* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download RSAW_v1.0-VAR-002-AB-1.1b Reliability Standard Audit Worksheet Generator Operation for Maintaining Network Voltages
Power inverter wikipedia , lookup
Electrical ballast wikipedia , lookup
Pulse-width modulation wikipedia , lookup
Current source wikipedia , lookup
Variable-frequency drive wikipedia , lookup
Power engineering wikipedia , lookup
Three-phase electric power wikipedia , lookup
Resistive opto-isolator wikipedia , lookup
Immunity-aware programming wikipedia , lookup
Opto-isolator wikipedia , lookup
Power MOSFET wikipedia , lookup
Power electronics wikipedia , lookup
Electrical substation wikipedia , lookup
Buck converter wikipedia , lookup
Surge protector wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Rectiverter wikipedia , lookup
Stray voltage wikipedia , lookup
Voltage regulator wikipedia , lookup
History of electric power transmission wikipedia , lookup
Alternating current wikipedia , lookup
Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b Reliability Standard Audit Worksheet RSAW_v1.0-VAR-002-AB-1.1b Generator Operation for Maintaining Network Voltages Alberta Reliability Standard Effective Date: October 1, 2013 Applicability: This reliability standard applies to: (a) the legal owner of a generating unit, including those that operate as a synchronous condenser, that: (i) is not part of an aggregated generating facility; (ii) has a maximum authorized real power rating greater than four point five (4.5) MW; and (iii) is directly connected to either the transmission system or to transmission facilities within the City of Medicine Hat; (b) the operator of a generating unit, including those that operate as a synchronous condenser, that: (i) is not part of an aggregated generating facility; (ii) has a maximum authorized real power rating greater than four point five (4.5) MW; and (iii) is directly connected to either the transmission system or to transmission facilities within the City of Medicine Hat; (c) the legal owner of an aggregated generating facility that: (i) has a maximum authorized real power rating greater than four point five (4.5) MW; and (ii) is directly connected to either the transmission system or to transmission facilities within the City of Medicine Hat; and (d) the operator of an aggregated generating facility that: (i) has a maximum authorized real power rating greater than four point five (4.5) MW; and (ii) is directly connected to either the transmission system or to transmission facilities within the City of Medicine Hat. Notwithstanding subsections (c) and (d) above, this reliability standard does not apply to the legal owner or operator of a wind aggregated generating facility that: RSAW_v1.0_VAR-002-AB-1.1b.doc Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b (e) is not equipped with a voltage regulating system; and (f) is the subject of an executed Construction Commitment Agreement and which has completed the ISO’s approval process for connection to the transmission system under the Technical Requirements for connecting generators (1999). The ISO will publish a list of facilities that meet these criteria in the information document related to this reliability standard. Registered Entity: Audit Period (dd/mm/yy): Date of Last Audit (dd/mm/yy): Type of Audit: Audit Authority/Organization: RSAW_v1.0_VAR-002-AB-1.1b.doc Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b PART ONE – ASSESSMENT SUMMARY (for the AESO use only) Suspected Contravention to the standard? Yes Assessment Commentary: Summary of Findings by Requirement R1 R2 R3 R4 R5 R6 R7 R8 R9 RSAW_v1.0_VAR-002-AB-1.1b.doc No Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b PART TWO – CONTACTS Contact Type Name Telephone Email Sign-off Entity Leader Not applicable Entity SME Not applicable Audit Leader Audit Team Audit Team Standard Owner Audit Manager RSAW_v1.0_VAR-002-AB-1.1b.doc Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b PART THREE – COMPLIANCE AUDITOR ASSESSMENT / CHECKLIST Requirement 1 R1 The operator of a generating unit, subject to requirement R3 and the ISO’s consent to operate otherwise, must only operate such generating unit with the automatic voltage regulator in service, in voltage control mode and controlling voltage. Measures 1 MR1 Evidence of operating as required in requirement R1 exists. Evidence may include operator logs or data files. Assessment 1 AR1 Evidence Description Evidence (For the audited entity use only) Embedded file, link to file Assessment Notes For AESO use only Part 1: Evidence Submission Pursuant to compliance monitoring audit the audited entity, to whom this requirement applies to, is requested to provide the following documentation for audit assessment: i. Documentation of measures/methods the audited entity deploys to meet R1 (note 1); and ii. Evidence deemed appropriate to demonstrate R1 compliance, e.g., operator logs, data files. Assessment on the evidence submitted with respect to this Part (ii) will be conducted on a sampling basis. The audit team will notify the audited entity of the sampling plan upon reviewing the information as identified in Part 1 (i). Note 1: Examples of methods/measures are status check every four hours or at the start/end of every shift, automatic alarm system to report changes in status, regular status report based on pi data, exceptions reports, automatic status logging system, or the alike. Part 2: Audit Assessment 1) Review the submitted evidence based on the sampling plan, cross-examine the submitted evidence pertaining to R3 and assess: a. Does the submitted evidence demonstrate that the audited entity operated each generating unit with the automatic voltage regulator in service, in voltage control mode and controlling voltage? Findings R1 RSAW_v1.0_VAR-002-AB-1.1b.doc Page 5 of 16 2017-05-25 Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b Requirement 2 R2 The operator of an aggregated generating facility, subject to requirement R3 and the ISO’s consent to operate otherwise, must only operate such aggregated generating facility with the voltage regulating system in service, in voltage control mode and controlling voltage. Measures 2 MR2 Evidence of operating as required in requirement R2 exists. Evidence may include operator logs or data files. Assessment 2 AR2 Evidence Description Evidence (For the audited entity use only) Embedded file, link to file Assessment Notes For AESO use only Part 1: Evidence Submission Pursuant to compliance monitoring audit the audited entity, to whom this requirement applies to, is requested to provide the following documentation for audit assessment: i. Documentation of measures/methods the audited entity deploys to meet R2 (note 1); and ii. Evidence deemed appropriate to demonstrate R2 compliance, e.g., operator logs, data files. Assessment on the evidence submitted with respect to this Part (ii) will be conducted on a sampling basis. The audit team will notify the audited entity of the sampling plan upon reviewing the information as identified in Part 1 (i). Note 1: Examples of methods/measures are status check every four hours or at the start/end of every shift, automatic alarm system to report changes in status, regular status report based on pi data, exceptions reports, automatic status logging system, or the alike. Part 2: Audit Assessment 1) Review the submitted evidence based on the sampling plan, cross-examine the submitted evidence pertaining to R3 and assess: a. Does the submitted evidence demonstrate that the audited entity operated each aggregated generating facility with the voltage regulating system in service, in voltage control mode and controlling voltage? Findings R2 RSAW_v1.0_VAR-002-AB-1.1b.doc Page 6 of 16 2017-05-25 Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b Requirement 3 R3 Each operator of a generating unit and operator of an aggregated generating facility must notify the ISO as soon as reasonably possible when the automatic voltage regulator or voltage regulating system is out of service. Measures 3 MR3 Evidence of notifying the ISO as required in requirement R3 exists. Evidence may include operator logs or voice recordings. Assessment 3 AR3 Evidence Description Evidence (For the audited entity use only) Embedded file, link to file Assessment Notes For AESO use only Part 1: Evidence Submission Pursuant to compliance monitoring audit the audited entity, to whom this requirement applies to, is requested to provide the following documentation for audit assessment: i. A list of incidents where the automatic voltage regulator or voltage regulating system was out of service during the audit period; and ii. Evidence deemed appropriate of notifying the ISO, e.g., operator logs or voice recordings. Assessment on the evidence submitted with respect to this Part (ii) will be conducted on a sampling basis. The audit team will notify the audited entity of the sampling plan upon reviewing the information as identified in Part 1 (i). OR iii. Where automatic voltage regulator or voltage regulating system was not out of service during the audit period, signed attestation document. Part 2: Audit Assessment 1. Based on the submitted list as identified in Part 1 (i), identify: a. Date/time of each sampled incident; 2. Review the submitted evidence based on the sampling plan, identify the date/time of the notification and assess: a. Did the audited entity notify the ISO as soon as reasonably possible for incident where the automatic voltage regulator or voltage regulating system was out of service? Findings R3 RSAW_v1.0_VAR-002-AB-1.1b.doc Page 7 of 16 2017-05-25 Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b Requirement 4 R4 Each operator of a generating unit and operator of an aggregated generating facility, upon receiving a directive from the ISO regarding reactive power or voltage levels must: (a) subject to the exceptions set out in section 301.2 of the ISO rules, Directives, comply with the directive by adjusting either the (i) set point of the automatic voltage regulator or voltage regulation system; or (ii) on-load tap changer; but (b) if the operator determines it is unable to comply, notify the ISO with an explanation as to why it cannot comply with the directive. Measures 4 MR4 Evidence of complying with a directive or notifying the ISO as required in requirement R4 exists. Evidence may include data files or operator logs. Assessment 4 AR4 Evidence Description Evidence (For the audited entity use only) Embedded file, link to file Assessment Notes For AESO use only Part 1: Evidence Submission Pursuant to compliance monitoring audit the audited entity, to whom this requirement applies to, is requested to provide the following documentation for audit assessment: i. A list of directives from the ISO regarding reactive power or voltage levels that were received during the audit period; and ii. Evidence deemed appropriate of complying with the directive, e.g., operator logs, data files. Assessment on the evidence submitted with respect to this Part (ii) will be conducted on a sampling basis. The audit team will notify the audited entity of the sampling plan upon reviewing the information as identified in Part 1 (i). OR iii. Where no directives from the ISO regarding reactive power or voltage levels were received during the audit period, signed attestation document. Part 2: Audit Assessment 1. Based on the submitted evidence based on the sampling plan, identify for each directive from the ISO regarding reactive power or voltage levels: a. Date/time of each directive; b. The equipment, e.g., automatic voltage regulator, voltage regulation system, on-load tap changer, where the adjustment was made. c. 2. Date/time of the adjustment made. For each sampled directive, assess: a. Did the audited entity comply with the directive by adjusting either the (i) set point of the automatic voltage regulator or voltage regulation system; or (ii) on-load tap changer within the specified timeframe? RSAW_v1.0_VAR-002-AB-1.1b.doc Page 8 of 16 2017-05-25 Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b 3. For those directives that the operator of a generating unit or an aggregated generating facility, determined it as unable to comply, assess : a. Did the operator notify the ISO with an explanation as to why it could not comply with the directive? b. Is the explanation consistent with the exceptions set out in section 301.2 of the ISO rules, Directives? Findings R4 RSAW_v1.0_VAR-002-AB-1.1b.doc Page 9 of 16 2017-05-25 Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b Requirement 5 R5 Each operator of a generating unit and operator of an aggregated generating facility must use an alternative method to control voltage and reactive power output to meet any voltage level directive or reactive power level directive the ISO issues when the automatic voltage regulator or voltage regulating system is out of service. Measures 5 MR5 Evidence of using an alternative method to control voltage and reactive power output as required in requirement R5 exists. Evidence may include data files, operator logs or voice recordings. Assessment 5 AR5 Evidence Description Evidence (For the audited entity use only) Embedded file, link to file Assessment Notes For AESO use only Part 1: Evidence Submission Pursuant to compliance monitoring audit the audited entity, to whom this requirement applies to, is requested to provide the following documentation for audit assessment: i. A list of voltage level directives or reactive power level directives received during the audit period from the ISO when the automatic voltage regulator or voltage regulating system was out of service; and ii. Evidence deemed appropriate to demonstrate alternative method was used, e.g., data files, operator logs, or voice recordings. Assessment on the evidence submitted with respect to this Part (ii) will be conducted on a sampling basis. The audit team will notify the audited entity of the sampling plan upon reviewing the information as identified in Part 1 (i). OR Where no voltage level directives or reactive power level directives from the ISO when the automatic voltage regulator or voltage regulating system was out of service were received during the audit period, signed attestation documents. iii. Part 2: Audit Assessment 1. Based on the submitted evidence based on the sampling plan, identify for each voltage level directive or reactive power level directive: a. Date/time of each sampled voltage level directive or reactive power level directive; 2. b. Details of the alternative method to control voltage and reactive power output; c. Date/time of the alternative method used. For each sampled directive, assess: a. Did the audited entity use an alternative method to control voltage and reactive power output to meet the voltage level directive or reactive power level directive within the specified timeframe when the automatic voltage regulator or voltage regulating system was out of service? Findings RSAW_v1.0_VAR-002-AB-1.1b.doc Page 10 of 16 2017-05-25 Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b R5 Requirement 6 R6 Each operator of a generating unit and operator of an aggregated generating facility must notify the ISO as soon as reasonably possible, but not more than thirty (30) minutes after any of the following: R6.1 a status or capability change of the reactive power resource on any generating unit or aggregated generating facility, including the status of each automatic voltage regulator, voltage regulating system and power system stabilizer, as applicable, and the expected duration of the change in status or capability; or R6.2 a status or capability change on any other reactive power resource under the control of each operator of a RSAW_v1.0_VAR-002-AB-1.1b.doc Measures 6 MR6 Evidence of notifying the ISO as required in requirement R6 exists. Evidence may include operator logs or voice recordings. Assessment 6 AR6 Evidence Description Evidence (For the audited entity use only) Embedded file, link to file Assessment Notes For AESO use only Part 1: Evidence Submission Pursuant to compliance monitoring audit the audited entity, to whom this requirement applies to, is requested to provide the following documentation for audit assessment: i. A list of incidents where a. a status or capability change , which occurred during the audit period, of the reactive power resource on any generating unit or aggregated generating facility, including the status of each automatic voltage regulator, voltage regulating system and power system stabilizer, as applicable; and b. ii. iii. where a status or capability change , which occurred during the audit period on any other reactive power resource under the control of each operator of a generating unit or operator of an aggregated generating facility; and Evidence deemed appropriate of notifying the ISO, e.g., operator logs, or voice recordings. Assessment on the evidence submitted with respect to this Part (ii) will be conducted on a sampling basis. The audit team will notify the audited entity of the sampling plan upon reviewing the information as identified in Part 1 (i) a and Part 1 (i) b . OR Where no status or capability change with respect to R6.1 and R6.2 occurred during the audit period, signed attestation document. Page 11 of 16 2017-05-25 Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b generating unit or operator of an aggregated generating facility and the expected duration of the change in status or capability. Part 2: Audit Assessment 1. Based on the submitted evidence based on the sampling plan as identified in Part 1, assess for each sampled incident: a. Did the audited entity notify the ISO as soon as reasonably possible, but not more than thirty (30) minutes after the incident? b. Did the audited entity provide the expected duration of the change in status or capability for each notification? Findings R6 RSAW_v1.0_VAR-002-AB-1.1b.doc Page 12 of 16 2017-05-25 Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b Requirement 7 R7 Each legal owner of a generating unit and legal owner of an aggregated generating facility whose step-up transformer for connecting to the transmission system or auxiliary transformer has primary voltages equal to or greater than the generating unit terminal voltage must provide the ISO any one (1) or more of the following within thirty (30) days of a request: R7.1 tap settings; R7.2 available fixed tap ranges; R7.3 impedance data; and R7.4 the plus/minus voltage range with step-change in percentage for on-load tap changing transformers. Measures 7 MR7 Evidence of providing the information identified in requirements R7.1 to R7.4 as required in requirement R7 exists. Evidence may include record of email or mail to appropriate recipients that identifies contents Assessment 7 AR7 Evidence Description Evidence (For the audited entity use only) Embedded file, link to file Assessment Notes For AESO use only Part 1: Evidence Submission Pursuant to compliance monitoring audit the audited entity, to whom this requirement applies to, is requested to provide the following documentation for audit assessment: i. Evidence deemed appropriate to demonstrate provision of information, e.g., email or mail identifying the information per requirements R7.1 to R7.4 ii. Where, no ISO’s request was received during the audit period, signed attestation document. Part 2: Audit Assessment 1) Review the submitted evidence and assess: a. Did the audited entity provide the ISO any one (1) or more of the following within thirty (30) days of a request: tap settings; available fixed tap ranges; impedance data; and the plus/minus voltage range with stepchange in percentage for on-load tap changing transformers? Findings R7 RSAW_v1.0_VAR-002-AB-1.1b.doc Page 13 of 16 2017-05-25 Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b Requirement 8 R8 Each legal owner of a generating unit and legal owner of an aggregated generating facility that has a step-up transformer, with offlad taps, for connecting to the transmission system must change the tap positions according to the specifications the ISO provides. Measures 8 MR8 Evidence of changing tap positions as required in requirement R8 exists. Evidence may include dated records that such changes conform to specifications the ISO provides. Assessment 8 AR8 Evidence Description Evidence (For the audited entity use only) Embedded file, link to file Assessment Notes For AESO use only Part 1: Evidence Submission Pursuant to compliance monitoring audit the audited entity, to whom this requirement applies to, is requested to provide the following documentation for audit assessment: i. Records of changes made to the tap positions according to the specifications the ISO provided; or ii. Where no specifications were received from the ISO during the audit period, signed attestation document. Part 2: Audit Assessment 1) Review the submitted evidence and assess: a. Did the audited entity change the tap position positions according to the specifications the ISO provided? Findings R8 RSAW_v1.0_VAR-002-AB-1.1b.doc Page 14 of 16 2017-05-25 Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b Requirement 9 R9 Each legal owner of a generating unit and legal owner of an aggregated generating facility that cannot comply with requirement R8, must notify the ISO within thirty (30) days of the ISO providing the specifications and must include the technical justification in such notice. Measures 9 MR9 Evidence of notifying the ISO as required in requirement R9 exists. Evidence may include record of email or mail to appropriate recipients that identifies contents submitted. Assessment 9 AR9 Evidence Description Evidence (For the audited entity use only) Embedded file, link to file Assessment Notes For AESO use only Part 1: Evidence Submission Pursuant to compliance monitoring audit the audited entity, to whom this requirement applies to, is requested to provide the following documentation for audit assessment: i. Evidence of notifying the ISO , e.g., email or mail identifying the technical justification. Part 2: Audit Assessment 2) Review the submitted evidence based on the sampling plan and assess: a. Did the audited entity notify the ISO within thirty (30) days of the ISO providing the specifications? b. Did the audited entity provide the justification in the notice? c. Is the justification based on technical reason? Findings R9 RSAW_v1.0_VAR-002-AB-1.1b.doc Page 15 of 16 2017-05-25 Reliability Standard Audit Worksheet RSAW_v1.0_VAR-002-AB-1.1b PART FOUR – ISO CMP AUDITOR GUIDES – “DISCLAIMER” ISO CMP Auditor Guides – “Disclaimer” ISO developed the Reliability Standard Audit Worksheet (RSAW) to add clarity and consistency to the audit team’s assessment of compliance with this reliability standard. In adding clarity for the assessment, the RSAW may include additional detail that is consistent with the Alberta Reliability Standard. This additional detail clarifies the methodology that ISO has elected to use to assess requirements and should not be considered additional reliability standard requirements. Alberta Reliability Standards are updated frequently. The ISO RSAWs are written to specific versions of each Alberta Reliability Standard. RSAW users should choose the applicable RSAW version of the Alberta Reliability Standard being assessed. PART FIVE – ADMINISTRATION Revision History This document is an AESO information document and guideline, and not an AESO authoritative document. Revisions to this document may be made from time to time by the AESO Compliance group. Market participants will be notified of revisions through the stakeholder update process. Revision 1.0 Date April 18, 2013 Comments Initial version of audit worksheet Audit Team - General Notes to File: RSAW_v1.0_VAR-002-AB-1.1b.doc Page 16 of 16 2017-05-25