• Study Resource
  • Explore
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
Exam2 - Academic Information System (KFUPM AISYS)
Exam2 - Academic Information System (KFUPM AISYS)

... If no claim are made in one year, the policyholder moves to the next higher level, or remain at the 75% level. If one claim is made in one year, the policyholder moves down one level, or remains at the 0% level. If two or more claims are made, the policyholder moves straight down to, or remains at, ...
PART 5: RISK MANAGEMENT CHAPTER 15: Hedging Instruments
PART 5: RISK MANAGEMENT CHAPTER 15: Hedging Instruments

... system of fixed exchange rates, many countries moved towards deregulation of financial systems in response to the problem of exchange rate variability. This resulted in increased volatility in the prices of all financial assets, leading to the emergence of financial futures. Forward Markets: Forward ...
Figure 10.12 Treasury Yield Curves
Figure 10.12 Treasury Yield Curves

Chapter 5
Chapter 5

... Should future rate differ from spot rate? forward rate? . Credit Risk of currency Futures Contracts: CME imposes margin requirements. If the contract holder cannot reach the margin requirement on the daily basis, the future contract will be sold in CME. ...
Aberdeen Global – Select Euro High Yield Bond Fund
Aberdeen Global – Select Euro High Yield Bond Fund

... • Contingent convertible bonds can automatically convert into shares or be written down if the financial strength of the issuer falls in a certain way. This may result in substantial or total losses of the bond value. • The Fund has a significant exposure to one currency, increasing its potential ...
Exam FM/2 Review Introduction and Time Value of Money
Exam FM/2 Review Introduction and Time Value of Money

... expected to be paid in 6 months. The risk-free interest rate is 10% effective per annum. X is the forward price of a one-year forward contact that has the stock as the underlying asset. Determine X. ASM p.612 ...
v - Researchmap
v - Researchmap

... same if they become the same shape by reordering children ...
ICS 220 – Data Structures and Algorithms
ICS 220 – Data Structures and Algorithms

... • Very similar to searching a binary tree – Beginning at the root node, branches are chosen as their values appear either side of the search value. ...
Valuation and Asset Liability Matching for Defined
Valuation and Asset Liability Matching for Defined

YEARNING FOR YIELD
YEARNING FOR YIELD

... years ago (October 2014), but the Fed has rolled proceeds from maturing bonds into new purchases. This has kept the size of its balance sheet relatively constant at roughly $4.2T and also likely kept interest rates slightly lower than they otherwise would be. Normalizing the balance sheet may push l ...
LCOL A sum of €3000 is invested in a five
LCOL A sum of €3000 is invested in a five

... A firm estimates that office equipment depreciates in value by 40% in its first year of use. During the second year it depreciates by 25% of its value at the beginning of that year. Thereafter, for each year, it depreciates by 10% of its value at the beginning of the year ...
Persistent Binary Search Trees
Persistent Binary Search Trees

... The AA tree (Anderssen, 1993) is a constrained version of the Red-Black tree. Only right nodes are allowed to contain “red” nodes. Also, instead of storing balance information as a bit in each node, nodes contain a level field describing the height of their biggest subtree. This results in only two ...
Week5 - WordPress.com
Week5 - WordPress.com

Source: Barron`s 7/4/2016 - Academy of Preferred Financial Advisors
Source: Barron`s 7/4/2016 - Academy of Preferred Financial Advisors

... Due to volatility within the markets mentioned, opinions are subject to change without notice. Information is based on sources believed to be reliable; however, their accuracy or completeness cannot be guaranteed. Unmanaged index returns do not reflect fees, expenses, or sales charges. Index perform ...
Problem Set #1: Basic Data Structures
Problem Set #1: Basic Data Structures

Nimble Group values a non-standard and complex retail mortgage
Nimble Group values a non-standard and complex retail mortgage

Exam Review 2 - City University of New York
Exam Review 2 - City University of New York

... – Difficult if not complete binary tree ...
probability prediction with static Merton-D-Vine copula model
probability prediction with static Merton-D-Vine copula model

Introduction
Introduction

High returns, low volatility
High returns, low volatility

Valuing and Hedging American Put Options Using
Valuing and Hedging American Put Options Using

... closed-form valuation function for the American put option, the investor uses an approximation technique. The investor wants the approximation technique to use as little computational time as possible, since the investor incurs costs while waiting for the approximation to be calculated. To the inves ...
Tree Indexing
Tree Indexing

... Disk Representation ...
The Greek Letters
The Greek Letters

...  D can be changed by taking a position in the underlying • To adjust G & n it is necessary to take a position in an option or other derivative ...
New EDHEC-Risk Institute research examines dynamic hedging of
New EDHEC-Risk Institute research examines dynamic hedging of

Name
Name

< 1 ... 146 147 148 149 150 151 152 153 154 ... 166 >

Lattice model (finance)



For other meanings, see lattice model (disambiguation)In finance, a lattice model [1] is a technique applied to the valuation of derivatives, where, because of path dependence in the payoff, 1) a discretized model is required and 2) Monte Carlo methods fail to account for optimal decisions to terminate the derivative by early exercise. For equity options, a typical example would be pricing an American option, where a decision as to option exercise is required at ""all"" times (any time) before and including maturity. A continuous model, on the other hand, such as Black Scholes, would only allow for the valuation of European options, where exercise is on the option's maturity date. For interest rate derivatives lattices are additionally useful in that they address many of the issues encountered with continuous models, such as pull to par.
  • studyres.com © 2025
  • DMCA
  • Privacy
  • Terms
  • Report