No postal transaction shall be entertained for obtaining bid documents. Issuance of bid documents shall not construe that the bidders would be automatically considered qualified. Self attestation of various documents enclosed along with the offer must be done. Bid documents are not transferable. Page 3 5. General Terms & Conditions 1.0 Scope of Work a) The Scope of work for 5kWp Grid connected SPV Power Plant includes manufacturing, shop testing, packing & forwarding, transportation, transit-insurance, supply, installation, testing & commissioning including 2years Maintenance Performance Warrantee Contract (MPWC) of SPPs complete in all respects along with one set of operational instruction cum maintenance manual (in English) and delivery on annex building of Victoria Institution (College) 78B, A.P. C. Road, Kolkata - 700 009. b) Design, supply, installation, commissioning and maintenance of 500 LPD Solar Water Heating System in the Victoria Institution (College) hostel building. 2.0 Quantity of Supply 2.1 The quantity required as given in the Bid Details of Notice Inviting Bid is final & firm. 3.0 3.1 Effective Date of Contract The effective date of commencement of execution of the order by the selected contractor shall be the date of issue of the work Order. 4.0 4.1 Contract Price The total contract price & rates of SPP and 2 years maintenance in full and complete set including SPV module, control electronics & inverter, mechanical components, etc. should be quoted . The price shall be for the total scope as defined in this document. The contract price includes supply of items in full & good condition at Victoria Institution (College) 78B, A.P. C. Road, Kolkata - 700 009 and all the i ncidental charges towards packing & forwarding, inspection, installation at site, door delivery charges, loading charges at site and transit insurance upto installation site. Contract Price is also inclusive of excise duty, central sales tax, West Bengal VAT on the finished items; turn over tax (TOT)/octroi, professional tax, service charge, income tax, entry tax, labour cess, etc. as applicable for the supplies. The project is to be implemented on turnkey contract basis and VAT will be applicable for the whole component including system cost, transportation, I&C and MPWC. 4.2 4.3 5.0 5.1 5.2 5.3 5.4 Terms of Payment 50% of the value of the contract of supply offers all equipment up to site in good condition. The storage is at the risk of the contractor. 40% at the successful commissioning of the system. 5% at the completion of 1st year of operation. Balance 5% at the completion of 2nd year of operation. 6.0 Dispatch Instructions: 6.1 All items/equipments shall be subjected to inspection by College officials after dispatched. 7.0 Transit Insurance: 7.1 Transit Insurance shall be arranged by the Supplier for his total supplies. In case of any damage/loss/pilferage/non-delivery during transit, the Supplier shall lodge the claim and settle the claim with the insurance agency. The Supplier shall also arrange replacement of the damaged, lost/pilfered items expeditiously pending settlement of commercial implications with insurance agency, if any, so as not to hamper the working of the system. The resultant loss if any due to failure of Supplier to comply with the above shall be to the account of the Supplier. Page 4 8.0 After Sales Service and Availability of Spare Parts: 8.1 The Supplier shall depute authorized Service Engineer within 3 days from the date of the intimation of fault, and establish sufficient inventory of spares, technicians in Kolkata in consultation with College authority to provide satisfactory and uninterrupted services during the guarantee/ MPWC period for which a servicing centre must be established at College. Address, contact number etc. of the Servicing centre must be submitted before commencement of the work. A.) Technical Specification for 5kWp Solar PV Power Plant 1. SPV MODULES: 1.1 The SPV Module must be tested, approved & certified by any one of the IEC authorized test centers – NABL/BIS Accredited Testing/Calibration Laboratories or by any International IEC authorized test centre. The PV modules must conform to the latest edition of any of the following IEC/equivalent BIS Standards for PV module design qualification and type approval (as per JNNSM): Type of Module:-Crystalline Silicon Terrestrial PV Modules - IEC 61215/IS14286. The manufacturer should certify that the submitted module is also manufactured using same design and process and modules being supplied are as per above. In addition, the modules must conform to IEC 61730 Part1-requirements for construction & Part 2- requirements for testing, for safety qualification. I-V curve both soft copy & hard copy must be provided (Image/PDF). 1.2 Stabilized output of the Solar PV Array for the Power plant should not be less than 5kWp under STC after one year of operation. Modules for Power Plant shall be made of Crystalline Silicon Solar cells (No. of PV cells 60 Nos.). 1.3 SPV modules to be supplied should have minimum declared output of 24 V 250 Wp. Number of modules to be supplied shall be 20(twenty) to be connected in series and parallel connections in order to have total output of 5kWp . 1.4 Module conversion efficiency should be equal to or greater than 14% under STC. 1.5 Electrical characteristics of each module should be as per IEC specifications. 1.6 Other general requirements of the SPV Modules and sub-systems shall be as follows: (a) The rated power output of any supplied module shall not vary more than 5% (five percent) from the average power rating of the modules. (b) Peak power point voltage and the peak power point current of any supplied module and/or any module string (series connected module) shall not be more than 5% from the respective arithmetic means for all modules and/or for all module strings, as the case may be. (c) Except otherwise specified, the front module surface shall consist of impact resistant, tempered & textured, low iron and high transmission glass. Thickness 3.2 mm (minimum). (d) The module frame Anodized aluminium type shall be made of corrosion resistant material, which shall be electrically compatible with the structural material used for mounting the modules. (e) The module shall be provided with a junction with provision of external screw terminal connection and with arrangement for provision of by-pass diode.( Minimum 3Nos. bypass diode & System Voltage 1000V) The box should have hinged, weatherproof lid with captive screws and cable gland entry points protection level IP65. (f) The PV module shall perform satisfactorily in humidity up to 100% with temperature between minus100 Celsius to plus 650 Celsius and to withstand a gust upto 200km/hr. from back side of the modules. (g) The rated output power of any supplied module shall have a tolerance of +/-5% as per MNRE/IEC standard specification. (h) The fill factor of modules shall not be less than 0.70. Page 5 1.7 Identification And Traceability Each PV module must use a RF identification tag(RFID), which must contain the following Information: i. Name of the Manufacturer of PV module ii. Name of the Manufacturer of Solar cells iii. Month and year of the manufacture(separately for solar cells and module) iv. Country of origin (separately for solar cells and module) v. I-V curve for the module vi. Peak Wattage, Im, Vm and FF for the module vii. Unique Serial No. and Model No. of the module viii. Date and year of obtaining IEC PV module qualification certificate ix. Name of the test lab issuing IEC certificate x. Other relevant information on traceability of solar cells and module as per ISO 9000series. Until March, 2013, the RFID can be inside or outside the module laminate, but must be able to withstand harsh environmental conditions. However, from 1st April, 2013 onwards RFID should be mandatorily placed inside the module laminate. • (a) Warranty PV modules used in solar power plants/systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) The mechanical structures, electrical works including power conditioners/inverters/charge controllers/distribution boards/digital meters/switchgear/storage batteries, etc. and overall workmanship of the SPV power plants/systems must be warranted against any manufacturing/design/installation defects for a minimum period of 5 years. 1.9 PV ARRAY a) Nominal Capacity 5kWp b) PV array String Voltage Compatible with the MPPT Channel of the inverter. 2. MODULE MOUNTING STRUCTURE: 2.1 The array structure shall be made of hot dip galvanized MS angles of size not less than 50 mm x 50 mm x 6mm size. The minimum thickness of galvanization should be at least 85 microns. All nuts & bolts shall be made of very good quality stainless steel. The minimum clearance of the lowest part of the module structure and the developed ground level shall be 600 mm. i. 2.2 Leg assembly PV Module mounting structure made of different diameter galvanized tubes may be accepted. The work should be completed with supply, fitting fixing of clamps, saddles, nut & bolts etc. While quoting rate, the bidder may mention the design & type of MMS. The minimum thickness of galvanization should be at least 85 microns. All nuts & bolts to be used for the system should be lock nut & bolt (anti-theft nut & bolt) and made of very good quality stainless steel except foundation bolts and the nuts to be used for connection of earthing strip with module mounting structure which will be of MS chrome plated. 2 The structure will be designed for easy and simple mechanical and electrical installation. It will support SPV modules at the mentioned orientation and absorb, transfer the mechanical loads to the ground or any suitable/existing strength structure as deemed fit. 2.3 The structure shall be designed for simple mechanical and electrical installation. It shall support SPV modules at a given orientation, absorb and transfer the mechanical loads to the ground properly. There shall be no requirement of welding or complex machinery at site. 2.4 The array structure shall be so designed that it will occupy minimum space without sacrificing Page 6 the output from SPV modules at the same time it will withstand severe cyclonic storm with wind speed upto maximum 200 kmph. 2.5 The supplier/manufacturer shall specify installation details of the PV modules and the support structures with appropriate diagrams and drawings. Such details shall include, but not limited to the following: a) Determination of true South at the site; b) Array tilt angle to the horizontal, with permitted tolerance; c) Details with drawings for fixing the modules/junction/terminal boxes; e) Interconnection details inside the junction/terminal boxes; f) Structure installation details and drawings; g) Electrical grounding (earthing); h) Inter-panel/Inter-row distances with allowed tolerances; and i) Safety precautions to be taken. 2.6 The drawings along with detailed design shall be submitted in triplicate to College for approval before starting the execution work. The work will be carried out as per designs approved by NBIRT. 3. RCC ARRAY FOUNDATION BASE: 3.1 The legs of the structures made with GI angles will be fixed and grouted in the RCC foundation columns made with 1:2:4 cement concrete. The minimum clearance of the lowest part of any module structure shall be 600 mm from ground level. While making foundations designs due consideration will be given to weight of module assembly, maximum wind speed of 200 km per hour. Seismic factors for the site to be considered while making the design of the foundation. 3.2 Foundation drawings & designs shall be submitted to College for approval before starting the work. 3.3 Proper adhesive should be add on the foundation base and the roof junction area to ensure leak proof. 3.4 The Civil foundation work should be vetted by a Civil engineering organization (assuring the roof condition) 4 POWER CONDITIONING UNIT/INVERTERS: 4.1 The Power Conditioning Unit/Inverters must conform to the latest edition of IEC/equivalent BIS Standards as specified below: Efficiency Measurements IEC 61683 Equivalent BIS Std. Environmental Testing IEC 60068 2 (1,2,14,30)/ Equivalent BIS Std. 4.2 The PCUs required shall be of 5 KVA rating designed to operate as a multifunction power conditioning system. 4.3 Common Technical Specification: Control Type : Voltage source, microprocessor assisted, output regulation Output voltage : 3 phase, 415VAC adjustable up to (+12.5%,-20%VAC) Frequency : 50Hz (+0.5Hz,-0.5Hz) Continuous rating:5KVA Total Harmonic Distortion: less than3% Operating temperature Range: -20˚C to +60˚C Housing cabinet:PCU to be housed in suitable switch cabinet, Within IP 200 of Ingress Protection PCU efficiency : 95% and above at full load Page 7 4.4 Other important Features/Protections of PCU: (a) The PCU shall be self commuted and shall utilize a circuit topology/DSP technology and components suitable for meeting the specifications listed above at high conversion efficiency and with high reliability. (b) Since the PCU is to be used in solar photovoltaic energy system, it should have high operational efficiency. (c) The idling current -if no load, must not exceed 2 percent of the full-load current. (d) The PCU shall have an appropriate display on the front panel to display the instantaneous AC power output and the DC voltage, current and power input. The display shall be visible from outside the PCU enclosure. Operational status of the PCU, alarms, trouble indicators and AC and DC disconnect switch positions shall also be communicated by appropriate messages or indicator lights on the front of the PCU enclosure. 4.5 Electrical safety, earthing and protection: a. Internal Faults: Inbuilt protection for internal faults including excess temperature, commutation failure, and overload and cooling fan failure (if fitted) is obligatory. b. Over Voltage Protection: Over Voltage Protection against atmospheric lightning discharge to the PV array is required. Protection is to be provided against voltage fluctuations in the grid itself and internal faults in the power conditioner, operational errors and switching transients. c. Earth fault supervision: An integrated earth fault device shall have to be provided to detect eventual earth fault on DC side and shall send message to the supervisory system. d. Cabling practice: Cable connections must be made using PVC Cu cables, as per BIS standards. All cable connections must be made using suitable terminations for effective contact. The PVC Cu cables must be run in GL trays with covers for protection. e. Fast acting semiconductor type current limiting fuses at the main bus-bar to protect from the grid short circuit contribution. 4.6 The PCU shall include an easily accessible emergency OFF button located at an appropriate position on the unit. 4.7 The PCU shall include ground lugs for equipment and PV array grounding. 4.8 The PCU enclosure shall be weather proof and capable of surviving climatic changes and should keep the PCU intact under all conditions in the room where it will be housed. The INVERTER shall be located in door and should be either wall/pad mounted. Moisture condensation and entry of rodents and insects shall be prevented in the PCU enclosure. 4.9 Components and circuit boards mounted inside the enclosures shall be clearly identified with appropriate permanent designations, which shall also serve to identify the items on the supplied drawings. 4.10 All doors, covers, panels and cable exits shall be casketed or otherwise designed to limit the entry of dust and moisture. All doors shall be equipped with locks. All openings shall be provided with grills or screens with openings no larger than 0.95cm. (about3x8inch). 4.11 Maximum Power Point Tracker (MPPT) Maximum power point tracker shall be integrated in the PCU to maximize energy drawn from the array. The MPPT should be microprocessor based to minimize power losses. The MPPT must have provision (manual setting) for constant voltage operation. 4.12 Operation outside the limits of power quality as described in the technical data sheet should cause the power conditioner to disconnect the system. Additional parameters requiring automatic disconnection are: Neutral voltage displacement over current Earth fault and reverse power. 4.13 Inverters should be of very high quality having high efficiency and should be capable of running in grid connected mode. Capacity of the inverter shall be 5kVA. The inverter should be completely compatible with the charge controller and distribution panel. 4.14 The inverter shall be designed for continuous, reliable and prime power supply as specified. The inverter shall have high conversion efficiency from 25 percent load to the full rated load. Page 8 The efficiency of the inverter shall be minimum 90% at full load and more than 80% at partial load (60%-80%). 4.15 The inverter shall have high overload capability. The overload capability of the inverter shall be a minimum of 150% at rated full load for 30 seconds. 4.16 The output power factor of the inverter should be of suitable range to supply or sink reactive power. 4.17 The output voltage of the inverter shall be sinusoidal with harmonic distortion less than 3% THD. 4.18 The Inverter shall have internal protection arrangement against short circuit, over load, AC&DC lines fault & other faults. 4.19 The dimension, weight, foundation details etc. of the inverter shall be clearly indicated in the detailed technical specification and the same should be submitted along with the bid. 4.20 The Inverter shall have provision for input & output isolation. Each solid-state electronic device shall have to be protected to ensure long life of the inverter as well as smooth functioning of the inverter. 4.21Supplier shall indicate tripping voltage & start up voltage for the inverters. 4.22 Technical features: Total output power (AC) 5 KVA Output Voltage: 415 V, Three Φ, 4-wire, Sine Wave. Wave form Sine wave with less than 3% THD RFI To minimize the both conducted and radiated RFI emissions Input DC voltage range 200V-500V Number of independent 1 No. / 2Nos. MPPT inputs Reactive Power Topology Regulation Internal consumption Night Frequency Dielectric strength Instrumentation Status Indication Fault indication Ambient temperature Degree of protection Cooling Power Switching Power Control Earthing provisions Surge rating Grid Acceptable Range Protection 0.80inductive to 0.80capacitive Transformer less Maximum 5% against input Voltage and load variation < 1.5 Watt 50 Hz ± 0.5 Hz 1.1 kV between input/output with ground with EMI protections & 1.5 kV between input and output. Input Voltage & Current, Output Voltage & Current, Frequency. Input, Output, Inverter (On/Trip/Fault/Off), Visual indication with blinking super glowing LED audio -20˚C to +60˚C IP65 Fan forced High Efficiency IGBT Phase controlled pulse width modulation AC bypassing to earth on Inverter and DC inputs 150% of rated output for 30 seconds AC Voltage ± 17% ,Frequency ± 3 i. Input over voltage ii. Reverse-polarity protection iii. Reverse current to PV array protection, over voltage, Page 9 iv. v. vi. vii. viii. ix. Under voltage protection Over current DC inject protection to grid Over current Over and under grid frequency protection Anti Islanding protection Inverter shall have arrangement for adjusting DC input current and should trip against sustainable fault in the Distribution system and shall not start till the fault is removed. 5. AC DISTRIBUTION BOARD (ACDB) This shall consist of box of suitable powder coated metal casting. One feeder per phase shall be provided in ACDB with MCB of suitable capacity installed at each feeder in the ACDB. One Electronic Energy Meter, ISI make, Single/Three Phase, of good quality shall be installed in ACDB suitably placed to measure the consumption of power from SPV Power Plant. Proper rating MCB shall be installed at every feeder to protect feeders from short circuit current as per requirement of the site. A separate dedicated feeder from conventional/grid line to PCU/Inverter as well as ACDB should also be installed. A separate change over switch of proper rating should be suitably installed in the ACDB to isolate the existing connected load from the SPV system and cater the power to the existing load from conventional/grid line, in case of emergency. ACDB should be connected between PCU and Load. Proper separation of distribution line of load for operation of other load of the Complex should be made so that there is no overload for the SPV Plant. The details specifications are as follows:- Parameter MCB Make Type Rating Bus Bar Rating Type Indicator Earthing Provision Enclosure Degree of Protection Type Type of Fixing Accessories mounting arrangement Desired Specification ABB / L & T / Siemens / Schneider / Havells / Crabtree or equivalent 4 pole 415V, 16A 3 Ø with Neutral, 415V 16A Aluminium Provided Terminal Blocks will be provided for Earthing IP 42/43 Sheet Steel, Powder coated. Horizontal / Vertical Enclosure dust and Vermin proof Wall Mounted DIN Rail or as Suitable 6. PV ARRY JUNCTION BOXES (AJB)/ENCLOSURES: 6.1 The Junction Boxes/Enclosures must conform to the latest edition of IEC/ equivalent BIS Standards as specified below: General Requirements IP 65 (for outdoor)/IP 21 (for indoor), IEC 62208 6.2 The junction boxes shall be dust, vermin and waterproof and made of FRP. The terminals will be connected to copper bus-bar arrangement of proper sizes to be provided with EPDM rubber gasket to prevent water entry. The junction boxes will have suitable cable entry Page 10 6.3 (a) (b) (c) (d) (e) (f) points fitted with cable glands of appropriate sizes for both incoming and outgoing cables with provision of earthing. Suitable markings shall be provided on the bus-bar for easy identification and cable ferrules will be fitted at the cable termination points for identification. Suitable arrangement shall be provided for connecting ‘Reverse Blocking Diodes’ in the Array junction Boxes. The Junction Boxes shall have suitable arrangement for the followings: Combine groups of modules into independent charging sub-arrays that will be wired into the controller. Provide arrangement for disconnection for each of the groups. Provide a test point for each sub-group for quick fault location & also group array isolation. The rating of the JBS shall be suitable with adequate safety factor to inter connect the Solar PV array. Suitable capacity MOVs provided within the box to protect against lighting. Technical features: Item Description Desired Data Enclosure Degree of Protection Material Withstanding Voltage Withstanding Temperature Accessories mounting arrangement Number of Strings entry Item Description Cable Entry and Exit Position Cable Entry and Exit connector type Cable gland Fuse with fuse holder Position Type Rating Earthing Provision IP65 Polycarbonate. 1000V DC 1000 C As suitable As may be required Desired Data Bottom at cable entry and exit MC4 (PV Array String cable) Earthing cable entry Positive and negative terminal for each series stringfuse, for PV use only Glass Current: Minimum 1.25 times the rated short circuit current of the Terminal blocks willseries have string to be provided for Earthing 7. CABLES 7.1 The Cables must conform to the latest edition of IEC/equivalent BIS Standards as specified below: General Test & Measuring Methods IEC 61427 PVC insulated cables for working Voltages upto & including 1100V IS 694/IS 1554 -do-, UV resistant for outdoor installation IS/IEC 69947 7.2 Unit length of cable has been shown in respective item in running meter. The length of cable shown is indicative & actual length may vary depending on layout, design & site condition. However, payment will be made on basis of actual utilization. 7.3 All cables shall be PVC insulated 1100 V grade conforming to IS: 694-1990 or IS: 1554 (Part-I). 7.4 The wiring for module inters connection shall be with hard PVC conduit of BIS approve make. All Tees, Bends etc. shall also be BIS approve make hard PVC material 7.5 Cables in the array yard shall be laid direct in ground at a depth of 500 mm in the excavated trenches along the approved route and covered with sand cushion. A continuous single brick protective layer of first class brick shall be placed over the entire length of the underground Page 11 cable before refilling the trench with loose soil. Alternatively, 6” wide continuous layer of 1½” thick concrete cable markers may also be provided as protective cable cover. The cables shall be laid inside class-B, GI pipes of suitable size under road crossings, drains, sewerage lines, entry or exit points of the buildings or where there are chances of mechanical damage. 7.6 Cables on the roof shall be laid in suitable Cable Tray. 7.7 All wires shall conform to IS: 694-1990 (as amended upto date) and should be of 650/1100 volt grade as per requirement. Only copper conductor wires of reputed make shall be used. Cable terminations shall be made with suitable cable lugs & sockets etc., crimped properly and passed through brass compression type cable glands at the entry & exit point of the cubicles. The panels’ bottoms should be properly sealed to prevent entry of snakes inside the panel. 7.8 All cable/wires shall be marked with good quality letter and number ferrules of proper sizes so that the cables can be identified easily. 7.9 The terminal end of cables and wires are to be fitted with good quality letter and number ferrules of proper sizes so that the cables can be identified easily. The details specifications are as follows:Item Description DC Cable Conductor Insulation Standard Make Tinned annealed stranded flexible copper PVC IS : 694 Polycab / LAPP / Top Solar / Nexans / Schneider or equivalent AC Cable Rated Voltage Construction Type Conductor Insulation Standard Make 1.1 k V Excellent resistance to Heat, Fire, Oil, Cold, Water, Abrasion, UV radiation Armoured or Unarmoured as per requirement Stranded flexible Copper / Armoured aluminium PVC IS : 1554 MESCAB / Polycab / LAPP / Havell’s / RR Cable or equivalent 8. LIGHTNING & OVER VOLTAGE PROTECTION 8.1 The Switches/Circuit Breakers/Connectors must conform to the latest edition of IEC/equivalent BIS Standards as specified below: General Requirements IS/IEC 60947 part I,II,III Connectors-Safety EN 50521 8.2 The SPV Power plants should be provided with Lightning and over voltage protection connected to proper earth pits. The main aim of over voltage protection is to reduce the over voltage to a tolerable level before it reaches the PV or other sub-system components. The source of over voltage can be lightning or other atmospheric disturbance. 8.3 The Lightning Conductors shall be made of 20mm - 25 mm diameter 3000mm - 4000 mm long G. I. Spike as per provisions of IS 2309-1969. Necessary concrete foundation for holding the lightning conductor in position to be made after giving due consideration to maximum wind speed and maintenance requirement at site in future. The lightning conductor shall be earthed through 20 mm x 3 mm thick GI flat with earth pits/earth bus made with 25 mm x 5 mm GI flats. Each Lightning Conductor shall be fitted with individual earth pit made with GI pipe, 4.5 m long 40 mm diameter including accessories, and providing masonry enclosure with cast iron cover plate having locking arrangement, watering pipe using charcoal or coke and salt as Page 12 required as per provisions of IS:3043. 8.4 The bidder shall ensure adequate lightning protection to provide an acceptable degree of protection as per IS: 2309 for the array yard. If necessary more numbers of Lightning conductor may be provided, in such a case payment will be made on actual basis. 9. EARTHING SYSTEM 9.1 The earthing for array and distribution system shall be made with GI pipe, 4.5 m long 40 mm diameter including accessories, and providing masonry enclosure with cast iron cover plate having locking arrangement, watering pipe using charcoal or coke and salt as required as per provisions of IS: 3043. Necessary provision shall be made for bolted isolating joints of each earthing pit for periodic checking of earth resistance. 9.2 Each Array structure of the SPV Yard shall be grounded properly. The array structures are to be connected to earth pits through 25 mm x 5 mm GI strip. 9.3 The earthing for the power plant equipment shall be made with copper plate 600 mm x 600 mm x 3 mm thick including accessories, masonry enclosure with cover plate having locking arrangement and watering pipe etc using charcoal or coke and salt as per provisions of IS: 3043. Necessary provision shall be made for bolted isolating joints of each earthing pit for periodic checking of earth resistance. 9.4 The earth conduction shall run through GI pipe partly buried and partly on the surface of the control room building. 9.5 The complete earthing system shall be mechanically & electrically connected to provide independent return to earth. All three phase equipment shall have two distinct earth connections. 9.6 The inverters and all equipment inside the control room to be connected to earth through 25 mm x 5 mm tinned copper strip including supplying of material and soldering. An Earth Bus shall be provided inside the control room with 25 mm x 5 mm tinned copper strip of minimum length 25m. The strip & all earth bus should run on suitable size porcelain base fixed on wall surface. 9.7 In compliance to Rule 33 and 61 of Indian Electricity Rules, 1956 (as amended upto date), all non-current carrying metal parts shall be earthed with two separate and distinct earth continuity conductors to an efficient earth electrode. The details specifications are as follows:i. Equipment grounding (Earthing) will connect all non‐current carrying metal receptacles, electrical boxes, appliance frames, chassis and PV panel mounting structures. ii. Array Structure will be earthed with GI Strip / GI wire. iii. The complete earthing system will be electrically connected to provide return to earth from all equipment independent of mechanical connection. iv. Earthing system design to be as per the standard practices. Minimum Two (02) numbers of earth pit (1 Nos. For PV Structure & Inverter & 1 Nos. For lightning arrestor) 10. OTHERS ACCESSORIES a. DANGER PLATES Size of the each Danger Notice plates will be 200 mm x150 mm made of mild steel sheet and at least 2 mm thick, and vitreous enameled white on both sides, and with inscription in signal red colors on front side as required. The inscriptions shall be in Bengali script and English. b. DRY CHEMICAL FIRE EXTINGUISHERS The dry chemical fire extinguisher shall be Upright type of capacity 10 kg having IS: 2171. 7 IS: 10658 marked. The fire extinguisher shall be suitable for fighting fire of Oils, Solvents, Gases, Paints, Varnishes, Electrical Wiring, Live Machinery Fires, All Flammable Liquid & Gas. c. SAND BUCKETS The sand buckets should be wall mounted made from at least 24 SWG sheet with bracket Page 13 fixing on wall conforming IS 2546. 11.0 Documentation An operation, instruction, maintenance manual in English should be provided with the Solar Power Plant. The following minimum details must be provided in the manual: i. About Photovoltaic ii. About Solar Power Plant–its components and expected performance iii. About PV Module. In case of imported modules it is mandatory to provide a copy of the international product qualification certificate to the test centre. iv. About PCU/Inverter. The make, model number and technical characteristics of PCU/ Inverter should be stated in the product datasheet and furnished to the test centers v. Clear instructions about Mounting of PV Module(s) vi. About Electronics vii. About Charging and Significance of Indicators. viii. DO's and DON’Ts ix. Clear instructions on operation, Regular Maintenance and Trouble Shooting of SPP x. Name and address of the person or service center to be contacted in case of failure or complaint. B.) Technical specifications for solar water heating system FLAT PLATE SOLAR WATER HEATING SYSTEM The Solar water heating system of 500 LPD capacity will be installed at Victoria Institution (College) hostel building. STANDARDS The details of the standard which contain minimum performance requirement along with the test method are as follows. 1. Solar Flat Plate Collector a) IS 12933 ( Part-1): 2003 , solar flat plate collector – Specification , part 1requirement b) IS12933 ( Part-2) :2003 , Solar flat plate collector-Specification, Part-2-Components c) IS 12933( Part-3) :2003 Solar flat plate collector –Specification ,part-3- Measuring Instruments d) IS 12933 ( Part-5) :2003 , Solar flat plate collector-Specification, part-5e) test method 2. MNRE Specification for test procedure Test procedure for Thermo-syphonic solar water heating systems are available on MNRE web sitewww.mnre.gov.in should be followed. Test Report & Testing laboratory /center The Solar Collector must be tested at any test centers in the country which is recognised by BIS for carrying out certification testing for solar water heating system as per Indian Page 14 Standard. Only Collector as per BIS specification No- 12933 solar flat collector and also BIS marked will be supplied. Other requirement of water heating system 1. Overall dimension of collector Size Length ( in mm) Height( in mm) Width( in mm) A 1860± 10 100±10 1240± 10 B 2120 ± 10 100± 10 1040± 10 C 2050± 10 100± 10 930± 10 2. Cover plate :- The cover plate shall be single piece tempered / toughened glass and minimum of 4 mm thick ,free from bubbles and rough surface as per the latest BIS specification ( ( IS: 12933 part-2: 2003)The solar transmission of the cover plate shall be minimum 82% at near normal incidence. 3. Collector Box: - The collector box shall be made of aluminium section only. Type, grade, size, workmanship and finish of the material used shall be as per latest BIS specification. The minimum thickness of Aluminium shall be as under. Channel Section for sides 1.6mm Sheet for bottom 0.7mm Support for glass retaining 1.2mm Sheet for entire body 1.0mm 4. Absorber:-The absorber consists of risers, headers and sheet for absorber. (a) Material :- Copper sheet and copper tubes (b) Thickness :- 34 SWG ( IS-191) (c) Copper tubes ( Riser) : Diameter = 12.7 mm(± .5mm) Thickness =24 SWG (IS-2501) (d) Header Diameter = 25.4 mm (±.5mm) Thickness = 22 SWG Projection = 40mm (± .5mm) outside the collector box including the flanges. (e) Space between riser tubes: Maximum 12 cm from center to center of the riser. (f) Bonding between riser and sheet.- Full length of all risers shall be welded with absorber sheet. In case of brazing / soldering /TIG welding of continuous nature, unbrazed /unsoldered portion should not exceed more Page 15 than 10 % of the length of the riser. For brazing /soldering, minimum 60% tin solder or suitable brazing material shall be used. The flux used for soldering /brazing shall be non greasy. (g) Header- riser joints:- The assembly of riser with the header shall ensure the tube protrusion inside the header not exceeding 3mm. The riser shall be brazed /welded with header. (h) Absorber coating: - In all systems selective coating shall be used. The selective coating shall have emissivity <0.2 and absorbitivity > 0.92. (i) Absorber area:- 2 sqm per 100 LPD at 60 °C .For 80 °C system of capacity 500LPD desired extra solar collectors to be provided to meet the standard requirement.. Testing of riser –Header: - Riser and header assembly designed for working pressure up to 245 kPa ( 2.5 Kg/cm² ) shall be tested for leakage at a minimum hydraulic pressure of 490 kPa ( 5Kg/cm² ) . The system designed for higher pressure than 245 kPa, the assembling shall be tested at a pressure twice the designed pressure. Collector box installation:(a) Back & side insulation: - Minimum 50mm thick insulation of rock wool/ glass wool/ mineral wool shall be provided. Thermal resistance of insulation materials shall be minimum 0.96 square meter ° C /W for back insulation and minimum 0.48 square meter° C/W for side insulation. The collector box insulation shall conform to latest BIS specification. (IS 3346). (b) Aluminium foil of thickness of .016 mm ± 0.005 mm shall be used for covering the back as well as side insulation. (c) Back and side insulation shall withstand at 175°C. Gaskets and grommets: - The load of the absorber should not be on the insulation. It should be taken by the collector box. Insulation should not be allowed to slide. Gasket used for sealing the glass with collector box may be of Neoprene / Silicon/EPDM rubber channel section. Grommets for sealing the collector box and the header joint may be one of the following types and shall fit properly so that no dust can pass through the joints: a) Neoprene rubber, b) EPDM, c) Silicon rubber Grommet and gaskets shall be capable of withstanding temperature up 125° C and shall conform to thermal shock test. Header flanges: - Copper/brass flanges of 62mm ± 3mm diameter and minimum thickness of 4mm with provision for 4nos of brass nut and bolts with diameter of Page 16 5mm -6mm shall be used. Flanges shall be brazed to header and brazing tested for leakage to test pressure. In no case crude solder flanges shall be used. Assembly of the flanges should be at right angle to the header area to ensure proper assembly at the side of the insulation. Assembly of the Collector:a) The collector shall be assembled in such a way that the weight of the absorber is distributed uniformly on the side wall of the collector box. b) The entire assembly shall be free from surface defects. All sharp edges and corners shall be rounded off. The exposed surfaces shall be properly made corrosion resistant. c) The air gap between the cover plate bottom and the absorber surface shall be within 20mm to 40mm. d) The glass should be firmly held, without strain taking in to account the expansion of glass. Top surface along with the edge between the glass and the aluminium angle shall be caulked with suitable sealant such as zinc oxide based or rubber based or silicon rubber based or epoxy based compound. Gasket for Flanges:- 3m thick compressed asbestos fibre or Neoprene rubber gasket shall be used for sealing the joints between flanges. Collector Support frame: - The structure shall be in a position to withstand wind velocity of 200 Km/hr. The structure shall be made with angle iron stronger than 35mm X 35mm X 3mm and shall have the vertical support at top and bottom edge of the inclined plane of the collector at a distance of 2.5 m or less. The vertical support shall be firmly grouted to the roof or in the ground in case of ground mounted system. The grouting blocks shall be minimum 25cm X 25cm X 15cm and finished properly. In case of grouting is carried out on a roof already water proofed with asphalt , the back support of the collector may be anchored to the parapet or the size of the grouting block shall be increased to provide for a dead load weight anchoring of 75 Kg per leg of the vertical stand. The collector support frame shall be rectangular shape i.e. having all four sides touching the collector edge. The cement pedestals should be made after chipping of the existing rooftop to provide proper gripping and strength. Structure should be such that collector’s bottom side is at least 30 cm above the ground/roof level. In case of inclined roof, the collector housing frame along with the vertical angle shall be mounted & fixed using suitable necessary structure keeping in view the load bearing capacity of the roof top ensure the stability against storm. The collector should be properly clamped and tightened with frame and supporting structure at both the ends by 20mmX 2mm size MS strip consisting rubber packing to avoid chemical reaction between the collector bodies and clamp. Last row of collector supporting structure should be Page 17 grouted throughout its length opposite to collector facing with c.c work ratio 1:2:4 of size 25cm X 30cm ( d x h i.e. height X width) and then plaster with cement. Painting of stand: - Proper cleaning and degreasing of the surface should be done before painting. Two coats of zinc chromate red oxide primer shall be applied followed by one coat of enamel paint. Suitable anticorrosion paint should be applied after proper treatment. Storage tank Materials: - The storage tank should be stainless steel SS304/316. The thickness of 500 LPD system should be 20 gauge (0.91mm) whereas for 1500 LPD system it should be 18 gauge (1.2mm). Socket and internal fittings should be stainless steel. Insulation: - Insulation should withstand temperature of 100 ° C. Thin polythene sheet shall be used as covering between the glass wool and the cladding sheet besides the retaining materials such as chicken mesh etc. Aluminium sheet of thickness, 22 SWG / GI sheet of minimum 24 SWG shall be used for cladding the tank insulation. External of the tank should be properly insulated so that hot water temperature does not decrease by more than 5 degree C in about 16 hours times. The storage tank shall be properly installed at site using enameled coat appropriate size angle iron stand, girder cement pedestals of 1:2:4 ratio or any other specific provision suitable to site to ensure the stability against heavy storm etc. Piping:½ inch to 2 inch dia ISI marked GI pipe, medium class of IS 1239 shall be used for piping. 50 mm thick rock wool insulation of 48 Kg/cum density be used for hot water pipes. Thin plastic sheet shall be used as covering between rock wool and aluminium cladding besides other retaining materials like chicken mesh etc. 26 SWG thick aluminium sheet shall be used for cladding the insulated pipe. The pipe line should be properly supported and fixed with clamp with the help of suitable size stand/civil structure (cement concrete ratio 1:4). ISI mark gunmetal strainer of standard make should be fitted in the main cold water supply line before the system. Valves/Nipple/tees/bend/taps:Gunmetal valve as per ISI specification shall be used. Nipple/tees and bends shall be of medium class G I (B-class) /brass or copper. Gunmetal valve in each row Page 18 shall be provided. TAPs of stainless steel ISI mark or reputed make shall be provided. Temperature gauge:Temperature gauge (ISI mark):- one for hot water storage tank/outlets – dial type – duly calibrated and suitable for temperature ranges (0 to 120 ° C) Cold water tank: a) Only Syntax or equivalent materials and it should be as per the capacity of the solar water heating system. Supply of cold water tank is not within the scope of the supplier. The same is to be provided by Victoria Institution (College). The supplier should install /grouted on suitable stand and do necessary connection for proper function of the system. b) Make up tank: - A suitable make up water tank should be provided with the system. Materials may be syntax or equivalent. C.) Two Years Maintenance and Performance Warrantee Contract (MPWC) 12.1 Preventive/Routine Maintenance This shall include activities such as, cleaning and checking the health of the SPV Power plant, cleaning of module surface, tightening of all electrical connections, changing of tilt angle of module mounting structure and any other activity that may be required for proper functioning of the SPV Power Plant as a whole. 12.2 Breakdown/Corrective Maintenance Whenever a complaint is lodged by the user, the bidder shall attend to the same within a reasonable period of time of 3days and in any case the breakdown shall be corrected within a period not exceeding 7 days from the date of complaint. 12.3. The bidder shall maintain the following facilities at the local Service Centre for ensuring highest level of services to the end user. 1. Adequately trained manpower, specifically trained by the bidder for carrying out the service activities. 2. Adequate provisions for record keeping, which shall inter-alia, include the following: (a) Details of system supplied within the command area of the service station including full name and address of end user, system and sub-system serial numbers and records of routine maintenance carried out (duly signed by the end user). These records shall include voltage, current, indicator charge, full glow, charge controller operation, electronics, etc. (b) History record sheets of maintenance done. 3. Adequate spares and manpower for ensuring least downtime of an individual system. Page 19 Bidding Schedule SR. Name of the Item Quantity YES NO No. Scope of work for 5kWp SPV Power plant and 500LPD Solar Hot Water System installation at Annex Building and Hostel of Victoria Institution (College) 1 Poly crystalline Solar PV Module of 250 Wp having 20Nos 60 cells.(Make: Vikram/ Sova/ Sunshine) 2 Hot dip galvanized MS Structures for mounting of 20 nos. SPV Modules with galvanization thickness of 80-85 micron. 1Set 3 Supply and making of necessary concrete foundation column for module mounting structure. L.S 4 5kVA, 3Ø, 415V, 50Hz AC Grid-Tied Inverter (Make – ABB / KACO New Energy/ SMA) 5 Cables & Wiring materials 6 PV Array Junction Box (AJB) 01Nos. 7 Grid Interfacing LT Panel / ACDB 01Nos. 8 Lightning arrestor and Earthing system. 1Set 9 1Set 10 Supply Installation commissioning of 500LPD Solar hot water system 415V, 16 Amps Switch Fuse Unit 11 Annual Maintenance 1Nos L.S 1Set 2years Page 20 Format for Submitting the Price Schedule BID No. : To The Principle Victoria Institution (College) 78B, A.P. C. Road, Kolkata - 700 009 Date: ……………. Price Schedule Sl. Item Price in Rupees Unit Price 1 Supply, Installation, Commissioning & Maintenance (2yrs)of 5kWpGrid connected Solar PV Power Plant as per the Bid Document including MPWC (2yrs) The price should be complete in all respect including taxes and duties, transportation, insurance, etc. 2 Supply, Installation, Commissioning & Maintenance (2yrs)of 500LPD Solar Hot Water system as per the Bid Document including MPWC (2yrs) The price should be complete in all respect including taxes and duties, transportation, insurance, etc. Total Price Note: 1. Above quoted price for SPPs are complete in all respect as per Technical Specifications inclusive of all Central/State/Local taxes & duties, packing, forwarding ,transit insurance, loading & unloading, transportation & other charges etc. FOR Kolkata, inclusive of installation, testing, commissioning, performance testing and training at Kolkata, West Bengal. 2. Certified that rates quoted for SPPs are as per specifications, terms & conditions mentioned in the bid document. Yours faithfully, (Signature of Authorized Signatory) Name: Designation: Company seal Page 21 Page 22