Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Status of the Nuclotron-NICA G.Trubnikov MAC, June 7, 2011 1 1/15 Nuclotron Run 43 21 February - 22 March 2011 KVINTA : 70 hours Gamma-3: 24 hours (Belarus, Poland, Czech, Greece, Germany, Bolgaria) MPD-STRELA (MRPCfor MPD): 72 hours (Russia, China, Germany) Delta-LNS: 67 hours (Russia) FAZA: 52 hours (JINR, ITEP) NIS-GIBS: 10 hours (JINR) MPD-STRELA 2 2/15 Nuclotron-M Results Magnetic field, T Beam intensity, particles Estimation of the average vaccum in the Nuclotron ring measuring circulating deutron beam lifetime at Е=5 MeV/u corresponds to the vacuum pressure not worse than 4*10-10 Тоrr. 2/15 Nuclotron Run 43 21 February - 22 March 2011 New digital system for on-line beam orbit measurment Beam signal amplitude evolution from pick-ups (Acceleration. Field rising from 300 to 1000 Gs) 4 3/15 Nuclotron-M Results 4.5÷ 5·1010 (d) at 300 MeV/u For the first time at Nuclotron had been performed beam slow extraction 3,1 GeV/u 4/15 Nuclotron Run 43 21 February - 22 March 2011 Automatic beam orbit correction system (kit of 28 correctors) MCP detector for residual gas ions registration Beam profile evolution at acceleration (transverse and longitudinal) 6/15 Nuclotron-M Results First 6 turns (about 50 s), deutron beam after orbit correction. Blue injected beam, Red - signal from pick-up. Circulating beam signals during 1150 ms. Small increasing of the signal amplitude is connected to beam de-bunching 7 7/15 Nuclotron-M Results Full-scale reconstruction of the power supply system for whole complex ! 8/15 Nuclotron-M Results 9/15 Nuclotron-NICA foreinjector Cascade transformer up to 0,7 MeV 10/15 Nuclotron-NICA Heavy Ion Source KRION-6T Assembling of electron/ion optics system: view from the “ion extraction” side. Superconducting test coil (L=19 cm, 32 layers of SC wire) : preparation for testing in a liquid helium. Magnetic field (T) versus current (A) for SC solenoids; experimental and expected data. 1) 26 layers (green line, 21 Jan.’11) – 7.41T at I_crit.=131 A (experimental data); 2) 32 layers (top green line, 25 Apr.’11) – 7.81T at I_crit=114 A (experimental data); 3) red line: critical current for SC wire according it’s manufacturer data; 4) blue line: expected for Krion-6T ESIS – 22 layers, L=120 cm, B=6 T at I_working=118 A . Should be ready in September 2011. 11/15 Nuclotron-NICA Source of polarized particles (p, d, H) JINR+INR RAS We plan to assemble and TEST SPP at Nuclotron with d in the end of 2012 12/15 Nuclotron-NICA Stochastic cooling system prototype at Nuclotron Vacuum chamber for pick-up Vacuum chamber for kicker Slot-coupler structures, manufactured at IKP FZJ We plan to assemble and TEST stochastic cooling system prototype at Nuclotron in the end of 2011 (everything will depend on electronics delivery) RF ON (h=1), Buncher ON RF OFF, Buncher OFF RF ON (h=10), Buncher ON 13/15 Nuclotron-NICA Moreover: - dedicated test bench for injection system (inflector plates) into Booster is in operation; - dedicated prototype of HV platform (PS 225kV/3A) is under assembly; - new system of the whole complex synchronization is under design and construction; - new thermometry and quench detection system for Nuclotron is in progress; -… PLANS: Next run at Nuclotron with prolonged period (1,5-2 months) is planned for November-December 2011 and beam will be delivered mainly for physicists. 14/15 Thank you for your attention 15/15