Download Appendix E - Biodiversity Offsets Strategy

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Document related concepts

Ecological fitting wikipedia , lookup

Restoration ecology wikipedia , lookup

Theoretical ecology wikipedia , lookup

Introduced species wikipedia , lookup

Latitudinal gradients in species diversity wikipedia , lookup

Conservation psychology wikipedia , lookup

Bifrenaria wikipedia , lookup

Conservation biology wikipedia , lookup

Biodiversity wikipedia , lookup

Mission blue butterfly habitat conservation wikipedia , lookup

Island restoration wikipedia , lookup

Biological Dynamics of Forest Fragments Project wikipedia , lookup

Habitat wikipedia , lookup

Habitat conservation wikipedia , lookup

Reconciliation ecology wikipedia , lookup

Biodiversity action plan wikipedia , lookup

Transcript
Appendix E | Biodiversity Offsets Strategy
Eastern Leases Project
EPBC Act Biodiversity Offsets Strategy
for South32 Pty Ltd
1.5
12 May 2015
Page 4
DOCUMENT STRUCTURE
The BOS is structured as follows:

Section 1 – Introduction (this section) – provides an overview of the project, its setting
and approval status, and outlines the requirement for the BOS;

Section 2 – Significant Residual Impacts – draws on the findings of the EIS specialist
studies in order to define the predicted significant residual impacts on MNES;

Section 3 – Profile of Target Species – provides a brief description of the MNES
species which require offsets, including their distribution, habitat requirements, threats
and identified research and management priorities;

Section 4 – Direct and Indirect Offsets – explains the difference between direct and
indirect offsets, and explains why indirect offsets are most suitable for the project;

Section 5 – Project Offsets – explains the offset programs that are proposed for the
project, including providing a high level overview of each program; and

Section 6 – Conclusions.
Ref: Gemco-Offsets Strategy
HANSEN BAILEY