Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
SECTION - I REPLACEMENT OF TURBINE MAIN INLET VALVE AND SLUICE VALVES 1.1 Scope: This section of the specification cover the following scope of works: i) Dismantling/removing of existing four (4) No.’s Butterfly type Turbine Main Inlet Valves (MIV), and four (4) No.’s sluice gates, all services, labour, tools and tackles required for dismantling including carriage, stacking at Owner’s store/ yard. ii) Design, engineering, manufacture, shop assembly & testing before dispatch, packing and forwarding, transportation, insurance, handling, delivery, storage at site, erection, testing & commissioning of four (4) Nos. Butterfly type Turbine Main Inlet Valves and four (4) No.’s sluice valves, as detailed in this specification and handing over to HPSEB LTD. complete with accessories, equipment, devices, piping, instruments, cabling and wiring etc. including all services, labour, tools and tackles. 1.2 Standards: The turbine main inlet valve to be supplied shall conform to the provision contained in the latest edition of IS – 7326 (Part 1, 2 & 3):1992 and other relevant IEC and IS standards in all respect. 1. 3 Basic Parameters: The following basic parameters and other pertinent data shall apply to the turbine inlet valve systems: 1.4 Type of valve Butterfly Valve diameter Elevation of valve centreline 500 mm (shall have to be matched with the spiral casing of turbine). 3600.399 m. Design discharge 0.856 cumecs Net head 79 m Max. pressure 12 Kg/cm2 Penstock diameter 700 mm (internal) Valve Design and Construction Requirements The main inlet valve shall be of the disc and trunnion, single seating butterfly valve to operate with complete reliability and good hydraulic properties, furnished with upstream and downstream pipes of suitable length. The inside diameter of the valve shall not be less than the internal diameter of spiral case. The valve together with its bypass valve assembly, drain valve, air valves and operating equipment shall be designed to fit into the existing space available with proper regard to accessibility. The valve shall be 1 supported on the concrete pedestal and secured by anchor bolts. The valve body and operating mechanism shall be designed for installation and removal from above by means of the powerhouse crane. The valve shall open through oil operated hydraulic servomotor by means of a high-pressure oil system and shall be capable of closing through counterweight under most adverse conditions. The oil servomotor shall be so designed that when the valve opens, the counterweight should lift up and on reaching at the end position of travel, a proximity switch shall trigger giving a signal to trigger the motor. The oil thus trapped in the cylinder keeps the piston extended and the valve remains open with counterweight raised. The cylinder piston seal shall be dynamic type and may cause some leakage, which may cause the counterweight to creep down over a period of time. This will un-trigger proximity switch and start the pump to push back the counterweight and keep the valve fully open. The normal closure and emergency closure shall be initiated by operation of the solenoid poppet valve. The pressure created by the counterweight acting on all the trapped oil shall be transferred to the pilot operated check valve, which opens and lets out the trapped oil back to the tank. The valve shall close down due to the action of the counterweight. Means shall be provided to control the valve closing speed by controlling the flow of oil back to the tank via pressure and temperature compensated flow control valve. 1.5 Operating Conditions 1.5.1 Design The operating mechanism shall be of sufficient capacity to close the valve in not more than 60 seconds against the discharge and head conditions indicated below. The opening time shall be approximately equal to the closing time. The closing and opening time shall be adjustable between 45 and 120 seconds with positive means for locking these adjustments. The minimum permissible closing time shall be controlled by a fixed orifice installed directly at the servomotor outlet as to prevent fast closure of the valve in case of oil piping failure. The valve should be capable of closing under most adverse conditions at maximum flow. The design pressure shall be 12 kg/cm2 1.5.2 Normal operation The butterfly valve and its operating mechanism, extension pipes, coupling, and related bypass system, sealing and drain system shall withstand safely the maximum stresses from the following operating conditions, with stresses in the materials not exceeding the maximum allowable stress for normal operation specified in clause- 4.3 of Vol.- 2A. 1. Continuous operation with valve in the open position passing the rated discharge of the turbine of 0.856 cumecs under the rated operating net head on the turbine of 79 m and a discharge of 0.96 cumecs while running at 10% overload. 2 1.5.3 2. With valve in open position withstanding total maximum water pressure 12 kg/cm2 on the valve centreline, which includes the design pressure rise allowance. 3. With valve in closed position withstanding a maximum water pressure 12 kg/cm2. Emergency closing The valve and its operating mechanism, extensions, by-pass system, seal, drain and air release valves and couplings shall withstand the maximum stresses from closing under a flow corresponding to the discharge of the turbine of .856 cumecs. 1.6 Valve Body 1.6.1 General The valve body shall be in two pieces, made of welded plate steel, or of cast steel, or a combination of both, bolted together by hydraulically or thermally pre-stressed bolts. It shall be of rigid construction and adequately ribbed as necessary to minimize distortion under full load and maximum pressure and designed to transmit the hydraulic thrust to the upstream valve body extension and penstock. The trunnion bearing housings and the flanges for the bypass line shall be integral with the valve body and supported by it. The valve body shall be provided with flanges for bolted connections to similar flanges on the valve body extensions. The valve body shall be machined only after it has been subjected to a stress-relieving heat treatment. 1.6.2 Foundation Foundation details shall match the existing valve foundations. This is a replacement job as such new foundation shall not be casted. Contractor shall collect the necessary details from the power house site. It shall be the responsibility of contractor for accuracy of foundation detail measurements. 1.6.3 Permissible Leakage Maximum permissible leakage from the main valve should not exceed 2litre/min/metre periphery of seal when valve is new. 1.7 Flanged Extensions and Erection Joints 1.7.1 General The butterfly valve shall be furnished with two valve body extensions, one for the inlet side of the valve and another for the outlet side. A sleeve type coupling (not transmitting any axial loads) shall be provided for connecting the outlet extension pipe to the turbine spiral case. The extensions shall be of plate steel construction, designed for a hydraulic pressure of 12 kg/cm2. All necessary nuts, bolts and gaskets for the flanged connection between the valve body and the extensions shall be furnished by the contractor. No special supports will be provided for the extensions. Their weight, including contained water shall be carried through the flanged joints to the valve body. 3 1.7.2 Upstream Connection The valve body inlet extension pipe which shall be of conical shape shall be provided with bolting flanges at one end for connection to the valve body. Bolts, nuts, and gasket for connecting the inlet extension to the valve body shall be included in the supply. The connections of the extension pipe to the existing penstock shall be of welded type. The contractor shall cut, chamfer and weld together the end of the penstock and the valve extension pipe including all necessary NDT or heat treatment. 1.7.3 Tolerance on Dimensions The extension pipes shall be sufficiently true to round so that the difference between maximum and minimum diameters, with temporary bracing in place, measured inside or outside, at any cross section along the length shall not exceed one per cent of nominal diameter for that section. The ends shall be within a tolerance of plus or minus 1.0 mm of the plane normal to the axis of the extension. The length of complete extensions shall conform to the limiting dimensions. The tolerances listed are exclusive of any allowance for shrinkage or distortion. 1.7.4 Bypass Connection Pipe connections shall be provided in the inlet and outlet extensions for the by-pass valve, and for a duplex pressure gauge and differential pressure switch. 1.7.5 Downstream Connection An extension pipe with a sleeve type coupling of an approved type shall be furnished to connect the valve to the spiral inlet pipe. The coupling shall allow the valve to be displaced along the penstock axis due to hydraulic forces and thermal expansion/contraction to facilitate erection and dismantling of the extension pipe to allow for any small differences in distributor extension length. The extension pipe shall be complete with all necessary steel flanges, seals or gaskets and coupling bolts. The surfaces of the coupling in contact with the seal and the seal groove shall be fitted with stainless steel plate. 1.8 Valve Disc and Trunnion 1.8.1 Valve Disc The valve disc shall be made of cast steel or of welded plate steel or a combination of both, ruggedly designed and heavily ribbed internally to sustain full differential pressure across the closed valve disc with minimum deflection. The disc shall be of the open-frame through flow type and shall be shaped and finished to minimize flow disturbances. The disc shall be accurately machined at its rim and provided with corrosion-resisting metal on its periphery to protect it against corrosion and abrasion. 1.8.2 Valve Trunnion The valve trunnion shall be of forged steel and shall extend into the valve disc and shall be securely and rigidly attached to it. The outside ends of the 4 trunnion shall be carried by the bearings in the valve body. The trunnion and seal areas shall be provided with renewable, stainless steel sleeves or suitable corrosion resistant coatings. Seal shall be provided at the outside ends of the trunnion to minimize leakage. The trunnion seals shall be designed and constructed for dependability, long life, and convenient replacement. 1.8.3 Disc and Trunnion Seals The valve disc and valve body shall be designed and machined to accommodate the valve seal. The seals shall be of a design and constructed of materials that will provide the maximum tightness consistent with dependability, long life, minimum maintenance, and convenient adjustment and replacement. The disc and trunnion sealing elements shall be of natural rubber, or other suitable elastomer, sealing against corrosion resistant metal. The seal retainers and fastening devices shall be made of suitable corrosion resistant metal. The seal shall be adjustable, removable, and replaceable. The adjusting may be accomplished either in the seal retaining element or the seal seating element. 1.9 Main Bearings 1.9.1 General The main bearings shall be of the sleeve type, supported integrally within the valve body. The bearings shall be designed and constructed so that all necessary adjustments may be made from outside the bearing housings. The sleeve bearings shall be of corrosion resisting material and shall be designed so that deflection and trunnion slope caused by the water load on the disc in the closed position will not result in binding between the trunnion and sleeves. The bearing shall be built into the valve body and shall transmit the loads to body. 1.9.2 Bearing Type The contractor shall determine from his own experience the most suitable bearing design. The contractor shall submit his design to the Engineer-incharge for approval. 1.9.3 Lubrication The disc trunnion bearing and all other points on the valve or operating mechanism requiring lubrication shall be provided with self lubricating bearing. 1.10 Bypass Valve and Piping 1.10.1 General A by-pass line of not less than 50 mm nominal pipe size shall be provided and shall be complete with hydraulically operated valve and necessary electrical controls, hand gear operated guard valve on upstream side of by-pass valve and piping, designed for a pressure of 12 kg/cm2. The opening and closing of the valve shall be controlled by hydraulic pressure from the pumping unit. 5 The needle type by-pass valves shall be of cast or forged steel with wearing parts of corrosion resisting material. "Open", "intermediate", "close", Proximity limit switches, each with two electrically independent contacts, shall be provided as required to accomplish the specified control and alarm functions. The by- pass line will be used for filling the turbine spiral casing and equalizing the pressure on the inlet valve disc before opening the valve. 1.10.2 Pressure Gauge A duplex pressure gauge and differential pressure switch for showing the difference between the water pressure upstream and downstream of the valve disc shall be provided. The pressure switch shall be provided with potential free contacts to accomplish the specified control and alarm functions. 1.10.3 Piping The by-pass piping shall be of seamless steel pipe with steel flanged connections, the necessary bolts nuts and gaskets shall be furnished by the contractor. 1.11 Valves 1.11.1 Air Valve One automatic spring loaded float type air valve complete with necessary bolts and gaskets shall be furnished for installation on top of the downstream extension pipe. The size of the valve shall be as required to exhaust the air trapped in the spiral case when the butterfly valve by-pass is opened for filling the spiral case and to admit air when the butterfly valve is closed and the spiral case in being drained. The air valve shall be designed to prevent any water spray during its operation. 1.11.2 Penstock and spiral case Drain Valves One No. drain valves of suitable size, made of cast or forged steel, shall be provided at the upstream and downstream connections of butterfly valve for emptying the penstock and spiral casing. Drain valves shall be complete with piping and fitting. 1.11.3 Sluice Valves :Four (4) No.’s manually operated sluice valves operated by geared mechanism shall be provided with main inlet valve package, so that the maintenance on MIV, if any, required could be carried out easily. The gate shall be suitable for operating under hydraulic parameters specified for main inlet valves. The test pressures shall be same as indicated for main inlet valve. Sluice valves shall have identical foundations and other details as those of existing ones. Bidder shall collect the necessary details from the power house site before bidding. 1.12 Set of Sundry Items: Comprising of foundation bolts, sole plate, lifting brackets etc. 6 1.13 Counter Weight The counter weight shall be sized to provide net closing torque on the valve disc under most adverse operating conditions and shall be of fabricated steel. 1.14 Operating Mechanism The operating mechanism shall include suitable stops to limit the disc travel at the fully opened and fully closed positions, and a manually operated locking mechanism for holding the disc in the closed position. The lock shall be capable of withstanding the full operating force of the operating mechanism. Parts with sliding contact shall be self-lubricating bushings and corrosion resistant shafts with surface finish and coating as required by the bushing manufacturer. A mechanical position-indicating device shall be provided on the operating mechanism to indicate the position of the valve disc. 1.15 Control Devices The operating mechanism shall be provided with at least the following control facilities to accomplish the specified alarm, indication and interlocking functions. Oil pressure switch for sensing the operating mechanism oil pressure. Water pressure switch for sensing the operating mechanism water pressure. Proximity switches showing open-closed and intermediate butterfly valve position s and open/close positions of the by pass valve. All the switches required shall be provided with at least two potential free contacts. 1.16 Control System: The Inlet valve control system shall include all the sensory and operating devices necessary to fulfil the functional requirement of the specification and is to be provided by the bidder. 1.17 Oil and Water Piping: Oil piping shall be seamless, stainless steel pipes and shall include all piping to the oil pressure supply system consisting of sump tank, pressure tank, servomotor, actuator cabinet instrumentation etc. as required. The piping shall be of such size that the maximum oil velocity shall not exceed 3.0 m/sec in the pressure lines and 1.5 m/sec in the return lines. Minimum pressure anywhere in the oil piping system during maximum speed of valve operation shall not be less than 0.5 bars absolute. All oil piping shall be thoroughly cleaned, oiled inside, and protected for shipment with flange protectors on all flanges, screwed caps on threaded end and suitable plugs in plain ends. 7 Water piping shall be made of heavy seamless stainless steel pipe and shall be flanged. 1.18 1.18.1 Spares Mandatory Spares : The below listed spare parts which comprise the total required for all turbine inlet valves under this contract shall be supplied. The prices for the following mandatory spare parts shall be stated separately in the offer. A set is defined as the total number required for one butterfly valve. 1 2. 3. 4. 5. 6. 7. 8. 9. 1.18.2 Proximity Limit Switches of each type used Pressure gauge of each type used Rubber cords, o-rings sealing, packing, gaskets etc. Servomotor complete Solenoid valve of each type used Valve of each type used Piston rings for a) Servomotor b) By pass valve Bushes for main trunnion Seal rings for by-pass valve 1 Set. 1 Set 2 Sets. 1 Set. 1 Set. 1 Set. 2 Sets. 1Set 2 Sets. 2 Sets. Recommended Spares : An itemized list of additional spare parts, including prices, which the contractor recommends shall be included in the Bid. In preparing this list, the contractor shall give due consideration to the time delay involved if it were necessary to obtain spare parts due to failure of a critical valve component. The purchase of any or all of the additional spare parts recommended shall be at the discretion of the Owner. 1.19 Maintenance Equipment The following tools and miscellaneous erection and maintenance equipment and devices shall be furnished which shall be included in the price for the main inlet valves. One complete set of case hardened wrenches for all sizes of nuts and bolts used in inlet valve, suitably mounted and identified. One or more lifting lugs or hanger pins and slings for attaching the assembled valve to the powerhouse crane. Any special tools and equipment or devices that may be required or which may be useful for the most expeditious assembling or dismantling of any part of the valves. A complete list of special tools and equipment to be supplied with the butterfly valves shall be submitted. 1.20 Shop Assembly and Tests - 1.20.1 Shop Assembly of valve: 8 The butterfly valve with extensions, by-pass valve and piping, operating mechanism controls, locks and indicators shall be completely assembled in the contractor's shop to assure satisfactory fit, and the assembly shall be match-marked and doweled, where required, to assure correct re-assembly and alignment in the field. 1.20.2.1 Shop Tests: - 1.20.2.2 General The completely assembled butterfly valve and by-pass valve with operating mechanism and control mechanism shall be given an operating test, pressure test and leakage test. 1.20.2.3 Operating Test: The completely assembled valve shall be operated through several opening and closing cycles to demonstrate satisfactory operation. 1.20.2.4 Pressure Tests: With both ends of the valve extensions closed by means of test heads and with the rotor disc in slightly open position, the valve body and by-pass system shall be subjected to a hydrostatic test pressure of 18 kg/cm2 to determine the soundness of the valve body and whether or not there are any leaks. The pressure in the valve body shall be maintained for at least 30 minutes. Upon completion of the leakage test specified below, the pressure on the upstream side of the valve disc (in closed position) shall be kept at hydrostatic test pressure of 18 kg/cm2 for not less than 30 minutes with zero pressure on the downstream side and the downstream cover removed, to determine the soundness of the valve disc. 1.20.2.5 Leakage Tests: Leakage tests shall be performed on the valve seal under a hydrostatic pressure of 12 kg/cm2 for not less 30 minutes. The leakage at this pressure shall be measured. 1.20.2.6 Witnessing of Shop Assembly and Tests: The shop assembly and tests shall be witnessed by the Engineer-in-charge or his representative as per the requirements of approved inspection and quality assurance document. 1.21 Installation: The contractor shall assemble (if required), erect, place and level the valve body servomotor and control system on the existing foundation. The contractor shall install interconnecting piping between equipment including support and hangers. All rust preventive compounds shall be removed, and any rust that may have formed on the parts shall be carefully removed. The oil piping shall be thoroughly cleaned and flushed before the oil is placed in the system. Extensions shall be fitted and welded. Flanged extensions and erection joint, and all welds shall be radio graphically examined. The bidder has to do all the works related to erection, testing and commissioning of butterfly valves complete in all respects. Supply of all types of consumables 9 1.22 and other materials required for erection including welding electrodes etc. shall be in the scope of the bidder. Field Testing: The contractor shall furnish a complete outline of the proposed methods and procedures to be followed for the main inlet valve field assembly, erection, testing, including a list of equipment and instruments to be used, to the Owner's Representative for review at least 60 days before the scheduled, first valve testing. All testing equipment and instruments shall be furnished by the contractor and will remain the Contractor's property after the fulfilment of all field tests. The contractor shall furnish a complete report of the field tests of the equipment. The tests at site should at least include the following: Pressure test of all field installed piping for oil and air at 1.5 times the maximum working pressure. Leakage test of all field piping with pressurized air and soap solution. Opening and closing of by-pass valve Opening and closing of main Inlet valve under balanced pressure conditions. Closing of main Inlet valve at rated flow Operation of all controls including the mechanical locking device. Other test as deemed necessary by the Engineer-in-charge The bidder shall provide all necessary material and labour for performing all the above tests. 1.23 Civil Engineering Works :Civil Engineering works related to addition and alteration of foundations of Main Inlet Valve shall be in the scope of contractor. Contractor shall quote the prices inclusive of civil works. Contractor shall be liable for correct assessment of civil works before bidding. No deviation of civil works shall be allowed after price bid is opened. 10 SECTION - II REPLACEMENT OF TURBINE RUNNERS 2.1 Scope: This section of the specification cover the following scope of works: i) Dismantling/removing of existing four (4) No.’s runners of Francis type Turbine, all services, labour, tools and tackles required for dismantling including carriage, stacking at Owner’s store/ yard. ii) Design, engineering, manufacture, shop assembly & testing before dispatch, packing and forwarding, transportation, insurance, handling, delivery, storage at site, erection, testing & commissioning of four (4) Nos. runners of Francis type Turbine as detailed in this specification and handing over to HPSEB LTD. complete with runner templates. including all services, labour, tools and tackles. 2.2 Technical requirements: The runner shall be made of cast stainless steel having a material composition of 13% chromium and 4% nickel. The contractor shall assure that a higher degree of quality finish and control is maintained during the manufacture of the runner, including bar test specimens, non-destructive flow detecting inspection, stress relieving of the casting and balancing. All surfaces of the runner shall be finished smooth without any humps or hollows, depressions, cracks and projections. The contours of the runner blades shall be accurate and shall be finished, so that the blade profile precisely conforms to the model design within the tolerance set out in IEC Publication-193. The blades shall be evenly and symmetrically spaced. Before shipment/despatch, manufacturer shall check the hydraulic surfaces with templates and submit proof that the finished runner contours and shape meet with the tested model and the design requirement. Templates for guidance in restoring blade shapes to original contour shall be supplied with runners. The runner shall be designed to safely withstand the stresses due to operation at runaway speed under condition of maximum head with no load on generator and any position of the wicket gates. Special attention shall be paid to reduce stress concentration at the fillet of the blade outlet edge with the band and crown. Replaceable stainless steel labyrinth seal shall be fixed to the runner on both ends with the help of stainless steel fasteners to reduce the leakage. The runner shall be statically and dynamically balanced at the works and shall be designed and constructed to withstand safely the stresses developed due to operation at runaway speed under conditions of maximum head including pressure rise due to water hammer. The runner shall be attached to the generator/turbine shaft through bolts with nuts and locking devices. The coupling bolt holes in the runner shall be line 11 reamed with the runner and shaft assembled. The connection shall be designed for tightening and holding from the above as required for incremental assembly. The equipment required for the assembly and disassembly of the runner shall be included in the offer. Runner inspection and quality control shall be according to CCH-70-2. Acceptance criteria shall be in accordance with these specifications and shall be subject to approval by owner's representative. 2.3 Performance Requirements: Bidder shall quote with the understanding that supply of runner is a part of the complete renovation job including the overhauling of turbine. Bidder may have to do reverse engineering wherever required. Accordingly efficiencies are to be quoted for complete turbine including runner. Guarantees for Unit Output, Efficiency & Penalties for Shortfall The bidders shall offer runners having the specified rating and highest feasible efficiencies in the permissible range of operation. The bidder on the bidding stage shall supply supporting documents for the prescribed guarantees by means of displaying results from earlier model tests of the runner which conforms as much as possible to the one now being offered. The output and efficiencies shall be guaranteed under penalty as given below. The turbine Output & Efficiency shall be guaranteed by the bidder in respect of the following: Rated output of 530 kW at rated net head of 79 m. Over load output of 583 kW at rated net head of 79 m. Output at minimum net head of 79 m shall not be less than 530 kW. Turbine efficiencies at 110%, 100% & 60%. Weighted Average Efficiency The guaranteed weighted average efficiency at the rated net head shall be calculated as follows: av. = 0.30 110 + 0.40100 + 0.3060 Where av. = Weighted average efficiency 110 = Efficiency at 110% of rated output when operating at net head of 79 m 100 = Efficiency at 100% of rated output when operating at net head of 79 m 60 = Efficiency at 60% of rated output when operating at net head of 79 m 12 Penalties will be evaluated and imposed as per clause 2.4 in case of short fall in the test values of the rated unit output and weighted average efficiency vis-à-vis the guaranteed values. Weighted average efficiency and rated output of the unit will be verified after installation and commissioning of the generating units on the basis of field acceptance tests on any unit to be decided by the owner. For equalisation in the comparison of bids, the weighted average efficiency as defined in clause 2.3 will be used.” Bidders shall quote turbine efficiencies in excess of 94%. Bids with output efficiencies less than 94 % shall be rejected 2.4 Penalties and Rejection Limit for Shortfall in overall Output and overall Weighted Average Efficiency of unit : Field acceptance test as per IEC code shall be carried out to determine the actual output and the efficiencies of the unit at various points of operation of the unit. Penalties to be levied for any shortfall in the tested values of rated unit output and of the weighted overall average efficiency of unit vis-à-vis the guaranteed values respectively shall be computed as follows: a) Output For each one 10th of one percent (0.1%) shortfall in test value of rated output vis-à-vis guaranteed MW. b) Rs. 8000 (Rs. eight thousand for each unit) Weighted overall Average Efficiency For each one 10th of one percent (0.1%) shortfall in test Value of weighted average efficiency vis-à-vis guaranteed value. Rs. 8,000 (Rs. Eight thousand for each unit.) For fractional values of the shortfall in percentage, the penalty amounts will be computed on pro-rata basis. The penalties on account of shortfalls of output and the weighted average efficiency shall be computed separately. The contractor will have option to conduct output and efficiency test on all the units at his own cost to prove that such contractual guaranteed values are fulfilled. Only units not fulfilling the guarantees will be subjected to penalty by multiplying the penalties for one unit by the no. of units and the total amount of penalty shall be sum of these two. The penalties shall be applicable if shortfall in either the rated output or the weighted average efficiency is less than the corresponding guaranteed figures in the range of 0 to 1.99%. If the tested values of either the rated output or the weighted average efficiency are less than the corresponding guaranteed figures by two (2%) percent or more after allowing the tolerances for efficiency as per IEC, the owner shall have the right to reject the equipment. No tolerance limits shall be permissible over the field tested figures of rated output. 13 SECTION-III REPLACEMENT OF GOVERNING SYSTEM AND TURBINE CONTROL PANEL 3.2.1 Scope This section of the specification cover the following scope of works: i) Dismantling/removing of existing four (4) No.’s mechanical governors, Turbine Auxiliary Control Panels, associated sensing/feedback instruments, all services, labour, tools and tackles required for dismantling including carriage, stacking at Owner’s store/ yard. ii) Design, engineering, manufacture, shop assembly & testing before dispatch, packing and forwarding, transportation, insurance, handling, delivery, storage at site, erection, testing & commissioning of four (4) Nos. Digital governors, Turbine Auxiliary Control Panels, associated sensing/feedback instruments as detailed in this specification and handing over to HPSEB LTD. complete with accessories, equipment, devices, piping, instruments, cabling and wiring etc. including all services, labour, tools and tackles. 3.2.2 General Governor for each unit shall be supplied and shall be of the digital programmable electronic type. Governor module shall be mounted in Turbine Auxiliary Control Panel. All equipment shall be suitable for continuous duty and interchangeable between the units. All control functions of generating unit shall be implemented from the Turbine Auxiliary Control Panel. A touch screen in addition to control switches and push buttons shall be provided on each TACP for unit control. Any equipment/hardware not mentioned, but required for unit control shall also be provided. Each governor shall be complete with speed sensing elements, restoring mechanism, pressure system, oil piping, shut down and speed-no-load solenoids, oil pressure level failure relays, gate position switches, speed switches, automatic brake valve and all parts & accessories required to constitute a completely automatic assembly for regulating the speed and controlling the gates of the turbine with which it is to be used. It is in the scope of these specifications that the governor shall be complete with all necessary devices for completely automatic and remote control, synchronising, and supervisory load frequency control and shut down. Remote control shall be from the control room of the power house. The normal pressure for operation of the pumps, pressure tank and servomotors of the turbine shall be 40 to 90 kg/cm2 .The speed sensing element shall be capable of causing the actuator relay valve to pass oil in the direction to effect corrective movement of the turbine wicket gate in consequence of a speed variation of less than 1/100th of 1 percent. All actuators and control assemblies shall be enclosed in a metal cabinet of rigid construction and neat appearance, which shall be dust proof and properly ventilated. All gauges, indicating and control devices shall be mounted on the front panels of the actuator cabinet in a symmetrical and convenient manner and shall present a pleasing appearance in size shape 14 and arrangement. Inspection doors shall be provided on all exposed sides and on the top for access to the actuator equipment and these doors shall be fitted with locking arrangement, handles and latches. Instruments within the cabinet shall be readily accessible for adjustment and maintenance through the inspection doors. Layout of governor actuator cabinet and pump set equipment shall meet the approval of Engineer-in-charge. 3.2.3 Capacity of Governor: The rating of the governor shall not be less than the capacity of the servomotors for operation of the turbine wicket gates. The governor shall be capable of supplying sufficient oil to the servomotors to operate the turbine gates to give an effective time from a complete closing or opening stroke for the range of operating times with a minimum oil pressure under the maximum net head on the turbine. The oil velocity in the pipes shall not exceed 3m/sec. The governor oil pressure system shall be designed for the extreme case of closing, opening and final closing of the wicket gates with both oil pumps and compressed air admission valve inoperative. 3.2.4 Governor Operating Parameters. The speed governing of the generating unit shall be carried out by a combination of proportional, integral and differential actions and non-linear characteristics in order to provide best quality of control. The governor shall have high sensitivity, quick response to speed/load changes, least possible dead band time and wide adjusting ranges as given below in respect to various parameters: a) Sensitivity speed Not more than 0.01% of rated. b) Speed level settings. Adjustable between (-) 3 Hz & (+) 3Hz of normal 50 Hz (85% to 110%). c) Permanent speed droop Adjustable between 0-10%. d) Temporary speed droop. Adjustable between 0-100%. e) Speed dead band at rated speed. less than 0.02%. f) Governor dead band times 0.2 sec. for step load change of 10% of rated load or more. g) Wicket gate closing time Adjustable 4 to 20 sec. having dual fast and slow action. h) Wicket gate opening time Adjustable, 20 to 60 sec. The turbine wicket gate closing time shall be specified. For the closing operation a dual rate of closure has been considered to be required to restrict transient speed rise of the turbine to within reasonable limit. The governors shall therefore provide a dual rate of closure for the wicket gates, faster in the 15 first half of the closing period and slower in the second half. The governor closing and opening time has the dual rates of closure & shall be adjustable within the specified range. 3.2.5 Provisions in Governors. 1. The digital governor shall have provisions for setting/adjusting and indication display of the set values of various governor characteristics/parameters with the help of the keyboard viz. a) Permanent speed droop. b) Temporary speed droop. c) Temporary speed droop decay time constant. d) Sensitivity. e) Frequency dead band f) Speed regulation. g) Power regulation. h) Opening limitation. i) Speed set point. j) Output set point. k) Monitoring and supervision of speed, power and position feed back signals. l) Other essential devices for smooth operation, protection and safety of the units. 2. It shall also have other essential provisions and devices as protective devices for locking out on failure of the regulator, for transfer to emergency manual control on UCB. 3. The hydraulic actuator units shall have various devices, control indications as given below: a) Two nos. remotely controlled from control room shut down devices for normal and emergency closure of wicket gates. For emergency closure, two solenoid-operated valves shall be fed from two independent 110V dc sources. b) Independent emergency solenoid valve which operates in emergencies and catastrophic condition and send the pressurised oil directly to the wicket gate servomotors bypassing the governor. c) Manual control devices acting directly on the actuator hydraulic system allowing opening and closing of wicket gates to any position. The actuator of valve shall have provision for manual operation also. 16 d) Wicket gate maximum opening limiting device remotely operatable. e) Wicket gate position and gate limit transmitters for remote indication. f) Direct indication of gate limit and position on actuator units. g) Other essential devices not specified but required for smooth operation, protection and safety of the units. 4) Rong Tong Power station is located in remote area and nearest grid (22 Kv) is available at 220 Km away. Most of the time power station shall run in isolated mode (Speed control mode). Governor shall be capable of operating under such conditions in isolated mode. Necessary hard ware and software provisions to this effect shall be made in governor. 3.2.6. Speed Sensing/Speed Switches. Speed of the unit for governor operation shall be measured by inductive transducer actuated by toothed wheel located on the generator unit shaft. Two fully independent speed sensing systems shall be installed, the main and the back up with automatic switchover in case of loss of signal of the main system. 3.2.7 Wicket Gate Feed Back and Other Devices. The feed back between the actuator and regulator cubicles and wicket gate servomotors shall be of electronic/ electrical type. The cables for feed back shall be as short as possible and shall be properly protected against injury and damage. The load feed back for the governor shall be provided by position sensing devices and from the CT's and PT's provided in the bus bar. 3.2.8 Software Program Features. 1. The software for the microprocessor based speed governor shall be capable of quick program running. In case of any power supply failure the program and parameters shall remain indefinitely retained. 2. The governor shall have auto test program to check permanently the correct operation of the main governor components. The correct execution of the software shall also be permanently checked for which suitable 'Watchdog' monitoring circuit shall be provided 3. The software shall prohibit the programming of the parameters beyond the allowed values. 3.2.9 Other Provisions: The speed governor shall be provided with the following provisions: a) Facility of data communication i.e. exchanging information through serial communication link. b) Provision for data exchange with automatic systems or the power station for remote indication logic information & remote control etc. if there are 17 any data exchange that can not be realised through the serial communication link. 3.2.10 Maintenance/ Replacement Provisions: The digital programmable electronic governor shall have modular construction with suitable configuration to enable quick and easy maintenance /replacement in case of fault. The maintenance and operation of the speed governor shall be feasible by use of an automatic internal checking program and also step by step manual internal checking program with the help of instruction manual. Adequate number of test points & Light Emitting Diodes on the front face of each card for an easy detailed analysis of each subassembly shall be provided. 3.2.11 Fail Safe Provision: The electronic governor and hydraulic actuator shall be designed on the basis of fail safe principles. The necessary details shall be furnished along with the bid. 3.2.12 Governor Operating Time Adjustment The wicket gate closing and opening time adjustment shall be possible without dismantling the main distribution valves of the actuator. Details shall be furnished along with the bid. 3.2.13 Control, Indication and Annunciation Scheme: The tentative scheme of distribution of various governor controls as indicated in the following list which may not necessarily be complete and may be amended & finalised during detailed designing stage. The following indicating instruments shall be mounted on the front face of the actuator cabinet. Tachometer Gate position and gate limit (duplex) Load control position. Speed adjustment position. Governor system oil pressure. The following controls shall be provided on the front face of the actuator cabinet: Gate limit setting device Generator brake control switch (On, Off & Automatic) Speed droop setting device. Speed adjustment device. Load control switch. 18 Automatic/Test/off/Manual control switch. Unit stop push button. Unit start push button. Emergency shut down push button MIV open push button. MIV close push button. The following indicating lights shall be provided on the front face of the actuator cabinet. Unit ready for start. Unit start. Unit excite. Unit spinning. Unit ready to accept load. Main breaker 'ON'. Unit synchronised/paralleled. Unit loaded. Servomotor gate lock 'ON/OFF'. Generator brakes switch on 'Auto' position. Generator brake 'ON/OFF'. Speed sensor failure. Auto/manual indication. In addition to above the cabinet shall have the following indicators: Governor pump-I 'ON'. Governor pump-II 'ON'. MIV open. MIV closed. MIV in transit Oil pressure too high. 19 Oil pressure too low. Oil level high. Oil level low. Brake 'Off'. Brake 'ON'. MIV by pass valve open. Oil temperature high. Lubrication Oil Pump ON All the above indications shall be LED type/binary matrix type. The supplier shall co-ordinate with the supplier of control and monitoring system for engineering control system etc. 3.2.14 Actuator Control and Instruments The following controls and instruments shall be provided in the actuator: 1. Gate position and gate limit indicators: A mechanical gate limit indicator and gate position indicator of duplex type shall be provided. These indicators shall have the provision to be adjusted at site to obtain correct indication of turbine gate position. The manufacturer shall supply the necessary transducers wired in the cabinet for remote indication of the gate position & gate limit at the power house control room & UCB. The output of these transducers shall be proportional to the gate position and gate limit. The gate limit control device shall limit the degree of wicket gate opening at any position within the full range of wicket gate travel from the control room & UCB. 2. Speed Adjustment Control and Indication: A device for adjusting the speed set point of the governor when the generator is isolated from the system shall be provided, operated manually at the actuator and electrically controlled by the synchronising equipment. For manual control, a dial type indicator shall be provided which shall cover a range of speed setting from 85% to 110%. At least four limit switches shall be provided to control speed adjustment and prevent the speed motor to over-travel the synchronous speed after the main breaker is closed. Open at and above 5 percent over synchronous speed. 20 Open at and below 15 percent below synchronous speed. Open at and above synchronous speed. Open at and below synchronous speed. 3. Load Adjustment Control and Indication: Necessary device for adjusting the output set point of governor when main breaker is closed and unit is synchronised along with two feedback systems, one from wicket gate and the other from generator output shall be provided with a provision to select any one feedback signal at site. 4. Speed Droop Control and Indicator: A speed droop control device which operates when main breaker is closed and determine the change in output if speed deviates from the synchronous speed shall be provided along with manual control from 0 to 10% and a speed droop indicator with a calibrated dial to indicate the speed change for which the unit is adjusted. 5. Manual Gate Control. The provision shall be made to manually control the wicket gates from the control cabinet, for local control, for testing and the unit can continue in operation, should the electronic circuitry, transducer or transducer valve be inoperative. The transfer of control from automatic to manual and vice versa shall be possible while unit is in operation. The provision to select the manual/ automatic control shall be made from the actuator cabinet or from the remote control system. The automatic shutdown protection shall be available under manual control. 6. Automatic Start, Shut down and Speed-no-load. Necessary provision for automatically starting the turbine, shut down the turbine and for emergency & catastrophic shut down of the turbine or operation of automatic protection devices for the generator, turbine and governor shall be made. The automatic speed-no-load device, when actuated, shall limit the turbine wicket gate to slightly above the speed-no-load position. The device shall permit manual and automatic shutdown of the unit to speedno-load at any time & shall be such that the wicket gate are again governed by the speed responsive element on reaching the speed-no load position. The automatic start-up/shut down shall be initiated by momentary closure of contacts. Synchronising action shall then be initiated from the governor when the unit attains 90 percent of the speed. The speed -no-load shutdown solenoid shall be energised after the main breaker closes. 7. Generator Brake Control. 21 A combination hand-operated and solenoid operated valve to control the operation of the generator brakes shall be supplied and mounted in the actuator cabinet. In the automatic mode the gate position switches and speed switches shall prevent the application of the brakes until the wicket gates are fully closed and the speed has decreased to less than 20% of rated speed .It shall be possible to apply brakes continuously below 20% speed after an adjustable period of time by means of the automatic control. The brakes shall be automatically released after the adjustable period of time sufficient to assure that the unit has been brought to a complete stop. When the control switch is in the 'Automatic' position, a separate contact shall be closed for inter lock in the auto-start circuit. A pressure switch shall be provided in the airline to the brake cylinders with contacts to open as an inter-lock to prevent start up whenever the brakes are on. The pressure switch shall be provided to energise the alarm when air pressure is low. 8. Tachometer: The speed sensing device shall be fitted in governor and signal for speed shall be taken from potential transformer. 9. Oil Pressure Gauge: The necessary oil pressure gauge shall be provided on the actuator to indicate the pressure in the governor oil pressure tank. 10. Gate Position Switch: Sufficient number of contact switch assembly operated by the servomotor position transducer shall be provided. Each contact shall be adjustable type at any point from zero to 100 % gate opening as per the site conditions. Contacts shall be electrically isolated, ungrounded and suitable for dc, operation. 11. Cabinet Light. Suitable vapour proof lighting for 240V, 50Hz ac. Fixture preferably C.F.L. (Compact Florescent Light) to illuminate the interior of all the cabinets shall be provided. 12. Governor Time Adjustment. The necessary provision shall be made to adjust the opening and closing time of the wicket gates between 4 seconds and 20 seconds for full gate opening/closing stroke and these adjustments shall be lockable. 13. Actuator Lock: Provision shall be made to lock the turbine wicket gate while maintenance works on the governor’s electronic amplifiers is to be carried out. The lock will automatically apply on withdrawal of an amplifier card and disengage on replacement of the same card. The device shall allow the closing of the wicket gates at any time by action of the gate limit or the shut down 22 solenoids. The automatic shut down protection shall be maintained during actuator lock. 3.2.15 Electronic Section: The electronic cards shall be housed in the actuator cabinet and shall be accessible from the front of the cabinet after opening the cabinet door. The governor shall be Proportional, Integral and Derivative (PID) type. The following adjustment range shall be provided: Integral gain 0 - 10 second Proportional gain 0 - 20 Derivative gain 0 - 2 second All the adjustments shall be calibrated in absolute terms. The governor shall be fitted with the devices to improve the response time of the generator unit to change in load adjustments and bypass the normal proportional, integral and derivative amplifiers. 3.2.16 Speed Switches: A mechanical over-speed switch shall be provided on the turbine-generator shaft to operate automatically as the unit speed rises slightly above the maximum speed rise allowed on full load rejection and shall trigger directly an emergency shut down valve in the hydraulic pressure circuit. The operation of the switch shall bypass all the electrical signals and action of other protective devices and give command to close the wicket gates. An auxiliary contact switch on the governor cubicle shall be provided to annunciate operation of the mechanical over speed switch. The electronic speed switch shall be provided and mounted on the electronic cabinet of governor for following functions: (a) Over-speed Protection: i) To cause unit shut down through shutdown solenoid via protection circuits at and above guaranteed speed rise. ii) To cause emergency shut down of the unit through certain specific protection circuits and/or when unit speed increase beyond 140 percent. iii) In the event of catastrophic conditions and speed rising to 150 percent and above simultaneous command shall go to emergency solenoid valve and Spherical valve control cabinet for closure. The setting of various speed switches for over speed protection are tentative and shall be decided at detailed engineering stage. b) Excitation and Synchronising 23 Two sets of contacts shall be provided to close at and above 90% of the rated speed and wired to the governor terminal block. c) Brake Control: The generator brake shall be arranged to activate at 20% of the rated speed and the wicket gates are closed when unit CB is open. d) Forced lubrication; To cause forced lubrication of thrust bearing from zero speed to predetermined speed and vice-versa. e) Zero Speed: The necessary set of contacts shall be provided and wired upto the terminal block of governor cubicle to indicate unit stopped and creep indication. The creep indication is to be provided by the supplier. The space shall also be provided for additional switch. 3.2.17 Electrical Power Supply The power for the governor shall be drawn from two source i.e. primary source shall be 230 V, single phase 50 Hz and secondary shall be 110 V, D.C. supply. The necessary power conversion equipment shall be provided by the governor supplier capable of drawing power from the primary or secondary sources and it should have necessary redundancy. The switch over from primary to secondary will follow automatically on the failure of the primary supply or converter and will return to primary source automatically following restoration of primary source. The switchover shall be smooth and shall not cause any mal-functions. The power conversion equipment shall include transient voltage protection for surge voltage up to 6kV. The unit shall be shut down if the 110 V dc supply fails. Failure of the power conversion equipment to deliver low voltage power to the governor shall cause shut down of the unit when the governor is on Auto mode. 3.2.18 Gate Position Feedback: The necessary displacement transducer will be provided to measure servomotor stroke and thus the wicket gate position. The output from the transducer shall be used to operate the gate position switches and for gate position indication. 3.2.19 Governor Oil Pumps: Two main motor driven oil pumps shall be provided in each governor and having a capacity of not less than 1.5 times the total oil volume of the wicket gate servomotor, MIV servomotor, brake servomotor and one jockey pump having a capacity in excess of the expected leakage of the distribution valve. The main pump shall run continuously without overheating and supply oil to the sump or accumulator. Necessary oil strainer shall be fitted in the suction line of each pump. 24 The motor pump unit shall be fitted on the sump tank and control switches/ indicating lamps shall be mounted on the front panel of actuator. The motor shall conform to IEC standard, with class 'F' insulation and having low starting current. The automatic pressure operated controls shall be provided to start and stop the pumps when the pressure rises or drops to pre-determined points. The two main oil pumps shall be arranged with echelon controls to be operated either independently or together with one pump used for normal operation and the other arranged to start with a drop in oil pressure. Manual control switch shall be provided to select one of the two pumps as the lead pump. An alarm shall be provided to indicate continuous running of the lag pump over on adjustable period of time. All valves and mechanisms shall be accurately set and tested in the shop before delivery. Each governor pump shall be provided with an adjustable temperature switch with two electrically separate contacts suitable for operation at 110 V dc. located in the pump suction side for governor oil high temperature alarm. 3.2.20 Pressure Tank: A pressure accumulator tank of steel plate welded construction shall be provided for each governor in accordance with the requirement of the relevant International Code for Pressure Vessels. The size of the tank shall be such that it shall be possible to operate the wicket gates and MIV 3 times (2 'C'+1'O') without re-charging the pressure accumulator. The pressure tank shall be pressure tested in the shop in accordance to the requirement of relevant standards. The necessary pressure gauge, sight gauges, manual shutoff and ball check valve and safety relief valve shall be provided on the pressure tank. The pressure tank shall be provided with nitrogen piston/bladder accumulator of suitable capacity. The manufacturer shall supply all necessary piping, fittings, solenoid controlled valves, pressure and level switches required for this system. The solenoid shall be suitable for operation at 110 V dc and completely wired. An adequate sized manhole with suitable oil resistant gasket shall be provided. The tank shall be painted on both sides. In addition to pressure switches required for echelon control the following pressure switches shall be provided and connected to each pressure tank. Governor oil low pressure alarm to the station annunciator, one contact to close on low pressure. For extreme low pressure trip and for unit start inter lock. Low oil level for unit shut down. Extreme low oil level. All contacts shall be adjustable, electrically separated and suitable for 110 V dc operation. 25 All pressure and level switches shall be provided with individual shut off valves and bleed valves as necessary. 3.2.21 Sump Tank: The governor system shall be supplied with a sump tank of sufficient capacity to hold at least 10 percent more than the total quantity of oil in the entire governor system. The sump tank shall be provided with a manhole, connection for venting and overflow. Suitable connection for oil purifier, draining and filling shall be provided. A vertical filter screen shall be arranged to divide the sump tank into 'clean' and 'dirty' oil compartments. All the strainers shall be readily removable for cleaning. Low and high level switches and oil temperature switch shall be provided on the oil sump tank. 3.2.22 Pipes and Fittings All pipes, fittings, all type of valves including non-return valves for connection between servomotors, oil sump tank, pressure accumulator and governor shall be provided. 3.2.23 Spares The following spares which comprise the total required for all the four governors under this contract shall be furnished. The price for the spare parts shall be stated separately in the Bid. A set is defined as the total number required for one governing system. A. GOVERNOR 1. Control valves of each (main distributor valves as well as pilot valves) 1set 2. Filtering element for governor 4nos. 3. Speed sensing device (complete) 1no. 4. Complete set of all plug in units, printed circuit cards and transducers for one governor furnished. 1set 5. Pressure and position transducers of each type used 1set 6. Circuit breakers and control switches of each type used 1set B. OIL PRESSURE UNIT (OPU) 1. Pressure oil pump-motor set 1No. 2. Nitrogen filled cyllender 1No. 3. Motor bearings 1set 4. Safety relief valve 1No. 5. Un-loader valve 1No. 6. Oil filter for oil sump 1No. 26 7. Level relays for OPU 1No. 8. Glass pipe for sight gauge 1No. 9. Pressure relay 1No. 10. Sediment level sensor 1No. C. COMMON TO GOVERNOR AND OPU 1. Resistance temperature detector of each type used 1set 2. Proximity switches of each type used 1set 3. Pressure gauge of each type used 1set 4. Dial type thermometer of each type used 1set 5. Rubber cords, o-rings sealing, packing, gaskets etc. 1set 6. Indicating instrument of each type used 1set 7. Solenoid valve of each type used 1set 8. Maintenance valve of each type used 1set 9. Indicating lamp with lamp assembly 2sets The Bidder shall include with his bid an itemised list and prices of all of additional spare parts he recommends to be purchased. Purchase of any or all of the additional recommended spare parts shall be at the option of the owner. 3.2.24 Maintenance Requirement. One complete set of special tools, which may be necessary for convenient assembly and dismantling of governors shall be furnished. The tools shall be furnished in a suitable toolbox, or on a suitable wall mounted panel stamped for identification and intended use. 3.2.25 Shop Assembly and Tests: 3.2.25.1 General: The governor and auxiliary equipment shall be completely assembled in the manufacturer/bidder's shop and tested, in so far as practicable. The pressure tanks and piping shall be shop hydrostatic pressure tested at a pressure 1.5 time the maximum allowable working pressure. Before painting, the sump tank shall be tested for leakage by compressed air and a soap solution or other approved means. 3.2.25.2 Operational Tests: Operational tests shall be performed on all of the equipment or devices to demonstrate that these function properly. Adjustable devices shall be checked for range of adjustment and given final adjustment in so far as 27 possible in the shop. The oil pressure pump, unloading valve, relief valve and starting and stopping pressure relays shall be tested and accurately set in the shop. Electrical devices shall be given and shall withstand dielectric tests in accordance with applicable provision of IEC recommendations or other approved standards. Where applicable, parts of the governors equipment shall be properly match marked and doweled during shop erection to facilitate correct assembly and alignment at site. The governing equipment shall be shipped with parts complete and ready for operation. 3.2.25.3 Shop Performance Tests. The governors shall be shop tested to demonstrate that these shall meet the requirements as specified. Performance requirements, in respect to dead band time, dead band speed and speed response. At least 60 days prior to the performance tests, detailed descriptions of the procedure and equipment to be used shall be submitted to the Engineer-in-charge. The charts shall be marked for identification of the test performed, traces labelled and incremental values of the recorded variable marked on the charts. 4.2.25.4 Witnessing of shop assembly and tests. The shop assembly tests shall be witnessed by the representative of the owner as per the approved inspection and quality assurance plan. All the necessary material, labour, test equipment and instruments shall be furnished by the bidder. 3.2.26 Installation: The bidder shall place, level and fasten the governor equipment on the concrete foundation. Interconnecting piping between various equipment, such as between the actuator, oil pressure unit, and servomotors and restoring mechanisms between the governors and servomotors, including supports and hangers, shall be supplied and installed by the bidder. All rust preventive compounds shall be removed from the equipment before initial operation, and any rust which may have formed on the parts shall be carefully removed. The oil piping, oil sump tank and pressure tank shall be thoroughly cleaned and flushed before governor oil is placed in the system. The bidder has to do all work related to erection, testing and commissioning of governor complete in all respect. Supply of all consumable and other material required for installation etc. shall be in the scope of bidder. 3.2.27 Field testing The bidder shall furnish a complete outline of the proposed method and field procedures to be followed for the turbine and governor tests, including a list of equipment and instruments to be used, to the Engineer-in charge for review not later than 60 days prior to the date on which the first turbine and governor is to be ready for testing. All necessary materials and labour for performing all the above tests shall be provided by the bidder. All test equipment and instruments, shall be furnished by the bidder and will remain the bidder's property after the fulfilment of all field tests. The test at site should at least include the following: 28 - Tightness tests on all pressure oil piping in connection with the turbine equipment - Pressure tests on all pressure oil piping (in connection with the governor equipment) and all pressure piping system shall be hydrostatic tested at a pressure 1.5 times than the maximum operating pressure after installation. - Start-up, load rejection and load acceptance tests including speed and power regulation test. - The tests shall be co-ordinated with the test for turbine, butterfly valve, generator and other equipment. Following parameters shall be measured recorded as function of time. Oil pressure in servomotors Turbine speed Servomotors stroke Pen stock pressure All other tests on the governor equipment as deemed necessary by the bidder or Engineer-in-charge. The tests shall be carried out in accordance with IEC publications and the contractor shall furnish a complete report of the field tests of the equipment. 29 SECTION-IV OVERHAULING / REPAIR OF GENERATOR, TURBINE, TURBINE SHAFT, BEARINGS AND REPLACEMENT OF BEARING SLEEVES 4.1 Scope i) ii) iii) 4.2 Complete overhauling / repair of generator, turbine including repair of shaft and bearings, of four units including all services, labour, tools and tackles required for dismantling and assembly, including design, reverse engineering, manufacture, manufacture through reverse engineering, site testing, delivery, erection, testing & commissioning, field acceptance test, handing over to owner/HPSEB Ltd. of the above system. Dismantling/removing of existing (4) No.’s bearing sleeves of francis type Turbine all services, labour, tools and tackles required for dismantling including carriage, stacking at Owner’s store/ yard. Design, engineering, manufacture, shop assembly & testing before dispatch, packing and forwarding, transportation, insurance, handling, delivery, storage at site, erection, testing & commissioning of four (4) No.’s bearing sleeves of francis type Turbine as detailed in this specification and handing over to HPSEB LTD. including all services, labour, tools and tackles Turbines The turbines are horizontal shaft Francis turbine directly coupled with the generators designed and supplied by M/s Jyoti. Ltd. Baroda (Gujarat). Each turbine consists of spiral casing with integral stay ring, guide apparatus with regulating mechanism, turbine shaft, runner, shaft gland seal, pedestal type thrust cum guide bearing, pedestal type 2nd guide bearing, coupling for turbine and generator, flywheel & pulley, discharge pipe and draft tube etc. Technical parameters of the turbines are given below :- i) No. of turbines 4 (four) ii) Type of turbine iii) Setting 400 HFIV-500, Francis turbine Jyoti Make. Horizontal iv) Turbine output 750 HP v) vi) Net head Rated speed 79 meters 1000 rpm vii) Runaway speed 1700 rpm viii) Specific speed 116.3 rpm ix) Runner Diameter 414 mm x) BF valve diameter 500 mm 30 xi) 4.2.1 Spiral inlet diameter 414 mm Spiral Casings:Spiral casing is cast fabricated with integral stay ring. The joints of spiral casing with butterfly valve outlet pipe and draft tube bend pipe are leaking. The outer and inner surfaces of the casing are severely corroded. 4.2.2 Guide Apparatus:Guide apparatus consists of turbine cover, lower ring, twelve guide vanes with upper/lower bushes, levers, links and regulating ring. Guide vanes of all the machines have been repaired a number of times resulting in change in their original profile and other dimensions. It is observed that the guide vanes do not close properly and openings between consecutive guide vanes are not uniform. This leads to non uniform flow of water, reduced efficiency and increased vibrations of the machines. 4.3 Performance Requirements of turbines :- 4.3.1 After overhauling/ repair as described in section 4.1 each turbine shall be able to give, at rated net head of 79 m, rated output not less than 530 kW at rated speed of 1000 rpm. Capacity test shall form the basis of successful completion. 4.4 Performance Requirements of generators :After overhauling/ repair as described in section 4.1 each generator shall be able to generate, rated output not less than 500 kW at rated frequency of 50 Hz. Capacity test shall form the basis of successful completion. Any modification required to make compatible AVR with existing generator shall also be carried out by contractor under this contract. 4.5 Bearing Sleeves 4.5.1 Scope: - 4.5.2 Technical requirements :Bearing sleeves shall have identical metallurgical properties as that of original and should be capable of safe operation at all loads and operating conditions. Details of the existing bearing sleeves shall be collected by contractor from the site. Bidders shall visit the site and assess the repair / overhauling requirements of each machines and quote accordingly. No deviation over the quoted overhauling / repair scope shall be allowed at later stage. 31 SECTION-V OIL LUBRICATING SYSTEM AND COOLING WATER SYSTEM 5.1 Scope This section of the specification cover the following scope of works: i) ii) 5.2 Dismantling/removing of existing four (4) No.’s oil lubrication system and four (4) No.’s cooling water system of francis type Turbine all services, labour, tools and tackles required for dismantling including carriage, stacking at Owner’s store/ yard. Design, engineering, manufacture, shop assembly & testing before dispatch, packing and forwarding, transportation, insurance, handling, delivery, storage at site, erection, testing & commissioning of four (4) Nos. oil lubrication system and four (4) No.’s cooling water system of francis type Turbine as detailed in this specification and handing over to HPSEB LTD. complete with accessories, equipment, devices, piping, instruments, cabling and wiring etc. including all services, labour, tools and tackles. Grease / oil lubricating system Each turbine shall be provided with an automatic grease/oil lubricating system complete with grease/ oil reservoir two motor operated grease / oil pumps with motors, starters, switches, timers, pipes and fitting for lubricating all points. One motor pump set shall operate on AC power supply and other motor pump by DC power supply. The system shall supply measured quantities of grease/ oil as often required to all bearing surfaces of levers, links, rods, wicket gate stems and all other parts to be lubricated. Different timing devices shall be used for fixing the different periods required for points requiring frequent lubrication such as wicket gate stems and points requiring in-frequent lubrication. Indicators shall be provided at all greasing points to indicate that the lubrication is being received. A pressure switch shall be provided to shut down the system in case of any block in the lubrication system resulting in high pressure. An alarm contact shall be provided for giving alarm in case of system failure. The grease reservoir shall have a capacity to store grease for 240 hours of operation. An electrically operated transfer pump shall also be supplied for transferring grease from barrels to the reservoir. Suitable provisions shall be made at all greasing points to receive grease by manual application. A portable grease pump shall be supplied for the station, All material such as pipes, fittings, supports etc. which are necessary for making the system complete in all respect shall be provided. The control panel with control indication, starting buttons, fault indicator and necessary contact for the PLC control shall be provided. The panel shall be of wall mounted. 32 5.3 Cooling water system The maximum temperature of the inlet water at site is 200C. The turbine supplier shall design and supply the complete cooling water system catering to the requirements of the entire turbine guide bearing, turbine seal and generator bearings. Cooling water shall be tapped off from the penstock through necessary pressure reducers/diffusers etc. The system for each unit shall be complete with isolating valves, manual/self cleaning type strainer, flow measuring device, pressure gauges, piping and fittings. Self cleaning strainer, and associated items shall meet the cooling water requirement of each unit . Strainers shall be fitted with pressure switches to give alarm in case the pressure differential across inlet outlet exceeds a preset value. Pressure gauges shall also be provided to indicate water pressure at its inlet and outlet. 33 SECTION-VI REPLACEMENT OF MANUAL VOLTAGE REGULATORS WITH AUTOMATIC VOLTAGE REGULATORS 6.1 Scope: This section of the specification cover the following scope of works: i) Dismantling/removing of existing four (4) No.’s manually controlled voltage regulators, all services, labour, tools and tackles required for dismantling including carriage, stacking at Owner’s store/ yard. ii) Design, engineering, manufacture, shop assembly & testing before dispatch, packing and forwarding, transportation, insurance, handling, delivery, storage at site, erection, testing & commissioning of four (4) No’s. digital type automatic voltage regulators as detailed in this specification and handing over to HPSEB LTD. complete with accessories, equipment, devices, instruments, cabling and wiring etc. including all services, labour, tools and tackles. 6.2 Technical requirements of Automatic Voltage Regulator: The voltage regulator shall be of quick acting microprocessor based and shall respond continuously and instantaneously to correct any change in generator voltage. It shall maintain the generator voltage for steady state load conditions without hunting, with 0.5% accuracy for any excitation with in the operating range of the generator. For steady state conditions with the generator circuit breaker open the regulator shall maintain the generator terminal voltage at or below 110% of its setting for speeds ranging from rated speed to an over speed of 130% rated speed. An excitation limiting control shall be provided to limit the generator voltage to maximum 125% of rated voltage in the event that the AVR is tripped co-incidentally with 110% load rejection and generator speed rising to runaway speed. The AVR shall be provided with over & under excitation limiters. The intervention of the limiters shall not cause perceptible deviations or oscillations of the generator active & reactive power. Such devices shall allow the regulator to reduce the excitation voltage to zero in order to prevent over voltage in case of operation, under line reactive load conditions and over speeding of the unit. The characteristics of the under excitation limiting curve shall match the static and dynamic stability curves of the generator. The following features shall be included: Stator current limiter. Field current limiter. Load angle limiter. The field current limiter shall act on AVR with a time delay so as not to disturb transient response of the system during voltage dips/faults. A slip stabilizer unit shall be provided to surpass the low frequency power oscillation during the operative conditions. The AVR shall be equipped with a sensitivity-adjusting device and with adjustable voltage droop compensation (compounding). The voltage regulating system shall include device for improving the damping of active 34 electromechanical oscillations. These devices shall operate to supplement the voltage regulation action by addition of an additional control signal into the excitation system input. This supplemental input signal shall influence the excitation system a.c. to cause a change in field current of the machine for stabilized operation. After, the generator voltage attaining initial maximum value neglecting the instantaneous rises following any load rejection upto 110% of rated load, AVR shall restore the generator terminal voltage to a value not more than 5% above or below the voltage being held before load rejection and shall maintain the voltage within these limits throughout the period of the generator over speed. The voltage setting device provided shall be of the solid state digital type having a range of 10% for local & remote control and indication. For testing purposes setting of 10% to 115% shall be adjustable at the AVR cubicle. The AVR system shall be capable of manual and automatic operation. AVR system shall be compatible with existing generators. Any additional hardware required for compatibility with generator shall be supplied by the contractor. The change over from automatic to manual control shall be performed automatically following a failure of the regulator when operating on automatic control. The generator voltage shall be controlled with in the range of 10% of rated voltage. A static follower shall be provided so that, in the change over from automatic to manual control, it prevents the excitation current from deviating more than 5% of no load excitation current under steady state conditions. An alarm and visual indication shall be provided to indicate change from "AUTO" to 'MANUAL'. The automatic and manual control circuit shall be fully independent. Local & remote control shall also be possible. 6.3 Mandatory Spare Parts: - Following mandatory spares shall be supplied alongwith main equipment:One (1) Set of all plug in units, printed circuits cards, power supply units, protection devices and transducers for the excitation equipment and automatic voltage regulator. One (1) Sets of thyristor complete with fuses and all accessories. One (1) Field circuit breaker. One (1) Set of discharge resistors. One (1) Set of relays, circuit breakers, contactors, switches, fuses, indication instruments etc., of each type used. One (1) Set of small parts, subject to wear and tear such as gaskets, valve components, etc. 35 SECTION-VII REPLACEMENT OF 30V, 400 AH BATTERY, BATTERY CHARGER AND DCDB WITH 110 V, 200 AH BATTERY, BATTERY CHARGER AND DCDB 7.1 Scope This section of the specification cover the following scope of works: i) Dismantling / removing of existing battery charger, battery bank and DCDB all services, labour, tools and tackles required for dismantling including carriage, stacking at Owner’s store/ yard. ii) Design, engineering, manufacture, shop assembly & testing before dispatch, packing and forwarding, transportation, insurance, handling, delivery, storage at site, erection, testing & commissioning of battery bank, battery charger and DCDB as detailed in this specification and handing over to HPSEB LTD. complete with accessories, equipment, devices, instruments, cabling and wiring etc. including all services, labour, tools and tackles. 7.2 7.3 Technical Requirements of Batteries General Description : The 110V, 200AH Lead Acid Type storage batteries with Plante Positive Plates are required for meeting the D.C. load requirements of Power House. 7.4 Standards: - 7.4.1 The equipment covered under this specification shall comply with the requirements of latest editions of the following Indian Standards as amended to date except where specified otherwise: IS : 1146 Rubber and plastic containers for lead acid batteries. IS : 1652 Stationary cells and batteries lead acid type with Plante positive plates. IS : 266 Sulfuric acid. IS : 8320 General requirement and method of tests for lead acid storage batteries. IS : 8320 General requirements and method of tests for lead acid storage batteries. IS : 6071 Synthetic separators for lead acid batteries. IS : 3116 Sealing compound for lead acid batteries. 7.4.2 Equipment meeting with any other authoritative standards, which ensure equal or better quality than the standards mentioned above are also acceptable. Where the equipment conforms to any other standards other than those mentioned above, salient points of difference between the standards adopted and standards mentioned shall be clearly brought out in the tender. Battery : - 7.5 7.5.1 Type: The Plante positive plates shall be of the pure lead lamelle type with plante formation. The negative plates shall be of pasted construction and assembly shall consist of sturdy lead alloy grid filled with active material. The 36 7.5.2 7.5.3 7.5.4 7.5.5 7.5.6 7.5.7 7.6 7.6.1 7.6.2 construction shall be used to ensure good mechanical retention of the active material and maximum electrical conductivity throughout, the life of the cell. Capacity: The capacity of each cell will be based on 10 hours discharge rate for an end voltage of 1.85 volts at 270C. The nominal voltage will be 2 volts. Voltage of each cell after complete discharge should not fall below 1.85 volts. The overall voltage across the load during float as well as boost charging shall not be more than 110% of the nominal voltage i.e. 110V. Number of cells: The battery consists of a total of 55 cells. The Tenderer shall give the optimum rate of charge for float charging the battery. The battery shall be operated alongwith two rates charger. Cell Terminals : All cell terminals shall have adequate current carrying capacity and shall be of lead alloy or lead alloy reinforced with copper core insets. Cell terminal posts shall be supplied with acid resistant connectors, bolts and nuts. Containers: The containers for cell shall be of transparent plastic. They shall have a neat finish and shall be free from leaks. The surface of container shall have a finish substantially free from blisters, rough spots, scales, blowholes and other imperfections or deformations. Electrolyte level lines shall be marked on all four sides of each container. Electrolyte: The electrolyte shall be battery grade sulphuric acid. The battery shall be transported empty and dry. The required quantity of battery grade electrolyte concentrated sulphuric acid, to be diluted at site to serve as electrolyte for first filling of the cells, shall be supplied in separate non-returnable containers including 10% extra quantity of electrolyte. The quantity of electrolyte alongwith its specific gravity shall be specified. Venting Device: Each cell shall be provided with a venting device at the top which shall be anti-splash type with more than one exist hole and shall allow gases to escape freely but shall effectively prevent acid particles or spray coming out. These shall also provide an opening for addition of distilled water as required to top up the electrolyte. The vent plugs shall be explosion proof. The construction details of vent plug shall be provided in the tender. Installation of Batteries: The battery shall be mounted on wooden racks in the battery room. Acid resistant insulation between cell and racks shall be provided. The racks shall be so arranged as to present a neat and aesthetic appearance. The arrangement shall be subject to approval of the Purchaser. Each cell as well as its location shall be numbered for proper record of maintenance and operation. Termination polarity of each cell shall be clearly stamped as positive and negative. The connections between the cells shall be bolted type. The bolts and nuts and connectors will be effectively lead coated to prevent corrosion and should be of adequate capacity to carry maximum current. As powerhouse lies in a seismic zone, the Tenderer/Manufacturer shall give specific recommendations in his offer for installation of batteries in such a fashion that these are not damaged due to seismic forces. The battery bank is required to be erected/installed on the existing wooden racks in two tier formation in a room of 6 x 3.25 m size approximately. Fitting and Accessories : The Tenderer shall provide all the fittings and accessories required for the satisfactory installation, operation and maintenance of the battery, even if 37 these are not specifically mentioned in this specification. The following accessories shall, however be supplied with the battery set: Sr. Description Quantity No. i) Inter cell and inter row connector with nuts and bolts. 1 set Inter cell connector shall provide about 12mm space between cells. These shall be lead plated copper connection. ii) Hydrometers complete with accessories (Temperature 2 nos. Correction charts). iii) Thermometer for measuring electrolyte temp. 2 nos. iv) Analogue type cell testing voltmeter scaled 3-0-3V, 2 nos. complete with leads. v) Glass funnels 2 nos. vi) Acid resistant jug 2 nos. vii) Rubber gloves 2 pairs viii) Rubber aprons 2 nos. ix) Rubber boots (knee high) 2 pairs x) Nylon brushes with stout bristles for cleaning 2 nos. connections xi) Identification plates for cells with location number of cell 1 set 7.6.3 7.6.4 7.6.4.1 a) i) ii) iii) iv) v) b) i) ii) iii) iv) v) vi) vii) c) i) ii) iii) Distilled Water Still: Distilled water still, electricity operated having output of 2.5 litres/hour Suitable for working on 230 volts, 50Hz. A.C. Single phase complete in all respects. Necessary supporting stands shall also be supplied. Tests: The battery shall comply with the requirement of routine, acceptance and type tests as per IS: 1652 and 8320. The following shall be routine, type and acceptance tests :Routine Tests :Verification of conformity of material. Verification of constructional requirement. Verification of dimensions. Verification of marking and packing. Air pressure test. Type Tests :The following shall constitute type tests and shall be carried out in the sequence given below: Verification of constructional requirements. Verification of marking. Verification of dimensions. Test for capacity - Test for voltage during discharge. Ampere-hour and watt-hour efficiency tests. Test for retention of charge Endurance test. Type test shall be carried out on two cells. One cell shall undergo all tests except endurance tests while the other would undergo endurance test preceded by a capacity test. Acceptance Tests :The following shall constitute the acceptance tests: Verification of marking. Verification of dimensions. Test for capacity. 38 iv) Test for voltage during discharge. Acceptance test shall normally be carried out at the discretion of the Purchaser on each cell after installation at site. The date and place of testing shall be subject to agreement between the Purchaser and the supplier. In case the manufacturer has conducted Type test earlier on the similar product, the type test certificate shall be submitted . 7.7 Technical Requirements of Battery Charger :- 7.7.1 Equipment Description (a) The battery chargers as well as their automatic regulators shall be of static type. Battery chargers shall be capable of continuous operation at the respective rated load in Float mode, i.e. Float charging the associated Lead-acid plante high discharge type Batteries while supplying the DC loads. The batteries shall be float charged at 1.4 to 1.5 Volts per cell. The charger shall also be capable of Boost charging the associated batteries at 1.42 to 1.7Volts per cell at the desired rate. The chargers shall be designed to operate, as mentioned above, up to an ambient air temperature of 500C. Tapping arrangement in the battery bank shall be provided to limit the over voltage for supplying load within allowed voltage range under boost charge conditions. The charger should automatically switchover to float charger & to boost charger when the specified limit of voltage is approached. However, necessary time circuit shall be used to allow a finishing charge before switching over to float mode, as recommended by battery manufacturer in order to ensure that battery gets fully charged. Note:- Charger rating shall be arrived at with charger in boost mode and also supplying 100% float load i.e. charger current shall be sum of float & boost rating. b) Battery chargers shall automatically select the appropriate mode of operation i.e. Float or Boost. Means shall be provided to avoid current/voltage surges of harmful magnitude/nature, which may arise during changeover. c) Soft start feature shall be provided to build up the voltage to the set value slowly within fifteen seconds. The chargers shall have load limiters, which shall cause, when the voltage control is in automatic mode, a gradual lowering of the output voltage when the DC load current exceeds the load limiter setting of the Charger. The load limiter characteristic shall be such that any sustained overload or short circuit in DC system shall neither damage the Charger nor shall it cause blowing of any of the charger fuses. The charger shall not trip on overload or external short circuit. After clearance of fault, the Charger voltage shall build up automatically when working in automatic mode. During external short circuit, output of the charger shall be automatically reduced to near zero volt till it is not isolated/disconnected & normal output voltage shall be restored by charger circuit on isolation with out any harm to source transformer/ protection/ regulator circuit. d) During Float charging, the charger output voltage shall remain within + 1% of the set value for AC input voltage variation of 230+10%-15% frequency variation of + 5% a combined voltage and frequency (absolute sum) variation of 10% and continuous DC load variation from 5% to full load. Uniform and stepless adjustments of voltage setting shall be provided on the front of the charger panel covering the entire float charging output range specified. Stepless adjustment of the load limiter setting shall also be possible from 80% to 100% of the rated output current for float charging mode. 39 e) During Boost charging, the Battery chargers shall operate on constant current mode with maximum current limiter setting (When automatic regulator is in service). f) Energising the Charger with fully charged battery connected plus 10% load shall not result in output voltage greater than 110% of the voltage setting. Time taken to stabilize, to within the specified limits in clause 3.1 (d) shall be less than five seconds. g) Momentary output voltage of the charger, with the Battery connected shall be within 90% to 110% of the voltage setting during sudden load change from 80% to 20% of full load or vice-versa. Output voltage shall return to, and remain, within the limits specified in clause 3.1(d) in less than 1 second after the above mentioned change. h) The charger manufacturer may offer an arrangement in which the voltage setting device for float charging mode is used as output voltage limit setting device for Boost charging mode, and the load limiter of the float charging mode is also used as Boost charging current setting device. i) Suitable filter circuits shall be provided in all the chargers to limit the ripple content (peak to peak) in the output voltage to 3% irrespective of the DC load, even when they are not connected to a battery. k) Battery shall be isolated in case of short circuit on the load side. l) Battery test circuit shall be provided with suitable resistance for discharging the battery for 30Sec at 5 hr rate. m) All potentiometers shall be electronically locked to contain the various parameters within allowable limits even if the setting position of potentiometers is changed to extreme positions. n) Minimum Insulation resistance shall be 5 M Ohm. 7.7.2 MCB: AC MCCB shall be provided at the incomer. DC MCCB with provision of auxiliary contacts shall be provided at the output of the battery charger. 7.7.3 Rectifier-Transformers and Chokes. The rectifier transformer and chokes shall be dry and air cooled (AN) type. The rating of the rectifier transformers and chokes shall correspond to the rating of the associated rectifier assembly. The rectifier transformers and chokes shall have classB insulation as per IS:4540. Rectifier transformer shall conform to all type tests as specified in IS:4540/IS: 2026. Type test and routine test reports shall be submitted to the owner. 7.7.4 Rectifier Assembly: The rectifier assembly shall be full wave bridge type and designed to meet the duty as required by the respective charger. The rectifier cells shall be provided with their own heat dissipation arrangement with natural air cooling. The rectifier shall utilize diodes/ thyristors with heat sinks rated to carry 130% of the load current continuously and the temperature of the heat sink shall not be permitted to exceed 850C absolute duly considering the maximum temperature inside charger panel with ambient temperature of 500C. The Contractor shall submit calculations to show what maximum junction temperature will be and what the sink temperature will be when 40 operating at 130% and 100% load current continuously duly considering the maximum surrounding air temperature for these devices inside the charger panel assuming ambient temperature of 500C outside the panel. Necessary surge protection devices and rectifier type fast acting fuses shall be provided in each arm of the rectifier connections. Static silicon controlled rectifiers and diodes complete with resistor/capacitor network for surge protection shall be provided. Design having IGBT or superior technology shall also be acceptable for which full justification & experience shall be required for acceptance. 7.7.5 Instruments: Analogue or digital D.C. voltmeter, D.C. ammeter and A.C. voltmeter with 96mm square display shall be provided for all chargers. The instruments shall be flush mounted type, dust proof and moisture resistant. The instruments shall have easily accessible means for zero adjustments. The instruments shall be of 1.5 accuracy class. 7.7.6 Control and Selector Switches: Control and selector switches shall be of rotary stayput type of reputed make, confirming to relevant IS with escutcheon plates showing the functions and positions. The switches shall be of sturdy construction and suitable for mounting on panel front. Switches with shrouding of live parts and sealing of contacts against dust ingress shall be preferred. 7.7.7 Fuses: Fuses shall be of HRC cartridge fuse link type. Fuses shall be mounted on fuse carriers, which are mounted on fuse basis. Where ever it is not possible to mount fuses on fuse carriers, they shall be directly mounted on plug in type bases. In such cases one insulated fuse pulling handle shall be supplied for each charger. Suitable fuse fail detector circuits with alarm contacts shall be provided for all D.C. fuses. 7.7.8 Indicating Lamps: The indicating lamp shall be of panel mounting, LED type and capable of clear status indication under the normal room illumination. The lamp covers shall be preferably screwed type, unbreakable and moulded from heat resistant. 7.7.9 Blocking Diode: Blocking diode, wherever required, with full redundancy shall be provided in the output circuit of each charger to prevent current flow from the D.C. battery into the Charger. 7.7.10 Annunciation System: Visual indications through indicating lamps/ LEDs or annunciation facia shall be provided in all Chargers for the followings: i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) A.C. supply failure Rectifier fuse failure Surge circuit fuse failure Filter fuse failure. Load limiter operated Input AC MCCB trip Output DC MCCB trip. Battery on Boost. Load-side DC under voltage & over voltage alarm. Battery side DC over voltage alarm. Earth fault alarm 41 xii) xiii) AC available – Battery discharge (Mains available battery discharge) alarm. Potential free NO contacts shall be provided for following remote alarms: a) b) Battery on boost. Charger trouble (this being a group alarm initiated by any of the faults other than Battery on Boost). 7.7.11 Name Plates and Making The nameplates shall be made of non-rusting metal/3 ply Lamicoid and shall have black background with white engraved letters and secured by screws. These shall be provided near top edge on the front as well as on rear side of Charger. Nameplates with full and clear inscriptions shall also be provided on and inside the panels for identification of various equipment. 7.7.12 Detailed dimensional drawings, commissioning and operating instructions and Test Certificates of the manufacturer shall be supplied with the equipment. 7.8 Construction: 7.8.1 The Chargers shall be indoor, floor mounted, self-supporting sheet metal enclosed cubicle type. The Contractor shall supply all necessary base frames, anchor bolts and hardware. The Charger shall be fabricated using cold rolled sheet steel not less than 1.6mm thick. The panel frame shall be fabricated using cold rolled sheet steel of thickness not less than 2.0mm. Removable un-drilled gland plates of at least 3.0mm sheet steel and lugs for all cables shall be supplied by the Contractor. The lugs for cables shall be made of electrolytic copper with tin plating. Cable sizes shall be advised to the Contractor at a later date for provision of suitable lugs and gland plates. Ventilating louvers shall be backed with fine brass wire mesh. All doors and covers shall be fitted with nitrile/neoprene/PU rubber gaskets. The Chargers shall have hinged double leaf doors provided on front and/ or backside for adequate access to the Charger internals. All the Charger cubicle doors shall be properly earthed. The degree of protection of Charger enclosure shall be at least IP-42. The construction shall meet the requirements of IS: 6619. All equipment mounted in the cabinet shall be provided with individual labels with equipment designation engraved. 7.8.2 The layout of Charger components shall be such that their losses do not give rise to excessive temperature within the Charger panel, Location of the electronic modules will be such that temperature rise, in no case, will exceed 10oC over ambient air temperature outside the Charger. 7.8.3 Charger panel shall be provided with an illuminating lamp (CFL or tube light) and one 5Amp socket. Switches and fuses shall be provided separately for each of the above. 7.8.4 Locking facilities shall be provided as following: a) For locking Float/Boost selector switch in the float position only. b) The Charger enclosure door shall have provision for padlocks. Padlock shackle arrangement shall allow ready insertion of the padlock shackle but shall not permit excessive movement of the locked parts with the padlock in position. 7.8.5 Wiring 7.8.5.1 Each Charger shall be furnished completely wired upto power cable lugs and terminals blocks, ready for external connection. The power wiring shall be carried out with 1.1kV grade PVC insulated cables conforming to IS: 1554 (Part-I). The control wiring shall be of 1.1kV grade PVC insulated stranded copper conductors of 42 1.5sq.mm. minimum, conforming to IS:694. Control wiring terminating at electronic cards shall not be less than 0.75sq. mm. Control terminals shall be suitable for connecting two wires of 1.5sq.mm stranded copper conductors. All terminals shall be numbered for ease of connections and identification. At lease 20% spare terminals shall be provided for circuits on terminal board. 7.8.5.2 Power and control wiring within panels shall be bundled separately. Any terminal or metal work which remains alive at greater than 415V, when panel door is opened, shall be fully protected by shrouding. An air clearance of at least ten (10)mm shall be maintained throughout all circuits, except low voltage electronic circuits, right upto the terminal lugs. Whenever this clearance is not available, the live parts should be insulated or shrouded. 7.8.6 Painting: Pre-treatment & phosphating shall be provided as per IS: 6005. The phosphate coating shall be ‘class-C’ as specified in IS:6005. Electrostatic powder painting with final shade – 692 (smoke grey) of IS: 5 shall be provided. The thickness shall not be less than 50microns. 7.8.7 Packing and Dispatch : The equipment shall be dispatched securely packed in wooden crates suitable for handling during transit by rail/road so as to avoid any loss or damage during transit. 7.9 Tests: Battery chargers including the components shall confirm to all type tests including heat run test as per relevant Indian Standards. Performance test on the chargers as per specification shall also be carried out on each charger. 7.9.1 Type Tests: 7.9.1.1 Following type tests, in addition to the requirement of IS: 4540, should have been carried out on each rating and type of Batter Charger for which reports are to be submitted. i) ii) iii) iv) v) a) b) c) vi) Complete physical examination. Temperature rise test at full load (at highest voltage and highest current) Insulation resistance test. High voltage (power frequency) test on power and control circuits except low voltage electronic circuits. Ripple content test at No load Half load Full load Automatic voltage regulator operation test at specified A.C. supply variations at: a) b) c) vii) viii) No load Half load Full load Load limiter operation test Short circuit test at full load and at no load for sustained short circuit of 1 minute minimum shall be carried out. 43 7.10 Technical Requirements of DCDB :DCDB shall conform to relevant Indian Standards. It shall have MCB’s/MCCB’s of sufficient ratings as per requirements of existing and renovated equipment of all the four machines. Broadly the DCDB shall feed DC supply to Oil Pressure units, Lubrication oil system, Protection panels, 22 Kv VCB’s, 440 V ACB’s and emergency lighting of the power house : Tentative requirements of feeders are given below :S.N. Description Current Rating 1 2 3 4 5 6 7 8 9 Lub. Oil System 22 Kv VCB 440V ACB Protection Panels LT panels Unit Control Boards Emergency Lighting Spares Spares 20 A 10A 7A 10A 7A 10 A 7A 20 A 10A/7a Qty. 4 No.’s 6No.’s 5 No’s 4 No.’s 2No.’s 4 No.’s 3 No.’s 2 No.’s 2 No.’s EACH Tests :Contractor shall offer the equipment for inspection and testing at works. All tests as per IS shall be carried out. 44 SECTION-VIII REPLACEMENT OF PROTECTION PANELS 8.1 Scope This section of the specification cover the following scope of works: I) II) 8.2.1 Dismantling/removing of existing four (4) No.’s generator protection panels and one No. Synchronising trolley all services, labour, tools and tackles required for dismantling including carriage, stacking at Owner’s store/ yard. Design, engineering, manufacture, shop assembly & testing before dispatch, packing and forwarding, transportation, insurance, handling, delivery, storage at site, erection, testing & commissioning of four (4) No’s. generator protection panels and one No. Synchronising trolley as detailed in this specification and handing over to HPSEB LTD. complete with accessories, equipment, devices, instruments, cabling and wiring etc. including all services, labour, tools and tackles. Generator Protection Scheme :The scheme consists for the four generator units. The electrical protection systems to be provided for the individual generator, shall comprise of at least following equipment :Four (4) sets of protection equipment for generating units:27G Generator under voltage relay. 32G Generator reverse power relay. 46G Negative Sequence Relay 51V Voltage restraint over current relay. 51 N Earth fault relay. 64 S Rotor Earth Fault Relay 59G Generator over voltage relay with definite time delay 81G Over/Under Frequency relay 40G Loss of field The protection system shall consist of micro processor based numerical relays for generator protection and generator transformer protection. Each trip relay shall be arranged to operate trip coil on the 0.415 kV Air circuit breaker. A single line diagram of the main electrical equipment of the power house and its protection scheme is shown on the drawings No. PHE-01-002. Means shall be provided to prevent operation of protective equipment due to magnetising current, in the case of switching-in the transformer from the high voltage side. Precaution shall also be taken that the unavoidable inductive and capacitive couplings from the power circuit do not cause disturbances. 45 Protection package shall be facilitated with following: i) Man machine communication interface shall be provided with alarm and trip value setting, displaying of service values, alarm/trip set values, alarmed/ tripped values etc. ii) Self-supervision and indication of any failure. iii) Continuous monitoring of external and internal auxiliary voltages. iv) Easiness of replacing a module in case of failure. v) Communication interfaces or ports. vi) Indication of alarm and trip conditions. 8.2.2 Synchronising Trolley Mobile Synchronising trolley consisting of but not limited to control switches, selector switches, Check synchronising relay, guard relay, shall be supplied. Synchronising equipment shall be capable of synchronising any of the generators at 415 V bus through ACB. Alternatively synchronising panel consisting of above equipment can also be proposed by the bidder. 8.3 Basic Dimensioning and Ratings 8.3.1 General Arrangement The system shall provide a high degree of selectivity and discrimination between faulty and healthy circuits. A microprocessor based modular system associated with a man machine communication interface shall be offered. All devices shall remain inoperative during internal faults and transient phenomena. They shall be insensitive to mechanical shocks, vibration and external magnetic fields. The protection systems shall be the standard product of a competent manufacturer, with organized type test certificates and adequate record of satisfactorily working plants. All relays shall be suitable for local reset. They shall have self-monitoring facilities and LED status indication. Service voltage failure and any fault in relays and tripping circuitry shall be indicated. Tripping circuits shall be operable at 70% nominal voltage. CT's shall be shorted automatically, when relevant modules are withdrawn. Two trip relays shall be provided to work as main and back trip relays. The relays shall be provided with the following information, suitably located: function of relay phase identification main characteristics The protection system shall be divided into protection groups and subgroups, each installed in a separate cubicle or cubicles. Each protection group shall consist of solid-state protection relays preferably numerical, auxiliary relays, tripping unit and all accessories as required and further specified in the following sections. 46 The protection groups are defined as follows: Mechanical protection for the generating units Generator protection for the generating unit Transformer protection, for the main and station transformers The protection equipment for the generating unit shall be installed in the Power house control room or near the UCB if, space is available. Current transformers, where possible, are to be located so as to include the associated circuit breaker within the protected zone and shall be located generally as indicated on schematic drawings. 8.3.2 Relays Relays shall be approved type with IEC 255 or BRITISH Standard 142 and 5992, parts 1, 2 and 3 or IS certification, as appropriate, fully tropicalised and shall have approved characteristics. Only protective relays from well established manufacturers with a minimum of ten years successful experience in manufacturing protective relays and with a minimum of five years of field experience shall only be accepted. The owner will reject any design he considers unsatisfactory or having insufficient field experience. The protection relays, shall be located in conventional panels and shall be flush mounted in dust and moisture proof cases with protection class IP54 and of the draw out type with rear connections. The protection class of the cover for all relays or protection systems, in which the modules are mounted shall not be inferior to IP53. Relays shall be of approved construction and shall be arranged so that adjustments, testing and replacement can be effected with the minimum of time and labour. Relays contact shall be suitable for making and breaking the maximum currents, which they may be required to control in normal service but where contacts of the protective relays are unable to deal directly with the tripping currents, approved auxiliary contacts, relays or auxiliary switches shall be provided. In such cases the number of auxiliary contacts or tripping relays operating in tandem shall be kept to the minimum in order to achieve fast fault clearance times. Relay contacts shall make firmly without bounce and the whole of the relay mechanisms shall be as far as possible unaffected by vibration or external magnetic fields. Relays, where appropriate, shall be provided with LED or flag indications, phase colored where applicable. LED or flag indicators shall be of the hand reset pattern and shall be capable of being reset without opening the case. Where two or more phase elements are included in one case, separate indicators shall be provided for each element. Relays, which rely for their operation, on an external DC supply, shall utilise for this purpose the same DC supply battery as the trip supply of the associated circuit breaker trip coils. The supply shall be monitored and an alarm provided in the event of failure. All DC breakers and relays for DC main switchgear protection shall be based on AC operated trip and close coils and protection relays. 47 Any auxiliary supplies needed shall be drawn from the DC Distribution Board and not from the separate internal batteries in the protection equipment. Relays, whether mounted in panels or not, shall be provided with clearly inscribed labels describing their functions and designation in addition to the general-purpose labels. To minimise the effect of electrolysis, relay coil operating on DC shall be so connected that the coils are not continuously energised from the positive pole of the battery. Draw out type relay shall be so designed that when the relay is drawn out , associated CT's shall be automatically short-circuited and tripping circuits disconnected. All static relays shall be adequately protected against damages from incoming surge and shall meet relevant IEC, BS, IS and ANSI SWC test standards. The input circuit must be galvanically isolated from the electronic circuits. Potential free output contacts must be suitable for the direct control of breaker trip coil. The setting ranges of the protection devices and the performance of the CT's and VT's shall fit the requirements of the individual circuits. Time delayed modules shall have definite time characteristic with continuous adjusting range. The selectivity with the other protection modules shall be proved by a protection setting study covering the entire system. This study shall be based on a short circuit calculation for maximum and minimum short circuit capacity and shall prove the selectivity of the relay setting from the high voltage to the low voltage system, taking into consideration the different modes of operation of the system. This study shall also prove correct matching with the provided instrument transformers. Trip circuit supervision relays shall be provided to monitor each circuit of 415 V air circuit breakers and earth relay shall have sufficient contacts for visual/audible alarm and indication purposes. The trip circuit supervision scheme shall provide continuous supervision of the trip coil and trip circuits with the circuit breaker in either the open or close position. Relay elements shall be delayed on drop off to prevent false alarms during faults on dc wiring on adjacent circuits or due to operation of a trip relay contact. Series resistance shall be provided in trip circuit supervision circuits to prevent maltripping of a circuit breaker if a relay element is short-circuited. Breaker failure protection shall be fitted to all air circuit breakers. The breaker failure protection on a circuit breaker shall be initiated by all the other protection devices, which normally initiated tripping of that breaker. In the event of the circuit breaker failing to open within a pre selected time, the breaker failure protection shall initiate tripping of all adjacent circuit breakers connected to the same bus bar, transfer tripping of the line breakers. The relays shall have an operating times of 10 ms, and a consistent reset time of less than 15 ms. The relays shall be more sensitive than the most sensitive circuit protection, both phase and earth fault. The relays shall be capable of remaining in 48 the operated position continuously and of carrying twice the circuit rated current continuously. The operating time of the breaker failure protection shall be selected by means of timers with ranges of 50 to 500 ms. There shall be two timers per circuit breaker. The timer tripping outputs shall be connected in a two out of two basis and shall energize both tripping coils of the adjacent circuit breakers via two back tripping circuit from separate dc supplies. The timers shall be of static design to minimise over travel. 8.3.3 Auxiliary Relays Auxiliary relays for inputs from the protection sensors and devices such as thermal relays, pressure switches etc. shall be provided as specified in the following sections and as necessary for the installation. The relays shall be equipped with a manually reset flag indicator when applicable. Each relay shall have self-resetting potential free contacts of suitable rating as needed for connection in the tripping circuits and at least two self-resetting potential free contacts for local and remote alarm and supervision, both wired to terminals. All relays shall be clearly marked with the corresponding relay function. The tripping relays shall have contact ratings suitable for acting directly on the trip coils and solenoids of the respective circuit breakers and shut down devices. As an alternative a tripping matrix having provisions for easy selection of the tripping scheme, and having means for manual and automatic testing of the trip circuits, can be offered. 8.3.4 Control and Tripping Circuitry The tripping circuits shall be accomplished via a tripping MATRIX. The MATRIX shall include all electrical and mechanical signals as per alarm/tripping schedule and sequence diagram. Any fault in tripping circuit shall be annunciated individually. Buzzer and bell shall be provided for alarm and trip functions separately. Each relay or relay assembly shall have a test device which facilitate checking the correct functioning of the equipment during operation or stand still. The trip circuits shall not be interrupted during test procedure. LED’s shall indicate correct working. For relay testing and setting by means of a portable, precision test set all required circuits shall be terminated to test plugs/switches, arranged at easily accessible locations. 8.3.5 Power Supply Requirements The 110V dc shall be provided for the power supply to the control and protection of ac switchgear equipment, while ac shall be provided for the power supply to the 49 control and protection of dc switchgear. Both systems shall be used to supply auxiliary voltage and tripping voltages to the protection system. All components of the protection system shall function properly at dc voltage from 70% - 115% of nominal voltage. If short-circuit protection is needed inside each protection group, miniature circuit breakers shall be used, having auxiliary contacts for initiating alarm for open position. Converters and suppression filters shall be provided for each protection part. The 110V battery banks installed in the battery room shall feed the protection systems. Relay shall be suitable for operation on 110V DC systems without the use of voltage dropping resistors. 8.4 Performance Criteria and Requirements The protection system shall be capable of performing all intended duties and it is the responsibility of the contractor to supply the equipment as per guaranteed technical particulars. 8.5 Design and Construction The protection system shall be the standard product of a competent manufacturer, with organized type test certificates and adequate record of satisfactorily working plants. The protection system offered by contractor shall be suitable and approved type for hydro power projects. The relay used in protection system shall be of the numerical, and plug in type arranged in protection cubicles. All relays including all ancillary devices, such as interposing transformers, tripping matrix and relays, test facilities, power supply units, etc. with all circuits complying to IEC 60255-4 Recommendation. 8.6 Indicating and Recording Instruments 8.6.1 Indicating instruments shall be as per single line diagram depicted in Drawing No.PHE-02-001 of Vol. 2C . All instruments shall be flush mounted on the top of the cubicle in a separate compartment. The instrument case shall be dust proof, water tight, vermin proof and especially constructed to adequately protect the instrument against damage or deterioration due to high ambient temperature and humidity. The instrument shall be provided with all auxiliary appliances and any special tools required for their maintenance. 8.6.2 All instruments shall be designed for accurate measurement of the quantity or state under all conditions of operation and any error due to change in ambient condition shall be kept to minimum. The instrument shall be damped to comply with the requirement of clause 7.2 of IS 1248 (Part-I) or equivalent. All the instruments shall comply with the requirement of first grade instrument of switch board type as per IS:1248 or equivalent standard. All instruments and meters shall be accurately, adjustabled and calibrated before shipment and shall have means for calibration, checking and adjustment at site. 8.6.3 The metric unit shall be used for displaying the values. The instrument shall be capable of withstanding over loads applied in accordance with IS:1248 or equivalent. The instrument shall be capable of withstanding the following tests, viz effect of shock, vibration and effect of humidity. 50 8.7 Calculation requirements The contractor is required to submit time setting for different relays and selection of relay types to owner for approval. The contractor is required to submit the DC power requirements. Contractor shall also submit a drawing of complete protection scheme. 8.8 Shop Tests 8.8.1 Type Tests All standard components of the protection systems shall have passed appropriate type tests in accordance with the relevant standards. The contractor is required to submit type test certificates to the owner. 8.8.2 Routine Tests These tests shall include material and tests during manufacture as per the manufacturer's practice. The contractor is required to submit complete routine test reports. The following inspections and tests shall be performed on the completely assembled protection systems: 8.9 Visual inspection Wiring test Insulation test High voltage test on outgoing circuits Functional test Field Tests The contractor shall prepare a detailed test program based on the requirements of the applicable standards and the specifications. All test results shall be recorded including the details on the used test equipment and instruments. 51 SECTION-IX REPLACEMENT OF 24 KV SWITCHGEAR 9.1 Scope: This section of the specification cover the following scope of works: I) Dismantling/removing of existing oil circuit breakers and associated control and protection panels all services, labour, tools and tackles required for dismantling including carriage, stacking at Owner’s store/ yard. II) Design, engineering, manufacture, shop assembly & testing before dispatch, packing and forwarding, transportation, insurance, handling, delivery, storage at site, erection, testing & commissioning of indoor type 630 A, 24 kv indoor type vacuum circuit breakers (draw out type) control & Relay panel complete with protective relays for two (2) transformers and four (4) feeders as detailed in this specification and handing over to HPSEB LTD. complete with accessories, equipment, devices, instruments, cabling and wiring etc. including all services, labour, tools and tackles. 9.2 9.2.1 Standards The equipment including all accessories supplied under this Contract shall conform to relevant IEC or IS or British Standards and shall be in accordance with the latest edition or revision thereof. 9.2.2 9.2.3 Equipment/material conforming to any other recognized standard, which ensures an equal or better quality other than, the provision of this specification, would also be acceptable. Where the equipment offered, conforms to any other standard, the salient points of difference between the standards adopted and the provision of this specification shall be clearly brought out in the bid. A complete list of the adopted Standards shall be supplied alongwith the bid. 9.3 Workmanship and Design The material and workmanship throughout shall be the best of their respective kind. The design shall be such that installation, replacement and general maintenance may be under taken with the minimum of dismantling time and expense. No patching, plugging or other such means covering defects, discrepancies or cover shall be carried out with out the prior permission of the Purchaser. 9.4 General Rating of Equipment The required capabilities and rating of the 24 kV switchgear will be governed by the requirement given below: i) Nominal system voltage 22kV ii) Highest System voltage 24kV iii) One min. power frequency withstands voltage. 50kV (rms) iv) Impulse withstand voltage positive and negative v) polarity. 95Kv (peak) System frequency 50Hz 52 vi) No. of phases Three vii) Rated normal current 630 A viii) Rated breaking capacity 6.3 kA ix) Rated making capacity 15.75kA x) Rated operating duty cycle 0-3min.-CO-3 min.-CO xi) 9.5 Total break time for any current upto the Rated breaking current. Less than 4 cycles. xii) Control circuit voltage. 110V DC+ 10% variation. xiii) Auxiliary A.C. supply 1 phase,240 V,50 Hz Type and Details 24kV indoor switchgear shall be steel enclosed indoor type. This shall be suitable for continuous operations and shall comply with the requirement of latest addition of relevant IEC, BS or Indian Standard. Each switchgear shall be complete with vacuum circuit breaker mounted on draw out trolley, bus bars, instrument transformers, instruments, protective relays, cable boxes and glands with all necessary wiring and auxiliary devices required to perform its functions. All the instruments, control switches indicating devices and relays, should be mounted on the front panel as a separate compartment. The design and arrangement of the equipment shall be such that adequate space and access is provided for inspection and maintenance of wiring, terminals switches, cables and end boxes etc. The switchgear shall be vermin proof and dust tight. Bus bars, CT & cable compartment & breaker compartment shall be provided with independently operated automatic shutters to avoid accidental contact with live parts. The arrangement of bus bars shall be such so as to provide ready extension for additional unit on either side. 9.6 24 KV Circuit Breakers 9.6.1 The electrical rating of the circuit breaker shall be as per clause 9.4 of this section. The breaker offered shall be vacuum type conforming to all the requirements of IEC/BS or Indian Standard. The breaker compartment shall be designed to have fully draw-out self contained truck arrangement with breaker mounted on the same. The devices fitted on the breaker truck shall allow for easy insertions and withdrawal of breaker from service position. The breaker truck shall have the following two definite positions. i) Service position: - In this position the circuit contacts as well as secondary contacts and fixed secondary contacts should get engaged on to the fixed power contacts and fixed secondary contacts respectively. ii) Test position: - In this position power contacts of the mobile portion of circuit breaker shall remain isolated from the fixed position whereas 53 secondary contacts shall remain connected to the fixed secondary contacts. The circuit breaker mobile truck shall be provided with additional metal barrier i.e. front shield between the actual breaker housing and the front door. Front door of the cubicle shall be provided with padlocking facilities. The front door should be closed and pad-locked even when the breaker is in test position Safety interlocks and automatic shutter shall be provided to ensure the following:a) The circuit breaker cannot be inserted into the service position when in closed position. b) The circuit breaker cannot be withdrawn from the service position unless it is in open position. c) Access to the breaker chamber and circuit breaker shall not be possible unless the breaker is withdrawn. 9.6.2 The circuit breaker shall be provided with rapid and smooth interruption of currents under all conditions completely suppressing all undesirable phenomena on even under the most severe and persistent short circuit conditions or when interrupting small leading and lagging currents. The detail of any device or special feature incorporated to limit or control the rate of rise of re-striking voltage across the circuit breaker contact shall be stated. The over voltage caused by the circuit breaker switching on inductive and capacitive loads shall not exceed 2.5 times the normal phase to neutral voltage. The total break time for the circuit breaker throughout the range of its operation duty shall be stated in the bid and it shall be guaranteed. 9.6.3 The circuit breaker shall be provided with suitable operating mechanism with automatic recharging of spring with the help of geared motor. Provision shall also exist for one detachable handle for manual charging in the event of failure of auxiliary voltage. The switchgear shall be suitable for remote operations in addition to auxiliary local operating mechanism. The operating mechanism shall be trip-free. All working parts in the mechanism shall be of corrosion resistant material and all bearings, which require greasing, shall be equipped with pressure grease fitting. The mechanism, shall be strong, quick in action with minimum noise and shall be removable without disturbing the other parts of the circuit breaker. The operating mechanism alongwith its accessories shall be housed in a weatherproof cabinet with hinged doors installed just adjacent to the breakers. The circuit breaker shall also be provided with means for manual operation for maintenance purpose and local tripping and closing. A local/remote change over switch shall also be provided. Operating mechanism shall also be provided with operation counter and space heaters with suitable thermostat switch to avoid condensation. 9.6.4 The control circuit shall be designed to operate on 110 V.D.C. supply with a variation from 70% to 110% of rated voltage. A.C power supply for auxiliaries shall be available at 240 V, single phase, 50 c/s. Provision shall be made for locking the breaker mechanism in open position and locking the doors in closed position through pad locks. Lamp indication as well as mechanical “open” and “close” indication shall be provided on the switchgear panels to show the contact positions of circuit breakers. Twelve numbers of the secondary auxiliary contacts shall be provided on mobile portion of circuit breaker in any combination of NO and NC and completely wired up to terminal blocks. 54 9.6.5 Means shall be provided for easy access to the contacts and other parts of the switchgear for inspection and repairs. When these facilities are obtained by provision of manholes, the manhole shall be of adequate dimensions and hinged type and located in convenient place. 9.7 Bus Bars All the bus bars within the switchgear assembly shall be air insulated and shall be housed in a separate compartment of the switchgear assembly supported on insulated supports. It shall have rated current capacity of not less than the rated capacity of the circuit breaker. Bus bar shall also have mechanical and thermal capacity not less than that represented by the short time current rating of the circuit breaker. The bus bar shall be of aluminum conforming to relevant IEC, BS or Indian standard. Phase-to-earth and Phase-to-Phase clearances shall also be in accordance with IEC standards and corrections in the clearance on account of altitude correction factor shall also be incorporated. No insulation sleeves shall be provided on the bus bars to reduce the phase-to-earth and phase-to-phase clearances. Support insulators shall be strong enough to take up dynamic forces on account of short circuit. Temperature rise of the bus bars and joints shall also be as per IEC standard. The bus bar phases shall be identified by painted bands of red, yellow, & blue spaced at suitable distances. 9.8 Current Transformers 9.8.1 Current transformers shall be mounted with in the cubicle and shall comply with the requirements of IS: 2705-1992 and its latest amendment. Current Transformers as shown in drawings No. PHE-01-002 of Vol. 2C shall be supplied by the contractor. The technical particulars shall be as given below: i) Normal service voltage 22kV. iii) Power frequency withstand voltage 50 kV iv) Impulse withstand voltage 95 kV Peak. v) Highest system voltage 24kV. Necessary steel brackets for mounting these CTs inside the cubicle shall also be provided. The required CT ratio, burden and accuracy class shall be as mentioned in the schedule of requirement. The Bidders shall have the option of offering multicore C.T.’s of accuracy classes specified in place of single core C.T’s inside the panel. The Bidder shall also furnish the knee point voltages, magnetizing currents and secondary winding resistances of P.S. class C.T’s. However, actual requirement will have to be worked out in coordination with other concerned suppliers and bidder should agree to accommodate any change in requirement with regards to numbers and characteristics of CT’s at the stage of approval of drawings. In addition to above technical particulars, the CT’s shall have the following ratings also. a) Continuous current rating factor for secondary winding. b) Thermal short time rating one second with secondary short circuit, winding temperature shall not exceed the limit as per IEC 185. c) Frequency: - 50HZ 55 9.8.2 The secondary winding of the CT’s shall be fully distributed around the core at all nominal taps. The actual exciting current up to the knee point voltage shall not vary beyond the permissible standard from the normal exciting current. 9.8.3 All the routine tests, type tests and tests at site shall be carried out on current transformers in accordance with Indian standard with up to date amendments thereof. The tests to be carried out by the Contractor shall clearly be stated in the bid. 9.8.4 Other requirement of different 22 kV rating CT’s are given below: S.N. DESIGNATION RATIO PURPOSE BURDEN 1 CT-6 50/1A Directional O/C 50 & E/F Protection 5P10 2 CT-7 (CORE-I) 50/1 A O/C & Protection 5P10 (CORE-II) 50/1A Metering E/F 50 50 ACCURACY CLASS 0.5 9.9 Voltage Transformers 9.9.1 Voltage transformer shall confirm to IS: 3156-1992 and its latest amendments. Voltage transformer shall be provided as shown in drawings No. PHE-01-002 of Vol. 2C and be of magnetic type. The voltage transformer shall be single-phase type and shall be mounted inside the cubicle. Voltage transformer shall be complete with its own high and low tension fuses and current limiting resistances if required. The fuses shall be so arranged that they are readily accessible and easily/quickly replaceable. The burdens of PT’s are given in cl.9.9.2 and are tentative only. The Bidder shall indicate in his offer the actual burden imposed by relays, meters so that modification, if required, in the rated burden of transformer can be done at the time of placing of order. The technical particulars shall be as given below: i) Normal service voltage 22kV. iii) Power frequency withstand voltage 50 kV iv) Impulse withstand voltage 95 kV Peak. v) Highest system voltage 24kV. All the routine tests, type tests and tests after installation given in relevant Indian Standard shall be carried and Bidders shall give details of such tests which shall be carried out, with their offer. 9.9.2 Other requirement of Voltage transformer are given below: - Sr.No. DESIGNATION RATIO BURDEN 1 CORE-I 50 VA 22KV/3/110V/3 56 ACCURACY CLASS 3P CORE-II 22KV/3/110V/3 50 VA CORE-III 22KV/3/110V 50 VA 0.5 3P 9.10 Indicating Instruments 9.10.1 Indicating instruments for measurement of electrical parameters of outgoing feeders shall be as per single line diagram depicted in drawing No Drawing No.PHE-02-001 of Vol. 2C. All instruments shall be flush mounted on the top of the cubicle in a separate compartment. The instrument case shall be dust proof, water tight, vermin proof and especially constructed to adequately protect the instrument against damage or deterioration due to high ambient temperature and humidity. The instrument shall be provided with all auxiliary appliances and any special tools required for their maintenance. 9.10.2 9.10.3 9.11 All instruments shall be designed for accurate measurement of the quantity or state under all conditions of operation and any error due to change in ambient condition shall be kept to minimum. The instrument shall be damped to comply with the requirement of clause 10.5 of IS 1248 or equivalent. All the instruments shall comply with the requirement of first grade instrument of switch board type vide IS:1248 or equivalent standard. All instruments and meters shall be accurately, adjustable and calibrated before shipment and shall have means for calibration, check and adjustment at site. The metric unit shall be used for displaying the values. The instrument shall be capable of withstanding over loads applied in accordance with IS:1248 or equivalent. The instrument shall be capable withstanding the following tests, viz effect of shock, vibration and effect of humidity. Relays The electrical protection systems to be provided, shall comprise of at least of the following equipment :- 9.11.1 Transformer Protection :Four (4) sets of protection equipment for generating units:51T 50 67 & 67 N Over current relay (LT Side). Local Breaker Back Up (HT Side). Directional over current and earth fault relay (HT Side). The protection system shall consist of micro processor based numerical relays for generator transformer protection. The transformer overall protection shall be provided for the detection of phase and earth faults . Group-A Winding temperature trip. Buchholz main tank. Group - B Oil temperature trip. 57 9.11.2 Transmission Line Protection :- 9.11.2.1 The electrical protection systems to be provided for the four (4) no.’s line feeder, shall comprise of at least of the following equipment :Four (4) sets of protection equipment for feeders :50 51 & 51 N Local Breaker Back Up Over current and earth fault relay Each trip relay shall be arranged to operate onto both trip coils of the 22 kV vacuum circuit breaker 9.11.2.2 The relays shall be provided as per single line diagram depicted in drawing No PHE-02-001 , Vol. 2C Relays shall be of Numerical type only. Relays shall be Alstom/ABB/ Siemens make. All the relays shall be suitable for operation over the range -70% to 110% of the nominal D.C. voltage. The relays shall be designed to have the minimum possible quiescent drain on the batteries. 9.11.2.3 The relay should be designed to secure against mal-operation for D.C. voltage dips, switch on, switch off and intermittent interruption of the power supply. All the relays shall have different contacts for alarm and tripping. All the relays should conform to the National & International Standards with up to date amendments. 9.12 Lightning Arrestors 9.12.1 The lightning arrestor shall be of distribution class with non linear resistance arrestor and shall be mounted in the cubicle. The lightning arrestor should conform to IS:3070/IEC-994 except where specified otherwise. Lightning arrestors manufactured to any other standard which ensures an equal or better quality than IS 3070 shall be also acceptable. Where the equipment conforms to any other standards other than IS: 3070-difference between the standard shall be clearly brought out. 9.12.2 The lightning arrestors shall be designed according to the latest techniques, testing and development incorporating the design features such as low resistance, non linear resistor, magnetically blown out spark gaps, voltage grading resistors and capacitor pressure relief device etc. 9.13 Panels All enclosures and Panels/Cubicles shall be of good quality Standard production. Panels/cubicles shall be free floor standing type of rigid frame covered with removal steel sheets. The frame should be bolted to floor. There shall be provision and enough space for entrance of cables from below. The cubicles shall be ventilated if needed, in this case removal filter inserts shall be fitted to the air entrance openings. Provision for cable fastenings shall be made inside the cubicles and enclosures and sufficient space for cable fastenings to nearest terminals shall be kept. All control and indicating instruments such as contactors, circuit breakers, auxiliary relays, indicating instruments, switches etc. shall be functionally displayed in appropriate locations. The layout is subject to approval of the Engineer –in- charge, 58 however, standard layout of the manufacturer is acceptable with minor changes if required. The panels/cubicles should be of IP-20 protection class and the outside paint shall be powder coated, pebble gray (RAL 7032) and inside either pebble gray or enameled white. No other shade shall be accepted. 9.14 Earthing Arrangement Two separate copper earth buses of suitable cross-sectional areas shall be provided in the 24 kV switchgear designed for a short circuit current of 25 kA. One earth bus shall run along the entire rear length of the switchgear panels and the lightning arrestors shall be connected to this earth bus. The other earth bus shall be run along the entire front side of the switchgear panel and the earth connections from the relays and control devices shall be made to this bus. Both the earth buses shall be connected to the station M.S. earth bus at the extreme ends using bi-metallic joints. The earthing inside the panels shall be done using green coloured PVC flexible copper cables. 9.15 Terminal Blocks (i) All terminal blocks shall be mounted in an accessible position with the spacing between adjacent blocks not less than 100mm and the space between the bottom blocks and the cable gland plate being a minimum of 200mm. Sufficient terminal shall be provided to allow for the connection of all incoming and outgoing cables including spare conductors and drain wires. In enclosed cubicles, the terminal blocks shall be inclined towards the door for facilitating terminations. At least 10% spare terminal shall be provided. (ii) The terminals shall be of the channel mounting type and shall comprise a system of individual terminals so that terminal blocks can be formed for easy and convenient cabling consistent with the high reliability required of the circuits. (iii) The terminal blocks shall be provided with shorting links and paralleling links where applicable, and mounted identification numbers and/or letters. (iv) The terminal blocks shall conform to the applicable NEMA standard. The smallest size to be used shall be designated for 2.5 millimeter square wire and no more than two (2) conductors shall be connected under one terminal clamp. (v) Terminal identification shall be provided corresponding to wire number of connected leads. (vi) Power circuit terminals shall be segregated from other terminals and shall be equipped with non-inflammable, transparent covers, to prevent contact with live parts. Warning labels with red lettering shall be mounted thereon in a conspicuous position. (vii) Disconnecting type terminals shall be provided for the Current & Voltage connections and non-disconnecting type used for other control circuits. (viii) One common alarm annunciator shall be provided in one of the VCB panels to annunciate the trip and non trip alarms. The annunciator shall have automatic silencing facility i.e. the audio alarm shall silence 59 off after one minute if the same is not acknowledged. However the alarm window shall remain lighted till the same is reset or the fault cleared. 9.16 Mandatory Spares : Following Mandatory spares shall be supplied :1 2 3 4 Closing Coil Trip Coil TNC Switch Overcurrent Relay 2 No. 2 No 2 No. 1 No. 9.17 Erection and Commissioning at Site : - 9.17.1 The Contractor shall furnish all labour, tools, tackles, slings and support and all other provisions or materials necessary to assemble, erect, install, test and commission the 24kV VCB’s in a thorough workmanlike manner following the best modern practices. The VCB’s and all their components shall be placed with great care and shall be aligned correctly. 9.17.2 The panels/cubicles shall be provided with complete set of foundation holding down bolts, washers, nuts, plates and other fixtures as may be required and these shall be supplied by the Contractor. 9.17.3 All test equipments and instruments shall be provided by the Contractor free of charge and shall remain the Contractor’s properties after the fulfillment of the field tests. 9.17.4 All civil works required for foundation shall be carried out by the Owner or his representative. The Contractor is required to submit the foundation drawings and supporting steel well in time. 9.18 Tests 9.18.1 Type test certificates, to ensure the quality and capability of the offered equipment, must accompany the bid documents. The Bidder shall specify the details of measurement and conducting of these tests alongwith the bid. TYPE TEST shall only be carried out on switchgear only if manufacturer has not conducted on the similiar equipment. However manufacturer has to submit the type test reports. 9.18.2 All the tests to be carried out on all the equipment shall conform to IEC, BS and Indian Standard. Bids not accompanied with the relevant type test certificate confirming to IEC & IS shall be summarily rejected. Routine tests shall be carried out on each equipment in the presence of Owner’s representative at the manufacturer’s expenses at his works. 9.18.3 Circuit Breakers TYPE TEST 1. Short circuit tests comprising of: - a) Breaking capacity tests for recovery voltage, the symmetrical and asymmetrical breaking currents, amplitude factor and rate of rise of recovery voltage. b) Making capacity tests for applied voltage and making current. 60 c) Test duty. d) Short time current tests. 2. a) Temperature rise test of the main circuit. b) Temperature rise test of the auxiliary circuit. c) Measurement of the resistance of the main circuit 3 Operational tests. 4 Mechanical endurance tests 5 a) Impulse voltage withstand test. b) One minute power frequency withstand voltage test. ROUTINE TEST: - 9.18.4 1 Operation test. 2 Measurement of the resistance of the main circuit. 3 One minute power frequency voltage withstand test. Potential Transformer : TYPE TEST 1. Verification of terminal marking and polarity. 2. Induced Power frequency test on primary winding 3 Induced Power frequency test on secondary winding. 4. Determination of errors according to the requirement of the appropriate accuracy. 5. Temperature rise test. 6. Impulse voltage test. ROUTINE TEST: - 9.18.5 1 Verification of terminal marking and polarity. 2. Induced Power frequency test on primary winding 3 Induced Power frequency test on secondary winding. 4. Determination of errors according to the requirement of the appropriate accuracy. Current Transformer :TYPE TEST 1 Verification of terminal marking and polarity. 2. High voltage power frequency on primary winding 3 High voltage power frequency test on secondary winding 4. Over voltage interturn test 5. Determination of errors according to the appropriate accuracy class. 6. Short time current test. 7. Temperature rise test. 61 8. Impulse voltage test. ROUTINE TEST: 1. Verification of terminal marking and polarity. 2. High voltage power frequency on primary winding 3 High voltage power frequency test on secondary winding 4. Over voltage interturn test 5. Determination of errors according to the appropriate accuracy class. ADDITIONAL TESTS FOR MEASURING CT’s: TYPE TEST: i) Accuracy test ii) Instrument security current test. ROUTINE TEST: Accuracy test: a) For class 5P10 Type and Routine tests: - 9.18.6 i) Current error and phase displacement test. ii) Composite error test. Lightening Arrestors :TYPE TEST: 1 Voltage withstand test of arrestor, insulation. 2. Power frequency spark over test. 3 100% 1.2/50 micro second spark over test. 4. Front of wave impulse spark over test. 5. Residual voltage test. 6. Impulse current withstand test. 7. Operating duty test. 8. Temperature cycle test on porcelain housing. 9. Porosity test on porcelain housing. 10. Galvanizing test on metal parts. ROUTINE TEST: - 9.18.7 1 Power frequency voltage spark over test. 2. Visual examination test on porcelain housing. Site Tests : All the equipments supplied shall be tested at site after successful installation as per the recommendation of IEC or equivalent Indian Standard. Details of the test and standard according to which these tests shall be carried out should accompany the bid. Any other test specifically required to prove the successful installation of the equipment shall also be carried out. The Contractor shall indicate details of tools plants and instruments required for site testing. 62 SECTION-X REPLACEMENT OF 415 V SWITCHGEAR 10.1 Scope:This section of the specification cover the following scope of works: i) ii) 10.2 Dismantling/removing of existing Air Circuit Breakers (ACB’s), all services, labour, tools and tackles required for dismantling including carriage, stacking at Owner’s store/ yard. Design, engineering, manufacture, shop assembly & testing before dispatch, packing and forwarding, transportation, insurance, handling, delivery, storage at site, erection, testing & commissioning of five No. 1000 A and 3 No’s. 2000A , 415V indoor type air circuit breakers (draw out type) panel, as detailed in this specification and handing over to HPSEB LTD. complete with accessories, equipment, devices, & fitting, instruments, cabling and wiring etc. including all services, labour, tools and tackles. Type and Rating of 415 Volt Switchgear :- 10.2.1 The 415 volts air circuit breakers shall have the following ratings :A i) ii) iii) iv) v) vi) vii) viii) B i) ii) iii) iv) v) vi) vii) viii) C i) ii) iii) iv) v) vi) vii) viii) Unit Breakers (4 No.’s) :No. of poles 3 Service voltage 415 V. Normal current 1000 Frequency 50 Hz. Symmetrical breaking capacity 10 KA Short circuit making capacity 25 KA Short time current 10 KA Control circuit voltage 110 Volts D.C. Transformer Breakers and Bus Couplers(3 No.’s) :No. of poles 3 Service voltage 415 V. Normal current 2000 Frequency 50 Hz. Symmetrical breaking capacity 20 KA Short circuit making capacity 50 KA Short time current 20 KA Control circuit voltage 110 Volts D.C. DG Breakers ( 1 No.’s):No. of poles 3 Service voltage 415 V. Normal current 1000 Frequency 50 Hz. Symmetrical breaking capacity 10 KA Short circuit making capacity 25 KA Short time current 10 KA Control circuit voltage 110 Volts D.C 63 10.2.2 Special Requirements :Circuit breakers for DG incomer and Bus coupler shall be provided with inbuilt overcurrent and earth fault protection. LT Distribution Board shall be connected with 415 V Bus through cable. A separate Chamber shall be provided for cable connection for this purpose. 10.3 Standards :The circuit breaker shall comply in all respect with the requirement of latest issue of Indian Standard No. 13947. Short circuit performance category P-2 except where specified otherwise. Equipment meeting with any other authoritative standard which ensures equal or better quality than the standard mentioned above is also acceptable. Where the equipment offered conform to any other standard, the salient features and points of difference between the standard adopted and the Indian Standard shall be clearly brought out in the tender. The L.T. switchgear shall comply in all respects with the latest editions of the following Indian Standards:I.S. 13947, 2516 Specifications for Alternating current circuit breakers. I.S. 8623 Specification for factory built assemblies of switchgear and control gear ; Voltages up to and including 1000 V A.C and 1200 V. D.C. I.S. 4237 General requirement for switchgear and control gear for voltages not exceeding 1000 volts I.S. 2147 Degree of protection provided by enclosures for L.V. Switchgear and Control gear. I.S. 2705 Specification for current transformers. I.S. 3156 Specification for voltage transformers. I.S. 3231 Specification for electrical relays. One number authorized copy of all the applicable standards (IS or IEC) shall be supplied after the award of work. 10.4 Particulars of 415 V System :The single line diagram for 415 V system is depicted in Drawing No.PHE-02-001 of Vol. 2C 10.5 Switchboards and Control Boards:The A.C switchgear shall consist of following switch boards :- S.N. DESCRIPTION QTY. CURRENT RATING i) ii) iii) iv) Incoming generators DG set incomer Outgoing transformers Bus Coupler 4 1 2 1 1000A 1000A 2000A 2000A No.’s No.and No.’s No. Other technical requirements are listed under clause 10.2.1 of this section. 10.6 Type and Details 415 V indoor switchgear shall be steel enclosed indoor type. This shall be suitable for continuous operations and shall comply with the requirement of latest edition of 64 relevant IEC, BS or Indian Standard. Each switchgear shall be complete with air circuit breaker mounted on draw out trolley, bus bars, instrument transformers, all necessary wiring and auxiliary devices required to perform its functions. All the instruments, control switches indicating devices and relays, should be mounted on the front panel as a separate compartment. The design and arrangement of the equipment shall be such that adequate space and access is provided for inspection and maintenance of wiring, terminals,switches, cables and end boxes etc. The switchgear shall be vermin proof and dust tight. Bus bars, CT & cable compartment breaker compartment shall be provided with independently operated automatic shutters to avoid accidental contact with live parts. The arrangement of bus bars shall be such so as to provide ready extension for additional unit on either side. 10.7 415 V Circuit Breakers The electrical rating of the circuit breaker shall be as per clause 10.2 of this section. The breaker offered shall be air break type conforming to all the requirements of IEC/BS or Indian Standard. The breaker compartment shall be designed to have fully draw-out self contained truck arrangement with breaker mounted on the same. The devices fitted on the breaker truck shall allow for easy insertions and withdrawal of breaker from service position. The breaker truck shall have the following two definite positions. i) Service position: - In this position the circuit contacts as well as secondary contacts and fixed secondary contacts should get engaged on to the fixed power contacts and fixed secondary contacts respectively. ii) Test position: - In this position power contacts of the mobile portion of circuit breaker shall remain isolated from the fixed position whereas secondary contacts shall remain connected to the fixed secondary contacts. The circuit breaker mobile truck shall be provided with additional metal barrier i.e. front shield between the actual breaker housing and the front door. Front door of the cubicle shall be provided with padlocking facilities. The front door should be closed and pad-locked even when the breaker is in test position Safety interlocks and automatic shutter shall be provided to ensure the following:- 10.8 a) The circuit breaker cannot be inserted into the service position when in closed position. b) The circuit breaker cannot be withdrawn from the service position unless it is in open position. c) Access to the breaker chamber and circuit breaker shall not be possible unless the breaker is withdrawn. The circuit breaker shall be provided with rapid and smooth interruption of currents under all conditions completely suppressing all undesirable phenomena on even under the most severe and persistent short circuit conditions or when interrupting small leading and lagging currents. The detail of any device or special feature incorporated to limit or control the rate of rise of re-striking voltage across the circuit breaker contact shall be stated. The over voltage caused by the circuit breaker switching on inductive and capacitive loads shall not exceed 2.5 times the normal phase to neutral voltage. The total break time for the circuit breaker throughout the range of its operation duty shall be stated in the bid and it shall be guaranteed. 65 10.9 The circuit breaker shall be provided with suitable operating mechanism with automatic recharging of spring with the help of geared motor. Provision shall also exist for one detachable handle for manual charging in the event of failure of auxiliary voltage. The switchgear shall be suitable for remote operations in addition to auxiliary local operating mechanism. The operating mechanism shall be trip-free. All working parts in the mechanism shall be of corrosion resistant material and all bearings, which require greasing, shall be equipped with pressure grease fitting. The mechanism, shall be strong, quick in action with minimum noise and shall be removable without disturbing the other parts of the circuit breaker. The operating mechanism alongwith its accessories shall be housed in a weatherproof cabinet with hinged doors installed just adjacent to the breakers. The circuit breaker shall also be provided with means for manual operation for maintenance purpose and local tripping and closing. A local/remote change over switch shall also be provided. Operating mechanism shall also be provided with operation counter and space heaters with suitable thermostat switch to avoid condensation. 10.10 The control circuit shall be designed to operate on 110 V.D.C. supply with a variation from 90% to 110% of rated voltage. A.C power supply for auxiliaries shall be available at 240 V, single phase, 50 c/s. Provision shall be made for locking the breaker mechanism in open position and locking the doors in closed position through pad locks. Lamp indication as well as mechanical “open” and “close” indication shall be provided on the switchgear panels to show the contact positions of circuit breakers. Twelve numbers of the secondary auxiliary contacts shall be provided on mobile portion of circuit breaker in any combination of NO and NC and completely wired up to terminal blocks. 10.11 Means shall be provided for easy access to the contacts and other parts of the switchgear for inspection and repairs. When these facilities are obtained by provision of manholes, the manhole shall be of adequate dimensions and hinged type and located in convenient place. 10.12 Bus Bars All the bus bars within the switchgear assembly shall be air insulated and shall be housed in a separate compartment of the switchgear assembly supported on insulated supports. It shall have rated current capacity of not less than the rated capacity of the circuit breaker. Bus bar shall also have mechanical and thermal capacity not less than that represented by the short time current rating of the circuit breaker. The bus bar shall be of aluminum conforming to relevant IEC, BS or Indian standard. Phase-to-earth and Phase-to-Phase clearances shall also be in accordance with IEC standards and corrections in the clearance on account of altitude correction factor shall also be incorporated. No insulation sleeves shall be provided on the bus bars to reduce the phase-to-earth and phase-to-phase clearances. Support insulators shall be strong enough to take up dynamic forces on account of short circuit. Temperature rise of the bus bars and joints shall also be as per IEC standard. The bus bar phases shall be identified by painted bands of red, yellow, & blue spaced at suitable distances. 10.13 Current Transformers Current transformers CT-3, CT-4, Ct-5 depicted in drawings No. PHE-01-002 of Vol. 2C shall be mounted with in the cubicle and CT-1, Ct-2 shall be mounted on 66 generator marshalling box. All CT’s shall comply with the requirements of IS: 27051971 and its latest amendment. Necessary steel brackets for mounting these CTs inside the cubicle shall also be provided. The required CT ratio, burden and accuracy class shall be as mentioned in section10.13.2. However, actual requirement will have to be worked out in coordination with other concerned suppliers and bidder should agree to accommodate any change in requirement with regards to numbers and characteristics of CT’s at the stage of approval of drawings. In addition to above technical particulars, the CT’s shall have the following ratings also. a) Continuous current rating factor for secondary winding. b) Thermal short time rating one second with secondary short circuit, winding temperature shall not exceed the limit as per IEC 185. c) Frequency: - 50HZ 10.13.1 All the routine tests, and tests at site shall be carried out on current transformers in accordance with Indian standard with up to date amendments thereof. The tests to be carried out by the Contractor shall clearly be stated in the bid. Type test certificates shall be furnished by the contractor. 10.13.2 Other requirement of different CT’s are given below: S.N. DESIGNATION RATIO PURPOSE BURDEN ACCURACY CLASS 1 CT-1 1000/5 PROTECTION 50VA 5P10 2 CT-2 1000/5A AVR SENSING 50VA 0.5 3 CT-3 1000/5A METERING 50 VA 0.5 4 CT-4 1000/5A PROTECTION 50 VA 5P10 5 CT-5 2000/5A PROTECTION 30VA 5P10 10.14 10.14.1 Voltage Transformers Voltage transformers shall confirm to IS: 4156-1965 and its latest amendments. Voltage transformers shall be provided as shown in drawing No. PHE-01-002 of Vol. 2C & as per the schedule of requirement and be of magnetic type. The voltage transformer shall be single-phase type and shall be mounted inside the cubicle. Each transformer shall be complete with its own high and low tension fuses and current limiting resistances if required. The fuses shall be so arranged that they are readily accessible and easily/quickly replaced. The burdens of PT’s are tentative only. The Bidder shall indicate in his offer the actual burden imposed by relays, meters so that modification, if required, in the rated burden of transformer can be done at the time of placing of order. All the routine tests, type tests and tests after installation given in relevant Indian Standard shall be carried and Bidders shall give details of such tests which shall be carried out, with their offer. 10.14.2 Other requirement of Voltage transformer are given below: - A) Bus PT’s : Two No. Bus PT’s shall be provided as per rating given below : Sr.No. DESIGNATION RATIO BURDEN 67 ACCURACY CLASS 1 B) CORE-I 415V/3/110V/3 50 VA 1 CORE-II 415V/3/110V/3 50 VA 3P Generators PT’s : Two No. PT’s shall be provided on each generator incommers as per rating given below : Sr.No. DESIGNATION RATIO 1 BURDEN ACCURACY CLASS CORE-I 415V/3/110V/3 50VA 3P CORE-II 415V/3/110V/3 50VA 1 CORE-III 415V/3/110V/3 100VA 1 10.15 Indicating Instruments 10.15.1 Indicating instruments shall be provided only on DG set incommer feeder and LT panels feeders as depicted in single line diagram Drg.No. PHE-02-001. All instruments shall be flush mounted on the top of the cubicle in a separate compartment, see details as per attached schedule of requirement. The instrument case shall be dust proof, water tight, vermin proof and especially constructed to adequately protect the instrument against damage or deterioration due to high ambient temperature and humidity. The instrument shall be provided with all auxiliary appliances and any special tools required for their maintenance. 10.15.2 All instruments shall be designed for accurate measurement of the quantity or state under all conditions of operation and any error due to change in ambient condition shall be kept to minimum. The instrument shall be damped to comply with the requirement of clause 10.5 of IS 1248 or equivalent. All the instruments shall comply with the requirement of first grade instrument of switch board type vide IS:1248 or equivalent standard. All instruments and meters shall be accurately, adjustable and calibrated before shipment and shall have means for calibration, check and adjustment at site. The metric unit shall be used for displaying the values. The instrument shall be capable of withstanding over loads applied in accordance with IS:1248 or equivalent. The instrument shall be capable withstanding the following tests, viz effect of shock, vibration and effect of humidity. 10.15.3 10.16 Panels 10.16.1 All enclosures and Panels/Cubicles shall be of good quality Standard production. Panels/cubicles shall be free floor standing type of rigid frame covered with removal steel sheets. The frame should be bolted to floor. There shall be provision and enough space for entrance of cables from below. The cubicles shall be ventilated if needed, in this case removal filter inserts shall be fitted to the air entrance openings. Provision for cable fastenings shall be made inside the cubicles and enclosures and sufficient space for cable fastenings to nearest terminals shall be kept. All control and indicating instruments such as contactors, circuit breakers, auxiliary relays, indicating instruments, switches etc. shall be functionally displayed in appropriate locations. The layout is subject to approval of the Engineer –in- charge, however, standard layout of the manufacturer is acceptable with minor changes if required. The panels/cubicles should be of IP-20 protection class and the outside paint shall be powder coated, pebble gray (RAL 7032) and 68 inside either pebble gray or enameled white. No other shade shall be accepted. 10.17 MIMIC Diagram: Overlaid mimic diagram using 10 x 2 mm aluminum strips to depict the circuit as per the single line diagram shall be provided. The colour coding shall be as per I.S. 11954 – 1987. 10.19 Earthing Arrangements Two separate copper earth buses of suitable cross-sectional areas shall be provided in the 500V switchgear designed for a short circuit current of 8 kA. One earth bus shall run along the entire rear length of the switchgear panels and the lightning arrestors shall be connected to this earth bus. The other earth bus shall be run along the entire front side of the switchgear panel and the earth connections from the relays and control devices shall be made to this bus. Both the earth buses shall be connected to the station M.S. earth bus at the extreme ends using bi-metallic joints. The earthing inside the panels shall be done using green coloured PVC flexible copper cables. 10.20 Terminal Blocks (i) All terminal blocks shall be mounted in an accessible position with the spacing between adjacent blocks not less than 100mm and the space between the bottom blocks and the cable gland plate being a minimum of 200mm. Sufficient terminal shall be provided to allow for the connection of all incoming and outgoing cables including spare conductors and drain wires. In enclosed cubicles, the terminal blocks shall be inclined towards the door for facilitating terminations. At least 20% spare terminal shall be provided. (ii) The terminals shall be of the channel mounting type and shall comprise a system of individual terminals so that terminal blocks can be formed for easy and convenient cabling consistent with the high reliability required of the circuits. (iii) The terminal blocks shall be provided with shorting links and paralleling links where applicable, and mounted identification numbers and/or letters. (iv) The terminal blocks shall conform to the applicable NEMA standard. The smallest size to be used shall be designated for 2.5 millimeter square wire and no more than two (2) conductors shall be connected under one terminal clamp. (v) Terminal identification shall be provided corresponding to wire number of connected leads. (vi) Power circuit terminals shall be segregated from other terminals and shall be equipped with non-inflammable, transparent covers, to prevent contact with live parts. Warning labels with red lettering shall be mounted thereon in a conspicuous position. (vii) Disconnecting type terminals shall be provided for the Current & Voltage connections and non-disconnecting type used for other control circuits. (viii) One common alarm annunciator shall be provided in one of the VCB panels to annunciate the trip and non trip alarms. The annunciator 69 10.21 shall have automatic silencing facility i.e. the audio alarm shall silence off after one minute if the same is not acknowledged. However the alarm window shall remain lighted till the same is reset or the fault cleared. Mandatory Spares Following mandatory spares shall be supplied :- 10.22 ACB 1000A 1 No. ACB 2000A 1 No. Trip Coil 2 No.’s Closing Coils 2 No.’s Erection and Commissioning at site : - 10.22.1 The Contractor shall furnish all labour, tools, tackles, slings and support and all other provisions or materials necessary to assemble, erect, install, test and commission the 415 V ACB’s in a thorough workmanlike manner following the best modern practices. The VCB’s and all their components shall be placed with great care and shall be aligned correctly. 10.22.2 The panels/cubicles shall be provided with complete set of foundation holding down bolts, washers, nuts, plates and other fixtures as may be required and these shall be supplied by the Contractor. 10.22.3 All test equipments and instruments shall be provided by the Contractor free of charge and shall remain the Contractor’s properties after the fulfillment of the field tests. 10.22.4 All civil works required for foundation shall be carried out by the Owner or his representative. The Contractor is required to submit the foundation drawings and supporting steel well in time. 10.23 Tests 10.23.1 Type test certificates of tests listed in the subsequent clauses, to ensure the quality and capability of the offered equipment, must accompany the bid documents. The Bidder shall specify the details of measurement and conducting of these tests alongwith the bid. 10.23.2 All the tests to be carried out on all the equipment shall conform to IEC, BS and Indian Standard. Bids not accompanied with the relevant type test certificate confirming to IEC & IS shall be liable to rejection. 10.23.3 Routine Tests : Routine tests shall be carried out on each equipment in the presence of Owner’s representative at the manufacturer’s expenses at his works. 10.23.4 Circuit Breaker i) TYPE TEST 1. Short circuit tests comprising of: - a) Breaking capacity tests for recovery voltage, the symmetrical and asymmetrical breaking currents, amplitude factor and rate of rise of recovery voltage. Making capacity tests for applied voltage and making current. Test duty. Short time current tests. a) Temperature rise test of the main circuit. b) Temperature rise test of the auxiliary circuit. c) Measurement of the resistance of the main circuit b) c) d) 2. 70 10.23.5 10.23.6 3 Operational tests. 4 Mechanical endurance tests 5 a) Impulse voltage withstand test. b) One minute power frequency withstand voltage test. ii) ROUTINE TEST 1 Operation test. 2 Measurement of the resistance of the main circuit. 3 One minute power frequency voltage withstand test. Potential Transformer : i) TYPE TEST 1. Verification of terminal marking and polarity. 2. Induced Power frequency test on primary winding 3 Induced Power frequency test on secondary winding. 4. Determination of errors according to the requirement of the appropriate accuracy. 5. Temperature rise test. 6. Impulse voltage test. ii) ROUTINE TEST: 1 Verification of terminal marking and polarity. 2. Induced Power frequency test on primary winding 3 Induced Power frequency test on secondary winding. 4. Determination of errors according to the requirement of the appropriate accuracy. Current Transformer : i) TYPE TEST 1 Verification of terminal marking and polarity. 2. High voltage power frequency on primary winding 3 High voltage power frequency test on secondary winding 4. Over voltage interturn test 5. Determination of errors according to the appropriate accuracy class. 6. Short time current test. 7. Temperature rise test. 8. Impulse voltage test. ii) ROUTINE TEST : 1. Verification of terminal marking and polarity. 2. High voltage power frequency on primary winding 3 High voltage power frequency test on secondary winding 4. Over voltage interturn test 5. Determination of errors according to the appropriate accuracy class. 71 10.23.7 iii) ADDITIONAL TESTS FOR MEASURING CT’s i) Accuracy test ii) Instrument security current test. iv) ADDITIONAL TESTS FOR PROTECTION CT’S a) For class 5P10 i) Current error and phase displacement test ii) Composite error test b) For class PS i) Knee point voltage ii) Exciting current iii) Secondary winding resistance iv) Turn ratio Site Tests: All the equipments supplied shall be tested at site after successful installation as per the recommendation of IEC or equivalent Indian Standard. Details of the test and standard according to which these tests shall be carried out should accompany the bid. Any other test specifically required to prove the successful installation of the equipment shall also be carried out. The Contractor shall indicate details of tools plants and instruments required for site testing. 72 SECTION-XI TECHNICAL SPECIFICATION FOR 415 VOLTS AC DISTRIBUTION BOARD 11.1.0 Scope :This section of the specification cover the following scope of works: i) ii) Dismantling/removing of existing 415 V LT switch Board, all services, at labour, tools and tackles required for dismantling including carriage, stacking Owner’s store/ yard. Design, engineering, manufacture, shop assembly & testing before dispatch, packing and forwarding, transportation, insurance, handling, delivery, storage at site, erection, testing & commissioning of 415 V AC Distribution Board, as detailed in this specification and handing over to HPSEB LTD. complete with accessories, equipment, devices, & fitting, instruments, cabling and wiring etc. including all services, labour, tools and tackles. 11.2.0 Type and Rating of 415 V AC Distribution Board :A.C. incomer circuits shall be controlled through power contactors and MCCB’s as depicted in drawing No. PHE-01-002 of Vol.-II. The outgoing feeders shall be moulded case circuit breakers (MCCB). The 415 volts Power contactors shall have the following ratings:i) ii) iii) iv) No. of poles Service voltage Normal current Frequency 3 415 V. 150 A. 50 Hz. 11.3.0 Standards:The power contactors and MCCB’s shall comply in all respect with the requirement of latest issue of Indian. The L.T. switchgear shall comply in all resects with the latest editions of the following Indian Standards:I.S. 8623 Specification for factory built assemblies of switchgear and control gear ; Voltages up to and including 1000 V A.C and 1200 V. D.C. I.S. 4237 General requirement for switchgear and control gear for voltages not exceeding 1000 volts I.S. 2147 Degree of protection provided by enclosures for L.V. Switchgear and Control gear. I.S. 2705 Specification for current transformers. I.S. 3156 Specification for voltage transformers. I.S. 3231 Specification for electrical relays. One number authorized copy of all the applicable standards (IS or IEC) shall be supplied after the award of work. 11.41 Particulars of 415 V System :The system for supplying A.C. power to the various auxiliaries of the generating units and the station is as per the single line diagram No. PHE-02-001 of Vol. 2 C. 73 11.5 Constructional Features :Switchboards shall be:- i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) Of the metal enclosed indoor, floor mounted, modular, free standing type. Made up of requisite vertical sections. Provided with a metal sill frame made of structural steel channel section properly drilled for mounting the switchgear alongwith the necessary mounting hardware. Hardware shall be zinc plated and passivated. The switchgear shall be capable to withstand earthquake forces giving dynamic accelerations of 0.5g in all the three directions at a frequency of the order of 10 cycles per second. The details of the calculations made for the designs of the various equipment’s taking into account the above seismic forces shall be furnished to the purchaser. Provided with a degree of protection IP-51 Provided with labels on the front and rear indicating the switchgear designation compartment wise and cubicle with the labels shall be fixed with the help of screws and not with an adhesive. Provided with cable entry facilities at bottom with 3mm thick removable gland plates and necessary cable glands. Of uniform height of not more than 2450mm including the base channels. The height of pillar boxes can be different but not more than 2450 mm height. Provided with gaskets all round the perimeter of adjacent panels, panel and base frame, removable covers and doors. Provided with bus bars running at the top as required all along the length of the switchgear in separate sheet steel enclosures. Operating devices shall be incorporated only in the front of the switchgear. Individual feeder modules shall be arranged in multitier formation. Enclosed vertical bus bars serving all modules in the vertical section shall be provided. For safety, isolation of the vertical bus bars, insulation barrier with cutouts shall be provided to allow the power contacts to engage with vertical bus bars. A vertical cable alley covering the entire height shall be provided. The cable alley shall be minimum 200m wide. A horizontal separate enclosure for all auxiliary and control buses, as required, shall be located so as to enable easy identification, maintenance and segregation from the main power buses. Tap off connections from these buses shall be arranged separately for each vertical section. Each vertical section shall be equipped with space heaters. Metal sheet shall be provided between the adjacent vertical sections running the full height of the switchgear except the horizontal bus bar compartment. Also each shipping section shall have metal sheets at both ends. All equipment associated with a single circuit shall be in a separate module compartment of the vertical compartment shall be sheet steel enclosed on all sides and for draw out type modules only the handles of control selector switches- push buttons, knobs and cutouts for lamps and meters shall be arranged on the front door respective compartments to permit operation without opening the door. On circuit breaker controlled circuit protective relays shall be mounted on the front door the compartment. All cut outs shall be provided with gaskets for the purpose of dust proofing. The opening of the doors shall be restricted to 1100 only. All current transformers on circuit breaker controlled circuits shall be mounted on the fixed portion of the compartment. In breaker compartment suitable barriers shall be between circuit breakers and all control, protective indication circuit equipment including instrument transformers. External cable connections shall be carried out separate cable compartments for power and control cable. 74 xxi) xxii) xxiii) xxiv) xxv) After isolation of the power and control connection of circuit, it shall be possible to safely carryout main in a compartment with the bus bars and adjacent circuit live. Cable alleys shall be provided with suitable hinged. It shall be possible to safely carryout maintenance on cable connections to any one circuit with the bus and adjacent circuits live. Adequate number of slot cable support arms shall be provided for cleating the cables Rear of the single front switchgear shall be provided removable panel covers hinged on one side and bolted the other side. All doors shall be provided with concealed type hinged captive screws. The neutral bus shall run continuously in the bus bar chamber and shall be solidly connected to ground bus bar. The housing shall be complete with adequate ventilation and heaters with all openings screened. All switches shall be designed to permit extension in either direct and shall be complete with all accessories including fixtures, foundation bolt, base channel etc. for securing the switch board to the floor. The switchyard and the service bay shall be weather proof and shall be of the same specifications described above 11.6 Earthing:The assembly comprising of chassis, framework and the fixed parts of the metal casing of the switchgear or control gear shall be provided with separate earthing terminals and should conform to IS- 4237.Bimettalic strips shall be provided for connecting the earthing bus with the station earth mat. 11.7 Power Cables and Sealing Ends :All power cables and control cables for connection to the switchgear will be brought from the bottom of the switchboard. Crimping type cable sealing ends suitable for aluminium cables of suitable sizes shall be supplied with each circuit of the switchgear. The exact dimension and number of such cable sealing ends shall be informed to the successful bidders after finalization of cable sizes. Cabling terminations shall be staggered along the depth of the board to allow cabling without difficult bends. Suitable arrangements shall be provided to hold the cables along the height of the panel so that the weight of the cable does not come on the cable sealing lugs. The terminals shall be of substantial mechanical construction and should conform to clause 5.3 of IS- 4237-1967. 11.8 Control Cables :All the control cables shall be terminated at the terminal blocks located in the switchgear frame and should be in a separate compartment other than the compartments where the power cables are terminated. These terminal blocks shall be suitable for 2.5mm multistrand copper, P.V.C. insulated cable, 1.1KV conforming to IS- 694 (1977)/IS-8130(1976). The terminal blocks used for cables from current transformers and potential transformers shall be of disconnecting type. 11.8.1 The switchboards shall be completed with all accessories including bus bars, bus bar chambers, supports, wiring, terminal blocks, labels, foundation fixture, earthing conductors, cable sealing ends, cable glands and gland plates etc. These will be climate proof as per the requirement of IS-3202 11.9 MCCB’s :The MCCB’s shall have inbuilt over current, earth fault and under voltage protection. 75 11.9.1 Switch board shall be designed on flush fronted principle with circuits arranged in multiple tier formation. 11.9.2 The incomer MCCB’s shall be provided with inbuilt over current and earth fault protection with settings to suit the full load values of the individual’s currents of the circuits. 11.9.3 Additional contacts or auxiliary relay with contacts shall be provided for interlocking inclosing circuits. Also if sufficient number of auxiliary contacts are not available with over current relays of these breakers, auxiliary relay shall be provided for use in interlocking. 11.9.4 All the outgoing feeders shall be provided with moulded case circuit breakers (MCCB) having suitably designed thermal magnetic overload protection. These protections shall be ambient temperature compensated for operation between -370 C to 400C. 11.9.5 The MCCB shall be manually operated. The operating handle shall give a clear trip indication. It shall assume a point midway between 'ON' and 'OFF' positions on tripping. To reset the trip mechanism, the handle shall be moved to the 'OFF' position. 11.9.6 The MCCB shall be quick make/ quick break, trip free and independent of manual speed for operation. 11.9.7 The breaking capacity shall be tested for P-2 class duty cycle as per IS- 2516. The breaking capacity test report shall be from a Government recognized test laboratory. MCCB shall be provided with direct acting magnetic thermal release for short circuit and overload protections. Settings of the thermal release shall be independent adjustable over a wide range percentage of nominal rating in all ranges. 11.9.8 The main contacts of the breakers shall be of appropriate silver alloys and mere silver plating of the faces will not be acceptable. 11.9.9 The type of arcing contacts and arc contact device shall be silver alloy arc chutes having profiles de-ion plate. 11.9.10 The mechanical life certificate shall be from Govt. recognized test house and shall be accompanied with the offer. 11.9.11 The temperature rise of various parts of the MCCB shall be in conformity to IS: 2516 and test certificate from Govt. Recognized test house shall be produced at the time of detailed engineering. 11.9.12 The power contactor shall be suitable for continuous current rating of 150 A . 11.9.13 The cubicles should comply with the requirement of relevant Indian Standard and Electricity Rules for providing minimum clearances between phases of the bus, live part from metalled cubicle. The drawing showing full dimensions of the cubicles alongwith size of the sheet used for manufacture should be got approved from this office before starting the fabrication of the cubicles. The colour of the paint to be applied to the cubicles shall be got approved from this office before final painting. The colour of the paint shall be RAL7032, pebble grey from outside and enamel white from inside. 76 11.9.14 All control wiring of the cubicle shall be done with 2.5mm copper cable with suitable numbering using plastic ferrules and suitable colour code for C.T. & P.T. cables. The cables should be PVC insulated of 1.1KV class conforming to IS: 694/IS 8130. 11.9.15 The Power Contactors and MCCB’s shall be either of ABB (E.max)/L&T (U power)/Snider (Master pact)/Siemens (3VL)/C& S. 11.10 Bus Bar and Bus Bar Chambers:- The 415 volts bus bars shall be of suitable cross section so as to carry the required current within the limits of temperature rise at the site conditions. They shall be so designed and mounted in the chamber that expansion or contraction does not subject either the bus bar or the insulating supports to any undue stress. 11.10.1 The bus bars shall be designed to withstand safely the dynamic forces due to short circuit. 11.10.2 Neutral links of suitable capacity shall be provided where ever necessary. 11.10.3 The bus bars shall be made of high conductivity aluminium grade 91-E (6101 A) high strength ionized aluminium alloy of suitable size. Bus bar shrouds shall be easily removable so that the joints are accessible for maintenance. The connections from bus bars to the ACB's shall be fully shrouded with PVC covers. 11.10.4 Adequate space shall be there to connect aluminium bars of different rating. 11.10.5 The bus bars shall withstand short circuit faults upto 16KA (rms.) for 1 sec. All the bus bars shall be braced with non- deteriorating SRBP supports to withstand thermal and electro-dynamic forces of fault current. 11.11 Temperature Rise :The switchgear shall be designed to operate satisfactorily under the site conditions and the maximum temperature attained by any part of the equipment wherein service at an ambient temperature of 40oC shall not exceed the limits specified under clause 6 of IS- 4237 corrected for the site conditions, when measured by variation of resistance method as given in Appendix-C of the Indian Standard IS- 4237. 11.12 Auxiliary Relays, Contacts and Devices :Suitable number of auxiliary contacts or auxiliary relays shall be provided with air circuit breaker for indication annunciation and automatic changeover and interlocking scheme. 11.13 Current Transformers Current transformers CT-8 depicted in drawings No. PHE-01-002 of Vol. 2C shall be mounted with in the cubicle of incomer circuit and shall comply with the requirements of IS: 2705-1971 and its latest amendment. Necessary steel brackets for mounting these CTs inside the cubicle shall also be provided. The required CT ratio, burden and accuracy class shall be as mentioned in section11.13.2. However, actual requirement will have to be worked out in coordination with other concerned suppliers and bidder should agree to accommodate any change in requirement with regards to numbers and characteristics of CT’s at the stage of approval of drawings. In addition to above technical particulars, the CT’s shall have the following ratings also. a) Continuous current rating factor for secondary winding. 77 b) Thermal short time rating one second with secondary short circuit, winding temperature shall not exceed the limit as per IEC 185. c) Frequency: - 50HZ 11.13.1 All the routine tests, and tests at site shall be carried out on current transformers in accordance with Indian standard with up to date amendments thereof. The tests to be carried out by the Contractor shall clearly be stated in the bid. Type test certificates shall be furnished by the contractor. 11.13.2 Other requirement of different CT’s are given below: S.N. 1 DESIGNATION RATIO PURPOSE BURDEN ACCURACY CLASS CT-8 150 /1A METERING 50 VA 0.5 11.14 Voltage Transformers 11.14.1 Voltage transformers (PT-5) shall confirm to IS: 4156-1965 and its latest amendments. Voltage transformers shall be provided as shown in drawing No. PHE-01-002 of Vol. 2C & as per the schedule of requirement and be of magnetic type. The voltage transformer shall be single-phase type and shall be mounted inside the cubicle. Each transformer shall be complete with its own high and low tension fuses and current limiting resistances if required. The fuses shall be so arranged that they are readily accessible and easily/quickly replaced. The burdens of PT’s are tentative only. The Bidder shall indicate in his offer the actual burden imposed by relays, meters so that modification, if required, in the rated burden of transformer can be done at the time of placing of order. All the routine tests, type tests and tests after installation given in relevant Indian Standard shall be carried and Bidders shall give details of such tests which shall be carried out, with their offer. 11.14.2 Other requirement of Voltage transformer are given below: Incomer PT’s : One No. PT’s shall be provided on each incomer as per details given below : Sr.No. 1 DESIGNATION RATIO PT-5 415V/3/110V/3 BURDEN 50 VA ACCURACY CLASS 1 11.15 Indicating Instruments 11.15.1 Indicating instruments shall be only on incommer feeder as depicted in Drawing.No. PHE-02-001 of Vol. 2C. All instruments shall be flush mounted on the top of the cubicle in a separate compartment, see details as per attached schedule of requirement. The instrument case shall be dust proof, water tight, vermin proof and especially constructed to adequately protect the instrument against damage or deterioration due to high ambient temperature and humidity. The instrument shall be provided with all auxiliary appliances and any special tools required for their maintenance. 11.15.2 All instruments shall be designed for accurate measurement of the quantity or state under all conditions of operation and any error due to change in ambient condition shall be kept to minimum. The instrument shall be damped to 78 comply with the requirement of clause 10.5 of IS 1248 or equivalent. All the instruments shall comply with the requirement of first grade instrument of switch board type vide IS:1248 or equivalent standard. All instruments and meters shall be accurately, adjustable and calibrated before shipment and shall have means for calibration, check and adjustment at site. The metric unit shall be used for displaying the values. The instrument shall be capable of withstanding over loads applied in accordance with IS:1248 or equivalent. The instrument shall be capable withstanding the following tests, viz effect of shock, vibration and effect of humidity. 11.15.3 11.16 Tests:Each switchboard shall be assembled at the manufacturers work with all apparatus instruments & meters connected up and the various components shall be tested in accordance with the requirements of the relevant Indian Standards. Each circuit breaker shall also be subjected to manufacturer’s standard routine tests in accordance with IS: 13947-2, 2516. These tests shall be performed in the presence of purchaser's representatives, if so desired by the purchaser. Type test certificate of short circuit level of 16KA withstand capacity shall be submitted by contractor. 11.16.1 1. 2. 3. 4. 5. 11.16.2 The following type tests shall be carried out :- 1. 2. 3. 4. 5. 6. 11.17 The following routine tests shall be carried out :Mechanical operation test. High voltage test. Test for verification of calibration of release. Milli-voltage drop test. Type test reports for proof of having tested the MCCB’s in the recognized Govt. Test house for the following type tests as per IS shall be furnished. Temperature rise test for main contacts. Temperature rise test for control circuits. Temperature rise test of auxiliary contacts. Verification of the rated short circuit making & breaking capacities. Verification of the ability to carry rated short time current. All test reports should be submitted and shall be got approved by the owner before despatch of the equipment. Test Certificates :Seven copies of instruction manual covering instructions for installation, operation, maintenance shall be supplied by the renderer. 11.18 Control Voltage :All the circuit breakers shall operate satisfactorily with the control voltage of 110 volts D.C. between the range of 85% to 110% of the rated voltage and ambient temperature of -350C to + 400C. 11.18 Marking of Push Buttons :79 Push buttons should be indelibly marked in words as per clause 10.1 and colour of the push buttons shall be as per clause 10.2 of IS: 4237. Selection and treatment of the materials use electrical equipment and enclosures and sealing of the equipment to ensure that it remains serviceable under conditions which may encourage chemical, physical and mechanical deterioration/ prevailing at site and adequate climatic proofing shall be as per IS : 3202. The bimetallic strips shall be annealed before assembly to climatic aging. 11.20 Spares :The Bidders shall quote for the following mandatory spares :1 2 3 4 3 11.21 Power Contactor MCCB (TP) MCCB (TP) MCCB (DP) MCCB (DP) 150A 30A 15A 30A 15A 1 No. 1 No 1 No 1 No 1 No Detail of Incoming Feeders : A) Incomer from 415 V P/H Bus B) Incommer from Station Transformer. Interlocking : Either power contactor shall be ON and both cannot be switched ON simultaneously. Interlocking Arrangement shall be made in panels. 11.20 Detail of Outgoing Feeders A) Double Pole MCCB feeders (Single Phase Supply) : 1 ACB Control Supply 30 A 2 VCB Control Supply 30 A 3 Protection Panels 15 A 4 Power House Illumination 30 A 5 Street/Yard Lighting 30 A 6 Turbine Auxiliary and control panel 15A 7 Spare Feeders 15 A 30 A B) Triple Pole MCCB Feeders :- Qty 1 No 1 No 1 No 3 No’s 2No.’s 4 No’s 1 No.’s 1 No.’s 1 2 3 4 6 7 8 4 No.’s 4 No.’s 1 No. 1 No 4No.’s 4 No.’s 1 No.’s 1 No.’s of detailed Oil Pressure Unit for Turbine and MIV Generator Lub Oil System Power House Crane Battery Charger Dewatering Pump Generator space heating Spare Feeders 30 A 15 A 50 A 30 A 30 A 20 A 15 A 30 A Above list is tentative. Actual quantity / rating may vary at the time engineering. 80