NOTICE!
• These materials are prepared only for the students enrolled in
the course Distributed Software Development (DSD) at the
Department of Computer Science and Engineering,
University of Mälardalen, Västerås, Sweden and at the Faculty
of Electrical Engineering and Computing, University of Zagreb,
Croatia (year 2010/2011).
• For all other purposes, authors’ written permission is needed!
• The purpose of these materials is to help students in better
understanding of lectures in DSD and not their replacement!
(Mass Observation)
Distributed Software Development
Contents
•
•
•
•
•
•
•
•
Overview
Development Methodology
Deliverables
Communication
Milestones
Activity Plan
Financial Plan
Project Risks
Project Overview
How is the
climate in
Vasteras today
Initiator
Observation
event
OE: Observation Event
Observers
Consumers
Development Methodology
• Iterative development
• Application to be divided
into modules which would
be simultaneously
developed. Hence it is
best to go with iterative
model as it would reduce
integration problems.
• Parallel approach for web
page development.
Deliverables
Deliverables
Date
Project plan document
2010-10-01
Requirements Definition document
2010-10-01
Design Description document
2010-10-08
Weekly Reports (Team Member to PL)
Every Friday
Summary Week Report (PL to Supervisor)
Every Monday
Minutes of Meeting
During project
Technical documents, Project policies etc.
During project
Revisions of existing documents
On major changes
Acceptance test plan
2010-12-10
Test report
2011-01-10
Final Project Report, final versions of existing
documents, other project-related documentation
(as negotiated with the customer)
2011-01-14
Final product (installation, source code, etc.)
2011-01-14
Communication
•
•
•
•
•
Voice/Video Conference
Weekly Meetings
Emails
Google Group
DSD Project website
Milestones
Milestones
Planned Date (Week)
Project Vision
2010-09-21 (Week 38)
Project Plan
2010-09-28 (Week 39)
Requirements Definition
2010-10-05 (Week 40)
Alpha Prototype
2010-10-26 (Week 43)
Beta Prototype
2010-11-16 (Week 46)
Release Candidate
2010-12-14 (Week 50)
Final Project Presentation
2011-01-11 (Week 02)
Activity Plan
Financial Plan
Activity
Volume (days)
Cost ($)
Project Preparation
5
$ 750
Requirement Analysis and Definition
10
$ 1500
Project Design
10
$ 1500
Implementation
40
$ 6000
Testing
35
$ 5250
Documentation
60
$ 9000
Final Delivery and Presentation
10
$ 1500
Planned effort
(man-days)
170
Man-day cost
$ 150
Planned project
cost (100%)
$ 25500
Project Risks
Possibility
Risk
Preventive Action
Architecture Drift
Medium
Brainstorming the pros
and cons of a design
and technology selected
before implementing.
Lack of Required Skills
Medium
Distribution of work
based on skills of a
team member.
Continuous research.
Unavailability of a member
Medium
Thorough and good
documentation.
Meetings to ensure that
each member is having
an idea of what other is
doing.
Crashes and Outages
Medium
Regular Backups.