Download CVE 4070 - My FIT (my.fit.edu)

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Cost estimate wikipedia , lookup

Construction management wikipedia , lookup

Transcript
CVE 4070
Construction Engineering
Course Review & Critique
Prof. Ralph V. Locurcio, PE
Course Wrap-up (new)
11/22
11/27
11/28
11/29
12/04
26
27
28
29
FIT Holiday – Thanksgiving
Construction Leadership & Ethics
Course Wrap-up; review & critique
Final Test & Critique
Study Day
Ethics Paper, Kerzner Ch 8.5
Notebook turn-in
Course review - I
 Project delivery process
 Pyramid analysis
 Responsibilities of parties
 Tour ongoing construction
 Conduct of operations
 Complexity of coordinating trades
 Impact of externalities
 Preconstruction operations




Contract documents & order of precedence
Specs & Drawings; use of standard specs
Contract bid & award process
Bonds
Preconstruction Operations






Project delivery system
Organization for construction… flow of activities
Idea for project, hire designer, design concept, final
design, cost estimate, contract documents, bidding
process, select contractor, notice to proceed, preconstruction meeting, inspection of work, project
turnover to owner.
Roles of individuals… owner, designer, builder, PM, CM,
owner’s rep
Who has responsibility for quality control on a project?
What is QA and what is QC.
How do you verify that construction conforms to the
design?
Typical types of projects, traditional, design-build. Who
hires the designer in each?
Course review - II
 Contract Administration




Inspection process & Inspection Manual
Submittal process
Quality Control & Assurance
Role of the resident engineer
 Contract scheduling
 Types of schedules & when used
 Use of MS Project
 Pyramid Schedule
 Disaster Recovery Construction
 Differs from normal
 Types of contracts used
 Skills you will need
Contract Documents
 Contract documents… drawings, specs,
contract agreement
 Construction estimates what are the two
types; conceptual & detailed.. when are
they used and what is the accuracy of each
 What is the order of precedence of CDs
 If conflict between drawings & specs,
which is followed.
 What are standard specifications and why
should you use them
Contract Types & Uses
 Contracts – what are the types typically
found – fixed price & cost plus
 When are these contracts used… what
situations.
 Bidding process - what are the key
activities in the process and what is the
order
 How do you maintain equity in bidding
 Legal aspects of contracts, evidence
 Negotiations & disputes, how settled
 Risk and risk management, how allocated
 Bonds and insurance, types and use
Contracting…







Letter contracts
Cost plus contracts
Unit price contracts
Indefinite quantity contracts
Design-build contracts
Design contracts
Fixed price contracts
Course review - III
 Construction operations…











Scheduling – types & when used
Use of MS Project – Pyramid schedule
Construction operations
Quality control
Measurement & Payments
Estimating
Changes & Disputes
Negotiating
Laws & legal issues
Value engineering
Project closeout
Pyramid Construction…
Build
Camp
Demob
Camp
Workforce
Site Selection
Train
Train
Train
Master Plan
Planning
Preparation
General Design
Construct Core
Structure
Demobilize
Trim Exterior
Bury Pharoah
Open Quarry
Cut Blocks
Interior Design
2
4
Cut Trim
Interior Finishes
Room Const
6
8
Time
10
Final
Insp
12
14
16
Pyramid Schedule…
Construction Operations











Site safety of construction… control of the site. Who
can issue a stop work order.
Shop drawings what are they and how used
The inspection process
Non-conforming work; how handled
What are differing site conditions
What is a change order
Change order process
What is the one-to-one concept of authority on a
construction project
Construction schedules what are the types…
Project inspection; what is the process
Value engineering; how used, where are savings
Contract inspection & supervision…
 Verify quantity & time of operations
 Manpower & equipment use
 Material quality & quantity





Engineering sufficiency of work
Quality of work
Deviations from damage survey
Negotiate claims for additional work
Certification for occupancy
CVE 4070 Review for Test 3




Preconstruction Operations – Bidding Process
Contract Documents
Contract Types & Uses
Construction Operations
 Scheduling
 Payments & Retention
 Estimating concepts & calculations




Conceptual vs Detailed
Methods
Adjustments for time, location
Escalation
 Value engineering
 Law for Engineers
Test #3… things to consider-1
 Construction operations…



Cost control
Performance control
Charting cost & performance
 Contracts & payments




What is a contract
Types of contracts… pros & cons, when used
Progress payment process
Problems with payments
Test #3… things to consider-2
 Estimating…







Definition
Accuracy vs level of design
Types of estimates – how calculated
Time & location adjustments
Scope, constructability, risk
Estimating process
Elements of cost
 Changes & extra work



What is a change & claim
Types of changes
Change order process
Test #3… things to consider-3
 Claims & disputes…







What is a claim or protest
What are owners responses
What are contractor’s responses
What are compensable or non-compensable claims
What is acceleration, when used, who pays
What methods are available to resolve disputes
Contract termination
Test #3… things to consider-4
 Law for Engineers…





Basis for Laws
Differences between engineering judgment & legal
judgments
Civilian Law vs. Public Law
Torts & Contracts
Damages & Compensation