Download status for SSG mtg 5 July 2016

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Phase-gate process wikipedia , lookup

Transcript
AeroSpace and Defence
Industries Association of Europe
SSG meeting N°27
on the 5th and 6th of July 2016
Status of progress of
the MoSSEC project proposal
(ISO /TC 184/SC 4)
Judith CROCKFORD
Airbus
1
AGENDA
• Reminder of scope
• Planning
• Preliminary Work Item [PWI]
• New Work Item [NWI]
• White Paper [WP]
• Workshop Feedback
Slide 2
ASD SSG N°27: 05 – 06 July 2016
Collaboration + Modelling & Simulation Data
Modelling and Simulation data
•
•
Managed in the PLM/M&S systems
Exchanged with technical standards
Together they
enable the
distributed dataset
Collaborative SE context data
•
•
Managed by MoSSEC Compliant Tools
Exchanged with MoSSEC standard
Slide 3
ASD SSG N°27: 05 – 06 July 2016
MoSSEC: A common approach
based on standards
• MoSSEC provides a common approach for:
• Structuring the Distributed Dataset
• Structuring the Information Services for Dataset Management
• MoSSEC is built on ISO standards
AP2xx
AP239
Structured By
Defined
By
Exposed
As
MoSSEC
Business
Object
Model
3D
Geom
Model Based
mapping
RM
PDM
etc
“New STEP Architecture”
Slide 4
ASD SSG N°27: 05 – 06 July 2016
MoSSEC: Within New STEP Architecture
•
Part of “New STEP Architecture” at “AP” level
•
Mapped to “Core” & Shares a Subset with other APs
•
Implementation Methods used to generate Implementation models
PDM
etc
“New STEP Architecture”
AP
RM
CM
Model Based
mapping
AAM
AP
3D
Geom
CM
MoSSEC
Business
Object
Model
AAM
AP2xx
AP239
APxxx
shared
subset Implementation methods
AP239
Bindings / transformations
MoSSEC
MoSSEC
contribution
Slide 5
ASD SSG N°27: 05 – 06 July 2016
AGENDA
• Reminder of scope
• Planning
• Preliminary Work Item [PWI]
• New Work Item [NWI]
• White Paper [WP]
• Workshop Feedback
Slide 6
ASD SSG N°27: 05 – 06 July 2016
Planning Overview
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
ASD SSG
PDES inc
AFNET
AIA ???
SC4
PWI
NWI
Vote
13/14
WP
PDES inc
15/16
Bi-weekly WebEx
Final
Vote
Slide 7
ASD SSG N°27: 05 – 06 July 2016
Preliminary Work Item [PWI]
Milestones

Presented at ISO-SC4 meeting [Sapporo] - End of May

Unanimous acceptance by delegates
Purpose:

State what is being planned

Who is participating

Get ISO-SC4 acknowledgement to submit NWI and WP
Slide 8
ASD SSG N°27: 05 – 06 July 2016
Planning – New Work Item [NWI]
Milestones

Final draft available – Mid September

Discussion for acceptance at SC4 Meeting [Seattle 2-7 October]

Vote - Mid October-Mid December
Purpose:

Formal document for approval by ISO-SC4

4 pages – executive summary of White Paper
Slide 9
ASD SSG N°27: 05 – 06 July 2016
Planning – White Paper
Milestones

Workshop [Toulouse] – 13/14th June

Final Draft available – Mid September

Discussion for acceptance at ISO-SC4 meeting [Seattle 2-7 October]
Purpose:

Proposed Technical content and development principles

Requirements and Benefits

Interdependencies, Risks, Project management
Slide 10
ASD SSG N°27: 05 – 06 July 2016
AGENDA
• Reminder of scope
• Planning
• Preliminary Work Item [PWI]
• New Work Item [NWI]
• White Paper [WP]
• Workshop Feedback
Slide 11
ASD SSG N°27: 05 – 06 July 2016
Workshop Feedback
Location: Toulouse, 13th 14th June
Attendance: 13 delegates: 9 physical and 4 virtual
Major topics discussed:

Requirements

Use Case

Scope and Work-plan

Project Management and Positioning in STEP architecture
Details available @ http://private.mossec.org
Slide 12
ASD SSG N°27: 05 – 06 July 2016
Project Management for MoSSEC
Aligned to AP239
Project
Management
These WPs include shared activities with
AP242 ed2 , AP239 ed3 and New STEP
architecture work
STEP MoSSEC ed1
Project Steering Committee (PSC)
WP0 Project Management &
Communication
WP1 Standard Edition
ISO
deliverables
WP3
Business
value and
models
(CD, DIS, IS)
WP2:
Architecture &
AP integration
Issues Resolution &
Interaction with other ISO
groups (TC184/SC4
WG12, WG21, and WG22)
Technical board
WP4
Information
Models
WP5
Implementation
methods
(incl. XML schema
and Web services)
Page 13
and preparation
of future Impl.
Forum
Agreed I/O from other AP activity models “Joined up data across activity model…”
Ensure integration of:
•
•
•
•
•
WP6
Pilots
Activity model
Conceptual model
Domain model
Core model
Implementation Method
within New STEP Architecture.
Activity model
Conceptual model
Pilot cases
Usage guidance
MoSSEC Domain model
(specific patterns & RD)
Implementation
models
Pilot implementations
Pilot cases running
Consistency assessment
Mapping with CTCs or
APs Business Objects
Management of interdependences with
other projects (AP242ed2, AP239ed3,
AP209)
Slide 13
ASD SSG N°27: 05 – 06 July 2016
Positioning in STEP Architecture
MOSSEC = Audit trail of all activities managing
the red
redboxes
boxes
Concept
Simulation
Definition
Product Life Cycle
Manufacture
Support
Disposal
Standards for Engineering processes and methods not described
AP 209 Multi-disciplinary Anaysis & design
AP 242 ed2
Structural
Analysis
Comput. Fluid
Dynamic
Suite of
AIA - ASD
ILS Specs (SX000)
Managed Model Based 3D Engineering
Additive Manufact. (ed2)
Composite design
Based
on PLCS
Process planning 2D drawing
AP
233
Systems Engineering
Requirement
Management
Project
Management
Function diagram
State machine
Issues management
Analysis
shape
Idealized
Analysis
shape
Electrical
Harness (ed2)
PDM:
Product Structure, Change
Mgt,
Mgt.,Pers.&Org.
Pers.&Org.Document
Document
Mgt
Mgt,Configuration
ConfigurationMgt.,
Mgt.,
Classification,,
Security,…
…
Classification, Security,
Machining
Kinematics Form Features
PMI 3D geometry
Interconnect substrate
Electronic assembly
Schedule
AP 238
AP 235
Engineering Properties for product design & verification
MoSSEC Scope
AP242 edition2 additions
Slide 14
AP 239/PLCS
Cutting tools
Turning
Milling
WorkpieceIntegrated CNC
Machining
tools paths
AP 210
NON Modular STEP standard
Tasks management
Messaging
Product Life Cycle Support
Electronic assembly, interconnect & packaging design
Modular STEP standard
Support tasks
Maintenance
Support history
State substance
Material properties
Analysis
model
Risk Management
Validation & Verif.
MoSSEC Scope as blackbox models
ASD SSG N°27: 05 – 06 July 2016
Contribution to New STEP Architecture
MOSSEC contribution to the
new STEP Architecture
Activity Model
Implementation
methods
Bindings / transformations
AP Conceptual Model
SysML to OWL binding
SysML
SysML to RESTful / ?json? binding
AP Domain Model
SysML
Core Model
Linked Data
Queries
SysML to WSDL binding
Web service
descriptions
WSDL + XML data
SysML to XSD binding
XML Files
XSD + XML data
(Core vocabulary)
SysML
AP Module
Concepts on the
web
Express to P21
EXPRESS
P21
P21
Slide 15
ASD SSG N°27: 05 – 06 July 2016
Workshop Feedback
Conclusions:
•
The Delegates considered this workshop was a success.
•
Good discussions were held on the variety of topics that need to be
addressed in order to publish the NWI/White Paper in October.
Next Steps:
•
The information captured during the workshop will be transcribed and
utilised in an updated version of the White Paper.
•
This will be further iterated during the conference calls
Slide 16
ASD SSG N°27: 05 – 06 July 2016
Slide 17
ASD SSG N°27: 05 – 06 July 2016